This document describes a procedure for managing changes at Auckland Transport. It involves identifying stakeholders, documenting proposed changes, implementing changes, and keeping records. The procedure aims to ensure significant business changes are planned, consulted on and assessed for their health and safety risk impact.

Uploaded by

Phụng Lê
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views

hs10 01 Management of Change Procedure

This document describes a procedure for managing changes at Auckland Transport. It involves identifying stakeholders, documenting proposed changes, implementing changes, and keeping records. The procedure aims to ensure significant business changes are planned, consulted on and assessed for their health and safety risk impact.

Uploaded by

Phụng Lê
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Auckland Transport

HS10-01 Management of Change


(Procedure uncontrolled when printing)

Relating to Standard: HS10 Management of Change

December 2016

Health and Safety-Procedure-HS10-01 Management of Change


Contents
1 Background and Purpose .............................................................................................................................. 3
2 Scope .............................................................................................................................................................. 3
3 Procedure........................................................................................................................................................ 3

Overview of MOC process ....................................................................................................... 4


Identify stakeholders and subject matter experts (SME) ......................................................... 4
Documentation of Proposed Change ...................................................................................... 4
Implementation of changes ..................................................................................................... 5
Temporary or Permanent Change ........................................................................................... 5
Record keeping for MOC ......................................................................................................... 5
Complex or design change ...................................................................................................... 5
4 Responsibilities .............................................................................................................................................. 6

Divisional Managers ................................................................................................................ 6


Project Managers ..................................................................................................................... 6
Group Health and Safety ......................................................................................................... 6
Workers.................................................................................................................................... 6
5 Other information ........................................................................................................................................... 6
6 Document Control .......................................................................................................................................... 6

Health and Safety-Procedure-HS10-01 Management of Change Page 2 of 6


1 Background and Purpose
This procedure describes the process for ensuring significant business changes are planned,
consulted on and assessed for their effect on health and safety (H&S) risk. It includes, but is not
limited to changes of materials, equipment, process or organisational structure that may affect the
capability for Auckland Transport (AT) to operate effectively. The focus for management of change
(MOC) is on AT critical risk processes and activities.
This procedure relates to the AT standard as described in HS10.

2 Scope
This procedure applies to all AT divisions and facilities that are undertaking changes that affect the
identified critical risks and their controls. It should be used in conjunction with the Critical Risk and
Hazard Management Procedure HS03-01.

3 Procedure
Is MOC required
The flowchart to the left is used to determine if MOC is
Start required. Given MOC is to be used where AT is making
decisions that impact on, or introduce, elements of Critical
Risk, this is an important step, and due consideration in
Define what is being making this decision is required.
changed and list the key
business process that
make it up. Use the flowchart to the left to support making the decision
about whether MOC is required.
This process should be used for both long term and short
change and the decision making process documented.
Are any of these
processes identified as
YES It is suggested that for both temporary and permanent
critical risks? changes the key business processes are documented into a
table that allows for an assessment to be completed. If it is
determined that MOC is required, this document forms the
NO basis of completing that change.
It is recommended to use this procedure for any significant
Will the work
undertaken create change project.
NO new Critical Risk?
Anyone using this procedure, who is unsure of the need to
No requirement to apply MOC, should seek guidance from the Group Manager
follow MOC
Procedure. YES – Health and Safety.

Follow the MOC Procedure to


ensure management of the
tempoary or permanent change

End Figure 1. MOC Requirement

Health and Safety-Procedure-HS10-01 Management of Change Page 3 of 6


MOC process
Overview of MOC process
Changes to our facilities, equipment or control processes, especially where these impact our Critical
Risk processes, require strong control over change. In particular, it requires identifying potential new
causes of harm that could be introduced, and where current Critical Controls could be impacted. The
process to be followed is as shown below.

Figure 2. Critical Risk Control of Change

Identify stakeholders and subject matter experts (SME)


The MOC process will be managed by the project manager or relevant person accountable for
managing the change. They will be responsible for ensuring consultation is undertaken, and identifying
who the key stakeholders are for involvement in the consultation process. Those chosen for
consultation must be capable of providing a broad perspective on the change being considered and
include independent (of the work area) advice. This could be the Health and Safety advisor, other SME
or relevant independent reviewer.

Documentation of Proposed Change


The consultation group will:

 Review the proposed changes in detail using available documentation such as plans, change
schedules, drawings etc.
 Identify potential hazards and risks
 Agree and document interim controls and action plans associated with the change including the
length of time temporary changes to critical risk controls will be in place.
 Develop processes for monitoring adherence to the action plans and temporary changes.
Once defined, the proposed changes must include authorisation by the divisional and departmental
manager accountable for the change. In authorising they are providing assurance that the following
documentation/changes to the following documentation are included as part of the process (not all will
be applicable for all MOC):

 H&S documentation;
 Training and communication plans;
 Critical Controls – with reference to Bow Ties or other control plans;
 Changes for the operating procedures;
 Maintenance procedures including preventative maintenance schedules;
 Inspection, testing and certification of any applicable equipment – e.g. electrical, pressure
vessels;
 Pre-start-up/change inspection to ensure changes have been made correctly and
acknowledged by impacted stakeholders;
 Duration (if a temporary change); and
 Approvals (from impacted departments/person(s)).

Health and Safety-Procedure-HS10-01 Management of Change Page 4 of 6


Implementation of changes
Changes must be implemented as documented and agreed with controls and written procedures to
manage changes (except for “replacements in kind”).

These written procedures must ensure that the following considerations are addressed from a health
and safety perspective prior to any change:

 Ensure there is knowledge and understanding of the purpose of the proposed change;
 Impacted stakeholders;
 Impacted processes and controls;
 Modifications to operating procedures;
 Necessary time period for the change; and
 Authorisation requirements for the proposed change.
All workers who operate a process, or part of a process that will be affected by change, or whose job
tasks will be affected by change, must be informed of, and trained in, the change prior to start-up. If a
change is covered by a standard operating procedure or practice, the required safety information must
be updated accordingly.

Temporary or Permanent Change


All significant changes that have the potential to alter a critical risk must go through a MOC process.
This is to ensure that even temporary changes return to their pre-change state rather than becoming
a permanent change without being fully assessed for impact on people and process.
For the purposes of this document, changes that are intended to revert to pre-change state within 90
days are defined as Temporary Changes.

Record keeping for MOC


A permanent record must be kept for seven years by the division or department undertaking the
change. The record can be kept within the overall project documentation, or if it is not covered by a
project, the person accountable for the change must ensure such a record is stored. It should be filed
clearly in a location associated with the management procedures for the area where the change has
occurred.

Complex or design change


For complex change or significant design change, a hazard evaluation procedure (HAZOP) with
approvals by the different operational, maintenance, and safety support personnel shall be
undertaken. This process should be facilitated by a trained HAZOP facilitator.
Changes in planning documents, technical specifications, raw materials, operating procedures,
mechanical integrity programs, including electrical classifications are to be noted so that these
revisions can be made permanent when the drawings and procedure manuals are updated. Copies of
process changes must be kept in an accessible location to ensure that design changes are available
to operating personnel.

Health and Safety-Procedure-HS10-01 Management of Change Page 5 of 6


4 Responsibilities
Divisional Managers

 Accountable for supporting and resourcing appropriate resources to support the activities of
change management processes and for the authorisation of change.
 Accountable for ensuring that the MOC processes are understood and effectively implemented.

Project Managers

 Ensures this procedure is followed when undertaking change associated with existing critical
risk or its controls, or if introducing potential critical risk into the business.
 Ensures appropriate resources are allocated to achieve and maintain compliance to MOC for
critical risk processes.

Group Health and Safety

 Accountable for driving a culture for MOC for Critical Risk processes in their respective
businesses.
 Must coach and mentor project or accountable managers in the MOC process.
 H&S Managers/Advisors are to provide support as SME's when required and provide support
for MOC to line managers.
 Group Health and Safety is accountable for ensuring that MOC for Critical Risk processes are
audited appropriately

Workers

 Be part of MOC stakeholder groups as required.

Actively participate in MOC processes and contribute to ensure all relative safety consideration is
given to the changes being made.

5 Other Information
 H&S Definitions (HS01-01-01).
 Full table of Procedures (HS01-01-02).
 Change Management Standard (HS10).
 Risk and Hazard Management Standard and Procedure (HS04 and HS4-01).

6 Document Control
Document Number HS10-01

Document Owner Group Manager – Health and Safety

Document Approver Chief People Officer

Original Issue Date July 2016 (version one)

Date Issued December 2016

Review Date December 2018

Health and Safety-Procedure-HS10-01 Management of Change Page 6 of 6