hs10 01 Management of Change Procedure
hs10 01 Management of Change Procedure
December 2016
2 Scope
This procedure applies to all AT divisions and facilities that are undertaking changes that affect the
identified critical risks and their controls. It should be used in conjunction with the Critical Risk and
Hazard Management Procedure HS03-01.
3 Procedure
Is MOC required
The flowchart to the left is used to determine if MOC is
Start required. Given MOC is to be used where AT is making
decisions that impact on, or introduce, elements of Critical
Risk, this is an important step, and due consideration in
Define what is being making this decision is required.
changed and list the key
business process that
make it up. Use the flowchart to the left to support making the decision
about whether MOC is required.
This process should be used for both long term and short
change and the decision making process documented.
Are any of these
processes identified as
YES It is suggested that for both temporary and permanent
critical risks? changes the key business processes are documented into a
table that allows for an assessment to be completed. If it is
determined that MOC is required, this document forms the
NO basis of completing that change.
It is recommended to use this procedure for any significant
Will the work
undertaken create change project.
NO new Critical Risk?
Anyone using this procedure, who is unsure of the need to
No requirement to apply MOC, should seek guidance from the Group Manager
follow MOC
Procedure. YES – Health and Safety.
Review the proposed changes in detail using available documentation such as plans, change
schedules, drawings etc.
Identify potential hazards and risks
Agree and document interim controls and action plans associated with the change including the
length of time temporary changes to critical risk controls will be in place.
Develop processes for monitoring adherence to the action plans and temporary changes.
Once defined, the proposed changes must include authorisation by the divisional and departmental
manager accountable for the change. In authorising they are providing assurance that the following
documentation/changes to the following documentation are included as part of the process (not all will
be applicable for all MOC):
H&S documentation;
Training and communication plans;
Critical Controls – with reference to Bow Ties or other control plans;
Changes for the operating procedures;
Maintenance procedures including preventative maintenance schedules;
Inspection, testing and certification of any applicable equipment – e.g. electrical, pressure
vessels;
Pre-start-up/change inspection to ensure changes have been made correctly and
acknowledged by impacted stakeholders;
Duration (if a temporary change); and
Approvals (from impacted departments/person(s)).
These written procedures must ensure that the following considerations are addressed from a health
and safety perspective prior to any change:
Ensure there is knowledge and understanding of the purpose of the proposed change;
Impacted stakeholders;
Impacted processes and controls;
Modifications to operating procedures;
Necessary time period for the change; and
Authorisation requirements for the proposed change.
All workers who operate a process, or part of a process that will be affected by change, or whose job
tasks will be affected by change, must be informed of, and trained in, the change prior to start-up. If a
change is covered by a standard operating procedure or practice, the required safety information must
be updated accordingly.
Accountable for supporting and resourcing appropriate resources to support the activities of
change management processes and for the authorisation of change.
Accountable for ensuring that the MOC processes are understood and effectively implemented.
Project Managers
Ensures this procedure is followed when undertaking change associated with existing critical
risk or its controls, or if introducing potential critical risk into the business.
Ensures appropriate resources are allocated to achieve and maintain compliance to MOC for
critical risk processes.
Accountable for driving a culture for MOC for Critical Risk processes in their respective
businesses.
Must coach and mentor project or accountable managers in the MOC process.
H&S Managers/Advisors are to provide support as SME's when required and provide support
for MOC to line managers.
Group Health and Safety is accountable for ensuring that MOC for Critical Risk processes are
audited appropriately
Workers
Actively participate in MOC processes and contribute to ensure all relative safety consideration is
given to the changes being made.
5 Other Information
H&S Definitions (HS01-01-01).
Full table of Procedures (HS01-01-02).
Change Management Standard (HS10).
Risk and Hazard Management Standard and Procedure (HS04 and HS4-01).
6 Document Control
Document Number HS10-01