0% found this document useful (0 votes)
253 views2 pages

Spec RCF Mdts 148

RCF 1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
253 views2 pages

Spec RCF Mdts 148

RCF 1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 2
SPECIAL REQUIREMENTS FOR PURCHASE OF RUBBER-METAL COMPONENTS MDTS-148 Did, 19/11/04 Rev‘ Page 1 of2 ‘NAME DESIGNATION | SIGNATURE DATE LEVEL ‘Mr.Naib Singh Mehta | SSE/BD_ whe ied Prepare ‘Mr. Ramnik Singh | Dy. CME/T/D_ OY ash mY Review & i Agreed by ‘Mr. Divya Vikas CDE ee W-[[-e4 | Approved Tssue/Rev_| Detail of change ae Dale OL 1. Clause 4(h) added 19.11.2004 Rater ‘SPECIAL REQUIREMENTS FOR RUBBER-METAL COMPONENTS MDTS-148. Did. 19/11/04 RevT’ Page no, 20F 2 1. Foreword 3. 4. PREI ‘The Specification intends to cover the special requirement for procurement of all rubber ‘metal components provided in FIAT bogies. Additional valid documents As specified in tender and others relevant specifications. ‘Technical Responsibility ‘The Supplier shall be fully responsible for the compliance of the specification, Special requirements: a a a Tenderer should submit comments on all applicable technical specifications in their offer. b. Manufacturing process, type of moulding to be used, manufacturing and testing facilities available to manufacture the component should be provided in detail by the bidder alongwith offer ©. For all the items ordered, firm should get its own drawings, mentioning all details, approved before start manufacture, 4. Supplier should submit documents as required against all the clauses of applicable specification specified in tender including first article tests. ©. Supplier should submit fatigue-testing schemes for approval, which is to be carried out fon the component. In case fatigue testing has already been done for the same component, test certificate and test scheme has to be shown to the satisfaction of inspecting authority. {The frequency dependence of the stffnesses should be demonstrated for the first component manufactured. g. The resistance against the cleaning agent listed in the technical specification 17.617 100 02 should be demonstrated for first component manufactured, h. “Manufacturer's Initials with Month and Year ” should be punched/embossed in letter it of 6mm on component at suitable location which should be visible even after assembly,

You might also like