Final Check List
Final Check List
General. Generally many items of work are not carried out according to dwg & specs
and good engg prac mainly due to carelessness, insufficient knowledge or negligence on
part of executives/ contractors.
1. Foundation
a. Layout Yes No
(1) Is the plot size according to the plan?
(2) Has the center lines been marked at correct places?
(3) Have the excavation lines been marked correct according to
excavation plan?
(4) Are the diagonal measurements for each room correct?
(5) Has the center line been marked outside the excavation for
future reference?
(6) Was the site cleared before laying out?
(7) Has the plinth level been marked at some place as permanent
mark?
b. Excavation
(1) Check whether the excavation is done exactly according
to the layout.
(2) Check whether the excavation is done to the required
depth.
(3) Check whether the excavation is properly leveled at the
bottom.
(4) Check whether the excavation is vertically done from top
soil to the bottom.
(5) In case of loose soil, are the sides protected by boards
with struts.
(6) Check if the bed of excavation has been properly
rammed.
(7) Check that loose organic soil if any has been replaced
with sandy soil.
c. Lean Concrete
(1) Check for completion of proceeding activities.
(2) Check of form work and dimensions.
(3) Check whether the surface was prepared / leveled before
the concrete work.
(4) Check whether the material brought to the site was
according to specification and proper gradation was done.
(5) Check whether the concrete is prepared with mixer
machine and the ratio of 1:4:8 (1500 psi) is maintained.
(6) Check that the water was added according to the right
quantity (w/c 0.35-0.45).
(7) Check whether the slump was according to the required
settlement (less than 3’’).
2
Yes No
(8) Check whether the mechanical vibrator was used during
the concrete pouring.
(9) Check whether the top surface of concrete is properly
leveled and finished.
(10) Check that curing is done for 3 days min.
d. Plinth Beams
(1) Check that all the preceding steps have been completed
satisfactorily. e.g. Leveling up and preparing walls for
plinth beams.
(2) Check that the material brought to the site was according
to the specifications.
(3) Check that the last block course was in proper level and
Level of plinth beam is not kept as per town plan.
(4) Check that the ratio of concrete for plinth beams was
1:2:4 (3000 psi) and was correctly measured.
(5) Check that the concrete prepared was used within 30
mins after adding water.
(6) Check that the thickness and level of plinth beam is
uniform and ensured.
(7) Check that there is no construction joint in plinth beam.
(8) Check that curing is ensured for 7 days min.
(9) Ensure that the plinth beams are poured with properly
prefabricated formwork.
(10) Check that adequate tamping of concrete is carried out
during laying and top surface is finished with steel float.
(11) Check that min 4 cylinders are casted for testing 7 and 28
days strength.
e. DPC
(1) Check as per drawing/CA thickness & mix ratio (PCC
1:2:4) using pan aggregate.
(2) Check that bitumen laid 0.75 kg/ sqm per layer, lvls and
diagonals ensures.
(3) Check that vertical DPC by plastering external walls have
been provided as per drawing.
(4) Check that 2 coats of hot bitumen have been applied after
drying of plaster.
f. Block Work in Foundation
(1) Check whether the blocks brought to the site are of
approved class/quality.
(2) Check whether the blocks were wet when used.
(3) Check whether the mortar was according to the
specification and was used within 30 mins after adding
water.
3
Ye
Yes No
No
(4) Check that the vertical joints are filled with mortar.
(5) Check that the level is maintained in all block courses.
(6) Check that the thickness of mortar joints (3/8’’) is not more
than specified.
(7) Check that the corners are vertical and in plumb. Corners
and junction are properly treated.
(8) Check that toothing is being provided where junction of
another wall is expected.
(9) Check that under no circumstances remixing/addition of
water to the mortar is allowed after final set.
g. Back Filling Inside/ Outside the Building
(1) Check for the approved quality of soil being used for back
filling.
(2) Check that backfilling is done in 6’’ layers.
(3) Check that backfilling is being watered sufficiently.
(4) Check that compaction (95%) is being done properly.
(5) Is backfilling being done up to the specified level?
(6) Check removal of surplus soil from site managed.
h. Anti-Termite Treatment
(1) Check that anti-treatment is provided as per CA with
approved chemical and approved contractor (applied @
4.75Kgs/Sqm)
(2) Ensure that treated surface is not exposed to rains before
pouring of lean concrete.
(3) Check that certificate/warranty is obtained from the firm.
2. Superstructure
a. Brickwork
(1) Check quality of brick check good source of bricks and
detail supervisor on quality brick source (crushing strength-
1500 psi of bricks personally checked).
(2) Check soaking of bricks in water for at least 24 hours
before use and thickness of mortar not exceeding 3/8”.
(3) Check dimensions incl diagonal, plumb mortar mix ratio &
brick bond.
(4) Check that curing is done for at least 7 days.
b. Casting of Blocks on Site
(1) It is not advisable to cut chases in the blocks after they
have been built in for running electric conduit it shall be
advisable to cast “conduit” blocks for use in required place.
(2) The blocks after casting shall be cured by either keeping
immersed in water or stacked in honey-combed pattern &
kept wet for min period of 7 & 14 days.
4
7. Bathrooms Yes No
(1) Proper layout of joints of UPVC pipes and GI pipes as per
CA/ specs. Layout of hot and cold water supply lines.
(2) All types of pipes/ joints have been tested for leakage
before covering (at 150 Psi pressure and test result
maintained for each bathroom).
b. Electric Fitting
(1) Electric fitting and fixtures and proper size of PVC
conduits have been properly Installed/ fixed as per
drawing.
c. Sanitary Fitting
(1) Check that sanitary fitting/ fixtures have been properly
fixed and installed as per drawing.
(2) Check that height of different sanitary wares/ fitting is
proper as per drawing/ specs.
(3) Check that Wash Basins and WC are not in proper
position.
(4) Accessory Set is not of standard make and also not
according to store list.
(5) Back board to mirror is not provided.
(6) Fitting set is not of standard make and also not according
to store list.
d. Tiles
(1) Check that cutting of wall/ floor tiles for accessories must
be smooth and strictly as per for fitting.
(2) Check that proper tiles with color combination are used.
(3) Check that tiles are not broken but drilled or cut nicely for
pipes.
(4) Check that filling color must be matching with tiles being
fixed.
(5) Check that min joints between the tiles and tiles laid in
true straight line.
e. Floor
(1) Ensured that floor is proper and slope is maintained.
(2) Check that joints of waste pipes are properly filled.
(3) Check that concealed pipes are tested before burying.
(4) Check that non-skid tiles are provided on floors.
(5) Check that proper slope towards float trap is provided.
(6) Check that drop in floor is provided.
8. Stairs
(1) Check that shuttering of waist, steel reinforcement and
pouring arrangement is proper.
(2) Check that shuttering for risers and treads and pouring of
concrete must be firm and in true plumb. Check that risers
and treads are uniform in size.
13 Yes No
(3) Check that width of stairs and size of landing is as per
drawing.
(4) Check that head clearance is ensured.
(5) Check that marble used in podium or stairs is proper and
polished.
(6) Check that nosing to steps is provided as per drawings.
9. Wood work
(1) Check that the timber used is seasoned 1 st class deodar
wood free from sap wood, loose or dead knots and
should not have moisture more than 5%.
(2) Check that all the doors and window corners are square.
(3) Check that all joints are tight and flush.
(4) Check that thickness of finished door is as per
specifications.
(5) Check that shutters close and fit into the rebate perfectly.
(6) Check that hinges and other door fitting are as per
specification.
(7) Check that there is no gap in meeting styles.
(8) Check that if internal lock is used, it closes truly.
(9) Check that floor clearance is not more than ½’’ for internal
doors.
(10) Check that the core of the flush door is filled.
(11) Check that the nails and screws are not projected out the
surface.
(12) Check that door should neither close nor open by itself
when unlocked.
(13) Check that in case of solid doors, the rails and styles are
true to their sizes.
(14) Check that preservatives are used to the back of
door/window chowkhats.
(15) Check that framed joints are not glued; these are fixed
with nails instead of hard wood pins.
(16) Check that commercial Plywood is 3 mm thick as
specified in CA.
(17) Check that lipping is provided on exposed surfaces.
(18) Check that bearers are provided under shelves.
10. Electric Fitting
a. Internal Electric Wiring
(1) Gauge of the cable being used is correct to
specifications?
(2) Care is being observed while drawing cables in pipes.
(3) There is no joint in cables except in joint boxes?
14
Yes No
(4) If iron junction boxes are being used, are they properly
earthed?
(5) There is no loose joint in junction boxes.
(6) Necessary circuit breakers are being installed as per
specifications.
(7) Separate pipes have been provided for TV, phone and
electricity?
(8) The position of switch boards, lights and fans are as per
drawings?
(9) Has the wiring been tested?
(10) Has the power plugs been provided on a separate circuit?
(11) Has the power plugs been earthed properly?
b. Before and During Concreting
(1) Check that conduits are placed according to the drawing.
(2) Check that joints of conduit are secure.
(3) Check that PVC pipe shall not be under pressure during
concreting.
(4) Check that open end pipes are plugged before concreting
such that the plug is removable after concreting.
(5) Check that pipes shall not be affected by movement of
persons and trolleys during concreting.
(6) Check that sufficient cover shall be available for pipes.
(6) Check that joints are sufficiently water tight.
(7) Check that conduits of required size are being places at
position.
(8) Check that PVC pipe not less than 20 mm shall be used.
(9) Check that the junction boxes shall be flush with plastered
surface.
c. In Walls
(1) Check that recesses have been cut according to the
drawings.
(2) Cuts are straight and of required depth.
(3) Cutter shall be used instead of chisel and hammer.
(4) Steel hooks of proper size are used to fix pipes in
recesses.
(5) Check that electric points are at proper height from FFL
maintained as per drawing. Lt Switch should be closed to
the entrance doors.
(6) Check whether un-necessary breakage is not carried out
for passage of electric wires/ points after plaster.
d. Wiring
(1) Check that wire of correct gauge is being used.
15
Yes No
(2) Check that due care is being observed while drawing
cables in pipes.
(3) No join in cable shall be made except in junction boxes.
(4) Distribution boxes shall be properly earthed with 8x swg
copper conductor on both sides.
(5) Check that there is no loose connection in distribution
boxes.
(6) Check that circuit breakers have been installed at places
according to drawing.
(7) Check that separate conduits are fixed for telephone and
TV cable.
(8) Check that position of switch boards, light, and ceiling and
exhaust fans according to drawing.
g. Testing of Electric Circuiting/ Earthing
(1) Check excavation for the earth pipe depth not less than
1.8m.
(2) Check pipe is perforated having 18 holes of 3mm and not
less than 25mm diameter (light quality).
(3) Check pipe is erected vertically and surrounded with 50kg
coke breeze (soaked coal) at the bottom and 50kg of rock
salt over the coke breeze to cover all sides.
(4) Check resistance of earth pipe with respect to the mass of
earth not exceeds 4 Ω.
(5) Check the earth wire from main earthing point to earth
pipe is of hard drawn bare copper conductor not less than
8 SWG.
(6) Check the wire is connected through thimble placed in
between brass nut bolt and two brass washers on the top
of 25mm diameter pipe.
(7) Check cap is provided on top of the pipe.
(8) Check insulation test-between each cable of a circuit and
between earth and individual cable.
11. Window/ Ventilators
(1) Check size/ dimensions of windows/ventilators openings
are as per drawing.
(2) Check there is no gap b/w the channel & opening.
(3) Check whether undersize sections are generally used.
(4) Check welding is properly done and welding marks are
filled.
(5) Check painting is done as specified i.e. one coat of rust
proof paint before leaving manufacturer shop and two
coats of paint after fixing.
(6) Check flat iron fillets are fixed with proper counter sunk
cheese head screws.
16
Yes No
(7) Check catch spring are provided instead of Window type
stays to CSWs, which can be easily operated.
(8) Check glass panes are fixed with fillets and silicone.
(9) Check glass panes are of specified thickness (5mm) and
free of parallax.
(10) Gauge (1.2mm) of wire gauze is ensured.
(11) Check lock and latches are of best quality.
(12) Check stay handles are functioning smoothly.
Window Sills
(1) Check sills are provided to all windows.
(2) Check sills are projected outside with throating to external
windows.
(3) Check sills are of proper size and thickness of specified
marble.
12. Plumbing
(1) Check that quality and size of pipes and its accessories is
as per drawing (extra light pipes must not be used).
(2) Ensure correctness of hot/cold water sup pipes as per
drawings.
(3) Check that joints of pipe are properly tight.
(4) Check that open ends of pipes are plugged in a way that
the plugs are removable after completion of work.
(5) Check that sufficient cover is available over pipes when
concealed.
(6) Check that joints are sufficiently leak proof.
(7) Check that pipes of different sizes are being placed at
proper positions.
(8) Check that union has been provided with each valve.
(9) Check that pipes have not been bent, fitting is used.
(10) Check/test leakage after completion of the work by giving
pressure for 24 hours.
13. Sewerage
(1) Check quality of RCC pipes including steel reinforcement
and strength of concrete as per specifications.
(2) Check size and location of manholes and gully traps as
per site/drawing.
(3) Jointing of RCC pipes with yarn and cement mortar and
benching underneath ensured.
(4) Check curing of joints is done as specified.
(5) Check leakage test of entire arrangements is carried out
before back filling.
(6) Ensure back filling of sewer trench to be done in 6” layers
with clean earth.
17
18
Yes No
(3) Check all the nails have been well sunk into timber.
(4) Check the holes have been filled in with putty.
(5) Check the timber is perfectly dry before paint work is
started.
(6) Check sufficient quantity of approved paint is available.
(7) Check turpentine oil is used for thinning the paint if
required.
(8) Check four strokes of brush comprise one coat.
(9) Check necessary priming and base coats have been
applied.
(10) Check the second coat is applied only when previous has
been dried.
(11) Check care is being taken from paint droppings on floor?
17. Roof Insulation
(1) Check roof top is cleaned before application of bitumen.
(2) Check bitumen layer is evenly spread.
(3) Check thickness of geo membrane is according to
drawing.
(4) Check waste mortar is cleaned while laying roof tiles.
(5) Check tiles are properly jointed and pointed.
(6) Check slope of roof and rain water pipes are as per
drawings.
18. Manholes
(1) Check benching is provided according to drawing as also
specified in CA.
(2) Check level of manhole is kept according to drawing.
(3) Check manhole covers are provided according to
drawings.
19. Drive Way, Porch and Plinth Protection
(1) Check dimensions, alignments and levels are as per
drawing/specifications.
(2) Check sub grade is properly compacted and cleared of all
organic matter.
(3) Check plinth protection is properly laid.
(4) Ensure slope/expansion joints as per drawing.
20. External Graffito Work
(1) Ensure that plaster is dry, free for dirt/ dust and smooth in
level.
(2) Check there are no broken corners/ edges on the external
walls/ parapet walls.
(3) Check any seepage/ leakage have been treated before
starting graffito.
19
Yes No
(4) Check acrylic base is laid as per drawing/ specifications.
(5) Check acrylic base is allowed to dry for 12 hrs.
21. Site Clearance
(1) Check the waste material, brick bats, leftover aggregates;
concrete etc. is disposed of from site by the contractor.
(2) Check 5 meter around the building is cleaned and
dressed with proper slopes by the contractor.
CHECK LIST