BOQ Refurbishment Toilet ROM (Revisi2) .

This document is a bill of quantity for the refurbishment of a toilet room at a mining department location in Martabe, Indonesia in 2023. It lists 11 items with descriptions, specifications, quantities, units, supply prices, installation prices, total prices in Rupiah and USD. The items include demolishing existing floor tiles and wall covers, supplying and installing a new closet, floor tiles, aluminum walls, a toilet door, plumbing, a concrete floor, handrail, floor painting, and helping to install and excavate an HDPE pipe. The total price is listed as 0 Rupiah and 0 USD.

Uploaded by

therey jawa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views1 page

BOQ Refurbishment Toilet ROM (Revisi2) .

This document is a bill of quantity for the refurbishment of a toilet room at a mining department location in Martabe, Indonesia in 2023. It lists 11 items with descriptions, specifications, quantities, units, supply prices, installation prices, total prices in Rupiah and USD. The items include demolishing existing floor tiles and wall covers, supplying and installing a new closet, floor tiles, aluminum walls, a toilet door, plumbing, a concrete floor, handrail, floor painting, and helping to install and excavate an HDPE pipe. The total price is listed as 0 Rupiah and 0 USD.

Uploaded by

therey jawa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

BILL OF QUANTITY

PROJECT : REFURBISHMENT TOILET ROM


OWNER : MINING DEPARTMENT PT AGINCOURT RESOURCES
AREA : ROM
LOCATION : MARTABE
YEAR : 2023 currency change $ 15.600

Supply Install TOTAL PRICE TOTAL PRICE


NO DESCRIPTION SPECIFICATION QTTY UNIT REMARK
(Rp) (Rp) (Rp) USD

- -
1 Demolish floor tile and closet. Pembongkaran keramik 1,44 m2 - 0,00
lantai dan closet

2 Demolish wall cover. Pembongkaran penutup dinding 5,76 m2 - 0,00

3 Supply and install new closet. Pengadaan dan pemasangan 1,00 ea - 0,00 closed jongkok merk TOTO
closet baru

4 Supply and install floor tile. Pengadaan dan pemasangan Keramik lantai roman 60x60 cm kasar 1,92 m2 - 0,00
keramik lantai

5 Supply and install alumunium wall. Pengadaan dan plat alumunium kulit jeruk 0,4 mm, termasuk 5,76 m2 - 0,00
pemasangan dinding alumunium skirting lantai dan list plafon dan sudut

6 Supply and install toilet door. Pengadaan dan pemasangan pintu UPVC 1,00 set - 0,00
pintu toilet

7 Supply and install plumbing and sanitary ware. Pengadaan pipa PVC, kran air, floor drain, dll 1,00 lot - 0,00
dan pemasangan perpipaan dan alat sanitasi

8 Supply and install concrete floor beside continer. Pengadaan include begisting and concrete 0,60 m3 - 0,00 by contractor
dan pemasangan lantai beton disamping kontainer

9 Supply and install handrail. Pengadaan dan pemasangan 16,00 m1 - 0,00 double pipa galvanis 1 inch
handrail

10 Supply and install painting floor. Pengadaan dan 36,00 m2 - 0,00 propan
pemasangan pengecatan lantai

11 Membantu memasang dan menggali HDPE pipe . DN32 PN16, penggalian uk. (20cm x 50cmx50m) 50,00 m2 - 0,00 by PTAR

Note: Ketentuan lain sesuai prosedur dan peraturan PT AR

TOTAL 0,00 0,00