0% found this document useful (0 votes)
20 views

02 Content

This 7 volume document provides the contents for a construction project tender. It includes the tender conditions and contract, specifications divided across multiple volumes, schedules of works with pricing, and appendices including insurance policies, indemnities, schedules of finishes and brands. The contents span over 600 pages and include 22 separate documents labeled A through R that cover all technical and commercial aspects of the tender.

Uploaded by

truong tran
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views

02 Content

This 7 volume document provides the contents for a construction project tender. It includes the tender conditions and contract, specifications divided across multiple volumes, schedules of works with pricing, and appendices including insurance policies, indemnities, schedules of finishes and brands. The contents span over 600 pages and include 22 separate documents labeled A through R that cover all technical and commercial aspects of the tender.

Uploaded by

truong tran
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

CONTENTS

DOCUMENT SCOPE PAGE NO.

Volume 1 of 7
- CONTENTS CONT/1 – CONT/4

A LIST OF CONSULTANTS / ASSISTANTS A/1

B THE TENDER
Conditions of Tender B/1 – B/6
Letter of Tender B/7
Appendix to Tender B/8 – B/10

C THE CONTRACT
Particular Conditions C/1 – C/8

Volume 2 of 7
D THE SPECIFICATIONS
Architectural Specifications Refer to content page within
Structural Specifications Refer to content page within
Interior Architectural Specifications Page 1 – Page 46
Civil Infrastructure Specifications Refer to content page within

Volume 3 of 7
E THE PREAMBLES
Preambles To All Trades E/1 –E/6

F THE SCHEDULE OF WORKS


General Notes F/LS/1
Schedule No.1 – Preliminaries and General
(Phase 1A – Part 1)
- Index F/INDEX/1 – F/INDEX/5
- Preliminaries F/1/1 – F/1/83
- Collection F/1/84 – F/1/87
Schedule No.2 – Preliminaries and General F/2/1 – F/2/6
(Phase 1A – Part 2)
Schedule No.3 – Preliminaries and General F/3/1 – F/3/6
(Phase 1B)
Schedule No.4 – Garden/Lagoon Villa 4/A/1 – 4/PS/1
Schedule No.5 – Beach Villa 5/A/1 – 5/PS/1

O:\Company\PROJECT LISTS\1020_BANYAN TREE\MC\Tender\Doc\RE-TENDER - OCT 09\BTR Front End\02 Content.doc


19-Oct-09
Cont/1
CONTENTS

DOCUMENT SCOPE PAGE NO.

Volume 4 of 7
F THE SCHEDULE OF WORKS (CONT’D)
Schedule No.6 – SPV2BR (Type A) 20 Units 6/A/1 – 6/PS/1
Schedule No.7 – SPV2BR (Type A) 45 Units 7/A/1 – 7/PS/1
Schedule No.8 – SPV3BR 8/A/1 – 8/PS/1
Schedule No.9 – RV3BR 9/A/1 – 9/PS/1
Schedule No.10 – BOH 10/A/1 – 10/PS/1

Volume 5 of 7
F THE SCHEDULE OF WORKS (CONT’D)
Schedule No.11 – FOH 11/A/1 – 11/PS/1
Schedule No.12 – Saffron 12/A/1 – 12/PS/1
Schedule No.13 – Beach Bar & Club 13/A/1 – 13/PS/1
Schedule No.14 – Spa Deluxe 14/A/1 – 14/PS/1

Volume 6 of 7
F THE SCHEDULE OF WORKS (CONT’D)
Schedule No.15 – Spa Royal 15/A/1 – 15/PS/1
Schedule No.16 – Yoga Pavilion 16/A/1 – 16/PS/1
Schedule No.17 – Spa Block 17/A/1 – 17/PS/1
Schedule No.18 – External Works 18/A/1 – 18/PS/1
Schedule No.19 – Provisional Sum F/19/1 – F/19/12
(Part 1A – Part 1)
Schedule No.20 – Provisional Sum F/20/1 – F/20/4
(Part 1A – Part 2)
Schedule No.21 – Provisional Sum (Part 1B) F/21/1 – F/21/4
Schedule No.22 – Alternative Roof Truss System F22/1

G THE FINAL SUMMARY G/1 – G/4

H THE APPENDICES
Appendix A - Contractor’s Particulars H/A/1 – H/A/5
Appendix B - Performance Security Specimen H/B/1 – H/B/4
for Due Performance of Main
Contractor
Appendix C Specimen of Performance Bond H/C/1 – H/C/3
for due Performance by Sub-
Contractor

O:\Company\PROJECT LISTS\1020_BANYAN TREE\MC\Tender\Doc\RE-TENDER - OCT 09\BTR Front End\02 Content.doc


19-Oct-09
Cont/2
CONTENTS

DOCUMENT SCOPE PAGE NO.

Volume 6 of 7 (Cont’d)
H THE APPENDICES (CONT’D)
Appendix D - Schedule of Day work Labour H/D/1 – H/D/2
Rates
Appendix E - Schedule of Daywork Rates for H/E/1 – H/E/2
Special Plant and Equipment
Appendix F - Definition of Daywork Rates for H/F/1
Materials and Goods
Appendix G - Definition of Incidental Costs, H/G/1
Overheads and Profit for
Daywork Rates
Appendix H Specimen Insurance Policies H/H/1 – H/H/25
Appendix J - List of Indemnities and H/J/1
Warranties
Appendix K - Specimen Deed of Indemnity H/K/1 – H/K/4
and Warranty for Works by
Contractor only
Appendix L - Specimen Deed of Indemnity H/L/1 – H/L/4
and Warranty for Works by
Contractor and Nominated Sub-
Contractor
Appendix M - Specimen Deed of Indemnity H/M/1 – H/M/4
and Warranty for Works by
Contractor and Nominated
Supplier
Appendix N - Specimen Deed of Indemnity H/N/1 – H/N/4
and Warranty for Works by
Contractor and Domestic
Specialist Sub-Contractor
Appendix P - Specimen Deed of Indemnity H/P/1 – H/P/4
and Warranty for Anti-Termite
Treatment Works by Contractor
and Domestic Specialist Sub-
Contractor
Appendix Q - Schedule of Finishes Refer to Drawings
Appendix R - Schedule of Brands and Trade H/R/1
or Product Names selected and
proposed by Tenderer for
Approval

O:\Company\PROJECT LISTS\1020_BANYAN TREE\MC\Tender\Doc\RE-TENDER - OCT 09\BTR Front End\02 Content.doc


19-Oct-09
Cont/3
CONTENTS

DOCUMENT SCOPE PAGE NO.

Volume 7 of 7
H THE APPENDICES (CONT’D)
Appendix S - Schedule of Drawings
Architectural Drawings H/S/AD/1 – H/S/AD/9
ID Drawings H/S/IA/1 – H/S/IA/6
Structural Drawings H/S/CS/1 – H/S/CS/15
Infrastructure Drawings H/S/Infra/1 – H/S/Infra/10
Landscape Drawings H/S/LA/1 – H/S/LA/2
Appendix T - Adjustment of Prime Cost H/T/1 – H/T/2
Supply Rates Items

Appendix U - Soil Investigation Report H/U/1 – H/U/72


Appendix V - Extract of EIA Requirements H/V/1 – H/V/16
Appendix W - Conditions of Nominated Sub- H/W/1 – H/W/146
Contract
Appendix X - Hardscape Suppliers H/X/1
Appendix Y - Pre-Qualification for General H/Y/1 – H/Y/14
Contractors

O:\Company\PROJECT LISTS\1020_BANYAN TREE\MC\Tender\Doc\RE-TENDER - OCT 09\BTR Front End\02 Content.doc


19-Oct-09
Cont/4

You might also like