MM - BPD - Procurement & GRN of FOC & Interim Materials - Final - Jun 19 2020
MM - BPD - Procurement & GRN of FOC & Interim Materials - Final - Jun 19 2020
REVISION HISTORY
2
REVIEW AND APPROVAL
3
TABLE OF CONTENTS
1. MATERI AL MANAGEMENT – PROCUREMENT PRI NCIPAL INTERIM & FOC MATERIALS – J45 5
1.1. Busine ss Proce ss Requirements...........................................................................................5
1.2. Busine ss Proce ss De scription ...............................................................................................5
1.3. Busine ss Proce ss Diagrams ..................................................................................................6
1.4. Process Step Detailed Requirements & Solution ...................................................................7
1.5. Locations where this Busine ss Proce ss i s performed ...........................................................8
1.6. Operational Decisions or Logic within the Process ...............................................................8
1.7. Reference to Key Process Change s ......................................................................................8
1.8. Integration Points ..................................................................................................................8
1.9. Organization Structure Considerations .................................................................................9
1.10. Master Data Consi derations (including all relevant data relationships) .................................9
1.11. System Configuration Consi derations ................................................................................. 10
1.12. Technical/Development Related Items................................................................................. 13
Workflow......................................................................................................................................... 13
Reporting ........................................................................................................................................ 13
Interfaces ........................................................................................................................................ 13
Enhancements ................................................................................................................................ 14
Output /Form s................................................................................................................................. 14
4
1. MATERIAL MANAGEMENT – PROCUREMENT PRINCIPAL INTERIM & FOC MATERIALS – J45
For details please refer to the following MM user stories – AG16 User Stories Document.
FOC purchasing process is used for procuring non valuated materials, FOC purchase order will be
created manually. If Principal sends his regular material as FOC then FOC PO will be created with
FOC valuation type which must be assigned into the respective Material Master. No Invoice will be
posted against FOC PO.
Principal Interim Stock purchasing process is used for procuring non valuated Principal materials
only. Principal Interim purchase order will be created manually with respective PO type. Principal
Interim PO will be created with Interim valuation type which must be assigned into the respective
material master. No Invoice will be posted against Principal Interim PO.
A purchaser has to validate the FOC check marked in FOC PO line item and Principal Interim PO
line item purchaser also have to validate FOC valuation type for Principal regular products &
INTERIM valuation type for Principal Interim PO.
Process Characteristics
5
1.3. Business Process Diagrams
The diagrams below explain the FOC and Interim Purchase Order processes that will work in
Burque
Close Purchase
Order
No
Record Inbound
Detail
Close Purchase
No
Requisition
6
1.4. Process Step Detailed Requirements & Solution
Create
Purchase
5 UAT PO Output MM-O001
Order
FOC/Interim
Approve MM06 – AG16
6 Purchase UAT - -
Order
Goods Receipt
FOC PO in
FOC location MM06 – AG16
7 UAT - -
& Interim PO
in Interim
location
7
1.5. Locations where this Business Process is performed
An approved PO cannot be changed / edited (quantity, price, addition and / or subtraction of line
items).
Batch characteristics functionality will be used to enter Truck time information at the time of GRN.
FOC materials will be received on FOC location only.
Interim materials will be received on Interim location only.
PO validation date can be set at PO level to so GR should not receive after validation date
Principal SKU code can be defined against each Burque SKU code and a PO can be created with
Principal code reference
All FOC stock will be received in FOC SLOC at FOC valuation type which is ZERO. This stock can
be Principal manufactured SKU or a general item used for a promotion scheme or item
All interim stock owned by Principal will be received in Interim SLOC at FOC valuation type which
is ZERO. This stock can be supplied to a Principal's customer
All details of FOC & Interim stock can be maintained and tracked within the system
Integration Points
SAP
ID Integration Point Data Element Contacts
Component
Warehouse
MM-WM WM
Operations (FOC)
8
1.9. Organization Structure Considerations
9
1.11. System Configuration Considerations
Configuration
Company Code Plant ID Description Owner
Object
KD01 KDC Wemyt Consultant
FU01
FB UL Wemyt Consultant
BU01
LH01
Plant Lahore Wemyt Consultant
10
Configuration
Company Code Plant ID Description Owner
Object
11
Configuration
Company Code Plant ID Description Owner
Object
12
1.12. Technical/Development Related Items
Workflow
Workflows
WRICEF
Description Data Object Engaged Parties Owner
ID
- - - - -
Reporting
Reporting
Report Type
WRICEF
Description (ABAP, BI, Data Elements Relevant KPI Owner
ID
BOBJ)
- - - - - -
Interfaces
Interfaces
WRICEF Interface Frequency /
Description Applications Owner
ID Method Volumes
- - - - - -
13
Enhancements
Enhancements
Alternative
WRICEF Data Functional
Description SAP Reason Owner
ID Object Gap
Standard
In the selection
criteria, Material To allow view of
MM- combination of block via materials Wemyt
- -
E001 principal/supplier source of relevant to Consultant
and Material should supply principal/supplier
be displayed
Required to
To create PO with
MM- create PO with Wemyt
one valuation type - - -
E002 one valuation Consultant
only,
type only,
To post one
batch against
To post one batch
MM- multiple Wemyt
against multiple - - -
E002 valuation type Consultant
valuation type
(required further
discussion)
PO Document type PO Document
MM- validation/restriction will be restricted Wemyt
- - -
E002 with storage with storage Consultant
Location location
Output /Forms
Output/ Forms
Output
WRICEF Data Type
Description Frequency Volumes Owner
ID Object (Form, EDI,
etc.)
Wemyt
Functional /
MM-O001 PO Output - Form High - ABAP
Consultant
14
1.13. Authorization
Data Objects # of
ID Authorization
employees
MM- A001 Supply Chain Officer ME51N, ME52N, ME53N
MM- A002 Supply Chain Officer ME21N, ME22N, ME23N -
15