Oil and Natural Gas Corporation LTD.: Code Group Code Group Description Done Code Group Code Group Description Done
Oil and Natural Gas Corporation LTD.: Code Group Code Group Description Done Code Group Code Group Description Done
PURN00036043
Valid from : 08:00:00 hrs of date : 05.07.2023 Valid upto : 20:00: hrs of date 11.07.2023
(Valid for work in shift as per time in clearance renewal only)
Issued to Section : I/C-LPG
Exact Loaction Of Work (Area/Unit): Flare Area
Functional Location: URN :
Description of Work : SCAFFOLDING ERECTION / DISMANTLING, GAS CUTTING, WORK AT HEIGHT, LIFTING & RIGGING,
MATERIAL STACKING, TRANSPORTATION AT BOX FLARE AREA.
Name of Contractor Company :ADOR WELDING LIMITED Name of ONGC Supervisor: MOHAN MAHTRE
Name of Contractor Supervisor: ABHISHEK SEN / SWAPNIL SHRAV
THE FOLLOWING ITEMS ARE TO BE CHECKED BY CONCERNED SECTION BEFORE THE ISSUE OF THE WORK PERMIT
Code Code
Code Group Description Done Code Group Description Done
group group
A GENERAL CHECK ITEMS
1 EQUIPMENT / WORK AREA INSPECTED. ✔ 2 SURROUNDING AREA CHECKED, CLEANED AND COVERED ✔
7 EQUIPMENT PROPERLY STEAMED / PURGED/FLUSHED WITH WATER . ✔ 8 GAS TEST : HCS = %LEL... TOXIC GAS/H2S = PPM = %" ✔
STANDBY PERSONNEL PROVIDED FROM PROCESS/MAINT./ CHECKED FOR OIL AND GAS TRAPPED BEHIND THE LINING IN
3 CONTRACTOR/FIRE/SAFETY DEPT. ✔ 4 EQUIPMENT ✔
VERIFIED THE PREPARTIONS AS PER CHECKLIST AND PAST KIRAN GIRJAPPA ALL SAFETY PRECAUTIONS
INSTRUCTIONS TO THE C/R AND CONCERNED SECTIONS.JSA HSE MANAGER ✔ GAIKWAD ( 83804 ) : PERTAINING TO THE
CARRIED OUT SPECIFICALLY.T 10:26:16 : 04.07.2023 OPERATIONS TO BE TAKEN.
I AM AWARE OF THE ABOVE WORK BEING CARRIED OUT.SUBJECT ANANDO BAGDDE PL RENEW PERMIT FROM C/
TO PRECAUTIONS BEING OBSERVED AND ISOLATIONS BEING RPS/RME/RIE/RE ✔ ( 70276 ) : 10:35:47 :
MADE,THIS PERMIT IS AU 04.07.2023 ROOM IN EVERY SHIFT
CLEARANCE RENEWAL
Permit No. PURN00036043
Clearance
Sr No. Clearance From Clearance To EXECUTOR Remarks AREA SHIFT IN Remarks
agreed
At 08:00:00 hrs of At 18:00:00 hrs of AMAR CHAND ARVIND KUMAR FOLLOW SOP AND USE
1 RAO ( 136176 ) ( 94252 ) ✔
Date : 05.07.2023 Date : 05.07.2023 PPE
10
12
13
Hour Reading (%LEL) Reading (PPM) Hour Reading (%LEL) Reading (PPM)
HC /
H2S /
Toxic
Gas
SPECIAL INSTRUCTIONS
1.The work permit shall be filled up carefully and accurately in clear handwriting ensuring that complete information is provided
in all the sections / subsections,sketches should be provided wherever possible to avoid miscommunication..
2. Appropriate safe guards and required personnel protective equipment (PPEs) shall be determined by a careful analysis of
the potential hazards and the operations to be performed prior to the starting of work.
3. In case of fire alarm /siren all work must immediately be stopped.
4. For renewal of work clearance, the issuer shall ensure that the conditions are satisfactory for the work to continue.If the
condition have changed, it may be necessary to issue a new permit or amend the existing permit.
5. This clearance on the same permit can be renewed / extended up to a maximum of seven calendar days.
6. This permit must be available at work sites at all times.
7. On completion of the work,the permit shall be closed.
8. the industry may add other relevant instruction based on their operating and maintainance practice.
Permit No. PURN00036043
9.Only certified vehicle/engines and permitted type of electrical equipment and tools are allowed in operating areas.
10.Welding machines should be located in non-hazardous and ventilated areas.
11.No hot work should be permitted unless the explosive meter reading is zero.
12. When a person is entering a confined space, the receiver must keep minimum two standby-designated persons at the
manhole of entry point.
13. Before box up of any vessel manhole cover,ensure that no med/materials are inside the vessel.
Emergency Contact: 4444/4445