Schedule Material

This document provides a schedule and timeline for renovation work on the 5th, 6th, 8th and 9th floors of Eka Hospital BSD from January 2024 to June 2024. It involves dismantling existing architectural, structural and MEP works and supplying and installing new structural elements, architectural finishes, doors, windows, flooring, wall finishes and ceilings. The work includes demolition, concrete work, steel structure installation, drywall partitioning, flooring and various painting/finishing works to be completed by code and area over the 6 month period.

Uploaded by

Kst
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
43 views

Schedule Material

This document provides a schedule and timeline for renovation work on the 5th, 6th, 8th and 9th floors of Eka Hospital BSD from January 2024 to June 2024. It involves dismantling existing architectural, structural and MEP works and supplying and installing new structural elements, architectural finishes, doors, windows, flooring, wall finishes and ceilings. The work includes demolition, concrete work, steel structure installation, drywall partitioning, flooring and various painting/finishing works to be completed by code and area over the 6 month period.

Uploaded by

Kst
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Renovation Work of Eka Hospital BSD 5th, 6th 8th 9th Floor

SCHEDULE MATERIAL

Januari 2024 Febuari 2024 Maret 2024 Apr-24 Mei 2024 Juni 2024
Code Description
week 1 week 2 week 3 week 4 week 1 week 2 week 3 week 4 week 1 week 2 week 3 week 4 week 1 week 2 week 3 week 4 week 1 week 2 week 3 week 4 week 1 week 2

2.1.1 Dismantle Architects, Structural & MEP Works


A Demolish Floor (Cipping Screed)
B Demolish Wall (depan lift)
C Demolish Roofing & Girder & Purlin
D Reinstall Purlin & Gutter
E Demilition Slab Roof lift
F Demilition Column lift ( 80 cm)
2.1.2 Supply & Install Structural Works
2.1 Steel Structure Main Building
A Column Rafter, Beam & purlin Steel Structure
B Zincromat Paint
C Anchor Bolt M16-300
D Anchor Bolt M19-300
E Anchor Bolt M25-450
F Grouting
G High tension Bolt A325 M16
H High tension Bolt A325 M19
J High tension Bolt A325 M25
K Metal Roof Klip-Lok 406 Colour Matt 0,45 mm
L Skylight FRP
M Aluminium Foil 1,5 mm
N Rockwool 60 kg/m3 - 50 mm
2.2 LIft Structure
A Column Rafter, Beam & purlin Steel Structure
B Zincromat Paint
C Anchor Bolt M16-300
D Grouting
E High tension Bolt A325 M16
F Concrete Lift
G Wiremesh M10-150
H Shuttering slab (Bondex)
I Hoisting Hook @ 3000 kg
2.3 Stair Structure & Roofing Slab lobby
A Stair Structure (Provisional Sum)
B Roof slab lobby lift & Tangga (Provisional Sum)
Architectural Finishes

2.2.1 WALL PARTITION


A Lightweight concrete wall, laid in stretcher bond,
including practical columns, 10mm dia. practical
column anchor (2 nos), lintel beams, ties and control
To External wall
To Internal wall (toilet & Panel, under Glass
B 10mm partition)
thick instant cement render with smooth
finish, including reveals to receive paint (paint
To External wall

To Internal wall
C 2 sided Drywall partitions; comprising 12mm thick
gypsum board to both sides, including rockwool
insulation with density 60kg/m3, metal stud, fixings
and accessories, as specified, to : (Note : Partition
height only up to ceiling +100mm)
To bed Room
C 1 sided Drywall partitions; comprising 12mm thick
gypsum board to both sides, including rockwool
insulation with density 60kg/m3, metal stud, fixings
and accessories, as specified, to : (Note : Partition
height only Room
To bed up to ceiling +100mm)
To Internal garden (above glass partition)
D Glazed partition; comprising 6mm thick clear glass,
including aluminium powder coated frame, sealants,
fixings and accessories, as specified, Yundari
To corridor
2.2.2 DOORS AND WINDOWS
Renovation Work of Eka Hospital BSD 5th, 6th 8th 9th Floor

SCHEDULE MATERIAL

Januari 2024 Febuari 2024 Maret 2024 Apr-24 Mei 2024 Juni 2024
Code Description
week 1 week 2 week 3 week 4 week 1 week 2 week 3 week 4 week 1 week 2 week 3 week 4 week 1 week 2 week 3 week 4 week 1 week 2 week 3 week 4 week 1 week 2

A Timber door; comprising 40mm thick door leaf,


aluminium door frame with powder coating finish,
6mm thick plywood core, including HPL finishes to
- Single Door tipe P1 overall size 1300 x
- Single Door tipe P2 overall size 1000 x
- Single Door tipe P3 overall size 1000 x
B Frameless glazed door and windows; comprising
frame, glass, ironmongeries including fixings and
accessories, as specified.
- Double doors & windows type PD1 overall size
C 2400 x 2100mm
Frameless glazed windows; aluminium frame with
powder coating finish, Glass, ironmongereis,
including fixings and accessories, as specified.
- Window type J1 overall size 2800 x 1900mm
- Window type J2 overall size 1800 x 1900mm
- Window type J3 overall size 7100 x 1900mm
- Window type J4 overall size 3300 x 1900mm
2.2.3 FLOOR FINISHES
Vinyl flooring; comprising 2mm thick non medical
grade vinyl including Screed, self leveling, soldering,
adhesive, fixings and accessories, as specified, to :
A Vynil flooring type V1
to corridor
ditto but for border (150mm)
100mm high skiriting
B Vynil flooring type V2
to bedroom
ditto but for border (150mm)
100mm high skiriting
Homogenous floor tiles; comprising Homogenous
tiles, including setting bed, adhesive and grouting
ex. Mortar Utama or Leicthmix or Power bond or
C equal approved,
Homogenous Tileastype
specified,
HT to :
To Room Toilet
To Dirty utility
To Panel room, Storage, CU, Nurse station

To stair
D Treshold
- corridor to IPD room
- IPD room to toilet
- corridor to Other room
E Prepare and apply waterproofing system coating
To toilet

To DU

To Internal garden

F Floor riser
To lobby lift (h= 500)
G ramp

To lobby lift (h= 500)


H Nosing
100mm (w) Homogenous tile nosing
F 150X150MM Embankment finish Homogenous wall
tiles (HT); , as specified, to :
To DU
WALL FINISHES
A Prepare smooth and apply acrylic emulsion paint
finish, in accordance with manufacturer's
To corridor, DU, CU, Panel
B Prepare smooth and apply Enamel paint finish, in
accordance with manufacturer's recommendations;
To Panel room
Renovation Work of Eka Hospital BSD 5th, 6th 8th 9th Floor

SCHEDULE MATERIAL

Januari 2024 Febuari 2024 Maret 2024 Apr-24 Mei 2024 Juni 2024
Code Description
week 1 week 2 week 3 week 4 week 1 week 2 week 3 week 4 week 1 week 2 week 3 week 4 week 1 week 2 week 3 week 4 week 1 week 2 week 3 week 4 week 1 week 2

C Prepare smooth and apply weathershield paint finish


in accordance with manufacturer's
recommendations;
To External wallas specified.
D Prepare and apply wallpaper
To IPD Room
E Homogenous wall tiles (HT); comprising 8mm thick
tiles, including backing, adhesive and grouting , as
specified, to :
To toilet
To DU (h = 1,5M)
CEILING
A Gypsum board ceiling; 9mm thick gypsum board
ceiling and prepare smooth to receive paint finish
(paint finish measured separately), including
aluminium trim, concealed metal furring framing and
fixing accessories; all as specified. (including curtain
To IPD Room
To corridor
To CU, Storage, R Panel
B Water resistant gypsum board ceiling; comprising
9mm thick gypsum board ceiling, taped and sanded
and prepare smooth to receive paint finish (paint
finish measured separately), including aluminium
- to Toilet
- to DU
C Drop Ceiling, Comprising 9mm thick gypsum board
ceiling, taped and sanded and prepare smooth to
receive paint finish (paint finish measured
separately), including aluminium trim, metal furring
- H (400+120+50)mm (bedroom)
- H 200mm (bedroom)
- H 500mm (corridor to lift, & Nurse Station)
- H 300mm ( Nurse Station)
D Curtain Box, comprising 9mm thicj gypsumboar for
vertikal side, 16mm multiplex for horisontal side,
taped and sanded and prepare smooth to receive
paint finish (paint finish measured separately),
including aluminium trim, metal furring framing and
- size 200x200
- size 50x100
E Cove & Drop Ceiling inc. Acrilic Cover
To Bedroom (size 200 x 200mm)
To Corridor (size 400 x 300mm)
F 600x600mm Manhole, comprising manhole frame,
aluminium list and fixing accessories as specified
To toilet
To corridor & DU
G Prepare smooth and apply acrylic emulsion paint
finish, in accordance with manufacturer's
To IPD Room
To corridor
To DU, CU, Storage, R Panel
H Repair gypsum Ceiling including Repainting at level
- at level 2
- at level 5 (connection to existing)
2.2.4 SANITARY
SUPPLY & INSTALL the following sanitary wares
and faucets, including all associated fittings and
A CW 1 : CLOSET : CW500PJ/SW500JP S-TRAP ex. TOTO
B JS-1 : JET WASHER : TX403SECR ex. TOTO
C LW-1 : WASTAFEL : LW660CJ ex. TOTO
D LW-1 : WASTAFEL FAUCET: TX115LX ex. TOTO
E SH-1: SHOWER : TX474KEA ex. TOTO
F FD-1: FLOOR DRAIN : TX1DBV1 ex. TOTO
G GB-1: GRAB BAR SHOWER : JSHR 14 ex. JAYA
STEINLESS/SETARA
H GB-2: GRAB BAR SHOWER : JSHR 14 ex. JAYA
STEINLESS/SETARA
Renovation Work of Eka Hospital BSD 5th, 6th 8th 9th Floor

SCHEDULE MATERIAL

Januari 2024 Febuari 2024 Maret 2024 Apr-24 Mei 2024 Juni 2024
Code Description
week 1 week 2 week 3 week 4 week 1 week 2 week 3 week 4 week 1 week 2 week 3 week 4 week 1 week 2 week 3 week 4 week 1 week 2 week 3 week 4 week 1 week 2

I MR-1: Mirror 5 mm size 800 x 900mm + 2cm bevel


J Robe Hanger
K Zink DU
L Lavatory Table; comprising Table Frame with
400mm (D) Homogenous tile counter top to receive
Lavatory including 220mm high fascia, grouting,
- to Toilet IPD
- to Corridor Wastafel
2.2.5 Sundries
A Stainles steel Railing compring S/S Railing dia
40mm w/ 1,2mm thickness c/w bolt, railing stand
B Hospotal Curtain
IPD rooms size 3,5m x 2.8m including rail
IPD rooms size 2,5m x 2.8m including rail
IPD rooms size 5,85m x 2.8m including rail
C Roller blind, 2,8 x 1.9m height
D Wall guard; comprising rail guard including acrylic
cover, fixed to walls, fixings and accessories, as
To corridor
E 1500mm High corner protector including 30x30
Stainless steel angles fixing to wall including all
necessary accessories; as specified to drawings
To corridor
F Repair waterproofing
To permeter wall
2.2.6 Fix & Loose Furniture
Fix furniture
A 2000(W)x 2700(H) mm Backwall Panel, comprising
frame, multiplex finish HPL, Stainless Steel MSP,
LED lighting c/w cover acrylic including making hole
for ME & medical outlet, accessories, fixing and
B 600(W)x 2700(H) x 600(D) mm Cabinet, comprising
frame, multiplex finish HPL,including, accessories,
fixing and necessary accessories as specified
C 2500(W)x 2700(H) x 120(D) mm VIP Backwall TV
(type F05), comprising frame, multiplex finish HPL,
including making hole for ME, accessories, fixing
D Nursestation
- size 2750 x 600 x 600(h)mm
Loose furniture
E Sofabeds

You might also like