This document provides guidelines for clearing and grubbing work for construction projects. It outlines that the purpose is to identify the sequence of work. The scope specifies that it applies to clearing and grubbing for various project implementations. The guidelines state that materials should be segregated, trees counted and a permit obtained from the DENR if trees need to be cut before implementing that activity.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views5 pages

Clearing and Grubbing

This document provides guidelines for clearing and grubbing work for construction projects. It outlines that the purpose is to identify the sequence of work. The scope specifies that it applies to clearing and grubbing for various project implementations. The guidelines state that materials should be segregated, trees counted and a permit obtained from the DENR if trees need to be cut before implementing that activity.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Document Code:

CLEARING & GRUBBING BIPI-ENG-WI-002-00

WORK INSTRUCTION Effectivity Date:


April 01, 2015

1.0 PURPOSE

Purpose of this guideline is to identify the sequence to be followed during the execution of
the project.

2.0 SCOPE

This guideline is applicable for any clearing and grubbing works for the variety project
implementation.
Document Code:

CLEARING & GRUBBING BIPI-ENG-WI-002-00

WORK INSTRUCTION Effectivity Date:


April 01, 2015

3.0 GUIDELINES

1. Segregate the materials (Solid Waste Management).

2. Count the plant trees and identify if we need to cut trees, if yes, process and get
Permit to Cut Trees to DENR before implementing the said activity.
Document Code:

CLEARING & GRUBBING BIPI-ENG-WI-002-00

WORK INSTRUCTION Effectivity Date:


April 01, 2015
Document Code:

CLEARING & GRUBBING BIPI-ENG-WI-002-00

WORK INSTRUCTION Effectivity Date:


April 01, 2015
Document Code:

CLEARING & GRUBBING BIPI-ENG-WI-002-00

WORK INSTRUCTION Effectivity Date:


April 01, 2015

You might also like