Project Management Report

The document provides a status report on an overall program. The program status is green, indicating it is within budget, scope and on schedule. The budget shows no changes, while an upgrade project was postponed by four weeks. No issues or changes are outstanding. Several subprojects are in progress, completed, or having their plans developed. Status.net is introduced as an automation tool to simplify reporting by regularly collecting data and running exportable reports.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views

Project Management Report

The document provides a status report on an overall program. The program status is green, indicating it is within budget, scope and on schedule. The budget shows no changes, while an upgrade project was postponed by four weeks. No issues or changes are outstanding. Several subprojects are in progress, completed, or having their plans developed. Status.net is introduced as an automation tool to simplify reporting by regularly collecting data and running exportable reports.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Automate your reporting with status.

net

Project Status Report

1. Executive Summary

Overall Program Status:

Green Yellow Red Status

(Controll (Caution) (Critical)


ed)

Budget:  No changes.

Schedule:  Upgrade project postponed by four weeks

Issues:  No outstanding issues.

Change:  All PCRs documented and presented.

Program:  Green

Application Completed

Upgrade

Budgeting In production – testing of forecasting underway

Process Review  In Progress

Receipting Project plan completed



Upgrade

Reporting Scope development being planned.



Structures

OCR  In Progress

Green: Project is within budget, scope and on schedule.

Yellow: Project has deviated slightly from the plan.

Red: Project has fallen significantly behind schedule or the forecast is significantly over budget, or
has taken on out of scope tasks.
Improving Worsening Stable
Automate your reporting with status.net

2. Controls

Issue Status:

Log # Date Description Summary Impact Actions required Current Date


logged level status resolved

Change Status:

# Description Priority Purpose Date in Date out Status


(Low/Med
ium/High)

001 Medium

002 Medium

003 Low

004 Medium

Risk Status:
Automate your reporting with status.net

Tired of working with reports manually? Status.net is a modern solution to share regular reports and
gather insights automatically.

Status.net collects data regularly with scheduled auto reminders. Run powerful reports with export
and print features.

Click here to try it now for free.

You might also like