The document outlines the requirements for a discharge permit application, including required supporting documents. Applicants must submit an engineer's report signed by a qualified professional containing details about the facility and wastewater treatment process. They must also provide drawings of the plant layout and wastewater treatment facility. Additional required documents include a notarized application, environmental compliance certificate, proof of accreditation, and details on wastewater volume and receiving body.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
50%(2)50% found this document useful (2 votes)
793 views
Requirements For Discharge Permit Application
The document outlines the requirements for a discharge permit application, including required supporting documents. Applicants must submit an engineer's report signed by a qualified professional containing details about the facility and wastewater treatment process. They must also provide drawings of the plant layout and wastewater treatment facility. Additional required documents include a notarized application, environmental compliance certificate, proof of accreditation, and details on wastewater volume and receiving body.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2
REQUIREMENTS FOR DISCHARGE PERMIT APPLICATION
Upload supporting documents by dragging files to this page or by cliking
the Add Files button.
NOTES:
Maximum filesize is 20MB.
Split files that are greater than 20MB and upload them separately. Accepted filetypes are pdf, jpg, jpeg, png, gif. An asterisk (*) indicates that the item is required. The Finalize application button will only be enabled once the required documents are complete.
For Discharge Permit:
1. Engineer's Report with at least containing the following:
o - Signed by PME/ChE/Sanitary Engr./Accredited PCO o - Name of project or business; o - Brief description of manufacturing process involved; o - Production capacity, quality or volume and the generic name of the products; o - The nature and character of the applicant's wastewater and its physical and chemical composition; o - Total daily volume of discharge of raw wastewater; o - Treatment process and estimated treatment efficiency; The expected quality of the effluent and other discharge shall meet the Effluent standards of the DENR; o - The total daily volume of water consumption and discharge of final treated wastewater effluent; o - The name of receiving body of water and its official water classification and in case of land discharge, the nearest receiving body of water and its official water classification; o - Information on flow measurement equipment and procedure; o - Pollution prevention/Environmental Management System plan or program; o - DENR ID Number as hazardous waste generator (if applicable); and o - State the cost incurred in the installation and maintenance of wastewater treatment facility; if any 2. Drawing requirements in 50cm x 90cm paper signed and sealed by the PME/ChE/Sanitary Engr. o - Vicinity Map of the Plant; o - The wastewater line layout from the wastewater sources to the WTF; and o - Plan and elevation drawings of the WTF as built with complete specifications.
Official Receipt for Application Fee
Notarized Application*
ECC or CNC* PCO Accreditation / Appointment letter *
Download ebooks file The China Management Handbook A Comprehensive Question and Answer Guide to the World s Most Important Emerging Market 1st Edition Engelbert Boos all chapters