0% found this document useful (0 votes)
8 views

Cross 10

This document contains station-by-station information about earthwork quantities along a roadway project. It lists the materials and area quantities such as cut, fill, and items used at 20 station points ranging from 0+000 to 0+240. For each station, it provides the material types and volumes in square meters for area cut, area fill, and specific item numbers.

Uploaded by

Bai Juwairiah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views

Cross 10

This document contains station-by-station information about earthwork quantities along a roadway project. It lists the materials and area quantities such as cut, fill, and items used at 20 station points ranging from 0+000 to 0+240. For each station, it provides the material types and volumes in square meters for area cut, area fill, and specific item numbers.

Uploaded by

Bai Juwairiah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

STA 0+000 STA 0+100 STA 0+200

C
L
C
L
C
L

Material(s) at
Material(s) at
Material(s) at STA 0+000
Area STA 0+000
STA 0+000 Material Area
Area (sq. m.) Material
Material (sq. m.)
(sq. m.) AREA CUT 0.85
AREA CUT 4.30
AREA CUT 1.81
AREA FILL 0.23
AREA FILL 3.21
AREA FILL 0.45
ITEM 311 1.00
ITEM 311 1.00
ITEM 311 1.00
ITEM 200 1.56
ITEM 200 1.56
ITEM 200 1.56

STA 0+020 STA 0+120 STA 0+220


C
L C
L
C
L

Material(s) at Material(s) at Material(s) at


STA 0+000 STA 0+000 STA 0+000
Area Area Area
Material Material Material
(sq. m.) (sq. m.) (sq. m.)
AREA CUT 1.28 AREA CUT 1.69 AREA CUT 13.44

AREA FILL 0.81 AREA FILL 0.60 AREA FILL 0

ITEM 311 1.00 ITEM 311 1.00 ITEM 311 1.00

ITEM 200 1.56 ITEM 200 1.56 ITEM 200 1.56

STA 0+240
STA 0+140
STA 0+040
C
L
C
L C
L

Material(s) at Material(s) at
Material(s) at
STA 0+000 STA 0+000
STA 0+000 Area Area
Area Material Material
Material (sq. m.) (sq. m.)
(sq. m.)
AREA CUT 4.11 AREA CUT 4.34
AREA CUT 1.52
AREA FILL 3.40 AREA FILL 3.43
AREA FILL 0.97
ITEM 311 1.00 ITEM 311 1.00
ITEM 311 1.00
ITEM 200 1.56 ITEM 200 1.56
ITEM 200 1.56

STA 0+060 STA 0+160 STA 0+260


C
L
C
L
C
L

Material(s) at
Material(s) at
STA 0+000 Material(s) at
Area STA 0+000
Material Area STA 0+000
(sq. m.) Material Area
(sq. m.)
Material
AREA CUT 1.40 (sq. m.)
AREA CUT 4.82
AREA CUT 3.05
AREA FILL 0.27
AREA FILL 3.96
AREA FILL 1.74
ITEM 311 1.00
ITEM 311 1.00
ITEM 311 1.00
ITEM 200 1.56 ITEM 200 1.56
ITEM 200 1.56

STA 0+080 STA 0+180 STA 0+280


C C
L C
L
L

Material(s) at Material(s) at Material(s) at


STA 0+000 STA 0+000 STA 0+000
Area Area Area
Material Material Material
(sq. m.) (sq. m.) (sq. m.)

AREA CUT 1.55 AREA CUT 4.99 AREA CUT 0.90

AREA FILL 0.47 AREA FILL 4.23 AREA FILL 1.59

ITEM 311 1.00 ITEM 311 1.00 ITEM 311 1.00

ITEM 200 ITEM 200 1.56 ITEM 200 1.56


1.56

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: SUBMITTED: GROUP: MEMBERS: SET NO. SHEET NO.
DEPARTMENT OF CIVIL ENGINEERING IMPLEMENTING CONCRETE ROAD AT PARONDO, Jerle Mae
REGION XII BARANGAY CAGAWASAN, KIBAWE
CROSS SECTIONS ENGR. BERNADETH V. DAPUN ASIM, Bai Juwairiah CS 10
CEIT INSTRUCTOR GROUP 6 LARIDA, Peter John B.