Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
99 views
Specifications
Uploaded by
kkagpaoareyes
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Specifications For Later
Download
Save
Save Specifications For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
99 views
Specifications
Uploaded by
kkagpaoareyes
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Specifications For Later
Carousel Previous
Carousel Next
Save
Save Specifications For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 11
Search
Fullscreen
section [TR ¢ Gonoral Conditions « Cloaring tho Sito * Staking tho Bullding Lines « Excavation « Backfilling « Concrete Works « Proportioning of Concrete « Forms for Concrete Works * Steel Reinforcing Bars * Concrete Hollow Blocks « Roofing and Accessories ¢ Roof Insulation and Ceiling Finishes « Windows * Doors * Storm Drainage * Painting © Plumbing Work and Fixtures. © Floor Finishes * Cabinets and Closets © Millworks « Waterproofing * Wainscoting * Finishing Hardware © Electrical Works ¢ Fences and Gates = Tagayun Fe CONSTRUCTION - Tad}SPECIFICATIONS PROJECT _ : PROPOSED TWO - STOREY RESIDENCE OWNERS LOCATION This set of Specifications shall govern the methods of construction and kinds of materials to be used for the proposed Project shown on the accompanying plans and detailed drawings. The plans, detailed drawings and the Specifications shall be considered as complementing each other so that what is mentioned or shown in one, although not mentioned or shown in the other, shall be considered as appearing in both. Any conflict to be found between the two should be referred to the designing Architect for clarification. GENERAL CONDITIONS All parts of the construction shall be finished with first class workmanship to the fullest talent and meaning of the plans and the Specifications, and to the full satisfaction of the designing Architect and the Project Owners. Any defective material or poor workmanship should be replaced or improved by the Contractor without additional cost to the Owner. The construction shall conform to all the requirements of the National Building Code of the Philippines and the rules and regulations enforced in the locality. CLEARING THE SITE The building site shall be levelled to a suitable grade according to the plans. It should be cleared of rubbish, roots and other perishable materials. Such unsuitable materials shall be spread over areas adjacent to the proposed building, or disposed of as may be directed by the Architect or Engineer who is in charge of the construction. BUILDING DESIGN AND CONSTRUCTION - TagayunSTAKING OUT THE BUILDING LINES Te building lines shail be staked out q arings accurately establishes before any pct M8 and gy th ANY excavation j redes shown jn IS Started Batter boards where construction reference jd be erected such that thoy would not bo distant Mave been ite foundation of the building, lurbed during the excavation EXCATION FOR FOUNDATION All excavation shall be made to grade indicated in the the buiding site is covered with any kind of fil, the excavation be made deeper until the specified safe bearing capacity of the drawings. Where for footings shail Soil is reached, If water is present at the excavation site, pumping. Great care should be taken in order eroded or cave in. it shall be removed by baling or that the surrounding soil is not BACKFILLING OF EXCATIONS When the concrete poured for foundation has hardened and can already withstand the pressure resulting from fills, the materials removed from excavations shall be used for backfilling them. The fils and backfills shall be placed in layers not more than 150mm (6") in thickness. Each succeeding layer shall be thoroughly compacted by wetting, ‘amping and rolling. CONCRETE WORKS Concrete should be mixed thoroughly such that there, is ae ¢sttbution among the cement and agaregates. The concrete shoul be Wi and its forms should be tapped as it is deposited to its final ie Padi: formation of voids in the concrete member which will weaken 1 shall be clean and free from Water to be used for mixing concret terial. ie : ic om “lirous amounts of oil, acids, salt, alkalis and other organk -Tagayu BUILDING DESIGN AND CONSTRUCTION - 192URE PROPORTIONING OF CONCRETE MIXTI be undertaken in accordance: with q AN concrete works for this project siete erate 26 approved by the (o the standard specifications for plain and reinic Goverment. ‘The following proportions of concrete shall be used for the various parts of the building : * Footings and Columns... ips * Girders, Beams and Slabs..." des * Septic Vault slab and Cover .. / * Cone, Holl. Bik. Footings ... Class B ( 1: 2-4/2 :5) * Concrete Slab on Fill Class C ( 1:3:6) Class A concrete shall be a mixture of 1 part cement, 2 parts fine aggregate and 4 parts coarse aggregate by volume, plus enough water to make the mixture into a pliable paste. Class B concrete shall be a mixture of 1 part cement, 2-1/2 parts fine aggregate and § parts coarse aggregate by volume, plus enough waler to make the mixture into a pliable paste. Class C concrete shall be a mixture aggregate and 6 parts coarse a the mixture into a pliable paste. of 1 part cement, 3 parts fine iggregate by volume, plus enough water to make The fine aggregate for concrete shall consist i ith si of natural s inert materials with similar characteristics, ural sand or of i having hard, i from organic matters or loam 9 | Clean and durable grains, free The coarse aggregate for concret aualies,o lan and tart, ne ete shal be of crushed rock of durable vary from 200mm (3/4") to 400mm ( 4.1/2" ) arse aggregate to be used shall Concrete slabs on fil shall be over well-compacted and thoroughly taped ent a/o f ard gravel fi re {© be poured shail not be more than dhe meat i, E20 concrete slab course a poured alternatively to the indicated tloor finishes wide, and each course shall be BUILDING DESIGN AND CONSTRUCTION - TagayunFORMS FOR CONCRETE WORKS Fons for all reinforced concrete shall be adequately supported and pracod oF ted logether to maintain tho correct positions and the shapes of Manse concrete, Wooden forms shall be constructed sufficiently tight to prevent fra bulging of concrote members upon pouring or leaking/draining of water during curing The forms shall not be removed until the concrete has attained sufficient strength to support its own weight and any temporary loads placed on it. The side forms of girders and beams may be removed earlier than the bottom forms. However, additional supports and shoring must be placed under until they have atiained strength, STEEL REINFORCING BARS Steel reinforcing bars to be used for this project shall consist of standard deformed structural bars meeting ASTM specifications. The steel reinforcements for concrete shall be formed accurately according to the sizes of the columns, beams and girders, footings, slabs etc., where they are to be used. They shall be tied together at each bar intersection with Gauge No. 16 G.I wire or by welding. No steel reinforcement should be installed unless it is free from rust, scale or other coating which would destroy or reduce the bond with concrete. The reinforcement bars must be positioned such that there is space between the steel at the sides and bottom of the forms. CONCRETE HOLLOW BLOCKS Concrete hollow blocks to be used in this project shall be Specify) or any other brand of equal quality readily available in the locality, Use of such alternative brand shall be approved by the Project Archtect or Engineer and the Owner/s. All cells of concrete hollow blocks to be laid shall be filled with cement mortar mixture of 1 part cement and 3 parts sand, by volume. The horizontal joints between units shall be provided with 1: 3 cement mortar mix. at least 10mm thick. BUILDING DESIGN AND CONSTRUCTION - TagayunThe size of concrete hollow blacks to be used for these walls shali be 8"x 16": ‘* All exterior walls at the First Floor * Entire firewall and fences * Walls where plumbing pipes will be located For interior walls at the First Floor and for both exterior and interior was at the Second Floor, concrete hollow blocks to be used shalll be 4" x 8" x 16”. All concrete hollow block walls shall be reinforced with 10mm diameter deformed bars bothways for every concrete hollow block laid horizontally ang vertically ROOFING FRAMING, ROOFING AND ACCESSORIES The materials to be used for the roof framing such as trusses, struts and web members shall consist of steel angles 1/4" thick. Other accessories for the roof frames are shown in the Details of Truss Joints and in the Roof Roof Framing Plan, Roofing sheets shall be Gauge No. 26 longspan "Stile Roof". The ridge rolls, gutters, vallleys and firewall flashings shall be 0.04mm thick longspan prepainted metal with epoxy baked finish. All downspouts shall be 3° diameter Schedule 40 PVC pipes. Heat insulation shall be installed under the roof of the building consisting of 1 inch thick fiberglass sheets. CEILING BOARDS Ordinary plywood, 1/4 inch thick shall be used for the ceiling of the following rooms of the building : * Foyer, Living Room, Dining Room, Kitchens, Pantry Driver's and Maid's Bedrooms at the First Floor. * Hallway, Family Room, Storage, Bedrooms and Closets at the Second Floor. Marine plywood, 1/4 inch thick for the ceiling shall be used in these rooms : « Powder Room, Toilet-Bathroom for Driver-Maid's Room, rear Lanai and Service Porch, Entrance Porch and Carport at the First Floor. * All Toilet-Bathrooms at the Second Floor. BUILDING DESIGN AND CONSTRUCTION - TagayunFiber coment boards, 3/4 inch thick having stone cut pattern shall be used as coiling underneath all roof eaves and floor overhangs of the Second Floor. All ceiling boards shall be installed on 2" x 2" KD Tanguile ceiling joists spaced 24” on centers bothways. The celling under roof eaves shall include wood slats vent at selected spats along the perimeter of the ceiling. DOORS, WINDOWS AND ACCESSORIES The designs and specifications of materials for doors and windows to be installed for this project are shown in the Schedule of Doors and Windows detail drawings. All interior doors shall be installed on door jambs with at least 3 sets of 3" x 3" loose-pin hinges. For exterior doors, use 4 sets, size 3-1/2" x 3-1/2" loose-pin hinges. Hinges shall be US-made ( SPECIFY ) brand. Exterior doors shall be fitted with ( SPECIFY ) dead bolts which are locked and unlocked at the interior side of the building. One can only unlock the dead bolts from outside by using a key. The entrance door lockset, with decorative dummy trim and dead bolt shall be ( SPECIFY ) brand. Footbolts and overhead barrel bolts shall also be installed. The sliding doors for terraces should be installed with ( SPECIFY ) rails and rollers. The sliding door panels shall be fitted with dead bolts, barrel and footbolts. PLUMBING WORKS AND FIXTURES, Plumbing works and materials shall be in accordance with the National Plumbing Code of the Philippines. Soil and waste pipes shall be properly graded or pitched downward to facilitate easy discharge of the solid and liquid wastes from the plumbing fixtures or receptacles to their place of disposal, Sloping pipes must be well supported and rigidly suspended to prevent sagging, displacement or pipe breakage, resulting in leakage of waste matter. All plumbing fixtures should be connected to a vertical vent pipe, with its top end extending above the roof at least 0.60 meter or 2 feet. BUILDING DESIGN AND CONSTRUCTION - TagayunThe water closets to be installed in the Toilet and Bathrooms for ihase rooms shall be ( SPECIFY ) brand: Master's Bedroom, Children's Bedrooms and Mother's Bedroom. For the Driver's and Maid's Toilet-Bathroom and at the Powder Room, SPECIFY ) water closets shall be installed. The kitchen sinks shall be stainless steel with ( SPECIFY ) brang faucets, flexible hoses and brass-chrome knobs. Toilet paper holders, soap holders shower heads and valves shall bg SPECIFY ) brand, to be installed in all Toilet and Bathrooms. The bathtub for the Toilet-Bathroom of the Master Bedroom shall be (SPECIFY ) Deluxe brand, size 0.75m x 1.70 m, complete with fittings and accessories. (SPECIFY ) brand counter top lavatories shall be used in the Toilet-Bathrooms of the Master Bedroom, Mother's Bedroom and the two Children's Bedrooms. For the Powder Room and the Toilet-Bathroom of the Driver's and Maid’s Rooms, use ( SPECIFY ) wall hung lavatories. PLUMBING PIPES AND FITTINGS Pipes and fittings to be used shall be as follows : Hot and cold water pipes.... ( SPECIFY ) brand Service entrance pipe .. Size 3/4" diameter Sewer line pipes ... (SPECIFY ) with O-rings Stainless steel floor drains . size 4” x 4", heavy duty Hose bibbs, brass finish ..... (SPECIFY ) brand gaoge Also to be provided in all Toilet-Bathrooms are : towel bars, faucels; clothes hooks, mirrors and medicine cabinets. All downspouts from the roof shall be 3" diameter PVC pipes ‘Schedue 40. The lower ends shall terminate in concrete catch basins. Underground reinforced concrete pipes, 8" and 10° in diameter shall connect fo the cat" basins for draining the water to the street gutter fronting the building. BUILDING DESIGN AND CONSTRUCTION - TagayunELECTRICAL WORKS Specifications for electrical works are included in the electrical plans of this project. (See Section E of this book). For brands of materials to be used, the following are to be followed : Installed Votage Wiring to be used Wiring Device: Panelboard Intercom . TV Antenna wiring 220 Volts. SPECIFY ) brand. (SPECIFY ) brand (Switches, outlets, etc.). . (SPECIFY ) brand. SPECIFY ) brand. SPECIFY ) coaxial cable. FLOOR FINISHES Following are the specified materials to be used as floor finishes for the different rooms of the project : 42" x 12" ( SPECIFY ) Ceramic Tiles For : Entrance Porch and Foyer. Living Room and Dining Room, Lanai and Terraces at First and Second Floors 8" x 8" ( SPECIFY ) Ceramic Tiles For : Kitchens, Pantry, Service Entrance Porch, Powder Room, Toilets and Bathrooms, Storages, Driver's and Maid's Bedrooms, Interior floors of Kitchen base cabinets, NARRA ParquevTiles 12° x 12° x 3.8 thick For : All 2nd Floor Bedrooms, Hallway, Family Room, Walk-in Closet, Mother's Bedroom and Stairs (with nosing). Red paving bricks are to be used for the Carport floor, Driveway and Walkways. WALL TILES FOR TOILET-BATHROOMS AND KITCHENS Walls of Bathrooms and Kitchens shall be finished with 8" x 8” (SPECIFY ) Ceramic Tiles. During construction and laying of tiles, the Owner may require that decorative tiles and mouldings be installed at certain parts of floors and walls for accents to enhance the overal design of each room. BUILDING DESIGN AND CONSTRUCTION - Tagayun oset tops and the lavatory counter tops shall be 2» The Kitchen base cabin je slab. thick reinforced concrete, finished with granit fect shall be of first class quality. Each rrated edges of other defects, ith 3/4” thick Cement mortar All tiles to be used for this prol piece should be free from chipped off corners, se The tiles must be sel in place accurately and firrnly wi for floors and al least 1/2" thick on walls The mortar for laying the wall and floor tiles shall = a Cis A ie 2) mix, consisting of one part cement and 2 parts screened 0 hs ay sae yn ite cement grout shall be used between mouldings, tiles and other tl BEDROOM CLOSETS AND KITCHEN CABINETS All Bedroom closets and Kitchen cabinets shall be built as shown in the plans furnished by the Architect. Materials to be used for walls, doors and shelves for cabinets and closets shall be 3/4” thick MDF boards. Frames for doors and shelves, as well as mouldings and conices shall be kilned-dried Tanguile lumber. All drawers shall run on metal tracks. Doors for closets and cabinets shall be provided with decorative door handles, catches, barrel bolts, locks and keys. The hanger rods inside the closets shall be chrome-plated, 1” in diameter. Closets and cabinets shall be hung with concealed type butterfly hinges. PAINTING AND VARNISHING All painting and varnishing works for this project shall be executed in first class workmanship using ( SPECIFY ) brand products. Surfaces should be thoroughly cleaned to remove mortar, dust, » dust, grease, rn i substances that may be present on areas to be painted or varnished. a. Surface defects such as cracks, dents and sandpapered before final coat of paint or caret ae venice H-9 BUILDING DESIGN AND CONSTRUCTION ~ TagayunAll concrete surfaces to be painted shall first be given a coat of concrete neutralizer. Metal and stee! must be primed with anti-rust paint before the application of subsequent coats of paint, Schedule of paint and varnish finishes to be followed for this project : Masonry walls ... Roof eaves, floor overhangs Interior ceilings Mouldings and comices . . Gloss latex paint . * Cabinets and closets . . . Flat varnish finish lat enamel paint . Duco paint/varnish do. Sliding doors ...... do. Front and rear wood doors do. Interior wood panel & flush doors . Flat varnish finish Steel windows and grilles ............. Gloss enamel paint All rough and finishing wood materials such as ceiling joists and hangers, door frames, stair treads, railings cabinet and closet doors and shelves, baseboards, mouldings, etc., must be treated with anti-termite solution such SPECIFY ) or any other brand approved by the Architect and Owners. The overall color scheme to be followed in painting and varnishing the building, including those of other materials like tiles, plumbing fixtures and other accessories shall be left to the decision of the Owners and the Architect. This set of Specifications covers 10 pages. Prepared by : Approved by: Architect Project Owner/s BUILDING DESIGN AND CONSTRUCTION - Tagayun
You might also like
Hourglass Workout Program by Luisagiuliet 2
PDF
76% (21)
Hourglass Workout Program by Luisagiuliet 2
51 pages
12 Week Program: Summer Body Starts Now
PDF
87% (46)
12 Week Program: Summer Body Starts Now
70 pages
Read People Like A Book by Patrick King-Edited
PDF
57% (82)
Read People Like A Book by Patrick King-Edited
12 pages
Livingood, Blake - Livingood Daily Your 21-Day Guide To Experience Real Health
PDF
77% (13)
Livingood, Blake - Livingood Daily Your 21-Day Guide To Experience Real Health
260 pages
Cheat Code To The Universe
PDF
94% (79)
Cheat Code To The Universe
34 pages
Facial Gains Guide (001 081)
PDF
91% (45)
Facial Gains Guide (001 081)
81 pages
Curse of Strahd
PDF
95% (467)
Curse of Strahd
258 pages
The Psychiatric Interview - Daniel Carlat
PDF
91% (34)
The Psychiatric Interview - Daniel Carlat
473 pages
The Borax Conspiracy
PDF
91% (57)
The Borax Conspiracy
14 pages
The Secret Language of Attraction
PDF
86% (108)
The Secret Language of Attraction
278 pages
How To Develop and Write A Grant Proposal
PDF
83% (542)
How To Develop and Write A Grant Proposal
17 pages
Penis Enlargement Secret
PDF
60% (124)
Penis Enlargement Secret
12 pages
Workbook For The Body Keeps The Score
PDF
89% (53)
Workbook For The Body Keeps The Score
111 pages
Donald Trump & Jeffrey Epstein Rape Lawsuit and Affidavits
PDF
83% (1016)
Donald Trump & Jeffrey Epstein Rape Lawsuit and Affidavits
13 pages
KamaSutra Positions
PDF
78% (69)
KamaSutra Positions
55 pages
7 Hermetic Principles
PDF
93% (30)
7 Hermetic Principles
3 pages
27 Feedback Mechanisms Pogil Key
PDF
77% (13)
27 Feedback Mechanisms Pogil Key
6 pages
Frank Hammond - List of Demons
PDF
92% (92)
Frank Hammond - List of Demons
3 pages
Phone Codes
PDF
79% (28)
Phone Codes
5 pages
36 Questions That Lead To Love
PDF
91% (35)
36 Questions That Lead To Love
3 pages
How 2 Setup Trust
PDF
97% (307)
How 2 Setup Trust
3 pages
The 36 Questions That Lead To Love - The New York Times
PDF
94% (34)
The 36 Questions That Lead To Love - The New York Times
3 pages
100 Questions To Ask Your Partner
PDF
78% (36)
100 Questions To Ask Your Partner
2 pages
Satanic Calendar
PDF
25% (56)
Satanic Calendar
4 pages
The 36 Questions That Lead To Love - The New York Times
PDF
95% (21)
The 36 Questions That Lead To Love - The New York Times
3 pages
Jeffrey Epstein39s Little Black Book Unredacted PDF
PDF
75% (12)
Jeffrey Epstein39s Little Black Book Unredacted PDF
95 pages
14 Easiest & Hardest Muscles To Build (Ranked With Solutions)
PDF
100% (8)
14 Easiest & Hardest Muscles To Build (Ranked With Solutions)
27 pages
1001 Songs
PDF
70% (73)
1001 Songs
1,798 pages
The 4 Hour Workweek, Expanded and Updated by Timothy Ferriss - Excerpt
PDF
23% (954)
The 4 Hour Workweek, Expanded and Updated by Timothy Ferriss - Excerpt
38 pages
Zodiac Sign & Their Most Common Addictions
PDF
63% (30)
Zodiac Sign & Their Most Common Addictions
9 pages
Detail Section 2: Reflected Ground Ceiling Plan 1 A4 Reflected Second Ceiling Plan 2 A4
PDF
No ratings yet
Detail Section 2: Reflected Ground Ceiling Plan 1 A4 Reflected Second Ceiling Plan 2 A4
1 page
BT4 Specifications Sample (ETEEAP)
PDF
No ratings yet
BT4 Specifications Sample (ETEEAP)
43 pages
Sample Project Specs 10 STOREY COMMERCIAL
PDF
No ratings yet
Sample Project Specs 10 STOREY COMMERCIAL
3 pages
Specifications: General Conditions
PDF
No ratings yet
Specifications: General Conditions
3 pages
Appendix2-UAP Doc 307-Specs Wrtiting
PDF
33% (3)
Appendix2-UAP Doc 307-Specs Wrtiting
20 pages
Scope of Works, Technical Specifications AND Bill of Materials
PDF
No ratings yet
Scope of Works, Technical Specifications AND Bill of Materials
16 pages
Masterformat: Advantages and Disadvantages
PDF
No ratings yet
Masterformat: Advantages and Disadvantages
3 pages
Architectural Specification
PDF
No ratings yet
Architectural Specification
5 pages
Specification Writing Seatwork Santiago, Simon Zackareeh F.
PDF
No ratings yet
Specification Writing Seatwork Santiago, Simon Zackareeh F.
14 pages
Materials Specification and General Notes Proposed 2 Storey Residence With Basement
PDF
No ratings yet
Materials Specification and General Notes Proposed 2 Storey Residence With Basement
8 pages
Division 3&4 Concrete&Masonry
PDF
No ratings yet
Division 3&4 Concrete&Masonry
9 pages
VERDANA SPECIFICATIONS Updated
PDF
No ratings yet
VERDANA SPECIFICATIONS Updated
32 pages
Specifications
PDF
No ratings yet
Specifications
15 pages
SECTION 01 30 00 Administrative Requirements Part 1 - General
PDF
No ratings yet
SECTION 01 30 00 Administrative Requirements Part 1 - General
6 pages
Section 04200 Masonry Unit
PDF
No ratings yet
Section 04200 Masonry Unit
14 pages
My I Always Build
PDF
No ratings yet
My I Always Build
1 page
Proposed Two Specification Writing
PDF
100% (1)
Proposed Two Specification Writing
4 pages
BT 4
PDF
No ratings yet
BT 4
18 pages
DIV 6 Wood Plastics and Composite PDF
PDF
0% (1)
DIV 6 Wood Plastics and Composite PDF
5 pages
Structural Specifications Items General: City Building and Architecture Office
PDF
No ratings yet
Structural Specifications Items General: City Building and Architecture Office
11 pages
Rmar0423 Chapter3
PDF
No ratings yet
Rmar0423 Chapter3
10 pages
DIVISION 4 - Assignment Technical Specifications
PDF
No ratings yet
DIVISION 4 - Assignment Technical Specifications
4 pages
TS - Rough Carpentry (Interior Fit - Out) PDF
PDF
No ratings yet
TS - Rough Carpentry (Interior Fit - Out) PDF
4 pages
Schedule of Ceiling Finishes: Ground Floor Plan Second Floor Plan Reflected Ceiling Plan Roof Plan
PDF
No ratings yet
Schedule of Ceiling Finishes: Ground Floor Plan Second Floor Plan Reflected Ceiling Plan Roof Plan
1 page
Sample of Outline Specification For Architects: Architect Philippines
PDF
No ratings yet
Sample of Outline Specification For Architects: Architect Philippines
9 pages
Section - 04 20 00 - Unit Masonry
PDF
No ratings yet
Section - 04 20 00 - Unit Masonry
2 pages
Building Technology 4 Part 4
PDF
100% (1)
Building Technology 4 Part 4
2 pages
General Specifications: I. Clearing and Earthworks
PDF
No ratings yet
General Specifications: I. Clearing and Earthworks
4 pages
Master Format Full Specifications Sample
PDF
No ratings yet
Master Format Full Specifications Sample
89 pages
Technical Specifications: Proposed Two Storey Residential Building
PDF
No ratings yet
Technical Specifications: Proposed Two Storey Residential Building
10 pages
General Notes:: Ground Floor Plan CWL Ground Floor Plan CWL
PDF
No ratings yet
General Notes:: Ground Floor Plan CWL Ground Floor Plan CWL
1 page
SPECIFICATIONS by SALVAN
PDF
No ratings yet
SPECIFICATIONS by SALVAN
22 pages
16-Division Format: Specification Formats
PDF
No ratings yet
16-Division Format: Specification Formats
2 pages
They Intentionally Make The Façade Accentuate The Open Plan To The Structure
PDF
No ratings yet
They Intentionally Make The Façade Accentuate The Open Plan To The Structure
4 pages
13 TB Bup
PDF
No ratings yet
13 TB Bup
1 page
Building Material Swatches AND Brochure
PDF
No ratings yet
Building Material Swatches AND Brochure
8 pages
Design and Construction of Assembled Multipurpose Shelter
PDF
No ratings yet
Design and Construction of Assembled Multipurpose Shelter
63 pages
Philippine Architectural Acronyms
PDF
No ratings yet
Philippine Architectural Acronyms
3 pages
Division 6 Wood and Plastics
PDF
No ratings yet
Division 6 Wood and Plastics
6 pages
General Specifications Mory
PDF
No ratings yet
General Specifications Mory
7 pages
Marces Osmeña General Specifications
PDF
No ratings yet
Marces Osmeña General Specifications
5 pages
BT Lectures
PDF
No ratings yet
BT Lectures
22 pages
Ppa-Industry Sectors
PDF
No ratings yet
Ppa-Industry Sectors
5 pages
Specifications Writing
PDF
No ratings yet
Specifications Writing
9 pages
A 7
PDF
No ratings yet
A 7
1 page
DIV 4 Masonry PDF
PDF
No ratings yet
DIV 4 Masonry PDF
12 pages
F Major Plate For Building Technology 2
PDF
No ratings yet
F Major Plate For Building Technology 2
6 pages
Division 9 - Materials and Finishes: Page 1 of 8
PDF
No ratings yet
Division 9 - Materials and Finishes: Page 1 of 8
8 pages
Project Specifications For "Construction of Tricycle Terminal"
PDF
No ratings yet
Project Specifications For "Construction of Tricycle Terminal"
62 pages
Building Technology 5 Reviewer
PDF
No ratings yet
Building Technology 5 Reviewer
5 pages
Tabon Cave 2. Lean-To: Katalogo NG Arkitekturang Filipino
PDF
No ratings yet
Tabon Cave 2. Lean-To: Katalogo NG Arkitekturang Filipino
23 pages
BT4 - Final - Technical Specifications - Compilation
PDF
No ratings yet
BT4 - Final - Technical Specifications - Compilation
23 pages
Hoa Toa PP Compiled Quiz Answers
PDF
No ratings yet
Hoa Toa PP Compiled Quiz Answers
29 pages
B05210 Steel Joists
PDF
No ratings yet
B05210 Steel Joists
7 pages
Residential Building Specification
PDF
0% (1)
Residential Building Specification
3 pages
Acceptable Noise Level in Buildings
PDF
No ratings yet
Acceptable Noise Level in Buildings
3 pages
Esparraguerra - 16 Divisions of Construction
PDF
No ratings yet
Esparraguerra - 16 Divisions of Construction
7 pages
Reyes - BT4 - Specification Writing Seatwork
PDF
No ratings yet
Reyes - BT4 - Specification Writing Seatwork
11 pages
Tagum - Building Gen Specs
PDF
No ratings yet
Tagum - Building Gen Specs
9 pages