P23008-St-Ti Tree Dry Mess-Rvt21-001 - Sheet - 7m-5650-S-00005 - Dry Mess Foundation Plan
P23008-St-Ti Tree Dry Mess-Rvt21-001 - Sheet - 7m-5650-S-00005 - Dry Mess Foundation Plan
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 FOUNDATION SCHEDULE
A DCB PN: P23008 B MARK SIZE REINFORCEMENT A
Z15012 PURLINS AT 1200 MAX
7M-5650-S-00005 CENTRES LAPPED AT SUPPORTS, PCB1 750x750x700 DEEP PAD
1 ROW OF MIDSPAN BRIDGING Ø600 PRECAST DONUT
PD1
FOUNDATION
PF1 700x700x300 DEEP PAD
c
7
7
UB18c
S0
S0
RW1 600x300 DEEP STRIP
PF1 PF1
SLAB ON GROUND SCHEDULE
UB18c
UB18c
MARK THICKNESS REINFORCEMENT
B CF02 150 SL82 MESH TOP B
c
7
7
UB18c
S0
S0
CF03 100
D6 CF04 100
PF1 PF1
LOADING DOCK, REFER TO A EXTERNAL WALKWAY
DRAWING 7M-5650-S-00006 7M-5650-S-00006
FOR DETAILS
STEEL COLUMN SCHEDULE
MARK SIZE COMMENTS
S07c 75x75x3.0SHS
S07e 75x75x4.0SHS
C C
STEEL FRAMING SCHEDULE
MARK SIZE COMMENTS
D5 P150 150PFC
UB18c 180UB22.2
D4
PRECAST BLOCK FOUNDATION
E E
CONCRETE CHASSIS
MODULAR BUILDINGS
BY OTHERS
D3
F F
PD1
TYP
G G
RO PLANT SLAB, REFER TO
D2 DRAWING 7M-5650-S-000011
FOR DETAILS
CF03 CF03 BUS SHELTER, REFER
TO DRAWING
7M-5650-S-00004
HATCH DENOTES MASS CONCRETE STAIR,
MECHANICAL/ELECTRICAL SL82 MESH TOP
SLAB
D6
H DRY MESS FOUNDATION PLAN H
SCALE 1 : 100
UB18c
UB18c
UB18c
S07c
S07c
CAUTION
PROJECT DRAWING ONLY
I I
CONCRETE CHASSIS
MODULAR BUILDINGS
BY OTHERS SECTION B NOT FOR CONSTRUCTION
SCALE 1 : 100 7M-5650-S-00005
PRELIMINARY
AX JL 14.06.23 ISSUED FOR XX DCB DRAWN JL 26.05.23 INFORMATION AND REPRESENTATIONS THIRD ANGLE
HAMERSLEY IRON PTY LTD ON THIS DRAWING ARE THE
TRACED HAMERSLEY HMS PTY LTD INTELLECTUAL PROPERTY OF THE
SHEET SIZE A1
CHECKED ROBE RIVER MINING COMPANY PTY LTD IDENTIFIED OTHERWISE. ALL RIGHTS
REVISIONS
REVISIONS
REV BY DATE DESCRIPTION CKD APP REV BY DATE DESCRIPTION CKD APP DRY MESS FOUNDATION PLAN PROJECT/JOB NUMBER
820 1 2 3 4 5 6 7 8 9 10 11 12 13 14