YCW 750 XT 2-Sided SSG Structural Silicone Glazed Curtain Wall System
YCW 750 XT 2-Sided SSG Structural Silicone Glazed Curtain Wall System
Installation Manual
TABLE OF CONTENTS
PARTS DESCRIPTION
YCW 750 XT SSG Framing Members ................................................ Pages 1 to 2
YCW 750 XT SSG Accessories .......................................................... Pages 3 to 5
YCW 750 XT SSG Fasteners .............................................................. Page 6
FRAME FABRICATION
Anchoring Methods/Framing Types..................................................... Pages 7 & 8
Fabricate Vertical Mullions .................................................................. Pages 9 to 12
Assemble 90° Outside Corner Mullions............................................... Pages 13
Attach Shear Blocks/Clips for Horizontals ........................................... Page 14
Using Alternate Reinforcing ................................................................. Page 15
Attach “J” Anchors ............................................................................... Page 16
Attach Corner Shear Blocks/Clips for Horizontals ............................... Page 17
Fabricate Horizontal Members ............................................................ Pages 18 to 22
Fabricate Pressure Plates ................................................................... Page 23 & 24
Fabricate Face Covers ........................................................................ Page 25
FRAME INSTALLATION
Typical Splices ..................................................................................... Pages 26 to 28
Install Continuous Perimeter Anchor ................................................... Page 29
Jamb/Vertical Installation with Perimeter Anchors .............................. Page 30
Attach SSG Mullion End Caps ............................................................ Page 31
Jamb/Vertical Installation with Mullion End Anchors ........................... Pages 32 & 33
Install Wind Load / Dead Load Anchors .............................................. Pages 34 to 36
Attach Horizontal Members ................................................................. Pages 37 to 39
Install Door Subframes ........................................................................ Page 40 to 43
Apply Perimeter Sealant ...................................................................... Page 44
Install Joint Plugs................................................................................. Page 45
Install 90° Outside Corner Trim ........................................................... Page 46 & 47
GLAZING
Install Glazing Adaptors....................................................................... Page 48
Install Interior Glazing Gaskets & Spacers .......................................... Page 49
Install Setting & Side Blocks................................................................ Pages 50 & 51
Install Exterior Glazing Gaskets .......................................................... Page 52
Install Glass ......................................................................................... Page 52
Pressure Plate Layout and Assembly ................................................. Page 53 & 54
Apply Interior Structural Silicone Sealant ............................................ Page 55
Install Exterior Jamb Face Covers ...................................................... Page 56
Install Exterior Horizontal Face Covers ............................................... Page 57
Apply Exterior Weatherseal ................................................................. Page 58 & 59
Installation Notes
1. Do not drop, roll or drag boxes of aluminum framing. Move and stack boxes with proper support
to prevent distortion. If fork lifts are used be especially careful about striking the boxes when lifting
or moving.
2. Store in a dry, out of the way area. If rain exposure, condensation or any water contact is likely,
then all packaging material should be removed. Wet packaging materials will discolor and may stain
aluminum finishes and paints.
3. All materials should be checked for quality and quantity upon receipt, YKK AP must be notified
immediately of any discrepancies in shipment. Check to make sure that you have the required shims,
sealants, supplies and tools necessary for the installation.
4. Carefully check the openings and surrounding conditions that will receive your material.
Remember, if the construction is not per the construction documents, it is your responsibility to notify
the general contractor in writing. Any discrepancies must be brought to the general contractor’s
attention before you proceed with the installation.
5. Gather your shop drawings, materials, packing list, and this installation manual. Carefully review
parts location, the sequence it goes therein, when you glaze it and how you seal it. Installation
instructions are of a general nature and may not cover every condition you will encounter. The shop
drawings and/or installation manuals were prepared specifically for the product.
7. Make certain that material samples have been sent for compatibility testing for all manufacturer’s
sealants involved. Make certain sealants have been installed in strict accordance with the
manufacturer’s recommendations and specifications.
8. Remember to isolate, in an approved manner, all aluminum from uncured masonry or other
incompatible materials.
9. System-to-structure fasteners are not supplied by YKK AP. Fasteners called out on shop draw-
ings are to indicate minimum sizes for design loading.
10. If any questions arise concerning YKK AP products or their installation, contact YKK AP for
clarification before proceeding.
11. YKK AP storefront and/or curtain wall framing is typically completed before drywall, flooring and
other products which may still be in process. Take the extra time to wrap and protect the work
produced.
12. Cutting tolerances are plus zero, minus one thirty second unless otherwise noted.
13. Check our website, www.ykkap.com, for the latest installation manual update prior to
commencing work.
FRAMING MEMBERS
Jamb / Mullion /
Outside Corner Mullion
Horizontal BE9-3942 E9-8121
2-1/2” x 8-1/4”
2-1/2” x 3-3/4”
Horizontal
BE9-3910 Sill Flashing BE9-3918
2-1/2” x 5-1/4”
Jamb / Mullion /
Flush Filler
Horizontal BE9-3901 E9-3162
Use With BE9-3904
2-1/2” x 5-1/4”
SSG Mullion **
1-1/2” x 1-1/2” x 1/8”
2-1/2” x 3-3/4” E9-3423 E9-9303
Angle
For 1/4” & 1” Glazing
SSG Mullion **
3/4” x 3/4” x 1/8”
2-1/2” x 6-3/4” E9-3426 E9-9307
Angle
For 1/4” & 1” Glazing
* Splay mullions and other face covers are available, contact YKK AP.
Door Stop
90º Outside Corner
Elastomer Weathering
Interior Cover E9-1281 BE9-1533
E2-0051 Not Included
For 5-1/4” Back Depth Only
Use with BE9-3650
Door Jamb
BE9-3650 Perimeter Anchor E9-1223
Use with BE9-1533
Perimeter Trim
E9-3409
For SSG Door Jamb
“J” Anchor
For 3-3/4” Depth Members Mullion Joint Sleeve
E1-3501 E1-3421
Use (2) FC-1220 & 18” Long, For E9-3423
Req. Fasteners
“J” Anchor
Mullion Joint Sleeve
For 5-1/4” Depth Members
E1-3502 6” Long, For E9-3401 & E1-3620
Use (2) FC-1220 &
E9-3402
Req. Fasteners
Intermediate Vertical
Mullion Joint Sleeve
E1-1365 “T” End Anchor* E1-1223
For BE9-3916
For BE9-3942
Intermediate Vertical
Setting Block
“T” End Anchor* E1-1222 E2-0513
For 1” Glazing
For BE9-3901 & E9-3401
Intermediate Vertical
Setting Block
“T” End Anchor* E1-3601 E2-0192
For 1/4” Glazing
For BE9-3916
Intermediate Vertical
Standard Joint Plug
“T” End Anchor* E1-1229 E2-3603
For 1” Glazing
For E9-3423
Elastomer Weathering
Temporary Glass Retainer
E1-3612 Used with BE9-1532 E2-0051
2” Long & BE9-1533
Steel Reinforcing
Interior Glazing Spacer 2” x 4” x 1/4” Steel Tube &
Silicone
E2-0110 E1-0154
(2) 1/4” x 1-3/4” Steel Bars
For BE9-3901 & BE9-3916
FASTENERS
FRAME FABRICATION
FRAME TYPES / ANCHORING METHODS
Fabrication of YCW 750 XT SSG varies depending on the type of vertical end attachment
required for a given project:
Perimeter Anchors are for low load anchoring conditions (maximum 500lb. end load reaction):
E9-1248, E9-1223, & E9-1231
“J” Anchors are for medium to high load conditions: E1-3501, E1-3502, & E1-3505.
Mullion End Anchors “F” & “T” are for high load conditions. See Accessories on Page 3 & 4.
FRAME FABRICATION
FRAME TYPES / ANCHORING METHODS
FRAME FABRICATION
FABRICATE VERTICAL MULLIONS
15/16”
Detail 1
15/16”
Step 1
-Cut all vertical and jamb mullions to dimensions as shown on shop drawings.
Allow for 1/2” caulk joint around the frame & 1/2” joint at vertical splices.
Step 2
-If you are using continuous perimeter anchors, E9-1223, the top and bottom of jamb mullions
must be notched as shown in Detail 1.
FRAME FABRICATION
STEP 3
FABRICATE VERTICAL MULLIONS
-Mullion hole locations for shear blocks, shear clips, and “J” anchors are shown below.
-Drill 0.213” dia. (#3 drill bit) holes for shear block/clip attachment at the locations indicated.
Drill 0.281” dia. (#9/32 drill bit) holes for “J” anchor attachment at the sill.
See Details 2 & 3.
Jamb
“A”
Caulk
Joint
1/2”
1-1/4”
1-1/8” “B”
Head
0.213” Dia.
(Std. Shear Block)
Frame/Mullion Height
Top of
Horizontal
1-1/4”
0.213 Dia.
Note: 3/4” caulk joint required (Std. Shear Block)
when using sill flashing. 0.281” Dia.
(”J” Anchor at Sill)
Sill
1-1/4”
FRAME FABRICATION
STEP 3 (Continued)
FABRICATE VERTICAL MULLIONS AT DOOR JAMB
Jamb
Mullion
Joint +
1-1/4”
Caulk
Detail 3
FRAME FABRICATION
STEP 3 (Continued)
FABRICATE 90° OUTSIDE CORNER MULLIONS
-Mullion hole locations for shear blocks, shear clips, and “J” anchors are shown below.
-Drill 0.213” dia. (#3 bit) holes for shear block/clip attachment at the locations indicated.
-Drill 0.281” dia. (#9/32 bit) holes for “J” anchor attachment at the sill at the locations indicated.
See Detail 4.
Note: Hole locations for standard shear blocks are not the same as shear clips for optional
incidental water head.
1-1/8” “B”
Nom.
1/2”
1-1/4”
Head
0.213” Dia.
Holes for Shear
Block (Typ.)
Frame/Mullion Height
Top of
Horizontal
1-1/4”
Sill
1-1/4”
1/2”
Nom.
Caulk
Joint
Detail 4
FRAME FABRICATION
STEP 4
ASSEMBLE 90° OUTSIDE CORNER MULLIONS
-Drill 0.281” diameter clear holes into the corner mullion adaptor at 1-1/2” from each end and at
9” maximum on center.
-Fasten the corner mullion adaptor onto the corner mullion using HM-2520-W3 screws. Tighten
the screws to 70 inch-pounds.
-Prior to attaching the corner shear blocks to the corner mullion, the interior covers must be
installed. Attach the interior cover base to the back of the corner mullion with PC-1010
screws at 24” maximum on center. Then snap on the interior cover.
See Detail 5.
Interior Cover
(E9-1281 for 5-1/4” B.D.
E9-7762 for 3-3/4” &
6-3/4” B.D.)
PC-1010 @
24” Max. O.C.
BE9-3912
Detail 5
FRAME FABRICATION
STEP 4
ATTACH SHEAR BLOCKS/CLIPS FOR HORIZONTALS
Shear blocks are used to attach one piece horizontal members to the jamb and vertical mullions:
E1-3503 for 3-3/4” back members.
E1-3504 for 5-1/4” back members.
E1-3506 for 6-3/4” back members.
-Attach the shear blocks/clips to jambs and verticals with two HF-2510-W1 fasteners per block.
See Detail 6.
Mullion
HF-2510-W1
HF-2510-W1
Detail 6
FRAME FABRICATION
STEP 5
USING ALTERNATE REINFORCING
Engineering calculations may require the vertical mullions to be reinforced with either
steel or aluminum.
-Steel reinforcing is always fastened through the shear blocks.
-Slide the steel reinforcing into the mullion and into position.
-Drill a 0.281” diameter (#9/32 bit) hole in the vertical mullion being careful not to drill a hole
in steel reinforcing.
-Drill a 0.213” diameter (#3 bit) hole in the steel reinforcing through the previous holes.
-Attach the shear blocks to the mullion and steel with two HF-2516-W1 fasteners per block.
See Detail 7.
Mullion
HF-2516-W1
Detail 7
FRAME FABRICATION
STEP 6
ATTACH “J” ANCHORS
In addition to anchoring the curtain wall frame to the structure, “J” anchors are used to attach
sill members to jamb and vertical mullions:
E1-3501 for 3-3/4” back members.
E1-3502 for 5-1/4” back members.
E1-3505 for 6-3/4” back members.
Note: “J” anchors are used at the sill only.
See Detail 8.
MULLION
Jamb Mullion
HM-2556
-W3
WW-2500
WS-2500
HM-2500
HM-2520-W3
E1-3502
“J” Anchor Detail 8
FRAME FABRICATION
STEP 6 (Continued)
ATTACH CORNER SHEAR BLOCKS/CLIPS FOR HORIZONTALS
Standard shear blocks are used to attach horizontal members to the jambs and mullions.
E1-3503A for 3-3/4” back members.
E1-3504A for 5-1/4” back members.
E1-3506A for 6-3/4” back members.
-Attach shear blocks to jambs and mullions with (2) HF-2510-W1 fasteners per block.
See Detail 9.
Corner
Corner
Mullion
Shear
Block
HF-2510-W1
Corner
Shear
Block
HF-2510-W1
Corner
Shear
Block
HF-2510-W1
Detail 9
FRAME FABRICATION
STEP 7
FABRICATE HORIZONTAL MEMBERS
-Cut all horizontal members to the daylight opening as shown in shop drawings.
-Horizontal members must be fabricated as shown below to attach to shear blocks or clips.
-Layout hole locations on the face of the horizontal at both ends as shown below.
-Drill 0.236” diameter (#B bit) holes and countersink for #12 flat head fasteners.
See Detail 10.
0.236” Dia.
11/16” C’Sink for
#12 Flat Head
11/16”
Detail 10
-Layout hole locations on the top of the horizontal at both ends as shown below.
-Drill 0.236” diameter (#B bit) holes and countersink for #12 flat head fasteners.
See Detail 11. 1”
0.236” Dia.
Top of
5-1/4” 2-3/4”
“A”
“B”
C’Sink for
3-3/4” 1-1/4” #12 Flat Head
Detail 11
1-1/8”
FRAME FABRICATION
STEP 7 (Continued)
FABRICATE HORIZONTAL MEMBERS @ 90° OUTSIDE CORNER
Note: Tubular head and sill members must be used at 90° corner mullion. Intermediate
horizontals can be either tubular or open back.
-Layout hole locations from the face of the tubular horizontal at both ends as shown below.
-Drill 0.236” diameter (#B bit) holes and countersink for #12 flat head fasteners. Screw
heads must be flush with face of horizontal.
See Details 12 thru 14.
Note: For 3-1/4” back depth open back horizontals (shown below in Detail 11), fabrication is the
same as for the tubular horizontal. Other open back horizontals (shown on Pages 19 & 20) have
different fabrication compared to their respective tubular versions.
4-1/32”
1”
2-17/32”
Open-Back
Back Depth
Tubular
Horiz.
Horiz.
Ø0.236”
3-3/4”
C’Sink
Holes
1-1/8”
2-5/8”
11/16”
Ø0.236”
C’Sink Holes
11/16”
Detail 12
FRAME FABRICATION
STEP 7 (Continued)
FABRICATE HORIZONTAL MEMBERS @ 90° OUTSIDE CORNER
5-9/32”
Back Depth
2-17/32”
Tubular
5-1/4”
Ø0.236”
Horiz.
1”
C’Sink
3-7/8”
Holes
1-1/8”
Horizontal Daylight Opening
11/16”
11/16”
Ø0.236”
C’Sink Holes
11/16”
Detail 13
5-27/32”
Open-Back
Back Depth
Ø0.236”
5-1/4”
2-11/32”
Horiz.
C’Sink
1”
4-7/16”
Holes
11/16” 15/16”
Ø0.236”
C’Sink Holes
11/16”
Detail 13A
FRAME FABRICATION
STEP 7 (Continued)
FABRICATE HORIZONTAL MEMBERS @ 90° OUTSIDE CORNER
6-29/32”
Back Depth
Ø0.236”
1”
Tubular
6-3/4”
Horiz.
C’Sink 2-17/32”
5-1/2”
Holes
1-1/8”
Horizontal Daylight Opening
11/16”
11/16”
Ø0.236”
C’Sink Holes
11/16”
Detail 14
6-27/32”
Back Depth
Open-Back
Ø0.236”
1”
6-3/4”
2-27/32”
Horiz.
C’Sink
5-7/16”
Holes
11/16” 1-7/16”
Ø0.236”
C’Sink Holes
11/16”
FRAME FABRICATION
STEP 7 (Continued)
FABRICATE HORIZONTAL MEMBERS
Open Back Head & Sill with “T” & “F” Anchors:
-Open back head & sill members require holes to access anchor bolts.
-Drill 1-1/2” dia. holes at anchor locations as required by approved shop drawings or
engineering calculations.
See Detail 15.
Detail 15
Open Back
Head/Sill
Tubular Head & Sill with “J”, “F” & “T” Anchors:
-Tubular head and sill members must be notched at each end to clear mullion end anchors and
anchor bolts.
-See Detail 16 below for notch dimensions.
Notch Horizontal
Ends to Clear
End Anchors “B”
& Anchor Bolts
“A”
FRAME FABRICATION
STEP 8
FABRICATE PRESSURE PLATES
-Cut all jamb pressure plates to the same length as the jamb mullions.
-Drill additional holes if required to ensure that end holes are 1-1/2” from each end.
-If jamb members are spliced, cut pressure plates to accommodate for 1/2” expansion joint
as shown in Step 10 on Pages 26 & 27.
Detail 17
FRAME FABRICATION
STEP 8 (Continued)
FABRICATE PRESSURE PLATES
-At the SSG mullion at the door jamb, the pressure plate is cut to overlap the mullion, flush with
the inside of the SSG door jamb mullion as shown in Detail 18. Perimeter pressure plates at sill
are notched 1-5/8” to accomodate the perimeter trim.
-Cut pressure plates between intermediate mullions and SSG door jamb mullion mullion to
D.L.O. plus(+) 3-11/16”.
-If an SSG door jamb mullion is adjacent to a jamb, cut pressure plate to D.L.O.
plus(+) 2-3/8”.
-If an SSG door jamb mullion is adjacent to a 90° SSG corner mullion, cut the pressure plate
to D.L.O. plus(+) 5-7/16”.
-Drill additional fastener holes if required to ensure that end holes are at 1-1/2” from the end at
the jamb and at 2-11/16” from the end at the SSG mullion.
-Drill 0.313” diameter weep holes per horizontal daylight opening as shown below.
Perimeter
Trim
4-3/16”
CL 1-5/8”
3” EQ EQ 3”
Notch
Ø5/16” Weep Holes
Notch Leg
@ Trim
Ø0.281” Holes
1/8” 1-1/2” 9” Max. O.C. 9” Max. O.C. 9” Max. O.C. 1-1/2” 2-1/2”
2-11/16” 4”
Note: Sill perimeter pressure plate shown. Pressure plates at intermediate horizontals do not
require notching.
FRAME FABRICATION
STEP 9
FABRICATE FACE COVERS
-Cut jamb face covers to the same length as the jamb mullions unless the mullions are spliced.
If jamb mullions are spliced, cut jamb covers to accommodate for the 1/2” expansion joint
as shown in Step 10 on Pages 26 & 27.
-Cut horizontal covers 1/32” short of jamb mullion on jamb side of frame. Covers are to be
spliced at every third light of glass at the centerline of vertical mullion. Optionally, covers
may be spliced at every centerline of vertical mullions.
-Drill two 0.313” diameter weep holes as shown, at 1/3 points of each daylight opening.
Face cover weep holes must not align with pressure plate weep holes.
-At the door jamb, horizontal and sill face covers are cut to run flush with the pressure plate,
flush with the inside edge of the mullion, as previously detailed on Page 19.
See Detail 19.
Detail 19
FRAME INSTALLATION
STEP 10
JAMB SPLICE
Stagger Mullion, Pressure Plate, and Cover Splice Joints as Shown Below.
Detail 20
Mullion Splice
Sleeve
2-3/4”
Vertical
1/2”
Mullion
Splice CL
6”
1”
1”
CL
2-3/4”
Pressure Plate
Splice
1/2”
2”
1-1/2”
3/4” 3/4”
CL
Cover
1-1/2”
Splice
1/2”
E1-1202
Cover Splice
FRAME INSTALLATION
STEP 10 (Continued)
JAMB SPLICE
Jamb
Mullion
Pressure
Detail 21 Plate
Jamb
Cover
FRAME INSTALLATION
STEP 10 (Continued)
SSG MULLION SPLICE
Bond
Breaker
Tape &
Sealant
Splice
Sleeve
6” Long
1/2”
1”
1”
FC-1212
”
7/32
2-1
Jamb
Mullion
Detail 21a
FRAME INSTALLATION
STEP 11
INSTALL CONTINUOUS PERIMETER ANCHOR
Detail 22
FRAME INSTALLATION
STEP 12
JAMB/VERTICAL INSTALLATION
WITH PERIMETER ANCHORS
-The notched ends of jamb mullions for 1” glazing leaves the interior of the mullion exposed
and must be plugged prior to installation.
-Install a small piece of backer rod into the notched out space directly behind the tongue
at the top and bottom of the jamb mullions.
-Push the backer rod into the opening at the face of the mullion.
-Apply and tool sealant to seal off the opening made by the notch.
-Install interior gasket, E2-0120, to jamb mullion (jamb side only) the full length of the mullion.
-Position jamb into opening as shown in Detail 23.
-Seal the gap between the perimeter anchor and vertical glazing pocket with sealant.
-Install temporary retainer clip, E1-3612, at the top and bottom of the mullion.
-Place a small length of backer rod below each SSG vertical and set the mullion onto the
perimeter anchors as shown below.
-Seal all gaps between the SSG vertical and the perimeter anchor at the sill.
See Detail 23.
1/2”
Nom.
Detail 23
E2-0120 E1-3612
1/2”
Sealant E9-1223 Nom.
Perimeter
Anchor
FRAME INSTALLATION
STEP 13
ATTACH SSG MULLION END CAPS
Mullion end caps are required at the head and sill of jambs and mullions.
-Clean the mullion ends and mullion end caps with a cleaner and method approved
by the sealant manufacturer.
-Apply sealant to the spline cavity and along the front of the mullions on both ends prior to installing
mullion end caps, FW-2500-SS. Also apply sealant to the reglets at both ends of the mullion.
-Attach the mullion end caps to each end of the mullion with FC-1410 fasteners as
shown Detail 24.
-Tool the excess sealant flush between the mullion end cap and the mullion and at the reglets.
-Seal over all screw heads.
-At the bottom of the mullions, apply sealant to the center cavity to a height of 1/2”.
See Detail 25.
Sealant
Seal All
Screw Heads
(FC-1410)
1/2”
C
L
FW-2500-SS
1/2”
Sealant
Detail 24 Detail 25
Sealant
FRAME INSTALLATION
STEP 13A
JAMB/VERTICAL INSTALLATION
WITH MULLION END ANCHORS
Mullion
Detail 27
FRAME INSTALLATION
STEP 13B
VERTICAL INSTALLATION
AT DOOR JAMB END ANCHORS
-Locate the mullion anchor for the door jamb and install it to
the substrate according to the approved shop drawings and
P.E. calculations.
Apply Sealant to
Mullion at Sill
Substrate
Detail 30
Detail 29
For Exposed Fasteners Shear
Block Used as Anchor
FRAME INSTALLATION
STEP 14
INSTALL WIND LOAD / DEAD LOAD ANCHORS
-Install steel wind load and dead load anchor clips. Anchor clips are normally template or
line set before mullions are hung. Outstanding leg of clip must be set at 90° to offset line.
The back of the vertical mullion should set 1” from the anchoring substrate.
See Detail 31.
1” Nom. 1” Nom.
Wind Load Detail 31 Dead Load
Anchor Anchor
-Install, plumb, and align vertical mullions. Drill and install appropriate diameter anchor bolts.
If shop drawings are not prepared by YKK AP, all anchors and bolts must be checked by a
qualified engineer.
-Nylon slip pads, E3-0103, must be installed between mullion and anchor.
See Detail 32.
Detail 32
FRAME INSTALLATION
Hex. Nuts
Flat Washer
Detail 33
TYPICAL DEAD LOAD ANCHOR
Lock Washer
Mullion
E3-0103
Nylon Slip Pad
E1-1205
Dead Load Anchor
Hex. Nuts
Flat Washer
FRAME INSTALLATION
JAMB WIND LOAD ANCHOR
Jamb Mullion
(Field Drill Tap Holes
for Tap Plate Screws
and Anchor Bolts)
FC-1212
E3-0103
Nylon Slip Pad E1-1204
Wind Load Anchor
FC-1212
E3-0103
Nylon Slip Pad
E1-1205
Dead Load Anchor
FRAME INSTALLATION
STEP 15
ATTACH HORIZONTAL MEMBERS
FC-1220
For Concealed Fasteners:
Detail 35
FRAME INSTALLATION
STEP 15 (Continued)
ATTACH HORIZONTAL MEMBERS
OPEN BACK HORIZONTAL
For Two Piece Horizontals: Mullion
FC-1220
Detail 36
Horizontal
At Head and Sills: Cover
-Mullion end anchors must be installed before head and sill members are attached.
-Provide anchor fasteners as per job requirements. See approved shop drawings or
engineering calculations for appropriate anchor fasteners.
-Install the anchor fasteners as recommended by fastener manufacturer.
-Attach head and sill members according to the procedures previously outlined with the
notched out portion facing the anchors.
See Detail 37.
Caution: There must always be a shim under the mullion to transfer glazing dead loads to
the foundation.
Mullion
Sill
(Notched)
Shear Block
Sealant Anchor Fasteners
(Not by YKK) Sill
(Notched)
Detail 37 Shim As
FC-1220 Req’d
“T” Anchor
FRAME INSTALLATION
STEP 15 (Continued)
ATTACH HORIZONTAL MEMBERS AT 90° OUTSIDE CORNER MULLIONS
Note: Before applying any sealant, clean aluminum surfaces using cleaner and method
approved by sealant manufacturer.
-Just prior to attaching the horizontal members to the corner mullion, apply sealant to the front
of the shear block as shown in Detail 38.
-Attach the horizontal members at the mitered end to the corner mullion at the shear blocks with
fasteners as shown below.
-When using incidental water head members, match drill 0.189” tap holes into the shear clips.
Attach the incidental water head using PC-1208 screws.
-Tool and wipe away any excess sealant at the vertical to horizontal joints.
FC-1212
Sealant
FC-1212
Detail 38
FRAME INSTALLATION
STEP 16
INSTALL DOOR SUBFRAMES
-Fabricate and and assemble the perimeter trim for the door jamb as shown on Detail 39 on the
next page.
-Attach the E1-3543 trim clips onto the E9-3409 perimeter trim, locating them at 2” from each end
of the trim and at 3’-0” maximum on center.
-Fasten E1-3579 end caps to the ends of the perimeter trim with PC-1210 screws.
FRAME INSTALLATION
STEP 16
INSTALL DOOR SUBFRAMES
E2-0110
1/4”
Bottom of
Horiz.
E1-3543
E9-3409
Door Head
for Reference
PC-1210
E1-3579
E2-0110
See Approved Shop Drawings for this Dimension
Detail 39
E9-3409 Cut Length
E1-3543
(2” from each
end & @ 3’-0”
Max. O.C.)
E9-3409
Sill Member
Beyond
E1-3579
PC-1210
Nom.
1/2”
FRAME INSTALLATION
STEP 16
INSTALL DOOR SUBFRAMES
Spacer Tape
-Clean all sealant contact surfaces as recommended by the
sealant manufacturer. Adhere E2-0110 spacer tape onto the
perimeter trim.
-Peel back tape liner of the perimeter trim 2” from each end
to expose the adhesive backing as shown in Detail 40.
-Press the perimeter trim onto the SSG door jamb member,
leaving a 1/2” caulk joint at the sill. Peel the remaining tape
liner from the perimeter trim while continuing to press the
E9-3409
trim against the mullion.
PM-1006-SS
1/2”
PM-2512-SS
Detail 41
FRAME INSTALLATION
STEP 16
INSTALL DOOR SUBFRAMES
1/4” Nominal
Shim Space
Detail 43
Backer Rod
Beneath End Cap AS-1539
Sealant
FRAME INSTALLATION
STEP 17
APPLY PERIMETER SEALANT
-Clean the area around the perimeter of the frame with cleaner and method approved by
sealant manufacturer.
-Insert a backer rod and apply sealant to the perimeter of the frame.
-Tool the sealant making sure that sealant does not get into the gasket reglets.
See Detail 44.
1/2”
Caulk Joint
Frame Height
Caulk Joint
1/2”
Masonry Opening
FRAME INSTALLATION
STEP 18
INSTALL JOINT PLUGS
FRAME INSTALLATION
STEP 19
INSTALL 90° OUTSIDE CORNER TRIM
Prior to glazing, install corner trim onto the 90° outside corner mullion.
-Cut E9-9307 angles to the same length as the 90° outside corner mullion adaptor.
-Drill 0.213” diameter holes into the E9-9307 angle at 2” from each end and at 24” maximum
on center as shown in Detail 47.
-Clamp the angle onto the mullion as shown in Detail 48, 3/16” from the edge of the glazing
tongue. Match drill 0.161” diameter tap holes into the 90° outside corner adaptor.
-Fasten the angle onto each side of the corner adaptor with PC-1008 screws.
11/32”
Ø0.213” Holes
2” From Each
End & @ 24”
Max O.C.
E9-9307
3/16”
PC-1008
Detail 47
Detail 48
FRAME INSTALLATION
STEP 19 (Continued)
INSTALL 90° OUTSIDE CORNER TRIM
-Adhere E2-0679 continuous structural tape to the installed E9-9307 angles as shown in
Detail 49.
-Cut the outside tirm angle (E9-9303 for 1” glazing, 1/8” formed aluminum for
other glazing thicknesses) to the length of the 90° outside corner mullion adaptor.
-Then firmly adhere the outside trim angle onto the structural glazing tape on both sides.
E2-0679
E2-0679
GLAZING
STEP 20
INSTALL GLAZING ADAPTORS
(When Required)
Note: 1/4” glazing adaptors shown
1/2” glazing adaptors similar.
Daylight Opening
Horizontal
Daylight Opening
Seal Intersection
Apply Sealant
of Adaptors
Into Reglet Before
Installing Adaptors Cut 4-1/2” Long
Notches for Setting
Block Chairs
Apply Sealant
Into Reglet Before
Installing Adaptors
Horizontal Adaptor Cut Length
= Daylight Opening – 1/32”
Horizontal
PC-0810
PF-1010-SS
PC-0810
-Cut glazing adaptors to size:
Vertical Cut Length = Daylight Opening plus(+) 7/8”. Detail 50
Horizontal Cut Length = Daylight Opening minus(–) 1/32”.
GLAZING
STEP 21
INSTALL INTERIOR GLAZING GASKETS & SPACERS AT SSG MULLIONS
Detail 52
GLAZING
STEP 22
INSTALL SETTING BLOCK CHAIRS AND SETTING BLOCKS
Note: For correct placement of setting block chairs and setting blocks, see Detail 54 on Page 51.
Consult YKK AP for setting block requirements on units that exceed 60” x 90” or 40 sq. ft.
-Install the E1-3603 setting block chair at 1/4 points as shown in Detail 53.
-Apply a small amount of silicone sealant to the tongue of the horizontal to keep the setting block
chair correctly positioned prior to the glass being set.
-Place the E2-0513 setting block on the setting block chair.
Setting Block
Chair Setting Block
Sealant
Detail 53
GLAZING
STEP 22
INSTALL SETTING BLOCKS (Continued)
5/8”
Glazing
Mullion Horizontal
CL
1/4 Point
5/8”
6” Minimum 4” Setting
Setting 5/8”
From Edge of Glass Block Width Block
Detail 54
GLAZING
STEP 23
INSTALL EXTERIOR GLAZING GASKETS
-Cut exterior jamb glazing gaskets to the same length as the jamb pressure plates.
-Cut exterior horizontal glazing gaskets to daylight opening plus 3/16” per foot of opening width.
-Install jamb glazing gaskets centered along the jamb pressure plates.
-Install horizontal gaskets by pushing each end into the reglet of the pressure plate. Next press
center of gasket into reglet; then push gasket into reglet working from center towards the ends.
Caution: Do not stretch the gaskets.
D.L.O. + 1-1/4”
D.L.O.
Daylight Opening Daylight Opening
Plus(+) 1-1/2” Plus(+) 2”
STEP 24 Detail 55
INSTALL GLASS
-Install glass.
See Detail 55 for glass sizes. E3-0001
-As each lite is installed, attach a temporary Temporary SSG
Retainer Clip
retaining clip, E1-3612, in the middle of each E1-3612
horizontal and 4” from glass edge at each Temporary
Retainer Clip
end with HD-2516-W3-SS fasteners.
-Additionally, secure glass with SSG temporary
glass retainers every 3’-0” maximum along the
SSG verticals.
-Apply sealant to the face of the joint plug
Apply Sealant
just prior to installing pressure plates. To Face of
Do not allow sealant to skin over prior to Joint Plug
installing pressure plates.
See Detail 56. HD-2516
-W3-SS
Note: Sealant must form a complete seal
between the exterior gasket, pressure plate, Detail 56
thermal isolator, and the joint plug.
GLAZING
STEP 25
PRESSURE PLATE LAYOUT AND ASSEMBLY
E2-0120
AS-3907
Mullion
AS-3908
E2-0120
AS-3907
Detail 57
-Pressure plate stock lengths are factory punched with 0.281” diameter holes at 9” o.c. maximum.
After cutting, additional holes may be required to have fasteners located 1-1/2” from each end.
-Install jamb pressure plates using HD-2516-W3-SS bolts. Initially torque bolts to 30 inch-pounds
with a speed wrench or torque limiting screw gun. Work from the bottom up.
-Center and install horizontal pressure plates in opening, leaving gaps at the ends as shown.
-Starting at the center of each pressure plate, tighten each retainer bolt to 50 inch-pounds.
-Apply and tool sealant to completely seal gaps at the pressure plate ends.
-Torque all vertical pressure plate bolts to 50 inch-pounds.
See Detail 57.
Note: Pressure plate AS-3908 must be used instead of AS-3907 on the perimeter when using
perimeter anchors. Mullion end cap, E1-3605, must be installed at jambs when using
mullion end anchors: “F” or “J”.
GLAZING
STEP 25 (Continued)
PRESSURE PLATE LAYOUT AND ASSEMBLY
-At the door jamb, the horizontal and sill pressure plates and face covers overlap the perimeter
trim.
E2-0127
HD-2516
-W3-SS
Detail 58
Face
Cover
GLAZING
STEP 25
APPLY INTERIOR STRUCTURAL SILICONE SEALANT
E9-3402
SSG Mullion
Detail 59
E2-0261
GLAZING
STEP 26
INSTALL EXTERIOR JAMB FACE COVERS
-Snap on exterior jamb face covers using a mallet and clean piece of lumber.
Start at one end. Work block and mallet down the vertical.
-Apply sealant to the joint between the horizontal pressure plate and the jamb face cover.
Make sure all sealant contact surfaces have been cleaned with method recommended by
sealant manufacturer.
Sealant
Detail 60
GLAZING
STEP 26A
INSTALL EXTERIOR HORIZONTAL FACE COVERS
-Snap on exterior horizontal face covers using a mallet and clean piece of lumber.
Start at one end. Work block and mallet across the horizontal.
Detail 61
GLAZING
STEP 27
APPLY EXTERIOR WEATHERSEAL
-Once interior structural silicone has cured, remove the temporary retainer clips and insert an
approved open cell polyurethane backer rod into the glass joint.
-Clean all silicone contact surfaces and joints with cleaner and method recommended by
sealant manufacturer.
-Apply masking tape to the edges of the glass and aluminum as shown in Detail 62.
-Apply silicone sealant into the cavity between the mullion and glass starting from the
bottom and work towards the top. Use positive pressure so that the silicone sealant completely
fills the cavity.
Note: The underside of face cover splices are left unsealed to allow for weepage.
-Using a spatula or other non-scratching implement, tool the silicone sealant immediately
after running the joint. Exert positive pressure while tooling to ensure that the silicone sealant
makes complete contact with all surfaces. Be careful not to remove too much silicone.
Backer
Rod
E9-3402
Silicone SSG Mullion
Masking
Tape
Do Not Seal
Underside of
Cover Splice
Detail 62
GLAZING
STEP 27 (Continued)
APPLY EXTERIOR WEATHER SEAL
-At the door jamb, seal the cavity at the exposed edge off the horizontal and sill face covers.
Insert backer rods as required to facilitate this sealant closure.
-Also, apply backer rod and seal between the glass and the perimeter trim.
Backer Rod
& Sealant
Masking
Tape
Face
Cover
Backer Rod
& Sealant
Detail 63