SD Nil
SD Nil
Replacement of broken
66 KV T/L Bhakkar-Mankera
disck insulator Supply will be restored
85 cont: 66 KV CB(BKR-2,MKR- 20-11-23 14:00 5:00 andTightening of jumpers through alternating source
2)at 132KV G/S Bhakkar 09:00
and sustaion of clamps MKR-1
Nil
66KV Transmission line
To wash,clean & change Supply will be restored
Nishatabad - OTP controlled by
113
circuit Breaker (F6Q1 - ISO 104
28-11-23 07:00 12:30 05:30 disc insulator at tower through alternative source
No.52-58 i.e 132KV C.B F5Q1.
).
Annual maintenance /
132KV Circuit Breaker KAN - 1 protection testing of Nil
controlling 132KV T/L Khanuana Circuit Breakers and all Supply will be restored
114
- 220KV Jaranwala Road at
28-11-23 8:00 12:00 04:00 allied through alternative source
132KV Grid station Khanuana. equipments.(Isolators, i.e 132KV C.B KAN-2.
C.Ts,)
132KV T/Line 220KV Jaranwala
For cleaning/replacement Supply will be restored
Road-Samundri Road
115
Controlling 132KV Circuit
28-11-23 8:30 14:00 5:30 of disc insulator T.No 13- from alternative source
24 (220KV Jaranwala Road).
Breakers (E8Q1-SRD2)
132kv T/Line Pirmahal - 220KV For cleaning/replacement Supply will be restored
116 T.T.Singh Controlling 132KV 28-11-23 9:30 14:30 5:00 of disc insulator T.No 10- from alternative source
Circuit Breakers (PMH-1 , E8Q1) 20 (132KV Shor Kot Road).
NIL
132 Kv T/Line 220 KV New
Disk Cleaning and jumper Supply will be restored
Ludewala---Bhera Industrial
117
Controlled by 132 Kv Circuit
28-11-23 0800 1400 6:00 Tightening of tower No. from alternative source
36 to 72 through 132 kv G/S Head
Breaker E11Q1---BRI2
Faqerian
Washing and cleaning of
132 KV T/L Daud Khel-Wan
polluted disc insulator at Supply will be restored
Bhachran cont: 132 KV (DKL-
118
3,WBC-1)at 132KV G/S Daud
28-11-23 8:00 14:00 6:00 loc no 115.1116.117 and through alternate source
tightening of jumper at loc WBC-2
Khel
no.123
66KV Transmission line Nil
To wash,clean & change
Nishatabad - OTP controlled by Supply will be restored
119
circuit Breaker (F5Q1 - ISO 105
29-11-23 07:00 12:30 05:30 disc insulator at tower
through alternative source
No.44-51
). i.e 132KV C.B F6Q1.
132KV T/Line 220KV Jaranwala
For cleaning/replacement Supply will be restored
Road-Samundri Road
120
Controlling 132KV Circuit
29-11-23 8:30 14:00 5:30 of disc insulator T.No 25- from alternative source
35 (220KV Jaranwala Road).
Breakers (E8Q1-SRD2)
E/ 2023/ Order Schedule
132KV G/S Shor Kot City. For annual
Supply will be restored
132KV Circuit Breaker SKC-1 maintenance/testing of
121 controlling 132KV Transmission 29-11-23 9:30 14:00 4:30 Circuit Breaker and its
from alternative source
Line Shor Kot City - Head Sidhnai (132KV T.T. Singh).
allied equipment.
132KV T/Line Toba Tek Singh -
For cleaning/replacement Supply will be restored
Shorkot City Controlling 132KV
122
Circuit Breakers (TTS-4 , SRC-
29-11-23 9:30 14:30 5:00 of disc insulator T.No 17- from alternative source
27 (132KV Shor Kot Road).
3)
66KV T/Line Head Faqerian--- Disk Cleaning and jumper
NIL
123 Malakwal Controlled by 66 KV 29-11-23 0800 1400 6:00 Tightening of tower No.
66KV Malikwal Not in Use
Circuit Breaker HFQ4-B4 40- to 80
132 KV T/Line 220KV Lalian--- NIL
Disk Cleaning and jumper
132KV Lalian Controlled by 132 Supply will be restored from
124
KV Circuit Breaker E15Q1---
29-11-23 09:30 14:30 5:00 Tightening of tower No. alternative source through
130-143 132 KV G/Station Kirana Hill
LLN1
66 KV T/L Bhakhar-Behal NIL
Tightening of jumpers and 11KV O/G Feeders.Notak
125 Cont;66 kv CB(BKR-3,ISO-101) 29-11-23 9:00 15:00 6:00 sustaion of clamps supply will be restored trough
at 132 kv G/S Bhakhar bus coupler at 132 kv Behal
132KV Transmission Line Nil
To wash,clean & change
Chiniot Road - Allied FSD Supply will be restored
126
Controlled by 132KV Circuit
30-11-23 07:00 12:30 05:30 disc insulator at tower
through alternative source
No. 12-20
Breaker (CRD-3, AFA-1). i.e 132KV C.B AFA-2.
132KV T/Line 220KV Samundri
For cleaning/replacement Supply will be restored
Road - Samundri Controlling
127
132KV Circuit Breakers (E4Q1-
30-11-23 8:30 14:00 5:30 of disc insulator T.No from alternative source
50,51,54,55,56 (132KV Gojra).
SMD2)
132KV T/Line Toba Tek Singh - Supply will be restored
For cleaning/replacement
220KV T.T.Singh Controlling from alternative
128
132KV Circuit Breakers (TTS-5 ,
30-11-23 9:30 13:30 4:00 of disc insulator T.No 150-
source(132KV Shor Kot
161
E6Q1) City).
For cleaning/replacement
132KV T/Line Gojra - Jhang Supply will be restored
129
Controlling 132KV Circuit
30-11-23 9:30 14:00 4:30 of disc insulator T.No 46-
from alternative source
60
Breakers (GRA-10 , JHG-1) (132KV Gojra).
It is therefore requested to carryout work within the above mentioned time frame to avoid any
inconvenience to the public as well as to important consumers.
Note
i. S.E GSO Circle FESCO advised to instruct concerned formation may be sure neither no area
affect nor load shedding involved during above shut downs.
ii. XEN SS&T Divisions under GSO Circle FESCO Faisalabad will adopt all safety measures and
shutdowns may be allowed / availed only when the same is approved from Director RCC North
Islamabad / Director RCC South Jamshoro & update on PITC / FESCO Web sites.
iii. The approval will stand cancelled if a prior unforeseen long duration outage occurs in the system.
iv. A copy of office order will be given to Dy; Director DCC FESCO for update on PITC Web Site and
FESCO Computer Center for update on FESCO Web Site.
This issue with the approval of competent Authority.
S/D
Dy: Director (Dev) T&G
FESCO H/Q Faisalabad
Subject:- APPROVAL OF SHUT DOWNS SCHEDULE FOR THE MONTH OF 11/2023 (AREA
EFFECTED).
As desired S.E GSO Circle FESCO Faisalabad vides his letter No. 9434-41 dated 31-10-2023, the
following shut downs is approved as under: -
SR NAME OF GRID
, TIME
N STATION / T/LINE DATE FROM TO DUR:
PURPOSE AREA AFFECTED.
O (EQUIPMENT) (HRS) (HRS) (HRS)
220KV Grid
Station Ludewala 132 KV G/Station 220 Ludewala (T-4
Annual
132/11.5KV,10/13 all 11KV O/G)
maintenance of
1 MVA Power T/F T- 02-11-23 08:00 12:00 4:00 087301 Dhrema 087302 Bhalwal
Power T/F T-4 and
4, Controlled by 132 Road
all 11KV O/G
KV Circuit Breaker 087304 Wegowal 087303 Grid Colony
E7Q1.
Annual
Maintenance of
132 KV Grid 132KV Circuit
Station Bhera Breakers BRI-1, 132 KV G/Station Bhera Industrial
Industrial BRI-2, BRI-81, 82, (All 11KV O/G
2 132KV BusBar 14-11-23 9:00 14:00 5:00 P/TF T-1, T-2 & all 106504 Maini-II 106503 Chan
Controlled by 132 11kv Outgoings. 106501 Bhera City 106505 Wadhan
KV Circuit Breakers Tightening the T- 106502 Zain pur
BRI-1 & BRI-2, Clamps of 132KV
BusBar & Cleaning
the Disc Insulators.
132KV Grid Station Bhalwal (All
Annual 11KV O/G)
Maintenance of 024311 Bhera Express 024304
132 KV Grid 132KV Circuit N.T.Mill 024317 Canal
Station Bhalwal Breakers BLW-1, 2 024309 Satghara 024313 Qudratabad
132KV BusBar & BLW-41 , BLW- 024315 Bhalwal Ind. State 024318
3 Controlled by 132 23-11-23 9:00 14:00 5:00 81, 82, 83, P/TF T- Chenab Bazar 024302 Lak/Sacser
KV Circuit Breakers 1, T-2, T-3 and all 024307 Bhalwal City 024301 Bhera
BLW-1, 2, & BLW- 11kv Outgoings, Noon 024303 Kot Moman 024316
41 Tightening the T- Noon Sugar Mill 024306 Lillani 024314
Clamps of 132KV Shaki Suleman 024310 Khizairabad
BusBar & Cleaning 024308 Deowal 024312 Purana
the Disc Insulators, Bhalwal 024320 Hunza Citrus
It is therefore requested to carryout work within the abovementioned time frame to avoid any inconvenience to
the public as well as to important consumers.
S/D
Dy: Director (Dev) T&G
FESCO Faisalabad