RC Drainage Boq
RC Drainage Boq
S/N
DESCRIPTION OF WORK UNIT QTY RATE (N)
1 MOBILIZATION
1.1 Mobilize adequate resources
(including equipment, personnel
and materials) and requisite
documentation. Coordinate all
required pre-mobilization Reviews
and Workshops. Premob all
equipment prior to site
deployment.
LS 1 7,500.00
SUB-TOTAL-1;
MOBILIZATION
2 PROJECT MANAGEMENT
2.1 Project Management
(Accommodation, HSE, PPEs,
Community levies , logistics, site
running cost including provision
of all utilities for own use, all
Project Management
Documentations, Site supervision
and administration, etc.)
LS 1 4,500.00
SUB-TOTAL-2: PROJECT
MANAGEMENT
3
EARTHWORK
TEGRACH NIGERIA LIMITED
3.1
SUB-TOTAL-3: EARTHWORK
4
FORMWORK
4.1 m2 4.3 8,500.00
5 REBAR WORK
5.1
5.6 m2 0.065 -
Plain in-situ concrete, mix (1:10 all
in aggregate) in blinding not
exceeding 50mm thick Foundation
7,500.00
7,500.00
4,500.00
4,500.00
-
36,550.00
24,720.26
-
14,256.00
99,526.26