This document provides a breakdown of work items, quantities, unit rates and costs for a construction project by Tegrach Nigeria Limited. It includes costs for mobilization, project management, earthworks including excavation and filling, formwork, rebar work including fabrication and installation, and concrete work for the base and walls of drains. The total contract lump sum price for all items is 99,526.26 Naira.

Uploaded by

orode franklyn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
635 views

RC Drainage Boq

This document provides a breakdown of work items, quantities, unit rates and costs for a construction project by Tegrach Nigeria Limited. It includes costs for mobilization, project management, earthworks including excavation and filling, formwork, rebar work including fabrication and installation, and concrete work for the base and walls of drains. The total contract lump sum price for all items is 99,526.26 Naira.

Uploaded by

orode franklyn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

TEGRACH NIGERIA LIMITED

S/N
DESCRIPTION OF WORK UNIT QTY RATE (N)
1 MOBILIZATION
1.1 Mobilize adequate resources
(including equipment, personnel
and materials) and requisite
documentation. Coordinate all
required pre-mobilization Reviews
and Workshops. Premob all
equipment prior to site
deployment.

LS 1 7,500.00
SUB-TOTAL-1;
MOBILIZATION
2 PROJECT MANAGEMENT
2.1 Project Management
(Accommodation, HSE, PPEs,
Community levies , logistics, site
running cost including provision
of all utilities for own use, all
Project Management
Documentations, Site supervision
and administration, etc.)

LS 1 4,500.00
SUB-TOTAL-2: PROJECT
MANAGEMENT
3

EARTHWORK
TEGRACH NIGERIA LIMITED

3.1

Excavation in foundation trenches


not exceeding 1.5m in width
including dressing and ramming,
disposal of surplus soil with 50m
lead and 1.5m lift, all types of soil
except rock
m3 1.80 -
100m length x 1m wide, 0.5 to
1.0m depth
3.2 m3 0.45 -
Filling of tenches side of
foundation

SUB-TOTAL-3: EARTHWORK
4

FORMWORK
4.1 m2 4.3 8,500.00

Provide and fix centering and


shuttering including strutting,
propping, etc and removal of
formwork

5 REBAR WORK
5.1

Fabricate, cut, bend, fix and install


reinforcement-bar in:
5.2 10-12mm dia. Bars in drain 1m kg 30.90032 800.00
wide
5.5 CONCRETE WORK
TEGRACH NIGERIA LIMITED

5.6 m2 0.065 -
Plain in-situ concrete, mix (1:10 all
in aggregate) in blinding not
exceeding 50mm thick Foundation

5.7 Vibrated reinforced in-situ m3 0.495 28,800.00


concrete (19mm aggregate) filled
into formwork and well packed
around reinforcement to achieve
30N/mm 2 strength after 28days
(formwork and reinforcement both
measured seperately) in: 5.20 Base
and walls of drrains

TOTAL CONTRACT LUMP


SUM PRICE
AMOUNT (N)

7,500.00

7,500.00

4,500.00

4,500.00
-

36,550.00

24,720.26
-

14,256.00

99,526.26