ArDesign 3 Module 2 - Site Analysis - Week 7
ArDesign 3 Module 2 - Site Analysis - Week 7
ARDESIGN3
PREPARED BY: AR./ENP. RACHELLE S. MORALES
HAU-ARCHITECTURE
Week CO Code Learning output Student output Topics / Course Core values Methodology Evaluation/
(Hours) Link At the end of the Content (Sub values) Learning
lesson, the Assessment
student will be
able to:
7 CO1, ➢ Familiarize • Sharing of Module 2: Site Christ- ➢ Facilitate lecture ✓ Assessment
(7 hours) CO2 with the Personal Analysis centeredness through in-class/ of the quality
elements of Insights • Introduction to (Prayerfulness) online class of personal
Site Analysis • Critical Site Analysis discussion insights
and its Thinking with the Excellence ➢ Synchronous e- through
importance to Exercise Influential (Competence, learning using individual
the Site • Quiz Elements Accuracy, Being Canvas Network, reactions
Development (asynchro- Module 3: Guide to Logical) video- and/or
Plan nous) Checking Building conferencing, consultation
➢ Interpret the • Research Standards from Integrity instant ✓ Assessment
provisions of Work/s the NBC (Conscientious- messaging, chat & of design
NBC with • Building ness, audio- solution
regards to Requirements Accountability) conferencing. through the
Group B based on PD ➢ Video use of specific
Occupancy 1096 / National presentation of grading
buildings Building Code pre-recorded Rubrics
Major Plate 2: lecture/
Group B - Multiple discussions and
Dwelling Units other related
(Dormitory) videos (e.g.
• Introduction to YouTube)
the Design ➢ Use of Asyn-
Problem chronous e-
learning methods
➢ Conduct of design
consultation and
progress checking
thru either
synchronous or
asynchronous
methods
SITE PLANNING & DESIGN
PROCESS
Programming
Site Inventory
1. Physical Conceptual Design
Site Analysis Design Development
2. Biological
Site Selection 3. Cultural
Project Construction
Implementation Documentation
Site Assessment Phase
Design Phase
Because site planning and design involve decisions about future uses
of land, an understanding of human behavior, attitudes, and
preferences is also necessary.
SITE INVENTORY
Physical Attributes Biological Attributes Cultural Attributes
or
STRENGTHS WEAKNESSES
(within the site)
INTERNAL
S+ W-
(outside the site)
OPPORTUNITIES THREATS
EXTERNAL
O+ T-
COMPONENT 1A:
SWOT MATRIX
STRENGTHS WEAKNESSES
S+ W-
OPPORTUNITIES SO STRATEGIES WO STRATEGIES
O+
Leverage/Reinforce Counter weaknesses by
strengths to maximize exploiting opportunities
opportunities = Build strengths for
= Attacking Strategy attacking strategy
T-
Leverage/Reinforce Counter weaknesses and
strengths to minimize threats threats
= Defensive Strategy = Build strengths for
defensive strategy
EXAMPLE
SITE ANALYSIS MATRIX
Categories Sub-categories Attributes Observations Implications to Design
1. Physical 1.1 Soil Bearing The soil on the site seem Buildings to be constructed in
Capacity to have a high bearing the future may also be
capacity as evidenced by medium rise (4-12 storeys).
the existence of several
mid-rise buildings.
1.2 Topography Slope Gradient The site is relatively flat. Various layouts for the
circulation system can be
explored as a flat site
requires less complexity in
terms of road design.
3. Cultural 3.1 Location Surrounding The site is located at the Being located in the “Heritage
districts, sites, central business district of District” and near the main
landmarks and Angeles City. Surrounding it commercial area of the city, the
buildings are the Holy Rosary Parish design calls for sensitivity to both
Church, Museo ning Angeles, heritage preservation and modern
Villa Teresa Subdivision, and building design styles and
several commercial technologies.
establishments. Within its
vicinity are other major Being adjacent to the HRPC,
landmarks of the city like the design should also ensure that
Nepo Business Center, buildings are of reasonable height,
Angeles City Public Market, not too imposing against the
Angeles Elementary School church.
and a couple of residential
subdivisions. The building layout within the site
shall ensure that campus activities
will not be causes of disturbance
to the surrounding church and
residential are.