0% found this document useful (0 votes)
77 views

Admmv13 Part 2 Requirements and Additional Information Final

This document provides guidance on asset data management requirements for National Highways. It outlines the asset data systems used, file transfer procedures, network referencing principles, locating and referencing assets, and operational roles and responsibilities. The document includes sections on approved network models, location reference points, cross section positions, topographical asset referencing, linear and point asset referencing, and condition inspections. It provides asset managers and custodians with standards for collecting, storing, and sharing consistent and accurate asset data.

Uploaded by

bviv
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
77 views

Admmv13 Part 2 Requirements and Additional Information Final

This document provides guidance on asset data management requirements for National Highways. It outlines the asset data systems used, file transfer procedures, network referencing principles, locating and referencing assets, and operational roles and responsibilities. The document includes sections on approved network models, location reference points, cross section positions, topographical asset referencing, linear and point asset referencing, and condition inspections. It provides asset managers and custodians with standards for collecting, storing, and sharing consistent and accurate asset data.

Uploaded by

bviv
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 164

NATIONAL HIGHWAYS

Asset Management Development Group

ASSET DATA MANAGEMENT MANUAL

Part 2 – Requirements and Additional Information

October 2021
Version: 13.0

Asset Data Management Manual Page 1 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Revision Sheet
For revisions across all ADMM documents see the Revision Log available on
Standards for Highways:
http://www.standardsforhighways.co.uk/ha/standards/admm/index.htm

Version Date Issued

3.0 April 2016

4.0 September
2016

5.0 March 2017

6.0 September
2017

7.0 March 2018

8.0 October 2018

9.0 April 2019

10.0 October 2019

11.0 April 2020

12.0 October 2020

13.0 October 2021

Asset Data Management Manual Page 2 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Contents
Revision Sheet ......................................................................................................... 2
Contents……… ......................................................................................................... 3
List of Figures. ......................................................................................................... 8
List of Tables… ........................................................................................................ 9
Foreword…….. ........................................................................................................ 11
Part 2.1 – GENERIC ASSET DATA REQUIREMENTS .......................................... 13
1 Overarching Data Requirements .............................................................. 14
1.1 Spatial Referencing ..................................................................................... 14
1.2 Format ......................................................................................................... 14
1.3 Currency ...................................................................................................... 14
1.4 Completeness.............................................................................................. 14
1.5 Accuracy ...................................................................................................... 14
1.6 Asset Data Systems .................................................................................... 15
1.7 Governance ................................................................................................. 15
2 Asset Data Systems .................................................................................. 16
2.1 The Company’s Asset Data Systems .......................................................... 16
Confirm Routine and Planned Maintenance .............................................. 17
Pavement Data Management System (HAPMS) ....................................... 17
IAM-IS Structures ...................................................................................... 19
Geotechnical Data Management System (HAGDMS) ............................... 20
Drainage Data Management System (HADDMS) ...................................... 21
Environmental Information Systems (EnvIS) ............................................. 22
ServiceNow ............................................................................................... 22
3 Transfer of Asset Data .............................................................................. 23
3.1 General Data Transfer Requirements .......................................................... 23
3.2 File Naming Convention .............................................................................. 23
Extended naming convention .................................................................... 23
Short naming convention ........................................................................... 23
3.3 Permitted Types of File Format for the use in Data Transfer Files .............. 24
Guidance for the use of Shape Files ......................................................... 24
4 Approved Network Model ......................................................................... 25
4.1 Section Referencing Principles .................................................................... 25

Asset Data Management Manual Page 3 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Section Labels ........................................................................................... 26
Chainage ................................................................................................... 26
Agent Authority Area Codes ...................................................................... 26
Section Start and End Dates ..................................................................... 27
Section Reference Markers ....................................................................... 27
4.2 Section Referencing Procedures ................................................................. 36
Section Length Changes – Re-Referencing / Re-Calibrating a Section .... 36
Changes Instigated by the Company......................................................... 36
Changes to the Approved Network within the Company’s Pavement Data
Management System............................................................................. 36
Re-Use of Section Labels .......................................................................... 37
Section Creation and Retirement Data ...................................................... 37
4.3 Geographic Representation ......................................................................... 38
4.4 Location Reference Points (LRPs) .............................................................. 39
Use of LRPs with the Company’s Pavement Data Management System .. 39
4.5 Cross Section Positions ............................................................................... 39
XSP Positions for Different Carriageway Types ........................................ 41
5 Locating Assets ......................................................................................... 50
5.1 Topographical Asset Referencing................................................................ 50
Point Items ................................................................................................ 50
Linear Items ............................................................................................... 50
Polygon Items ............................................................................................ 51
Recording Individual Assets ...................................................................... 51
5.2 Linear Asset Referencing ............................................................................ 52
Matching Assets to Sections ..................................................................... 52
5.3 Nominated Carriageway .............................................................................. 53
5.4 Boundary Extents ........................................................................................ 53
6 Operational Data Management and Requirements ................................. 54
6.1 Operational Roles and Responsibilities ....................................................... 54
Asset Data and Intelligence Manager ........................................................ 54
Asset Data Custodians .............................................................................. 54
Pavement Data Custodian ......................................................................... 55
Structures Data Custodian ........................................................................ 55

Asset Data Management Manual Page 4 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Geotechnical Maintenance Liaison Engineer (GMLE) ............................... 55
Drainage Liaison Engineer (DLE) .............................................................. 55
Carriageway Inventory Data Custodian ..................................................... 56
Lighting Liaison Engineer (LLE) ................................................................ 56
Environmental Liaison Co-ordinator (ELC) ................................................ 56
Technology Data Custodian ...................................................................... 56
Network Referencing Manager (NRM) and Deputy ................................... 56
Network Auditor ......................................................................................... 57
6.2 Condition Inspections .................................................................................. 57
DMRB Condition Grading .......................................................................... 57
Asset Condition Grading............................................................................ 58
Recording Asset Condition ........................................................................ 59
6.3 Litter Condition Grading ............................................................................... 60
Recording Litter Condition ......................................................................... 61
6.4 Network Safety Inspections ......................................................................... 61
Recording Asset Defects ........................................................................... 62
Defect Record Tables ................................................................................ 62
Pavement Defect Record .......................................................................... 63
6.5 Performance Inspections ............................................................................. 65
Recording Asset Performance ................................................................... 65
Performance Record Tables ...................................................................... 66
6.6 Cyclic Maintenance Activities ...................................................................... 67
Recording Cyclic Maintenance Activities ................................................... 68
Cyclic Maintenance Activity Record Tables ............................................... 69
7 Major Schemes and Asset Data Management ......................................... 70
Asset Data Systems .................................................................................. 70
Data Requirements and Formats .............................................................. 71
Key Parties ................................................................................................ 72
7.2 Contracts and Building Information Modelling ............................................. 73
Pre-Collaborative Delivery Framework ...................................................... 73
Collaborative Delivery Framework (CDF) .................................................. 74
Regional Delivery Partnerships (RDP) ...................................................... 74
Employers Information Requirements (EIR) .............................................. 75

Asset Data Management Manual Page 5 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
BIM Execution Plan (BEP)......................................................................... 75
Model Production Delivery (MPDT) ........................................................... 75
Project Information Model (PIM) ................................................................ 75
Asset Information Model (AIM) .................................................................. 75
GG 184 Data/CAD Standard ..................................................................... 75
Data Quality ............................................................................................... 76
Common Data Environment (CDE) ........................................................... 77
7.3 Scheme Lifecycle / Plan of Work ................................................................. 77
Major Projects: Project Control Framework ............................................... 77
7.4 Asset Data Exchange Procedure................................................................. 77
Options, Development, or Pre-Works ........................................................ 78
Construction .............................................................................................. 81
Handover ................................................................................................... 83
Network Referencing ................................................................................. 86
PART 2.2 – ASSET CLASS SPECIFIC REQUIREMENTS ..................................... 89
8 Drainage ..................................................................................................... 90
8.1 Flood Events................................................................................................ 90
8.2 Data Maintenance ....................................................................................... 91
8.3 Drainage Data Acceptance Criteria ............................................................. 92
8.4 Drainage Condition Defect Scoring Criteria ................................................. 97
Inspection Observation Codes .................................................................. 97
Inventory Observation Codes .................................................................... 98
Structural and Service Observation Codes................................................ 99
9 Environmental.......................................................................................... 115
9.1 Environmental Data Types ........................................................................ 115
9.2 Environmental Inventory Data ................................................................... 115
Environmental Inventory Tables .............................................................. 115
Asset Objectives ...................................................................................... 116
9.3 Submission of Data ................................................................................... 117
Data Identifiers ........................................................................................ 118
Data Validation ........................................................................................ 118
Submission Process ................................................................................ 119
10 Geotechnical ............................................................................................ 121

Asset Data Management Manual Page 6 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
11 Lighting .................................................................................................... 122
11.1 Data Transfer Requirements for Standard Lighting Billing Inventory ......... 123
11.2 Data Transfer Requirements for Variable Lighting Billing Inventory .......... 124
12 Pavements................................................................................................ 125
12.1 Pavement Condition Surveys .................................................................... 125
Pavement Condition Survey Strategy ...................................................... 125
Network Level Surveys ............................................................................ 126
Scheme Level Surveys ............................................................................ 126
12.2 Emergency Areas ...................................................................................... 126
13 Road Restraint ......................................................................................... 128
14 Structures................................................................................................. 129
14.1 Structures Information Tables.................................................................... 129
Appendix A: Condition Grading Guide ........................................................... 145
A.1 Ancillary ................................................................................................... 147
A.2 Carriageway Control ................................................................................ 148
A.3 Environmental ......................................................................................... 150
A.4 Pavements .............................................................................................. 156
A.5 Road Restraint ........................................................................................ 157
Appendix B: Cyclic Maintenance Activities .................................................... 159

Asset Data Management Manual Page 7 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
List of Figures
Figure 2-1 – The Company’s Prime Asset Data Systems. ....................................... 17
Figure 4-1 - Position of Markers of Two-Lane Dual Carriageway. ............................ 29
Figure 4-2 - Markers on Two Way Single Carriageway. ........................................... 30
Figure 4-3 - Start of Dual Carriageway. .................................................................... 31
Figure 4-4 - Slip Road entering Main Carriageway. ................................................. 32
Figure 4-5 - Main Line Additional at a Ghost Island Merge. ..................................... 33
Figure 4-6 - Lane Gain and Drop – where the entering/leaving traffic is likely to use the
additional left hand lane. .......................................................................................... 34
Figure 4-7 - Lane Gain and Drop – where the through traffic is likely to use the
additional left-hand lane. .......................................................................................... 35
Figure 4-8 - XSP lines and strips. ............................................................................. 41
Figure 4-9 - Dual 2 Lane Layout example. ............................................................... 43
Figure 4-10 - Single 2 Lane 2 Way Layout example................................................. 44
Figure 4-11 - Single 3 Lane 2 Way Layout example................................................. 45
Figure 4-12 - Dual 3 Lane Motorway Layout example. ............................................. 46
Figure 4-13 – “Dual All Lane Running” (ALR) Smart Motorway Layout example.
................................................................................................................................. 47
Figure 4-14 - Dual “Hard Shoulder Running” (HSR) Smart Motorway example. ...... 48
Figure 5-1 – Point item spatial referencing example. ............................................... 50
Figure 5-2 – Linear item spatial referencing example............................................... 51
Figure 6-1 - The data schema structure for recording condition. .............................. 60
Figure 6-2 - The data schema structure for recording litter condition. ...................... 61
Figure 6-3 - The data schema structure for recording defects. ................................. 62
Figure 6-4 - The data schema structure for recording performance. ........................ 66
Figure 6-5 - The data schema structure for recording cyclic maintenance activities. 68
Figure 7-1 - Relationship between different documents. .......................................... 70
Figure 7-2 - Relationship between elements of Information Management (from
PAS1192-3).............................................................................................................. 74
Figure 7-3 – Asset Data Exchange Options, Development, or Pre-Works. ............. 78
Figure 7-4 – Asset Data Exchange Construction. .................................................... 81
Figure 7-5 – Asset Data Exchange Handover. ......................................................... 83
Figure 7-6 - Asset Data Exchange Network Referencing ........................................ 86

Asset Data Management Manual Page 8 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
List of Tables
Table 1-1 – Currency of data upload. ....................................................................... 14
Table 3-1 – Extended name convention. .................................................................. 23
Table 3-2 – Short name convention. ........................................................................ 24
Table 4-1 - XSPs to be used in the Company's Pavement Management System and
the Provider's Routine and Planned Maintenance System. ...................................... 40
Table 5-1 - Example of the Employer's 1:2500 Network Idealisation attributes. ....... 52
Table 6-1 - The 5-point condition grading scale for constructed and non-constructed
assets. ...................................................................................................................... 58
Table 6-2 - The defined lengths for grading linear assets. ....................................... 59
Table 6-3 - Defect Record tables in Part 3 – Data Dictionary and the applicable assets.
................................................................................................................................. 63
Table 6-4 - Translation of the defect types that can be applied based on the Pavement
type. ......................................................................................................................... 64
Table 6-5 - Grading scale for the assessment of performance. ................................ 65
Table 6-6 - Assets and their applicable Environmental Objectives that require a
performance assessment. ........................................................................................ 67
Table 7-1 - Asset Data Exchange Format. ............................................................... 72
Table 7-2 - Roles and Responsibilities. .................................................................... 73
Table 7-3 - Delivery Partner actions and data. ......................................................... 85
Table 8-1 - HADDMS check report code definitions. ................................................ 96
Table 8-2 – Inspection observation codes. ............................................................... 97
Table 8-3 – Inventory observation codes. ................................................................ 99
Table 8-4 – Structural observation code and score (no defects). ............................. 99
Table 8-5 – Service observation code and score (no defects). ................................ 99
Table 8-6– Structural and Service observation codes and scores for above applicable
assets. .................................................................................................................... 103
Table 8-7– Structural and Service observation codes and scores for above applicable
assets. .................................................................................................................... 104
Table 8-8 – Structural and Service observation codes and scores for above applicable
assets. .................................................................................................................... 105
Table 8-9 – Structural and Service observation codes and scores for above applicable
assets. .................................................................................................................... 105
Table 8-10 – Structural and Service observation codes and scores for above
applicable assets. ................................................................................................... 106
Table 8-11 – Structural and Service observation codes and scores for above
applicable assets. ................................................................................................... 107

Asset Data Management Manual Page 9 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Table 8-12 – Service observation codes and scores for above applicable assets. 107
Table 8-13 – Structural and Service observation codes and scores for above
applicable assets. ................................................................................................... 110
Table 8-14 – Structural and Service observation codes and scores for above
applicable asets. .................................................................................................... 111
Table 8-15 – Structural and Service observation codes and scores for above
applicable assets. ................................................................................................... 112
Table 8-16 – Structural and Service observation codes and scores for above
applicable assets. ................................................................................................... 113
Table 8-17 – Structural and Service observation codes and scores for above
applicable assets. ................................................................................................... 114
Table 9-1 - Translation of Environmental assets in Part 3 – Data Dictionary to their
corresponding GIS layer name. .............................................................................. 116
Table 12-1– Pre-defined lookup vales for PV_XSPDET_FUNCTION. ................... 127
Table 14-1 – Additional information for Assessment Location. ............................... 130
Table 14-2 – Additional information for Activity Sub-Type. ..................................... 131
Table 14-3 – Additional information for Defect Severity. ........................................ 133
Table 14-4 – Additional information for Defect Types............................................. 144

Asset Data Management Manual Page 10 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Foreword
The Asset Data Management Manual (ADMM) sets out National Highways (the
Company’s) asset data requirements to achieve both its corporate objectives as well
as its asset management objectives. It brings clarity and consistency to reflect National
Highways asset data needs and is revised every six months to accommodate changes
and expansion to the business needs.
The ADMM contains the company’s asset data requirements to ensure the company
collects and maintains the asset data it needs to operate safely and efficiently. It is for
use by anyone creating, maintaining, or using data on behalf of or within National
Highways.
What are its components?
• Part 1 – Data Principles and Governance, which introduces the asset data
management concept and defines how this is structured and governed within
National Highways. Additionally, further guidance surrounding the purpose of
the ADMM is provided.
• Part 2 – Requirements and Additional Information, which includes National
Highways requirements for asset data management and provides supporting
guidance for each asset class.
• Part 3 – Data Dictionary, which defines the asset data requirements,
hierarchy, and rules for individual assets and attributes.
• Part 4 – Asset Reference Catalogue, which includes a tool to assist in
identifying and recording specific assets.
Additionally, a Revision Log and Change Request Submission Form are provided with
each iteration of the ADMM:
• Revision Log: provides a full listing of all changes made between versions.
• Change Request Submission Form: provides instructions for submitting a
change request. An overview of the change process is detailed in Part 1 – Data
Principles and Governance under Section 2.4 “Change Management”.
Due to the upcoming expiry of Asset Support Contract’s any related requirements have
been removed from the ADMM. Access to these requirements is only permitted via
earlier versions of the ADMM. If access is required please contact
[email protected].
Part 2 – Requirements and Additional Information

Part 2 – Requirements and Additional Information consists of two parts which detail
the requirements for asset data which have been defined to fulfil the Company’s
strategic objectives.
Part 2.1 - Generic Asset Data Requirements
The generic asset data requirements outline data requirements that apply to all
asset data unless specific exceptions are stated elsewhere in the ADMM. In particular:

Asset Data Management Manual Page 11 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
• Asset Data Lifecycle requirements, which relate to the over-arching activity of
asset data management.
o Information about Asset Data Systems; including ownership, scope and
contacts.
o Methodology for transferring data into and out of Asset Data Systems.
o Additional advice on working asset data operationally (Section 6) and in
major schemes (Section 7).
o Requirements for the approved network model (Section 4). The network
model is an information asset which generates value in the same way as
other physical infrastructure assets.

Part 2.2 - Asset Class Specific Requirements


Asset class specific requirements provide further guidance of each asset class.
Specifically, the hierarchal structure for each asset class, references to any related
Requirements and Advice Documents (RADs) and further guidance relating to the
Asset Data Categories.

Asset Data Management Manual Page 12 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
PART 2.1 – GENERIC ASSET DATA
REQUIREMENTS

Asset Data Management Manual Page 13 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
1 Overarching Data Requirements
The following requirements relate to the over-arching activity of asset data
management. These are the default Company requirements which apply unless
modified for specific purposes by other elements of the ADMM or a replacement
requirement is stated as an exception.

1.1 Spatial Referencing


For each asset where co-ordinates are required, the Easting and Northing (XY)
coordinates are referenced to the OSGB36 (Ordnance Survey Great Britain 1936)
datum. The Company requires the accuracy level for locating assets to be within 3m
on average, with an error of no more than 5m for individual assets.

1.2 Format
Data will be provided in the appropriate format as required in the ADMM or by
reference to the relevant Requirements and Advice Documents (RAD’s). Where no
format is specified in either source, the format of the data must be agreed with the
Information Custodian.

1.3 Currency
All data created by an activity will be loaded into the relevant asset data system within
three months of completion on site of the activity or within the timescales listed for the
specific activities:
Hard Surfaces, Carriageway Inventory and Network Inspections 30 days
Structures Inspections 90 days
Drainage Inspections 30 days
Geotechnical Inspections 90 days
Recording of flood events 7 days
Closure of the flood event 28 days
Other Surveys 60 days

Table 1-1 – Currency of data upload.

1.4 Completeness
All asset data which is changed by an activity is updated in the relevant prime asset
data system in its entirety.

1.5 Accuracy
The asset data which is changed by an activity shall be updated accurately into the
relevant master asset data system.

Asset Data Management Manual Page 14 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
1.6 Asset Data Systems
The Company is responsible for the provision of several systems which enable it to
meet the need to store and retrieve asset data to fulfil this asset data life cycle
requirement. The current types of asset data management systems are listed and
detailed in Section 2.
The Information Steward is responsible for ensuring that an initial population of data
is available in these systems to enable the creation, update and use of data as
required.

1.7 Governance
An Information Custodian will not release asset data without the prior approval of the
Information Steward or their named representatives.
Appropriate care should be given to the distribution of asset data as without proper
context it can be easily misinterpreted causing reputational damage to the Company
and its partners.

Asset Data Management Manual Page 15 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
2 Asset Data Systems
2.1 The Company’s Asset Data Systems
The Company has the following asset data management systems for recording
inventory, construction, condition, and maintenance data.
Future systems may be developed which provide broadly equivalent functionality to
the systems listed below:
• Routine and Planned Maintenance System
• Pavement Data Management System
• Carriageway Inventory Data Management System
• Structures Data Management System
• Geotechnical Data Management System
• Drainage Data Management System
• Environmental Data Management System
• Technology Data Management Service
The following table illustrates which systems are used for the management of each
asset class.
Asset Class Data Category Primary Asset Data
System
Pavement HAPMS
Inventory
Construction
Condition
Operational Confirm
Structures IAM-IS
Inventory
Condition
Operational
Drainage HADDMS
Inventory
Condition
Operational Confirm
Geotechnical HAGDMS
Inventory
Condition
Operational
Environmental EnvIS
Inventory
Condition
Operational Confirm
Carriageway Ancillary Confirm
Inventory
Inventory2
Operational
Carriageway Control Confirm
Inventory
Operational
Lighting Confirm
Inventory

Asset Data Management Manual Page 16 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Operational
Road Restraint Confirm
Inventory
Operational
Figure 2-1 – The Company’s Prime Asset Data Systems.

1 Operational data includes data to support routine maintenance management.


2 Carriageway Inventory is defined in Section 2.1 of Part 1 – Data Principles and Governance.

Confirm Routine and Planned Maintenance


Support:
IT Service Helpdesk ([email protected])
Scope of data:
The Routine and Planned Maintenance System includes the following functionality:
1. The ability to capture, store and report asset inventory and defect data for
carriageway inventory assets.
2. Works ordering to manage routine and planned maintenance for carriageway
inventory assets.
3. Customer enquiry management.
4. The ability to import and export data.
The Routine and Planned Maintenance System does not provide:
1. Mobile hardware.
2. An incident management system.
3. Enterprise resource or finance management capabilities.

Pavement Data Management System (HAPMS)


Support:
HAPMS Support Team (HAST) ([email protected]).
Note: non-NH users, please forward queries via your NH project sponsor, who will be
able to log your support call appropriately.

Associated documents:
• HAPMS Documentation Index - http://hawacphap013/hapms/ (available
through National Highways extranet)
• CS 228, Skidding Resistance
• CS 229, Data for Pavement Assessment
• CS 230, Pavement Maintenance Assessment

Asset Data Management Manual Page 17 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
• Various standards for carriageway inventory data as referenced in the ADMM
sub processes in this document.

Scope of data:
To provide core data on the pavement asset in support of corporate governance and
to provide a pavement management tool. To provide information for forwarding to the
public on planned road works and incidents.
Facilities within the HAPMS software are provided to update and maintain the following
information:
• Construction: HAPMS contains the definitive record of the physical construction
of the carriageway asset.
• Skidding Resistance Investigatory Level: HAPMS contains the definitive record
of Skidding Resistance Investigatory Levels for the Strategic Road Network.
• Speed Limits: NTIS contains the definitive record of speed limits on the
Strategic Road Network.
• Lane Geometry: HAPMS contains records of lane geometry, including widths,
within the XSP Detail section attribute.
Carriageway Construction
HAPMS contains the record of pavement construction for the Approved Network
Model. The pavement record is stored against each half lane width (wheel track) and
is to be updated from as-built records following all new construction / maintenance
actions.
Skidding Resistance Investigatory Levels (IL)
The skidding resistance investigatory levels are set in accordance with the Company
policy as defined in CS 228.
Speed Limits
The legal speed limit is stored against each section or parts therein, where speed limits
differ over the length of the section.
Machine Survey Pre-processor (MSP)
MSP is a stand-alone software application for the validation, route-fitting and pre-
processing of data collected during machine pavement condition surveys.
The MSP is owned by the Company and a license is not required to use it on the trunk
road network only.
Network Occupancy Management System (NOMS)
The Network Occupancy Management System (NOMS) is used for the recording of
lane closures on the Network. It ensures that all works on the Strategic Road Network
have a minimal impact on customers.
Accident Data
The Company is committed to improving safety on its network and to contribute to
achieving the Department for Transport’s casualty reduction targets. Under the
Company’s safety strategy, the ‘operational folder - operational guide to the safety

Asset Data Management Manual Page 18 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
strategic plan’ sets out guidance for managing safety, provides injury accident data at
both national and local levels, and offers information and advice on data analysis. This
advice includes suggestions for extending traditional problem identification, analysis
and prioritisation techniques and reflecting changes in accident patterns across the
Network.
With the inclusion of accident data within the HAPMS database, those individuals
working in the fields of road safety and maintenance on the trunk road network will
have desktop access to data on injury and fatal accidents.
Accident data available within HAPMS
The accident data in HAPMS relates only to reported injury accidents (no damage-
only data is included). The current policy is to accept only validated data into the
HAPMS system. This validation exercise is undertaken annually, and the data made
available between June and August of the following calendar year. The earliest year
that data is available for is 1994.
Accessing accident data using HAPMS
To obtain access to this newly available data, users are directed in the first instance
to the Contact ICT Service Desk with details of your requirements. (Note the data is
automatically available to existing HAPMS users).
Source of the accident data
The data is from the national STATS19 injury accident database. This is a database
held by the Department for Transport and contains all the objective information
recorded by the police when a road traffic accident is reported. The STATS19 form
consists of attendant circumstances, a vehicle record for each accident-involved
vehicle and a casualty record for each casualty and can be found on the DfT website.
Advice on data usage
Note: National Highways are unable to assure the quality of this data, provided by a
third-party.
This is contained in the operational folder which can be found on the DfT website.
Other sources of trunk road accident information
For additional accident information please continue to use:
• Summaries of the injury accident data relating to the motorway and trunk road
network available in the operational folder (which can be found on the Employer
web site).

IAM-IS Structures
Support:
• Engineering Issues and Access Support
([email protected])

Associated documents:

Asset Data Management Manual Page 19 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
• CG 302, As-Built, Operational and Maintenance Records for Highways
Structures.
• CS 450, Inspection of Highway Structures

Scope of data:
To provide core data on the structure’s assets in support of corporate governance,
and to provide a structures management tool.
Provides the functionality to schedule and record routine and planned maintenance
activities for Structures assets.
Associated Structure Keys
An Associated Structure Key is a cross-reference between two individual structure
keys.
Individual structure keys must be Associated if structures or parts of structures are
either structurally or operationally dependent.
In addition, they should be Associated if structures or parts of structures have a
structural or operational relationship.
It is normally intended that Associated Structure Keys are used for structures that are
in relatively close physical proximity to each other.
Examples where Structure Keys must be Associated include:
• Separate neighbouring structures carrying related vehicle traffic route(s).
• Neighbouring Structure Keys of large structures or viaducts split over multiple
Structure Keys, i.e. associate only adjoining Structure Keys, 2 or 3 in total,
rather than all sections of a viaduct.
• Neighbouring Structure Keys crossing one another, i.e. total number of levels
at grade separated junctions.
• Structure Keys where a structure is mounted on another structure with a
separate Structure Key or part thereof.
Examples where Structure Keys should be Associated include:
• Existing separate neighbouring bridges within a junction.
• Existing separate neighbouring bridges carrying related vehicle and
pedestrian traffic route(s).
• Demolished and replacement structures at the same location.
• Gantries with digital enforcement camera system(s) (HADECS3) and
accompanying external aspect verification (EAV) mast(s).
New widening and other extensions to structures must be recorded as part of the
inventory of the original structure key.
Historically existing widened or otherwise extended structures with multiple structure
keys should be combined such that they become part of the inventory of the original
structure key.

Geotechnical Data Management System (HAGDMS)

Asset Data Management Manual Page 20 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Support:
HADDMS and HAGDMS Support Team ([email protected]).

Associated documents:
• CS 641, Managing the Maintenance of Highways Geotechnical Assets.
• CD 622, Managing Geotechnical Risk.
• HAGDMS/HADDMS User Manual.
• Handover of Geotechnical As-Built Data Guidance Document.

Scope of Data:
HAGDMS contains the master data set for geotechnical asset management consisting
of inventory and condition data as defined in CS 641 and associated guidance.
It includes data relating to inspections, approvals, defects, investigations, and
geotechnical events. Geotechnical As-Built data can be held in HAGDMS, and the
process for achieving this is set out in the Handover of Geotechnical As-Built Data
Guidance Document.

Drainage Data Management System (HADDMS)


Support:
HADDMS and HAGDMS Support Team ([email protected])

Associated documents:
• CD 535, Drainage Asset Data and Risk Management.
• CD 535, England National Application Annex to Drainage Asset Data and Risk
Management.
• CS 551, Drainage Surveys.
• LA 113, Road Drainage and the Water Environment.
Supporting documents from the HADDMS downloads page:
• HAGDMS/HADDMS User Manual
• Guidance on the assessment of flooding hotspots, priority culverts, priority
outfalls and priority soakaways.
• HADDMS as-built records, attached documents and data packaging
requirements.

Scope of Data:
HADDMS is the primary national repository of the Company drainage asset inventory
and its current condition, which supports 'joined-up' processes for the management of
the Strategic Road Network.
HADDMS is not to be used for recording routine inspections or maintenance activities.

Asset Data Management Manual Page 21 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Environmental Information Systems (EnvIS)
Support:
EnvIS Management Team (EMT) ([email protected]).

Scope of Data:
EnvIS is a system for defining and categorising the man-made or natural assets within
and surrounding the Strategic Road Network. EnvIS contains environmental data and
is displayed in the Highways Agency Geographical Information System (HAGIS). The
data within EnvIS identifies the asset, location, condition, and broad management
requirements.

ServiceNow
Support:

Scope of data:
ServiceNow is an asset management tool containing a central register of inventory
information, together with maintenance records, condition, and fault information, for all
Technology Systems, including electrical equipment and roadside infrastructure.
The Roadside Operational Technology section of Part 3 – Data Dictionary articulates
the existing technology asset requirement and does not make any change to
contractual use of ServiceNow or the way data is handled at present.

Asset Data Management Manual Page 22 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
3 Transfer of Asset Data
This section refers to the generic transfer file format for assets, as detailed in the Part
3 - Data Dictionary; for purposes other than those defined by the individual systems
for the management of those assets.

3.1 General Data Transfer Requirements


The data transfer requirements for individual systems will be as agreed with the
system owners as detailed in Section 2 of this document.

3.2 File Naming Convention


Two versions of the file naming convention are defined for use in the ADMM:
• the extended naming convention (Section 3.2.1) which has been defined in
accordance with the PAS 1192-3 2014.
• the short naming convention (Section 3.2.2) which may be used where there is
no requirement to follow the standard above.
Names should be composed using characters A to Z, a to z, 0 to 9, and the _
underscore character. The following characters should not be used in names: ,. ! “ £ $
% ^ & * ( ) { }[ ] + = < > ? | \ / @ ’ ~ #¬ ` ‘
The name should use _ underscore character as the delimiter.

Extended naming convention


All relevant asset files must adhere to the following naming convention:

NH-Originator ADMM Asset Date Number Extension File type


Code
Originator is a ADMM Feature Date is The Number need have no The file name
unique abbreviation Code is a four- formed as significance, other than to give should reflect its
for the contract, it character CCYYMMDD a unique file name. It shall be format using the
shall be 2 to 6 code. . 2 characters and contain appropriate
characters long. leading zeros. The default extension (i.e. .csv)
value will be 01.
Example: HE_09_ SABO_20150713_01.csv

Table 3-1 – Extended name convention.

Short naming convention


All asset files must adhere to the following naming convention:

ADMM Asset Code Date File type


ADMM Feature Code is a four-character Date is formed as The file name should reflect its format
code. CCYYMMDD. using the appropriate extension (i.e. .csv)
Example: SABO_20150713.csv

Asset Data Management Manual Page 23 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Table 3-2 – Short name convention.

3.3 Permitted Types of File Format for the use in Data


Transfer Files
The following data file types should be used where applicable and unless otherwise
specified.
• Non-geometric data: csv – comma separated text file
• Geometric data: shapefile – a file containing geometric data and attributes.

Guidance for the use of Shape Files


A shapefile must comprise at least the following four files:
• a shape format file (*.shp)
• a shape index file (*.shx)
• a shape attribute file (*.dbf)
• a shape projection file (*.prj)
All shapefiles shall be projected to the Ordnance Survey Great Britain 1936
(OSGB1936) datum.
The purpose of storing asset data in a shape file format is to enable an asset to be
spatially referenced against other topographical features. In fulfilling this purpose, the
digitised feature must provide an adequate representation of the shape, position, or
form of the asset such as defined in the Topographical Asset Referencing section.
The first row in the shapefile shall contain the column headings in database-ready
form. This will include a different heading with alphanumeric characters and
underscores only. Part 3 – Data Dictionary provides truncated column headings for
attributes from the following asset classes:
• Ancillary
• Carriageway Control
• Drainage
• Environmental
• Geotechnical
• Lighting
• Road Restraint
The column field name must not exceed 10 characters and shall be composed from
the start of the given words, separated by underscores, to remove any ambiguity.

Asset Data Management Manual Page 24 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
4 Approved Network Model
The Company requires an accurate Approved Network Model that can be used as a
master data set to reference asset data in multiple asset data systems.
This is a modelling system which maps the position of the Strategic Road Network,
facilitating:
• Geospatial location of assets/objects.
• Linear referencing in relation to the carriageway.
The master data set is maintained in the Pavement Management System; this forms
the definitive record of the network. The data set must be complete, current, and
correct.
Complete means that all changes as a result of adoptions or stopping up orders are
reflected in the model, where deficiencies are discovered, the network must be
amended.
Current means either by the date of the adoption or stopping up order, or within 30
days of identifying and validating the change due to a deficiency.
Correct means that the model and changes to the model are made in line with the
requirements set out in this section.

4.1 Section Referencing Principles


Section referencing divides the Network into sections, each having fixed start and end
positions and road alignment. Each section also has certain constant characteristics
along its length, for example, the number of permanent lanes and environment
(rural/urban).
Sections must be terminated at the following locations:
• Major road junction
• End of slip road taper (sections on both the slip road and main carriageway must
terminate)
• Change from one-way to two-way traffic or vice versa
• Change in the number of permanent lanes (short lengths of additional or
reduced lanes at or around junctions may be ignored)
• Rural/urban boundary
• Area/region boundary
• Change of road number (including, for example, a change from A1 to A1M)
• End of Strategic Road Network, e.g. the road becomes a local road
In addition, care should be taken to select practical section lengths because accuracy
is essential to all aspects of section referencing. When selecting sections, account

Asset Data Management Manual Page 25 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
should also be taken of the recommendations on network referencing contained in this
document.
Note that:
• Each side of a dual carriageway must be referenced separately
• Lay-bys separated from the main carriageway (known as ox-bow lay-bys) are
sections in their own right. It is not necessary to split sections on the main
carriageway to form a junction between the main carriageway and the lay-by.
• Roundabouts are referenced as separate sections.

Section Labels
Each section is assigned a section label formulated as follows:
• A four-digit Agent Authority (AA) area code, followed by
• An “A” or “M” character depending on the section’s road class, followed by
• The road number of up to four digits, followed by
• An optional “M” character (depending on the road class), followed by
• A forward slash (“/”), followed by
• A section number of up to three digits
The following are all examples of syntactically valid section labels:
• 1900M1/3
• 1900M62/105
• 1900A1M/25
• 1900A1001M/123
• 1900A10/15
• 4720A6120/103
Each section label is individual to that section, irrespective of surrounding sections.
There is no requirement to maintain sequential labelling of sections along a road.

Chainage
Chainage forms part of the linear networking system; a count of distance from the
section start to the section end, in metres. Chainage corresponds to the direction of
referencing. This is used for locating a variety of assets, in addition to operational uses
planning and deploying personnel, locating works, etc.

Agent Authority Area Codes


Agent Authority (AA) Area Codes are used for the referencing of sections. In most
cases AA area codes correspond to Local Authority areas (Counties and Metropolitan

Asset Data Management Manual Page 26 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Authorities) and must be used for the referencing of sections wholly or primarily within
those areas. However, each Service Provider is also assigned its own AA area code
which may be used, but only with the approval of the Network Auditor.
For the complete list of Company Authority Area Codes refer to the DfT website.

Section Start and End Dates


Each section has a start date, i.e. the date on which it is considered to have become
part of the Approved Network.
Initially each section will not have an end date – it will be known as a “Live” section. An
end-date will be defined when the section is no longer considered to be part of the
Approved Network. This will be either because the length of road no longer exists, has
been de-trunked or has been re-referenced.

Section Reference Markers


Section start, and end points are referenced on the ground by one or more pairs of
cored thermoplastic markers (Asset = Node Stud (MKNS), Type = Section Reference
Marker) positioned in the left-hand lane of dual carriageways or one-way single
carriageways and on both sides of two-way single carriageways. The markers are
100mm in diameter and placed 175mm apart. They have a depth of between 10mm
and 20mm and the top surface is level with the road surface. The material is a plastic
resin with white filler that contains reflective glass particles. It conforms to BS 3262
(1989).
The section reference markers referred to in this section are patented. The Company
has authority to install them as section reference markers on its carriageways. They
cannot be used for any other purpose (e.g. delineating zebra or pelican crossings) or
on any other roads without the patent being infringed. The patent number is
GB2179385B and is administered by:
East Midlands Diamond Drilling Ltd., a member of the Vickers Highbank Group
Ltd.,
Churchfield House,
1 Lockwood Close,
Top Valley,
Nottingham
(0115 967 9000).
The section reference markers form the first order of surveying reference for all
maintenance assessment surveys (excluding TRACS, TRASS, or Retro-reflectivity
surveys). They must be positioned with a longitudinal tolerance of ±0.25m. The centres
of the 100mm diameter holes used to form the section reference markers must be
175mm ±5mm apart.

Asset Data Management Manual Page 27 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
4.1.5.1 Typical On-Carriageway Layouts
Examples of typical use of on-carriageway layouts for Section Node Reference
Markers are shown in the figures below.
These notes apply to all Figures in this Section:
• On dual carriageways, section reference markers must be positioned in the
centre of the wheel tracks of the left-hand lane.
• On single carriageways section reference markers must be positioned in the
centre of the wheel tracks in the left-hand lane in both directions.
• Section reference markers must be installed at staggered crossroads as if it is
two separate ‘T’ junctions.
• The cored thermoplastic markers must be installed on a line perpendicular to
the nearside kerb, edge line or projected kerb line passing through the notional
position of the end of the sections(s). Markers must be installed clear of all
carriageway markings.

Asset Data Management Manual Page 28 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Figure 4-1 - Position of Markers of Two-Lane Dual Carriageway.

Asset Data Management Manual Page 29 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Figure 4-2 - Markers on Two Way Single Carriageway.

Asset Data Management Manual Page 30 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Figure 4-3 - Start of Dual Carriageway.

Asset Data Management Manual Page 31 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Figure 4-4 - Slip Road entering Main Carriageway.

Asset Data Management Manual Page 32 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Figure 4-5 - Main Line Additional at a Ghost Island Merge.

Asset Data Management Manual Page 33 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Figure 4-6 - Lane Gain and Drop – where the entering/leaving traffic is likely to use the additional left hand lane.

Asset Data Management Manual Page 34 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Figure 4-7 - Lane Gain and Drop – where the through traffic is likely to use the additional left-hand lane.

Asset Data Management Manual Page 35 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
4.2 Section Referencing Procedures
Section referencing is primarily a desk exercise but should be supported by site visits
if necessary.

Section Length Changes – Re-Referencing / Re-Calibrating a


Section
Before changing a section’s length, the distance between the start and end section
reference markers must be measured using a calibrated measuring device, capable
of measuring to an accuracy of ±1m. If the section reference markers are not in place,
these must be re-instated before the length is measured.
If a section length is found to be wrong, adjacent sections must be investigated to
ensure the overall Network length is consistent with identifiable physical features, for
example, roundabouts.
Re-calibrating a section causes associated condition data to be stretched (or shrunk)
in length.
Sections should only be re-calibrated when correcting a section length that was found
to be wrong.
If a section’s measured length is more than 10% (for sections shorter than or equal to
500m in length) or 50m (for sections over 500m) of the current the Company’s
Pavement Data Management System length, and other data is located on that section
(for example, condition data) the section must be re-referenced not re-calibrated.
Re-referencing means end-dating an old section and creating a new one – it should
happen only when sections change or are outside the recalibration tolerance. The new
section created should be populated with any condition and wheel track information
from the original section - copied and assigned to the relevant lanes - ensuring that
survey data remains assigned to the correct real-world location.
A section must be re-referenced under the following circumstances:
• The start and/or end point of the section has moved (for example, the taper of
a slip road has been extended). This may also result in a length change;
• A change in section function or direction, or;
• A change in the number of permanent lanes, environment or one-way or two-
way status.
• An error in the length has been identified and re-calibration is not possible
because of the recalibration tolerances are exceeded.

Changes Instigated by the Company


The Company reserves the right to make changes to section referencing.

Changes to the Approved Network within the Company’s Pavement


Data Management System

Asset Data Management Manual Page 36 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
If any of the characteristics of a section are altered, the section must be retired, and
one or more sections created. This is done by giving the original section an appropriate
end date and creating the new section(s), with the updated characteristics, giving
it/them a start date that is one day after the end date of the now retired section. (See
section 4.1.4).
Where a section becomes no longer a part of the Approved Network, such as when it
is detrunked or demolished, it must be retired by giving it an appropriate end date.

Re-Use of Section Labels


Section labels of retired sections may be re-used. Re-used section labels must have
a start date after the end date of the retired section previously using the label.

Section Creation and Retirement Data


Introduction
This section describes the data requirements within the Company’s Pavement Data
Management System to support the Company’s System for Management (SfM) Phase
2 Network Assets Solution.
Data Requirement
When any section is created or retired, the reason (and certain other data) must be
entered into the Company’s Pavement Data Management System.
Within the Company’s Pavement Data Management System, the section data fields
required for SfM are:
• Road, section label
• Start date
• End date
• Length
• Section Function
• Operational Area
• Permanent Lanes
• Single or Dual
• Environment
• Local Authority
Sections Creation
For all sections created the following data is also required:
Creation Type
Creation Type is to be selected from the following:

Asset Data Management Manual Page 37 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
• New Build. For all section creations resulting from a construction or
improvement scheme. This includes modified sections – e.g. where they are
widened or lengthened.
• Trunking. When the section addition results from a local authority road being
brought into the Company’s ownership.
• Re-referencing. The new section has been created solely due to re-referencing
– this is most common following a road number change.
• Data Cleansing. When a section is ‘found’ i.e. the section has been in existence
and under the control of the Company but has not previously been recorded.
PIN (Project Identification Number)
All “New Build” sections require the PIN field to be populated with the PIN of the project
that created that section.
Traffic Accumulation Date
The Traffic Accumulation Date should be set to the date of last major strengthening or
the date of original construction if no major strengthening has since been carried out.
Retired Sections
For all sections retired the following data is also required:
Retirement Type
Retirement Type is to be selected from the following:
• Demolition. For all section retirements resulting from a construction scheme,
e.g. an existing pavement section is demolished as part of a bypass scheme.
• Detrunking. When the section retirement results from the section being
transferred to local authority management.
• Re-referencing. The section has been retired solely due to re-referencing – this
is most common following a road number change.
• Data Cleansing. This type should be selected when a section is retired because
it should not be recorded as a section e.g. a single physical section has been
recorded twice.
PIN (Project Number)
All “Demolition” sections require the PIN field to be populated.
N.B. Within the Company’s Pavement Data Management System, the above Creation
and Retirement data can vary by chainage within a section.

4.3 Geographic Representation


Two geographic representations of each section are held within the Company’s
Pavement Data Management System. These are known as the 1:50,000 and 1:2,500
idealisations.

Asset Data Management Manual Page 38 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
4.4 Location Reference Points (LRPs)
Within the Company’s Pavement Data Management System Location Reference
Points (LRPs) can be recorded against sections.
A Location Reference Point (LRP) is a known point somewhere on a section.
• LRPs are virtual assets, requiring no physical presence in the real-world
location.
• However, they may be associated with the presence of a Node Stud asset,
marked on the carriageway at the real-world location.
Each LRP is given a label, a chainage, a cross-section position (XSP), a position within
the XSP between 0.0 (left hand side) and 1.0 (right hand side), and a pair of
coordinates.

Use of LRPs with the Company’s Pavement Data Management


System
Currently the only direct use of LRPs within the Company’s Pavement Data
Management System are as reference points for the start and end of survey lanes
within planned survey routes. When a planned survey route is created, for each survey
lane the Company’s Pavement Data Management System will search for a LRP in the
following sequence:
• An LRP at the start of the survey lane in the survey lane XSP;
• An LRP at the start of the survey lane in another XSP;
• An LRP at the end of the preceding survey lane in its XSP;
• An LRP at the end of the preceding survey lane in another XSP.

4.5 Cross Section Positions


Each reference section represents a strip of road including both the carriageway and
off-carriageway features (e.g. footways and verges) up to the highway boundary. The
section therefore may be considered to consist of several longitudinal strips that
correspond to features such as lanes, and lines that indicate the edge of the
carriageway etc. These longitudinal strips and lines are referred to as Cross Section
Positions (XSPs). It should be noted that each strip does not have to have a constant
width.
The XSPs that may be used within the Company’s Pavement Data Management
System are shown in Table 4-1 with the numbering and position of the XSPs across
the highway:

Name of XSP Abbreviation Strip or Line Numbering Convention

Left Boundary LB Line

Asset Data Management Manual Page 39 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Name of XSP Abbreviation Strip or Line Numbering Convention

Left Boundary Area LA Strip

Left Off Carriageway L Strip 1 to 9, right to left

Left Edge LE Line

Left Hard Shoulder LH Strip

Left Additional Nearside Lane -L Strip 1 to 9, right to left

Left Permanent Lane CL Strip 1 to 9, left to right

Left Additional Offside Lane +L Strip 1 to 9, left to right

Centre Line CC Line

Right Additional Offside Lane +R Strip 1 to 9, right to left

Right Permanent Lane CR Strip 1 to 9, right to left

Right Additional Nearside Lane -R Strip 1 to 9, left to right

Right Hard Shoulder RH Strip

Right Edge RE Line

Right Off Carriageway R Strip 1 to 9, left to right

Right Boundary Area RA Strip

Right Boundary RB Line

Table 4-1 - XSPs to be used in the Company's Pavement Management System and the
Provider's Routine and Planned Maintenance System.

The Implied Direction of Reference of the section is ‘left to right across the page’. The
shaded XSPs correspond to the longitudinal lines, the un-shaded XSPs to longitudinal
strips.

Asset Data Management Manual Page 40 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Figure 4-8 - XSP lines and strips.

Items at XSP Boundaries


Items occuring at the boundary of two cross sectional positions must be recorded as,
described in the following sub-sections.
Note:
• The two sides of a dual carriageway must be modelled separately, this section
assumes this to be the case.
• The outer lane or outer strip must not be confused with the outside lane, in the
overtaking sense, they are different.

XSP Positions for Different Carriageway Types


The following Figures show some examples of XSP positions for different carriageway
types.

Asset Data Management Manual Page 41 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Note: Within the following example diagrams the XSP lines and strips are highlighted
with blue and white labelled cubes respectively. For clarity, each Section is shown
with Direction of Reference highlighted by a blue arrow/line.
It should be noted that the XSP conventions assume that the two sides of a dual
carriageway are modelled independently. Thus, any details relating to shared
elements in the central reservation must be modelled by Right Off Carriageway XSPs,
for the side of the dual carriageway which is the nominated carriageway. Also, as
shown below, some XSPs may have an ‘index’ in the range 1 to 9.

Asset Data Management Manual Page 42 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Figure 4-9 - Dual 2 Lane Layout example.

Asset Data Management Manual Page 43 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Figure 4-10 - Single 2 Lane 2 Way Layout example.

Asset Data Management Manual Page 44 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Figure 4-11 - Single 3 Lane 2 Way Layout example.

Asset Data Management Manual Page 45 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Figure 4-12 - Dual 3 Lane Motorway Layout example.

Asset Data Management Manual Page 46 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Figure 4-13 – “Dual All Lane Running” (ALR) Smart Motorway Layout example.

Asset Data Management Manual Page 47 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Figure 4-14 - Dual “Hard Shoulder Running” (HSR) Smart Motorway example.

Asset Data Management Manual Page 48 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
XSPs on Smart Motorway Schemes:
Note that Figures 4-13 and 4-14 refer specifically to Smart Motorway Schemes. When
consulting these diagrams appreciate the following:
• All Lane Running (ALR) – a Smart Motorway where there is no continuous hard
shoulder; all lanes (typically four) are used for moving traffic. Emergency Areas
are present intermittently, to allow refuge in the case of incident or emergency.
• Hard Shoulder Running (HSR) – a Smart Motorway where the hard shoulder
may be flexibly used for vehicle traffic (only under specific instruction from the
overhead signage). Emergency areas also present intermittently, to allow
refuge in the case of incident or emergency.
XSP Boundaries with an XSP of Type = Line:
Where an item occurs at the conjunction of two or three XSPs, and one of those XSPs
is of type line as defined in Figure 4-8, then the item must be recorded as having the
XSP of type line.
Examples:
1. A longitudinal road marking occuring at the right edge of the fast lane of a
carriageway, between the carriageway and the central reserve where there is
no right edge strip / hard shoulder, is recorded at the line XSP Right Edge (XSP
RE). See Dual 2 Lane layout at Figure 4-9.
2. A line of road studs marking the centre of a two-way section, is recorded at the
line XSP Centre Line (XSP CC). See Single 2 Lane 2 Way layout at Figure 4-10
above.
XSP Boundaries without an XSP of Type = Line:
Where an item occurs at the bounary of two XSPs, of type strip, and there is no XSP
of type line at that location, as defined in Figure 4-8. Then the item must be recorded
as having the XSP of the outer strip.
The outer strip is that furthest from the Right Edge (XSP RE), for a one-way section
(including a dual carriageway section). It is the furthest from the Centre Line (XSP CC)
for a two-way section.
Examples:
1. A longitudinal road marking occuring between lane 1 and 2 of a one-way section
(XSPs CL1 and CL2), is recorded at the strip XSP Left Permanent Lane 1 (CL1).
See Dual 2 Lane layout at Figure 4-9.
2. A line of road studs occuring between right hand lanes 1 and 2 of a two-way
section (XSPs CR1 and CR2), is recorded at the strip XSP Right Permanent
Lane 1 (CR1). See Single 3 Lane 2 Way layout at Figure 4-11.
3. A longitudinal road marking occurring between lane 3 and a right edge strip /
hard shoulder, of a 3-lane dual carriageway section (XSPs CL3 and RH) is
recorded at the strip XSP Left Permanent Lane 3 (CL3). See Dual 3 Lane
Motorway layout at Figure 4-12.

Asset Data Management Manual Page 49 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
5 Locating Assets
5.1 Topographical Asset Referencing

Point Items
The location of the asset should be recorded as the centroid (geographic centre),
according to the Company’s requirements for spatial referencing (Section 1.1) unless
additional requirements are specified. New point assets must be located by XY
coordinates and section, chainage and XSP.
Recorded assets must not overlap other recorded assets unless this is the true
representation of asset.

Figure 5-1 – Point item spatial referencing example.

Linear Items
The location of the asset should be recorded with the start/end point with sufficient
vertices to ensure an accurate spatial representation of the centre line of the asset,
according to the Company’s requirements for spatial referencing (Section 1.1) unless
additional requirements are specified. These requirements apply to the vertices and
vectors between vertices as well as the whole asset. New linear assets must be
located by section, chainage and XSP.
For a linear asset which connects to another asset, the digitised feature must be
snapped onto the connecting asset digitisation creating a contiguous feature.
Digitised features must not overlap other features unless this is the true representation
of asset.

Asset Data Management Manual Page 50 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Figure 5-2 – Linear item spatial referencing example.

Note: when recording linear assets which may run perpendicular to the network
idealisation (e.g. Footways or Steps) convention must be followed to ensure that,
where present, attribute values for “Start Chainage” and “End Chainage” have a
minimum difference of 1m. This is to ensure the asset is compatible with linear
referencing systems.

Polygon Items
The location of the asset should be recorded with enough vertices to ensure an
accurate spatial representation of the boundary or outline of the asset, according to
the Company’s requirements for spatial referencing (Section 1.1) unless additional
requirements are specified. These requirements apply to the vertices and vectors
between vertices as well as the whole asset. New polygon assets must be located by
XY coordinates and section, chainage and XSP using the centroid of the polygon as
reference for the XY and chainage.
For a polygon asset which borders another polygon asset it must be snapped onto the
bordering asset, so it is contiguous.
Digitised features must not overlap other features unless this is the true representation
of asset.

Recording Individual Assets


Each asset record must have a single consistent set of attribute values.
This is critical to the recording of linear/polygonal assets, where a physical asset can
continue uninterrupted, but a variation in form (attributes) may occur. E.g. a Steel
Safety Barrier can transition its beam profile from ‘boxed’ to ‘corrugated’.
Where a physical asset continues uninterrupted, but the attributes vary, the record
must be divided, creating multiple assets corresponding to the position and variation
of attributes.
Part 3 - Data Dictionary defines additional rules for specific assets to aid understanding
of recording/division.

Asset Data Management Manual Page 51 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
5.2 Linear Asset Referencing
Section 4 of this document details the convention for referencing to the National
Highways network model. This includes details on Sections, Chainage, and cross-
sectional positions (XSPs).
For each asset collected, the relevant Section Label and the Start and/or End chainage
from within the section shall be associated with the Company’s 1:2500 Network
Idealisation (see Table 5-1).

Matching Assets to Sections


Each individual asset must be recorded and referenced to a single network section.
Assets are referenced to a corresponding section based on their position orthogonal
to the network.
Point assets occupy a single discrete position, making this calculation straightforward.
However, linear/polygonal asset types run along(side) the carriageway; and can
appear in consecutive sections. E.g. Safety Barrier may appear continuously, running
adjacent to the carriageway, for many kilometres through multiple sections.
Where a physical asset crosses more than one section, the record must be divided,
creating multiple assets corresponding to the sections they fall within.
Note: if less than 1m (measured longitudinally to the carriageway) of the asset crosses
into an adjacent section, this is not considered an independent asset. As 1m is the
minimum recorded length for linear assets.
funct_name

direc_code
sec_length

area_name

dual_name
sect_label

0200A1/156 710 Main Carriageway Area X NB Dual Carriageway (Nominated)


0200A1/188 1586 Main Carriageway Area X NB Dual Carriageway (Nominated)
0200A1/173 1719 Main Carriageway Area X SB Dual Carriageway (Not Nominated)
0200A1/152 211 Roundabout Area X CW One Way Single Carriageway

Table 5-1 - Example of the Employer's 1:2500 Network Idealisation attributes.

For the calculation of chainage from spatially located assets, the spatial coordinate at
any given point shall be projected tangentially to the section and the distance then
calculated from the first vertex based upon the actual length of the section in the
direction of travel. Start chainage shall always be less than the end chainage.
For Motorways and Dual Carriageways, each carriageway has a separate section, and
therefore chainage will always increase with the direction of referencing.
However, Single Carriageways have one section relative to both directions of travel:

Asset Data Management Manual Page 52 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
• The lanes which share direction of travel with the direction of referencing, will
have increasing chainage (for example – Left Permanent Lane 1 in XSP terms
(see Section 4.5.1)).
• The lanes which have direction of travel opposite to the direction of referencing,
will have decreasing chainage (for example – Right Permanent Lane 1 in XSP
terms (see Section 4.5.1)).

5.3 Nominated Carriageway


Assets which are relative to or shared between two separate sections i.e. a Double
Sided VRS in the central reserve of a dual carriageway shall be recorded in the
nominated carriageway only, which will negate the potential to record an asset twice
i.e. in both directions thus “double booking” assets.

5.4 Boundary Extents


All assets shall be collected within the highway boundary, defined between boundary
fences, walls, hedges and other similar features for mainline sections. For other areas,
the following rules shall apply if adjoining 3rd party roads/sections.
• Junctions, End of Exit Slip and beginning of Entry Slips – Give Way Road
Markings perpendicular across the carriageway (feature included)
• Roundabouts
o On carriageway features (Road Markings etc.) - Outside of Kerbs and/or
Road Markings (both features included)
o Off carriageway features (Signs, Lighting Points etc.) – Within 10m of
the on-carriageway features stated above
• For Drainage assets follow the guidance set out in CD 535.

Asset Data Management Manual Page 53 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
6 Operational Data Management and Requirements
6.1 Operational Roles and Responsibilities
National Highways is responsible for ensuring that asset data is up to date and
accurate. To achieve this, National Highways have defined asset data governance
roles as laid out in the following sections.
There are no defined roles for suppliers relating to asset data. All requirements for
suppliers are defined in their respective contract (which may include reference to this
document) and may include requirements for:
• Providing asset data in an accurate manner.
• Use of asset information systems.

Asset Data and Intelligence Manager


The Asset Data & Intelligence Manager oversees regional asset data activities.
Specific responsibilities include:
• Implementing asset information policy e.g. primacy, access, and update cycles.
• Implementing national and local asset information management processes,
ensuring these are resourced and are operationally effective.
• Supporting Asset Data Custodians to achieve compliance with asset data
requirements and the ADMM, including facilitating continual improvement.
• Ensuring that local and central asset information management systems are
aligned.

Asset Data Custodians


Asset Data Custodians are responsible for controlling quality of asset data. The Asset
Data Custodians will, for their relevant asset class, ensure that asset data is:
• complete;
• correct;
• accurate;
• current;
• integral from point of capture to point of load into the relevant primary asset
data system;
• compliant with the relevant standards;
• available in the relevant asset data system in a timely manner, and
• referenced using the metadata as defined in the relevant asset data
management system.

Asset Data Management Manual Page 54 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
The Asset Data Custodians will, for their relevant asset class:
• Drive continual improvement in asset data management, including working with
the appropriate Asset Type Specialist to identify improvements to specifications
for asset data management and improvements to asset data management
systems;
• ensure compliance with all data management specifications;
• act as focal point to receive any communications regarding changes to the
specifications for data management or asset data management systems and
communication of these changes to relevant regional personnel;
• be the first point of contact for providing access to the relevant asset data
management systems; and
• manage access rights to the asset data management systems.
The role of these Asset Data Custodian is to be undertaken by the Engineering Team
Manager for the relevant asset class within their operational area. The roles are not
mutually exclusive, and one individual may carry out more than one role.

Pavement Data Custodian


The Pavement Data Custodian is responsible for controlling the quality of pavement
asset data in the Pavement Data Management System.

Structures Data Custodian


This Structures Data Custodian is responsible for controlling the quality of structures
asset data in the Structures Data Management System.

Geotechnical Maintenance Liaison Engineer (GMLE)


The GMLE is responsible for all operational geotechnical management activities
including geotechnical asset data. The GMLE is to be appointed in accordance with
the requirements of CS 641.
The GMLE will, in addition to the obligations in section 2.1 of Part 1 – Data Principles
and Governance, liaise directly with the Geotechnical Advisor as required.

Drainage Liaison Engineer (DLE)


The DLE is responsible for all drainage surveys, maintenance, and renewals. The DLE
is to be appointed in accordance with the requirements of CD 535, including ensuring
that requirements for minimum qualifications and experience are met.
The DLE will, in addition to the obligations in section 2.1 of Part 1 – Data Principles
and Governance, ensure compliance with the requirements of CD 535 and CS 551.
The DLE may choose to appoint a dedicated Flood Champion. The Flood Champion
is responsible for the integration and coordination of flood risk management. The Flood

Asset Data Management Manual Page 55 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Champion is to be appointed in accordance with the requirements of CD 535, including
ensuring that requirements for minimum qualifications and experience are met. The
Flood Champion will ensure compliance with all data management specifications
relevant to managing the flood hotspots in accordance with CD 535.

Carriageway Inventory Data Custodian


The Carriageway Inventory Data Custodian is responsible for controlling the quality of
carriageway inventory asset data (section 2.1) in the Routine and Planned
Maintenance System and the Carriageway Inventory Data Management System.

Lighting Liaison Engineer (LLE)


The LLE is responsible for the provision of timely and up to date inventory data to meet
the requirements of the applicable asset data management system.
The LLE’s duties will, in addition to the obligations in section 2.1 of Part 1 – Data
Principles and Governance:
• submit an inventory monthly return to the System Administrator;
• follow up on error correction of the inventory as advised by the System
Administrator or unmetered supplies operator (UMSO); and
• ensure that all the equipment is maintained in good working order.

Environmental Liaison Co-ordinator (ELC)


The ELC is responsible for coordinating and overseeing environmental operations and
includes both asset inventory activities and activities associated with ensuring
regulatory compliance and permit renewal.
The ELC will, in addition to the obligations in section 2.1 of Part 1 – Data Principles
and Governance:
• Work with cross-functional teams to maintain environmental management and
monitoring programmes as well as developing and encouraging sustainability
reporting; and
• Assess potential environmental risks and develop mitigation plans. Follow and
enforce environmental health and safety procedures along with CDM
regulations.

Technology Data Custodian


The Technology Data Custodian is responsible for controlling the quality of technology
asset data in the Technology Data Management System.

Network Referencing Manager (NRM) and Deputy

Asset Data Management Manual Page 56 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
The NRM and deputy must be fully appraised of the Approved Network maintenance
procedures and must have attended the NRM course run by National Highways or
other persons authorised by the National Highways.
The role of the NRM is to be undertaken by the Asset Data & Intelligence Manager.
The NRM:
• Is responsible for the accuracy, completeness, and timeliness of the updates to
the Approved Network Model; and
• Is responsible for liaison with the Network Auditor regarding section referencing
when necessary.

Network Auditor
This role is fulfilled by the HAST team.

6.2 Condition Inspections


GS 801 identifies the following inspection type to mitigate asset condition risks:
• Network Condition - asset condition inspections that look at the longer-term
condition of all asset.

Inspections for Network Condition are intended to gather data on the long-term
performance of the asset. This is achieved by applying condition grades to each asset
that will be used to inform the planning and generation of future renewal schemes. GS
801 defines the frequency at which each asset type should be inspected for condition.

DMRB Condition Grading


The following DMRB guidance shall be referred to in assessing condition and grading:
• Carriageway Control:
o Road Markings and Road Studs – shall be considered in line with CS
126 and the NAA of CS 126.
o Posts and Sign Faces – shall be considered in line with CS 125.
• Drainage: shall be considered in accordance with CS 551.
• Environmental:
o Cultural Heritage - shall be considered in line with LA 116
• Geotechnical: shall be considered in accordance with CS 641.
• Lighting: shall be considered in accordance with TS 501.
• Structures: shall be considered in accordance with CS 450.
• Road Restraint:
o Safety Barriers - considered in line with section 3 of BS 7669.

Part 3 – Data Dictionary articulates the data requirements for the assessment of
condition for Cultural Heritage, Drainage, Geotechnical, and Structures assets.

Asset Data Management Manual Page 57 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Asset Condition Grading
Where no asset grading system exists in the DMRB, i.e. where assets typically form
part of general highway inspections and do not require specialist discipline training,
the assets will be assessed using a 5-point condition grading scale. GS 801 defines
the 5-point condition grading scale, which is shown in Table 6-1.
Grade Description

1 As New/ No deterioration/Meeting management plan

2 Superficial damage/Deterioration with no loss of performance

3 Some damage/Deterioration and performance may be slightly reduced

4 Significant damage/Deterioration and performance may be severely reduced

5 Significant damage/Deterioration/Missing/ Failed and no longer fulfils its intended purpose

Table 6-1 - The 5-point condition grading scale for constructed and non-constructed assets.

Detailed condition grading criteria for the application of the 5-point condition grading
scale to each relevant asset is included in Appendix A:.

When using this condition grading scale, additional grades of 9 or 0 may be assigned
in the following circumstances:
• A Grade 9 should be assigned where the inspection of an asset has been
attempted, but it was not possible to assess its condition. Examples of such
instances may be when access to the asset is not possible (e.g. a manhole
cover can be seen but not accessed due to excessive vegetation).
• A Grade 0 should be assigned where the inspection of an asset has not been
attempted. Examples of such instances may be because the asset record was
not produced during a field survey, recording of that asset's condition is
irrelevant (e.g. for ghost nodes), or because the previously recorded asset
could not be found in the field (e.g. a manhole cover cannot be found in the
location where it should be).

The following must be considered when applying the 5-point condition grade:
• Asset condition grades are to be applied following a visual assessment.
• A ‘whole number’ condition grade should be assigned to each asset inspected
i.e. no decimals.
• The worst-case component score shall be allocated to the asset, not the
average score.
• Where it has only been possible to inspect part of an asset, the condition grade
applied should reflect those parts that have been seen. For example, it may not
be possible to inspect an asset fully due to severely overgrown vegetation.

Asset Data Management Manual Page 58 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
• Each asset should be scored ‘as seen’ regardless of whether maintenance or
repair works are planned for that asset. The condition grade should then be
reset on completion of any maintenance or repair works.
• It may be appropriate for some asset types to use only parts of the grading table
e.g. grade 1, 3 and 5. This is highlighted, where appropriate, in Appendix A:.
• Grading of linear assets will be carried out on defined sections/lengths. The
applicable assets and their respective segments/lengths are outlined in table 6-
2:
Asset Class Asset Name Distance

Ancillary Bridleway 100m

Combined
Ancillary Cycle Track 100m
and Footway

Ancillary Cycle Track 100m

Ancillary Footway 100m

Carriageway
Fence 20m
Control
Carriageway
Block Wall 20m
Control
Carriageway
Brick Wall 20m
Control
Carriageway
Stone Wall 20m
Control
Pavement
Pavement 100m
Section

Environmental Hedgerow 200m

Linear
Environmental 200m
Woodland Belt
Pedestrian
Road Restraint 20m
Guard Rail
Safety Barrier
Road Restraint TBC
(Concrete)
Safety Barrier
Road Restraint 30m
(Steel)
VRS Add On
Road Restraint Motorcycle 30m
Protection
Table 6-2 - The defined lengths for grading linear assets.

Recording Asset Condition

Asset Data Management Manual Page 59 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Figure 6-1 outlines the structure of the data schema for recording condition against an
asset. Part 3 – Data Dictionary articulates the requirements for condition as three
separate tables:
• Inspection Record
• Condition Record for Point/Polygon Assets
• Condition Record for Linear Assets
The Inspection Record defines who conducted the inspection and when; this is
referentially linked to a Condition Record, which holds information defining the
condition of the asset (using the 5-point condition grading scale). In turn this is
referentially linked to the Asset Record. For a linear asset (e.g. a Safety Barrier)
multiple Condition Records would be appended to an Inspection Record and an Asset
Record in line with the linear segmentation method.

Figure 6-1 - The data schema structure for recording condition.

6.3 Litter Condition Grading


GS 801 states that the cleanliness of paved and non-paved areas on the affected
property should be assessed and recorded annually. The grading of litter condition
should be based on the 5-point condition grading scale set out in Table 6-1 and
recorded by road section.
The following must be considered when applying the 5-point condition grade:
• Litter condition grades are to be applied following a visual assessment.
• A ‘whole number’ condition grade should be assigned to each asset inspected
i.e. no decimals.
• The worst-case component score shall be allocated to the road section, not
the average score.

Asset Data Management Manual Page 60 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
• Litter condition should be scored ‘as seen’ regardless of whether maintenance
or repair works are planned.

Recording Litter Condition


Figure 6-2 outlines the structure of the data schema for recording litter condition. Part
3 – Data Dictionary articulates the requirements for litter condition as two separate
tables:
• Inspection Record
• Litter Condition Record
The Inspection Record defines who conducted the inspection and when; this is
referentially linked to a Litter Condition record, which holds information defining the
litter condition of the road section. Additionally, the road section being inspected
should also be recorded as part of the Litter Condition record.

Figure 6-2 - The data schema structure for recording litter condition.

6.4 Network Safety Inspections


GS 801 defines a defect as when an asset:
1. Causes an unintended hazard, nuisance, or danger to the users of the highway.
2. Represents a deterioration from the normal condition.
3. Prevents the asset from acting in the intended manner.
4. Is damaged.
5. Is likely to increase the rate of deterioration of another asset.
Undertaking Network Safety patrols and inspections to ensure the network is safe and
serviceable and to identify and classify defects to assets should be done in conjunction
with GS 801.

Asset Data Management Manual Page 61 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Recording Asset Defects
Figure 6-3 outlines the data schema structure for recording defects against an asset.
Part 3 – Data Dictionary articulates the requirement for defects as a Safety Patrol
Record and a Defect Record. The Safety Patrol Record holds information pertaining
to the date and name of the safety patroller, this is referentially linked to a Defect
Record which defines the type of defect, date and time of identification, and an
indication of its location. The Defect Record is referentially linked to the relevant Asset
Record. Note: multiple Defect Records can be assigned against an individual Asset
Record.

Figure 6-3 - The data schema structure for recording defects.

Defect Record Tables


Multiple Defect Record tables exist in Part 3 – Data Dictionary to account for the varied
defect types that can be recorded against certain assets (i.e. Pavement). Table 6-3
outlines the different tables articulated.
Table Name (in Part 3 – Data Asset Class Applicable Assets
Dictionary)
Bridleway Defect Record Ancillary Bridleway
Crisis Signage Defect Record Ancillary Crisis Signage
Equipment Store/Switch Room Ancillary Equipment Store, Switch Room
Defect Record
Footway/Cycle Track Defect Ancillary Combined Cycle Track and
Record Footway, Crossover, Cycle Track,
Footway
Handrail Defect Record Ancillary Handrail
Non-Carriageway Surface Ancillary Non-Carriageway Surface
Defect Record
Pedestrian Crossing Defect Ancillary Pedestrian Crossing
Record
Salt Bin/Spill Kit Defect Record Ancillary Salt Bin, Spill Kit
Snow Gate Defect Record Ancillary Snow Gate
Steps Defect Record Ancillary Steps
Stile Defect Record Ancillary Stile

Asset Data Management Manual Page 62 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Street Furniture Defect Record Ancillary Street Furniture
Toilet Block Defect Record Ancillary Toilet Block
Anti-Glare Barrier Defect Carriageway Control Anti-Glare Barrier
Record
Bollard Defect Record Carriageway Control Bollard
Carriageway Gate Defect Carriageway Control Carriageway Gate
Record
Cattle Grid Defect Record Carriageway Control Cattle Grid
Fence Defect Record Carriageway Control Fence
Fence Gate Defect Record Carriageway Control Fence Gate
Kerb Defect Record Carriageway Control Kerbs.
Node Stud Defect Record Carriageway Control Node Stud
Posts Defect Record Carriageway Control Post (Sign), Post (Traffic Signal)
Reference/Utility Marker Defect Carriageway Control Reference Marker, Utility Marker
Record Post
Road Markings Defect Record Carriageway Control Hatched Road Markings,
Longitudinal Road Markings,
Transverse Road Markings.
Road Stud Defect Record Carriageway Control Road Studs
Sign Face Defect Record Carriageway Control Sign Face
Walls Defect Record Carriageway Control Block Wall, Brick Wall, Stone Wall
Environmental Defect Record Environmental All Grassland, Vegetation, Water
(Area) Bodies and Wildlife Structures
assets in the Environmental asset
class.
Environmental Defect Record Environmental All Grassland, Vegetation, Water
(Points) Bodies and Wildlife Structures
assets in the Environmental asset
class.
Bracket Defect Record Lighting Bracket
Feeder Pillar/Interface Cabinet Lighting Feeder Pillar, Interface Cabinet
Defect Record
Lighting Column Defect Lighting Lighting Column
Record
Lighting Unit Defect Record Lighting Lighting Unit
Pavement Defect Record Pavement Pavement Section
Arrester Bed Defect Record Road Restraint Arrester Bed
Crash Cushion Defect Record Road Restraint Crash Cushion
End Terminal Defect Record Road Restraint End Terminal
Inspection Cover Defect Road Restraint Inspection Cover
Record
Pedestrian Guard Rail Defect Road Restraint Pedestrian Guard Rail
Record
Safety Barrier Gate (Steel) Road Restraint Safety Barrier Gate (Steel)
Defect Record
Safety Barrier/Gate/Transition Road Restraint Safety Barrier (Concrete), Safety
(Concrete) Defect Record Barrier Gate (Concrete),
Transition (Concrete)
Safety Barrier/Transition Road Restraint Safety Barrier (Steel), Transition
(Steel) Defect Record (Steel)
Table 6-3 - Defect Record tables in Part 3 – Data Dictionary and the applicable assets.

Pavement Defect Record

Asset Data Management Manual Page 63 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Table 6-4 specifies which defect types can be applied based on the Pavement type.
Defect Type Pavement Type
Chip Loss Flexible/Flexible Composite
Corrosive Spill All
Cracking Area All
Cracking Bifurcated All
Cracking Longitudinal All
Cracking Transverse All
Dead Animal All
Debris All
Defective Joint Seal Rigid
Defective Overband Crack Rigid
Defective Repair All
Edge Defect All
Fatting Flexible/Flexible Composite
Fire Damage All
Fretting Flexible/Flexible Composite
Fuel Spill All
Gouging Flexible/Flexible Composite
Graffiti All
Horizontal Projection All
>50mm
Joint Faulting Rigid
Joint Movement Vertical Rigid
Joint spalling Rigid
Offensive Graffiti All
Other All
Pop-out Rigid
Pothole Flexible/Flexible Composite
Pumping Flexible/Flexible Composite
Rutting Flexible/Flexible Composite
Settlement Flexible/Flexible Composite
Surface Crazing Flexible/Flexible Composite
Surface Defectiveness Flexible/Flexible Composite
Surface Scaling Rigid
Vertical Projection >20mm All
Worn Texture All

Table 6-4 - Translation of the defect types that can be applied based on the Pavement type.

Asset Data Management Manual Page 64 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
6.5 Performance Inspections
The inspection of performance should indicate whether the asset is performing as
intended (i.e. meeting its function(s)/objective(s)). Table 6-5 defines the grading scale
which is to be used to assess performance against an asset.
Grade Description

Pass Asset is effectively meeting its intended objective(s)/is new and will take time to effectively
meet its intended objective(s)

Monitor Asset is meeting its objective(s) but there is some risk of future failure. Monitoring
recommended.

Fail Asset is not functioning in line with its intended objective(s)

Table 6-5 - Grading scale for the assessment of performance.

The following must be considered when assessing performance:


• Performance grades are to be applied following a visual assessment.
• The worst-case component grade shall be allocated to the asset, not the
average grade.
• Where it has only been possible to inspect part of an asset, the performance
grade applied should reflect those parts that have been seen. For example, it
may not be possible to inspect an asset fully due to severely overgrown
vegetation.
• Each asset should be graded ‘as seen’ regardless of whether maintenance or
repair works are planned for that asset. The performance grade should then be
reset on completion of any maintenance or repair works.

Recording Asset Performance


Figure 6-4 outlines the data schema structure for recording performance against an
asset. Part 3 – Data Dictionary articulates the requirement for performance as an
Inspection Record and Performance Record.
The Inspection Record holds information pertaining to the date and name of the
inspector, this is referentially linked to a Performance Record which defines the
objective type, its performance grade, and any additional information (i.e. description
or photograph references).
The Performance Record is referentially linked to the relevant Asset Record. Note:
multiple Performance Records can be assigned to an individual Asset Record.

Asset Data Management Manual Page 65 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Figure 6-4 - The data schema structure for recording performance.

Performance Record Tables


Currently a Performance Record table only exists in Part 3 – Data Dictionary to
account for assets which have been assigned an Environmental Objective. These exist
to indicate why the asset has been constructed/installed and whether it is being
effectively managed to meet its intended purpose. Table 6-6 outlines the assets which
have been assigned Environmental Objectives that require a performance
assessment.
Asset Class Asset Applicable Objectives
Ancillary Handrail Landscape Integration, Visual Amenity, Visual Screening
Ancillary Street Furniture Enhancing Built Environment, Visual Amenity
Carriageway Auditory Amenity, Conservation and Ecology, Enhancing Built
Block Wall
Control Environment, Visual Amenity, Visual Screening
Auditory Amenity, Conservation and Ecology, Enhancing Built
Carriageway
Brick Wall Environment, Landscape Integration, Visual Amenity, Visual
Control
Screening
Auditory Amenity, Conservation and Ecology, Enhancing Built
Carriageway
Fence Environment, Landscape Integration, Visual Amenity, Visual
Control
Screening
Carriageway
Fence Gate Visual Amenity
Control
Auditory Amenity, Conservation and Ecology, Enhancing Built
Carriageway
Stone Wall Environment, Landscape Integration, Visual Amenity, Visual
Control
Screening
Amenity Enhancing Built Environment, Landscape Integration, Visual
Environmental Grassland Amenity
Climbers or Conservation and Ecology, Enhancing Built Environment,
Environmental Trailers Landscape Integration, Visual Amenity, Visual Screening
Conservation
Environmental Area Protect Cultural Heritage
Ecological/Wildlife Conservation and Ecology, Landscape Integration, Manage Water
Environmental Ponds Quality, Visual Amenity
Auditory Amenity, Conservation and Ecology, Enhancing Built
Grass Reinforced Environment, Landscape Integration, Visual Amenity, Visual
Environmental Walls Screening
Grassland with Conservation and Ecology, Enhancing Built Environment, Visual
Environmental Bulbs Amenity

Asset Data Management Manual Page 66 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Conservation and Ecology, Enhancing Built Environment,
Environmental Groundcover Landscape Integration, Visual Amenity
Heath and
Environmental Moorland Conservation and Ecology, Landscape Integration, Visual Amenity
Auditory Amenity, Conservation and Ecology, Landscape
Integration, Protect Cultural Heritage, Visual Amenity, Visual
Environmental Hedgerow Screening
Historic
Environmental Battlefields Landscape Integration, Protect Cultural Heritage
Environmental Historic Wreck Protect Cultural Heritage
Auditory Amenity, Conservation and Ecology, Enhancing Built
Environment, Landscape Integration, Protect Cultural Heritage,
Environmental Individual Trees Visual Amenity, Visual Screening
Environmental Habitat Areas Conservation and Ecology, Landscape Integration
Habitat
Environmental Boundaries Conservation and Ecology, Landscape Integration, Visual Amenity
Linear Woodland Conservation and Ecology, Landscape Integration, Visual Amenity,
Environmental Belt Visual Screening
Environmental Listed Building Protect Cultural Heritage, Visual Amenity
Marsh and Wet Conservation and Ecology, Landscape Integration, Manage Water
Environmental Grassland Quality, Visual Amenity
Environmental Non-Designated Landscape Integration, Protect Cultural Heritage, Visual Amenity
Environmental Open Grassland Conservation and Ecology, Landscape Integration, Visual Amenity
Parks or Gardens
of Specific Historic
Environmental Interest Landscape Integration, Protect Cultural Heritage, Visual Amenity
Environmental Rock and Scree Conservation and Ecology, Landscape Integration, Visual Amenity
Scheduled
Ancient
Environmental Monument Protect Cultural Heritage, Visual Amenity
Environmental Scrub Conservation and Ecology, Landscape Integration
Enhancing Built Environment, Landscape Integration, Visual
Environmental Shrubs Amenity, Visual Screening
Environmental Species Areas Conservation and Ecology
Environmental Species Locations Conservation and Ecology
Species Rich
Environmental Grassland Conservation and Ecology, Landscape Integration, Visual Amenity
Environmental Splay/Swath Conservation and Ecology, Landscape Integration, Visual Amenity
Environmental Wildlife Housing Conservation and Ecology
Wildlife
Environmental Underpass Landscape Integration
Conservation and Ecology, Landscape Integration, Visual Amenity,
Environmental Woodland Visual Screening
World Heritage
Environmental Site Protect Cultural Heritage, Visual Amenity
Geotechnical At-Grade Landscape Integration
Geotechnical Bund Back Landscape Integration, Visual Amenity, Visual Screening
Geotechnical Bund Front Landscape Integration, Visual Amenity, Visual Screening
Geotechnical Cutting Landscape Integration
Geotechnical Embankment Landscape Integration
Table 6-6 - Assets and their applicable Environmental Objectives that require a performance
assessment.

6.6 Cyclic Maintenance Activities


GM 701 defines all asset cyclic maintenance activities and their baseline frequencies
to facilitate a programme of preventative maintenance. The outcomes of this includes
the elimination of a potential defect or mitigating a potential risk impacting on safety,
customers, or the performance of the asset.

Asset Data Management Manual Page 67 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Part 3 – Data Dictionary articulates the data requirement associated with each cyclic
maintenance activity to enable intelligence-led maintenance to design the optimum
maintenance intervention for individual assets, improve asset quality and customer
satisfaction, and offer greater value for money.

Recording Cyclic Maintenance Activities


Figure 6-5 outlines the data schema structure for recording maintenance activities
against an asset. Part 3 – Data Dictionary articulates these requirements as a
Maintenance Record, the applicable cyclic maintenance activity (i.e. Clean Bollards
Activity Record) and an optional Maintenance Defect Record.
The Maintenance Record holds information pertaining to the organisation and name
of the maintainer and the activity being undertaken, this is referentially linked to the
applicable cyclic maintenance activity record which defines the date/time the activity
was undertaken, whether the activity was completed and any additional information
(i.e. an indication of whether the asset was clean or dirty prior to the activity being
undertaken).
The applicable cyclic maintenance activity record is referentially linked to the relevant
asset record. In instances where the maintainer encounters a defect whilst undertaking
the maintenance activity the Maintenance Defect Record should be used to indicate
that a defect was encountered, what the defect was and whether it was rectified at the
time of the activity.
The Maintenance Defect Record is referentially linked to the applicable cyclic
maintenance activity record. For a linear asset (e.g. a Safety Barrier) multiple
applicable cyclic maintenance activity records can be appended to a Maintenance
Record and an Asset Record in line with the linear segmentation method.

Figure 6-5 - The data schema structure for recording cyclic maintenance activities.

Asset Data Management Manual Page 68 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Cyclic Maintenance Activity Record Tables
Multiple cyclic maintenance activity record tables exist in Part 3 – Data Dictionary in
line with the activities defined in GM 701. Appendix B lists the cyclic maintenance
activity record tables, the applicable activity defined in GM 701 and which assets they
apply to in the ADMM.

Asset Data Management Manual Page 69 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
7 Major Schemes and Asset Data Management
This section provides guidance to parties involved in the collection, creation, and
transfer of asset data during the lifecycle of a major scheme. It provides a prime point
of reference for the requirements and responsibilities regarding asset data exchange
ensuring all parties have a common understanding of the wider process they are
operating within.
Figure 7-1 demonstrates how the ADMM interrelates with GG 182 and GG 184.

Figure 7-1 - Relationship between different documents.

Asset Data Systems


Scheme delivery partners are not expected to interact with the asset data systems,
but provide data suitable for their update, the exception being the Geotechnical Data
Management System (HAGDMS). This interaction may be undertaken by National
Highways or their supply chain as appropriate.
Based upon the requirements of GG 182, scheme delivery partners shall from the
outset establish with the regional National Highways teams a list of key systems and
contacts to support the exchange of asset data, supported by a single point of contact
for all correspondence.
Refer to section 2 for the further information and for details of the systems is in use in
the region/area (local requirements and specific contract arrangements must be
considered).

Asset Data Management Manual Page 70 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Data Requirements and Formats
Part 3 – Data Dictionary provides the requirements for attributes for each asset class
currently recognised by the Company. The exchange of the asset data required by the
ADMM will be included in the scheme Health & Safety File and delivered in accordance
with the scheme Handover Schedule.
Suppliers are advised to review section 3 of this document and the following section
for guidance in preparing data for exchange.
Class Exchange Format Notes
Network Shapefile & The delivery partners should liaise with the local
Reference Alignment and Lining Network Reference Manager for requirements.
Drawings
Pavement CSV Construction data file
Construction layer data file
Ancillary Shapefile
Carriageway Shapefile
Control
Road Restraint Shapefile
Technology Shapefile
Structures Keyed in data Structure file records to be provided covering the items
Electronic and Native below:
Formats Inventory
• General inventory details
• Structure type details
• Structure summary
Drawings in accordance with GG 184
• Location Plan (and/or Strip Map)
• General Arrangement drawings
• As-built drawings
Design
• Approval in Principle or equivalent
• Design and check certificates
• Construction compliance certificates
• Key correspondence
• Design option choice
Construction and Demolition
• Special construction techniques
• Special demolition techniques
• Construction problems and repercussions
Materials, Components Materials and Treatments
• Materials
• Components
• Surface and protective treatments
Certification and Tests
• Operation
• Operation Manual
• Logbook

Asset Data Management Manual Page 71 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Class Exchange Format Notes
• Access
Inspection
• Acceptance Inspection
Maintenance
• Routine maintenance schedule
• Design features affecting maintenance
Legal
Environmental
Supplementary records
Geotechnical Data entered into Refer to: CS 641, CD 622, and the Handover of
HAGDMS Geotechnical As-Built Data Guidance Document.
Reports and drawings Data transfer is directly into the Geotechnical Data
in PDF format Management System (HAGDMS).
Ground Investigation Recording of the creation of, or modifications to
data in AGS4 format geotechnical assets should be undertaken in
Attachments in other accordance with CS 641 and the processes set out in
data formats the Handover of Geotechnical As-Built Data Guidance
Document. This relates to data held in the Geotechnical
Asset Database of HAGDMS and as-built drawings.
In accordance with CD 622, the following will be
uploaded Geotechnical Investigation Reports (GIR),
Geotechnical Design Report (GDR) and Geotechnical
Feedback Reports (GFR).
Drainage Shapefile Part 3 – Data Dictionary details the asset data
requirements for Drainage data, and for non-asset data
(such as flooding and priority registers), all in
accordance with CD 535 and CS 551.
Requirements for as-built records, attached documents
and data packaging are given on the downloads page
of HADDMS.
Documents associated with the assessment of routine
runoff on surface water courses carried out in
accordance with LA 113 are to be attached as
documents to the relevant drainage assets in
HADDMS. These include HEWRAT assessments and
field log sheets for Tier 2 assessments.
Template files for the asset data SHP file format are
available on the downloads page of HADDMS.
Lighting CSV or Shapefile Further detail behind the requirements in the ADMM
can be found in HE Guidance, currently entitled ‘Elexon
BSCP520 – MAC-ASC Inventory Maintenance
Procedures.doc’
Environmental Shapefile Part 3 – Data Dictionary details the asset data
requirements for Environmental data.
Section 9 provides detailed guidance on acceptable file
formats and data rules.
Land & Property Shapefile Refer to guidance available via the Supply chain portal;
Guidance_for_Land_Referencing_Plans

Table 7-1 - Asset Data Exchange Format.

Key Parties

Asset Data Management Manual Page 72 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Requirements contained within this section are referenced by GG 182 which in turn
requires all parties reach and record agreement of their roles and responsibilities.
Role Responsibilities
Asset Data Shall be the party as defined in Part 1 - Data Principles and Governance
Custodian from the Company (Asset Delivery Team) or the supply chain (Maintenance
Service Provider) as appropriate for the operating model in the relevant Area
Maintenance The supply chain. Further guidance is provided here.
Service Provider
(MSP)
Asset Delivery Refer to the regional team for further information.
Team
Principal Designer Holds duties for the client under CDM 2015 for ensuring safe systems of
work on site and that the Pre-Construction Information and Health and Safety
File hold the appropriate information.
Scheme Designer Requirements contained are referenced by GG 182; the Detailed Local
Operating Agreement (DLOA) and the Handover Schedule PCF products.
Construction Requirements contained are referenced by GG 182; the Detailed Local
Supplier, Principal Operating Agreement (DLOA) and the Handover Schedule PCF products.
Contractor, Main
Contractor
ADMM Custodian, Author of the ADMM, see Part 1 - Data Principals and Governance for
Asset Management guidance regarding responsibilities and process.
Development
Group
Major Projects Responsible for the delivery of the scheme and the production of all
Project Manager information there-in.
Operations Responsible for the taking the scheme into operations and maintenance at
Directorate Senior handover.
User

Table 7-2 - Roles and Responsibilities.

7.2 Contracts and Building Information Modelling


National Highways is making continuous improvement to its Asset Management
Framework, systems, and requirements. Prior to the inclusion of Building Information
Modelling (BIM) into contracts, asset data requirements would often stipulate a
‘system’ upon which the scheme should deliver, this led to inconsistent and often poor
data being uploaded into the asset management systems.
As the systems and requirements are developing over time, suppliers will need to be
continually aware of changes to the ADMM. Suppliers should have access to the
Supply Chain Portal for updates on the ADMM, PCF, BIM, and other Major Project
matters.

Pre-Collaborative Delivery Framework


Any current scheme which precedes the Collaborative Delivery Framework or April
2016 may not have had the ADMM explicitly written into contract. However, all
schemes must follow the DMRB and any Interim Advice Notes (IAN). GG 182 has
required delivery in line with the requirements of the ADMM since 2014. This may

Asset Data Management Manual Page 73 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
constitute a change in scope and should be dealt with under normal contractual
procedures.

Collaborative Delivery Framework (CDF)


Following the introduction of the Collaborative Delivery Framework (CDF), and as of
April 2016 each scheme is contracted to develop its information digitally in line with
the UK Industrial Strategy (previously Construction Strategy). The principles of the
BS/PAS 1192 suite of standards have been enacted by National Highways and the
ADMM is the principal source of Asset Information Requirements (AIR) for all National
Highways schemes as specified in PAS 1192-3 (see Figure 7-2).

Figure 7-2 - Relationship between elements of Information Management (from PAS1192-3).

Regional Delivery Partnerships (RDP)


The Regional Delivery Partnerships (RDP) is a successor to CDF. Under RDP,
Delivery Integrations Partners (DIPs) will be awarded contracts to deliver packages of
schemes.
All schemes are to be provided in compliance with the Government’s Strategy for
Building Information Modelling as set out in the Cabinet Office Government
Construction Strategy paper dated May 2011.

Asset Data Management Manual Page 74 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
The relationship between the elements of Information Management supporting this
approach, including the relationship to the ADMM, is as per that described for CDF in
section 7.2.2 above.

Employers Information Requirements (EIR)


Employer’s Information Requirements (EIR) is an element of the contract that
describes how models and associated information are produced, delivered, and used,
including any processes, protocols and procedures referred to in it.

BIM Execution Plan (BEP)


The BIM Execution Plan (BEP) is an element of the quality plan for a scheme that
describes how the Supplier will produce the specified Information Models and meet
the requirements in the EIR.

Model Production Delivery (MPDT)


The delivery partners shall confirm by completion of the Model Production Delivery
Table (MPDT) the provision of information at each stage. The MPDT should be
completed and included in the BIM Execution Plan submission for acceptance by the
Project Manager.
MPDT is the schedule that sets out:
• the subject matter of each Model,
• the person who is to produce and deliver each Model at each Stage and
• the proposed Level of Definition for each Model at each Stage.

Project Information Model (PIM)


Project Information Model (PIM) is the accumulation of data developed during the
design and production and construction phase of a project, consisting of graphical
information, non-graphical information and documentation defining the delivered
project.

Asset Information Model (AIM)


An Asset Information Model (AIM) can relate to a single asset, a system of assets or
the entire asset portfolio of an organization. An AIM represents data and information
that relates to assets to a level required to support an organisation’s asset
management framework. The AIM consists of graphical, non-graphical and
documentation components as well as metadata.

GG 184 Data/CAD Standard

Asset Data Management Manual Page 75 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
National Highways requires scheme delivery partners to create the PIM in accordance
with GG 184 and the ADMM. The key elements to efficient and trustworthy asset data
delivery, which can be validated and verified are.
• Named Containers
• Classification
• Unique Identification
• Asset Data Schema (Part 3 - Data Dictionary)
The application of these principles by the supply chain will ensure efficient exchange
of asset data.
Named Containers - the implementation of BS 1192:2007 is believed to significantly
reduce time spent searching for files, furthermore its consistent application across a
programme such as National Highways should lead to enhanced management and
quality of information in use. Leading to improved re-use of data and a reduction in
errors, re-creation, and rework.
Classification – National Highways will continue to support the development of the
UK classification; Uniclass for infrastructure and is a key stakeholder of the NBS. The
Uniclass coding included in the Part 3 - Data Dictionary is currently considered to be
‘Best Fit’ and is subject to change due to the dynamic nature of the classification.
Virtually all classes have been matched to a Uniclass code and are subject to
continuous change and improvement for each iteration of the ADMM, however a small
number remain under negotiation with NBS at the time of publishing.
Unique Identification - combined with classification, an asset which is uniquely
identified provides an ability for links to schedules to be created. Several examples of
suppliers linking their graphical models to spreadsheets or databases. National
Highways recommends this approach thus providing assurance that wherever an
asset is listed it is consistent in every other rendition.
Asset Data Schema - Part 3 - Data Dictionary provides the asset data schema for
each asset. Although designed for handover, it is applicable to every stage of a project
and suppliers are required to develop their PIM’s with the end in mind.
Providing that delivery partners robustly apply the principles laid out in this section
National Highways can be assured that improvements in asset information will be
delivered by major schemes.

Data Quality
All delivery partners and suppliers certify the information provided in accordance with
their business management systems. National Highways requirements for suppliers
Quality Management Systems are found in GG 102, GG 184, and BS 1192. Suppliers
are reminded that they must check, review, and approve their information.
Explicit quality criteria for all PCF Products are found in the guidance notes found on
the supply chain portal.

Asset Data Management Manual Page 76 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
After completion of any works activity the Asset Data Custodian is required to update
the relevant prime asset data systems with changes to inventory, construction, and
condition data in a complete, accurate and timely manner.

Common Data Environment (CDE)


Provision of a Common Data Environment (CDE) is determined by the Major Projects
PMO and Digital Services, they contact the Project Manager for confirmation of which
systems is in use.

7.3 Scheme Lifecycle / Plan of Work


A scheme lifecycle or plan of work can help the project team understand their
obligations and ensure appropriate deliverables of geometry, data and other
documentation are prepared for the client to enable timely and efficient decision
making throughout the life of the project.

Major Projects: Project Control Framework


All major road projects are progressed through the Project Control Framework (PCF)
which is split into three phases as shown below.

Each of the functional stages incorporates a transfer of asset data as follows:


Pre-works (Options & Development) – the Asset Data Custodian transfers data to the
major scheme Delivery Partner (Designer)
Construction – the Delivery Partner transfers data to the Asset Data Custodian if the
Delivery Partner acquires responsibility for maintenance
Handover – the major scheme Delivery Partner transfers data to the Asset Data
Custodian
The key to good project handover is engagement with Operations Directorate
throughout the scheme and not just as the project is coming to an end.

7.4 Asset Data Exchange Procedure


The purpose of this section is to guide all parties through the exchange of asset
information throughout the lifecycle of a scheme. By providing a clear procedure it is
anticipated that National Highways will receive good quality, complete asset
information. This information will improve the prime asset data set and result in
significantly improved customer, safety, and efficiency outcomes.

Asset Data Management Manual Page 77 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Options, Development, or Pre-Works
Data Need:
The major scheme Delivery Partner1 (Designer) requires relevant and available asset
data, stored on the National Highways prime asset data systems or locally, from the
Asset Data Custodian to:
• enable the preliminary, and then pre-construction design, to be developed
• compile the pre-construction information required for identifying hazards and
constraints that will impact the programming and methods of work.
Data: Process Map, Guidance and Responsibilities:
The following process map and notes define the process where the Maintenance
Service Provider (MSP) arrangement exists.
Where the Asset Delivery model is operating, elements of the role of the MSP will be
undertaken by the Company. In such cases, equivalent arrangements should be
agreed locally.

Figure 7-3 – Asset Data Exchange Options, Development, or Pre-Works.

1Delivery Partner – Subject to contractual arrangement, scheme designer or contractor (Design and
Build).

Asset Data Management Manual Page 78 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Asset Data Management Manual Page 79 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
A. The Delivery Partner must identify what data they require in terms of the asset
types and section/location details; this will be provided by the MSP. The MSP is
responsible for managing the data held within the Company’s prime asset data
systems, as well as locally held records, and should provide all available data from
these sources. If the Designer wants the data to be transformed in any way, from
its bulk extract format, they can ask the MSP to carry out this work; there is no
obligation on either party for the MSP to be the one that carries out such work.
B. The National Highways Project Team should contact the National Highways
Service Manager who is responsible for managing the MSPs contract. The Service
Manager is a defined role within the MSPs contracts and therefore is responsible
for overseeing interaction with the MSP.
C. The Service Manager will either forward the data request themselves or authorise
the Designer to make direct contact with the MSPs. In either case, this constitutes
an Asset Data Request from the Employer as specified in section 6.
D. The MSP reviews the data request and, if applicable, advises of any costs
associated with data transformation. Where a bulk download is being provided
there should be no cost to the Company as the MSPs is fulfilling their obligation to
provide access to the data they are managing on behalf of the Company.
E. The MSP is expected to respond to bulk download requests within 10 working
days. The default position is to provide data in the standard file format used by the
relevant prime asset data systems (see section 7.1.1). The Company’s prime asset
data systems hold unique references (system IDs) for each asset and these should
be provided to support the matching of records later in the scheme lifecycle.
F. The MSP manages asset data on behalf of the Company whether in the
Company’s prime asset data systems or local systems. Therefore, providing bulk
downloads/extracts from any of these systems is a responsibility of the MSP. The
Service Manager should be satisfied that the Company is only occurring additional
costs where extra effort is required to mine and manipulate the data.
G. The National Highways Project Team should authorise any data
mining/manipulation as cost reimbursable work through a project specific budget
(PIN).
H. The MSP will supply any required context to ensure the data is understood. This
would be expected, but not limited, to cover any reasons that reduce confidence in
the completeness or accuracy of the data, clarification of any codes/terminology
used and explanation of data structures/rules (particularly for local systems).
I. The clarification of data can be repeated until the Designer has sufficient
understanding of the context surrounding the data. Updates following initial data
process handover
J. From the point at which asset data is first handed over to the scheme Designer
there will be ongoing maintenance activities which will affect the asset until the
Delivery Partner assumes responsibility for the site. The Designer will need to be
informed of updates to asset data to ensure they are working with the most current
available data. Providing such updates is equivalent to a series of Asset Data
Requests from the Employer; however, it will be most efficient to agree specific
criteria or subsets of data to define what is provided in any updates.

Asset Data Management Manual Page 80 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
K. Therefore, the MSP and Designer should agree an appropriate mechanism and
frequency for updates to be provided when the initial data handover occurs.
L. The Service Manager will ultimately decide on the mechanism and frequency for
updates if a collaborative arrangement cannot be agreed.

Construction
Data Need:
The Company needs to ensure the integrity of its maintenance records for all assets
throughout the duration of the major scheme. Therefore, where the maintenance
responsibility for an asset transfers to the Delivery Partner, any inspections, planned
or reactive maintenance records need to be captured and populated into the relevant
prime asset data system or local system.
Data: Process Map, Guidance and Responsibilities:
The following process map and notes define the process where the Maintenance
Service Provider (MSP) arrangement exists.
Where the Asset Delivery model is operating, elements of the role of the MSP will be
undertaken by the Company. In such cases, equivalent arrangements should be
agreed locally.
Figure 7-4 – Asset Data Exchange Construction.

Asset Data Management Manual Page 81 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Asset Data Management Manual Page 82 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
A. At the Pre-work stage, the Delivery Partner is required to engage with key
stakeholders, including the MSP, to seek approval to of a Detailed Local Operating
Agreement (DLOA). Through the Detailed Local Operating Agreement, it should be
agreed which assets will have their maintenance responsibility transferred during
the process of scheme delivery.
B. Where the MSP retains responsibility for an asset directly through their
maintenance contract they will continue to capture and record asset data as per the
ADMM (e.g. data from inspections / defect reporting).
C. The resulting detailed design and site clearance will determine which assets will in
some way be changed by the scheme (e.g. removed, replaced, modified) and which
assets will be within the area of works but will just require ongoing monitoring and
maintenance. GG 182 provides guidance on the maintenance requirements
Delivery Partners will have to operate to; in most cases this is likely to be the
requirements under the MSP’s contract.
D. Where an asset will be changed by design of the scheme e.g. removed, newly
installed or modified in some way, any asset data will only need to be provided
when the scheme is handed over (defect history will not be required for removed
assets and is likely to be minimal/nil for modified and new assets).
E. Where an asset is not due for change but requires periodic or reactive maintenance
during the time responsibility for the asset has been handed to the Delivery Partner,
the maintenance history must be kept up to date. Therefore, the Delivery Partner
must keep the same records as the MSP would under their contract. The ADMM
details the inspection/defect records that the Delivery Partner should compile where
the MSP is operating.
F. The Delivery Partner and MSP should agree the most practical and efficient way
for the Delivery Partner to submit these records on a weekly basis. The MSP has
one month from the date of receipt to upload these records into the Company’s
prime asset data systems in accordance with the ADMM requirements.

Handover
Data Need:
The Company requires appropriate data about the assets installed or modified as part
of the major scheme to populate its prime asset data systems for ongoing asset
management. The Provider has been appointed by the Company to be the custodian
of its asset data and therefore plays a key role in accepting the asset data on behalf of
the Company.
Data: Process Map, Guidance and Responsibilities:
The following process map and notes defines arrangements the process where the
Maintenance Service Provider (MSP) arrangement exists. Equivalent arrangements
should be agreed with the Asset delivery where appropriate. Where the Asset Delivery
model is operating, elements of the role of the MSP will be undertaken by the
Company. In such cases, equivalent arrangements should be agreed locally.
Figure 7-5 – Asset Data Exchange Handover.

Asset Data Management Manual Page 83 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Asset Data Management Manual Page 84 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
A. At the Construction, the Delivery Partner is required to engage with key
stakeholders, including the MSP, to seek approval to a Detailed Local Operating
Agreement (DLOA). As part of these discussions the Delivery Partner and MSP
should agree a programme for data handover. This programme will need to
consider the broader approach to scheme handover (e.g. section by section) and
the need to have as built asset data handed over for any section of network prior
to the MSP accepting the scheme into maintenance.
B. The DLOA & Handover Schedule will record the programme for data handover has
been agreed. This does not mean the detail of the programme should not change
if circumstances alter, but both Delivery Partner and MSP must agree.
C. During the construction phase of a scheme the Delivery Partner will take
responsibility for assets in many ways. The data to be handed over in conjunction
with transferring responsibility for the asset back to the MSP depends on what the
Delivery Partner has done to the asset whilst being responsible for it (see Table
7-3).
Action by Delivery Data to be provided by Delivery Partner
Partner

No change None (maintenance records supplied during construction stage)

Asset Removed Confirmation of removal – date of removal, asset location, asset descriptor
all to be provided in accordance with the format outlined in section 7.1.2;
also, unique asset identification references from the relevant prime asset
data system (as supplied when data provided for scheme design in Pre-
works stage)
Asset Modified Existing inventory records updated in accordance with the format and
content requirements outlined in section 7.1.2; also, unique asset
identification references from the relevant prime asset data system (as
supplied when data provided for scheme design in Pre-works stage)

Asset Added New, full inventory records created in accordance with the format and
content requirements outlined in section 7.1.2; unique reference created by
Designer/Delivery Partner (in accordance with relevant standards where
applicable)

Table 7-3 - Delivery Partner actions and data.

D. The Delivery Partner hands over the asset data to the National Highways Project
Team to issue to the MSP. This process could well be repeated several times
depending on the programme agreed as part of the DLOA/Handover Schedule.
E. The MSP is responsible for loading the data into the Company’s prime asset data
systems; this is part of the ADMM requirements. If the MSP wishes to use Delivery
Partner resource to carry out this requirement this would be as a sub-contract
arrangement under the MSP’s contract; there should be no additional cost to the
Company and the MSP remains accountable for ensuring data is uploaded in a
timely and accurate manner.
F. The MSP must assess whether the data provided to them is complete, current, and
compliant with standards.
G. A set of process maps, guidance, and details of responsibilities specific to
geotechnical assets are provided in the Handover of Geotechnical As-Built Data
Guidance Document.

Asset Data Management Manual Page 85 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Network Referencing
Data Need:
The Company requires an accurate Approved Network Model to fit asset data to; this
is achieved through network referencing which divides the Network into sections, each
having fixed start and end positions and road alignment. Changes introduced by a
major scheme will require this referencing to be reviewed and modified.
At the point where maintenance liability for the scheme transfers from the Delivery
Partner to the MSP, the Network Referencing Manager will initiate the new network
referencing within the Company’s prime asset data systems.
Data: Process Map, Guidance and Responsibilities:
The following process map and notes defines arrangements the process where the
Maintenance Service Provider (MSP) arrangement exists. Equivalent arrangements
should be agreed with the Asset delivery where appropriate.
Where the Asset Delivery model is operating, elements of the role of the MSP will be
undertaken by the Company. In such cases, equivalent arrangements should be
agreed locally.

Figure 7-6 - Asset Data Exchange Network Referencing

Asset Data Management Manual Page 86 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Asset Data Management Manual Page 87 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
A. Delivery Partner must issue to the MSP’s Network Referencing Manager, drawings
and shapefile showing scheme alignment, lanes, and road markings for the entire
scheme. This should be done as early as possible in the construction stage; with
a change control process agreed if there is any potential for alteration after
handover of these drawings. The Handover Schedule PCF product states this
activity must be done at least 3 months prior to the scheme opening date – this is
the latest possible date and should be the exception not the target.
B. The Network Referencing Manager’s responsibilities are outlined in the ADMM.
They will consider the effect of the scheme on existing sections and determine
which sections need to be modified, retired, or replaced. They will also identify
where section reference markers need to be installed or removed because of the
changes.
C. Delivery Partners should reference all new assets using the new network
referencing (i.e. section, start/end chainages) when compiling the asset data
required at the handover stage. The dependency of this exercise on Network
Referencing is why step A) of this process needs to start as early as practicable in
the construction stage.
D. The installation of network reference markers and the removal of any redundant
markers must be undertaken as part of the scheme to ensure the correct section
reference markers are in place before the new or improved road opens.
E. Assets that have been within the scheme boundary but are not impacted by the
works will have their network reference updated through the process which
updates the Approved Network Model within the prime asset data systems.
Note: Refer to Section 4.5.1, the position of the Network Reference line is illustrated
in ‘blue’ within lane 1 on both carriageways.

Asset Data Management Manual Page 88 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
PART 2.2 – ASSET CLASS SPECIFIC
REQUIREMENTS
NOTE:
• The asset data requirements are entirely set out in Part 3 – Data Dictionary.
• The asset must be located according to Section 5.

Asset Data Management Manual Page 89 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
8 Drainage
The Drainage Data Management System (HADDMS) maintains the primary data set
for drainage asset inventory and condition (excluding routine defects) data.
The drainage data requirements are defined as follows
• The high-level asset data requirements for the drainage asset and for non-asset
data (such as flooding and priority registers) are defined in CD 535 and
associated England NAA, and in CS 551. Requirements for as-built records,
attached documents and data packaging are given on the downloads page of
HADDMS.
o Documents associated with the assessment of routine runoff on surface
water courses carried out in accordance with LA 113 are to be attached
as documents to the relevant drainage asset in HADDMS. These include
HEWRAT assessments and field log sheets for Tier 2 assessments.
• Template files for asset data SHP file formats can be downloaded from
HADDMS.

8.1 Flood Events


The Company has a requirement to record all reported flood events on their network.
All reported flood events are recorded in the Flood Events Register on the Drainage
Data Management System in accordance with CD 535.
• As soon as a flood is reported, actions must commence to mitigate any impacts.
• The flood must be assessed to determine if it is a reportable flood event in
accordance with the flood definition in the England NAA to CD 535.
• The flood event and arising mitigation actions must be logged within the Area’s
operational management system within 24 hours. This should include as a
minimum:
o Location of the approximate centre of the flood.
o Date and time the flood was initially reported.
o Whether the flood affected the carriageway and/or adjacent third-party
property.
• The flood event must also be recorded in the Flood Events Register on
HADDMS within 7 days of the flood event being notified. The following
information is required to “Open” a flood event on HADDMS:
o Location of the approximate centre of the flood using Ordnance Survey
(OSGB36 datum, using the OSTN15 transformation model, as required
in the England NAA to CD 535).
o Date and time the flood was initially reported.
o Whether the flood affected the carriageway and/or adjacent third-party
property.

Asset Data Management Manual Page 90 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
• The Flood Events Register on HADDMS must be updated within 28 days of the
initial notification with full details of a flood event to “Close” the flood event
record. The additional data needed to “Close” a flood event is detailed in Part
3 – Data Dictionary and in the Data Formats document on the download page
of HADDMS.
All reported flood events are recorded in the Flood Events Register on HADDMS in
accordance with CD 535.
• Once a flood notification has been confirmed as a flood event, mitigation actions
must be initiated and recorded on Confirm within 24 hours including the
location, date/time, and impact of the flood.
• The information required to “Open” a flood event must be transferred from
Confirm to HADDMS within 7 days of the flood being notified to satisfy the 7-
day CD 535 reporting requirement. This will be carried out via an automatic
transfer in due course (see footnote).
• The additional information required to “Close” a flood event must be entered on
to HADDMS within 28 days of the initial notification to satisfy the 28-day CD
535 reporting requirement. This will be carried out via an automatic transfer in
due course (see footnote).
• If the flood event record requires any further editing after it has been “Closed”
this must be carried out on HADDMS, not Confirm.
Footnote: Until the automated Confirm to HADDMS transfer process is in place,
it will be necessary to manually transfer the data into HADDMS.

8.2 Data Maintenance


The drainage asset data held on HADDMS is currently undergoing a consolidation
process, which will remove data duplication and help identify gaps. Consolidated data
on HADDMS is grouped into drainage highway catchments, each being a group of all
the drainage systems and the adjacent land they drain, between two geographical high
points of the highway network. Both carriageways of a dual carriageway are
considered part of the same catchment, but risks can be assessed separately for each
carriageway.
A drainage highway catchment can include one or more drainage systems, each being
a group of drainage assets that are directly or indirectly connected to each other, within
a single drainage highway catchment. Each highway catchment’s data is managed as
a drainage “scheme” on HADDMS. The process described in the England NAA to CD
535 must be followed for maintaining the data for each drainage highway catchment
all drainage data must be round tripped from and back to HADDMS when any survey
is carried out. In any Areas that have yet to be consolidated the round-tripped data
must be de-duplicated and re-organised into drainage highway catchments as part of
the survey process.

Asset Data Management Manual Page 91 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
8.3 Drainage Data Acceptance Criteria
Drainage contractors and other data suppliers may be given access to HADDMS for
the purposes of checking data prior to submission to Service Providers. They are not
permitted to amend the HADDMS database or import their data into the database.
Data to be imported into the database must be finally uploaded and checked by the
Service Provider.
If any of the checks fail, a report of the problems will be provided. Failures can result
in either a “critical error” or a “warning”, as indicated below.
The presence of any “critical errors” indicates an illogical or ambiguous drainage
model and means that the whole scheme must be rejected. Such errors must be fixed,
and the data re-uploaded before the data can be added to the system.
The presence of any “warnings” means that the scheme can be added to the system,
provided there are no critical errors. Warnings may indicate incorrect data or can arise
due to unusual drainage layouts or incomplete records (e.g. due to a limited scope
survey). Any warnings should be reviewed before confirming that the scheme can be
added to the system.
The scope of checking is to ensure that a logical and unambiguous drainage model
has been defined in the supplied data and that it is provided in the correct format;
checking of data quality and completeness is otherwise not checked at import stage
by HADDMS and is the responsibility of the data supplier.
If data is uploaded as a new version of an existing scheme, additional checks are
carried out to detect potential loss of existing data, for example the removal of any
assessed priority assets from a scheme. If significant data loss is detected, users may
need to discuss this with the HADDMS Support Team before they can complete the
data import.
Additional checks resulting in “warnings” may be added to HADDMS periodically to
help promote improvements in data quality.
HADDMS provides a check report of all critical errors and warnings using the reporting
codes given and defined in Table 8-1 below.
HADDMS
check HADDMS check report code description
report code

A10.7 Basic checks

The following checks confirm that all files are present, hold appropriate types of data in the correct
format, and that all mandatory fields have been completed. Checks A10.7.1 and A10.7.2 relate to
the fundamental structure of the data; failure of these will generally prevent the system from
carrying out any further checks.

A10.7.1 Critical check: The shapefiles submitted in the .zip file must be correctly named and
contain the appropriate type of geometry (i.e. points, lines or polygons for “point”,
“continuous” and “region” assets respectively).

Asset Data Management Manual Page 92 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
HADDMS
check HADDMS check report code description
report code

A10.7.2 Critical check: All fields in the data file specification must be present and contain the
appropriate type of data (e.g. text, number, date, etc.). To avoid some software
defaulting blank number fields to 0, “Integer” and “Number” fields may be formatted
as text, provided these only contain a number or are left blank.

A10.7.3 Critical check: All system-assigned fields (“SYS”) for new inventory assets must be
blank. When re-uploading a catchment that has been downloaded from HADDMS,
the values in these fields must be left unchanged. If the values are deleted, then
those inventory assets will be treated as new assets and assigned a new CD 535
reference, and the old assets will be removed from HADDMS.

A10.7.4 Critical check: All mandatory fields (“M”) must be completed.

A10.7.5 Critical check: The catchment reference (“SUPP_SCH”) must be the same for all
entries in each of the submitted shapefiles for a catchment. This is to confirm that all
inventory assets are part of the same catchment.

A10.7.6 Critical check: All fields identified as requiring a code (e.g. asset type, system type,
material, shape, etc) will be checked for valid code entries, as defined in the ADMM.

A10.8 Referencing checks

The following checks confirm that there is connectivity between the point, continuous and region
assets, based on their supplier’s asset references.

A10.8.1 Critical check: As per check A10.7.3, all CD 535 asset reference fields are system
assigned, and must be left blank for newly submitted inventory asset.

A10.8.2 Critical check: All supplier’s reference fields (“SUPP_REF”) will be checked to
ensure there are no duplicates within the submitted catchment. (Duplication with
assets in other catchments is permitted.)

A10.8.3 Critical check: The supplier’s reference of any point asset must not match the
supplier’s reference of any continuous asset in the same catchment.

A10.8.4 Critical check: All upstream and downstream references of continuous assets
(“SUPP_REFUP” and “SUPP_REFDN” respectively) must exist as point references
within the same catchment.

A10.8.5 Critical check: All region assets must have a corresponding region node point asset
(asset type code = “RN”) with the same supplier’s reference within the same
catchment.

A10.8.6 Warning check: All supplier’s reference fields (“SUPP_REF”) will be checked to
ensure that they are not in a CD 535 format.

A10.9 Connectivity referencing checks

The following checks relate to checking the referencing used in connectivity attributes and
connectivity nodes.

Asset Data Management Manual Page 93 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
HADDMS
check HADDMS check report code description
report code

A10.9.1 Critical check: If the connectivity attribute (“SUPP_CONN”) of a point asset is


specified, it must exist as the reference of a continuous asset within the same
catchment.

A10.9.2 Warning check: If the connectivity attribute of a point asset is specified, the asset
should not be used as the upstream node of any continuous asset.

A10.9.3 Warning check: The connectivity attribute should not be specified for outfalls,
soakaways, soakaway boreholes, ghost nodes, region nodes or phantom nodes.

A10.9.4 Critical check: The connectivity attribute must be specified for connectivity nodes
(asset type code = “CN”).

A10.10 Upstream and downstream asset checks

The following checks ensure that appropriate point assets have been used as upstream and
downstream nodes of continuous assets.

A10.10.1 Warning check: Point assets that are gullies should not be used as the downstream
point asset for a continuous asset. (In some cases, this is required; however, in the
majority it is not appropriate, so it is flagged as a warning.)

A10.10.2 Warning check: Outfalls should not be used as the upstream point asset for a
continuous asset.

A10.10.3 Warning check: Ghost nodes and phantom nodes should be specified as either the
upstream or the downstream node of at least one continuous asset. The only
exception is a ghost node at the centroid of an isolated region asset. Connectivity
nodes (asset type code = “CN”) should be specified as the downstream node of at
least one continuous asset. All other point assets may exist in isolation.

A10.10.4 Warning check: Point assets that are only referenced as downstream nodes of
continuous assets should be outfalls, soakaways, soakaway boreholes, connectivity
nodes, phantom nodes, region nodes or ghost nodes.

A10.10.5 Warning check: The region node at the centroid of a region asset should only be the
up- or downstream asset of region connectors (asset type code = “RC”).
Conversely, region connectors should have either their upstream or downstream
node assigned as a region node.

A10.11 Location checks

The following checks ensure that spatial geometry is appropriate, and that point assets are located
correctly relative to any continuous asset to which they are connected.

A10.11.1 Critical check: All locations given in the geometry and attribute data must be to OS
Grid (as defined in the NAA to CD 535) within the appropriate range of Eastings and
Northings.

A10.11.2 Critical check: All point assets must have “EASTING” and “NORTHING” attributes
that match the easting and northing defined in the SHP geometry.

Asset Data Management Manual Page 94 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
HADDMS
check HADDMS check report code description
report code

A10.11.3 Critical check: The geometry Eastings and Northings of the ends of the line
representing each continuous asset must match the Eastings and Northings of its
upstream and downstream point assets.

A10.12 Observation related checks

The following checks ensure that observations are referenced to a valid asset. If observations are
referenced to an inappropriate asset (e.g. a pipework observation is related to a gully), then it will
be accepted but not scored.

A10.12.1 Critical check: All observations must have a “SUPP_REF” that matches a point,
continuous or region asset in the same catchment.

A10.12.2 Critical check: If an “ASSET_REF” is provided in the observation data, it must match
the “ASSET_REF” or “PIPE_REFER” of the same asset as its “SUPP_REF”.

A10.12.3 Critical check: All observations must have an “OBS_CODE” entry.

A10.12.4 Warning check: The “OBS_CODE” of an observation should be associated with an


asset of the appropriate type, otherwise it will not be scored.

A10.13 Attached documents checks

The following checks ensure that any documents which should be attached to the assets or
observations are present and referenced in the data.

A10.13.1 Critical check: Documents in the ZIP file must be of one of the acceptable types, as
defined in guidance on the downloads page of HADDMS.

A10.13.2 Warning check: Any document that is named in an “ATT_DOCS” or


“PHOTO_REFS” attribute should be present in the root folder of the ZIP file. This
warning could indicate a document has been omitted, incorrectly named or
referenced, or placed in a sub-folder in the ZIP file.

A10.13.3 Warning check: Any document that is present in the ZIP file should be referenced in
at least one “ATT_DOCS” or “PHOTO_REFS” attribute.

A10.13.4 Warning check: Referencing a single document to large numbers of assets or


observations is discouraged, so a warning is generated for any document
referenced more than once.

A10.14 Other checks

A10.14.1 Critical check: The Structural Grade (‘STRU_GRADE’) and Service Grade
(‘SERV_GRADE’) for this asset must be a whole number between 0 and 5 or 9 (field
surveyed condition) or between 100 and 105 or 109 (desk assessed condition) or
left blank (no assessment).

A10.14.2 Critical check: Text fields must not contain backslashes

A10.14.3 Warning check: An asset has a data origin of other (‘ORIGIN_DAT’ is “OT”) but has
no description of the origin in ‘OTHER_SOU’.

Asset Data Management Manual Page 95 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
HADDMS
check HADDMS check report code description
report code

A10.14.4 Warning check: An asset has a cover shape of other (‘COVER_SHAP’ is “OT”) but
has no description of the cover shape in ‘OTHER_SHAP’.

A10.14.5 Warning check: The soakaway, culvert or outfall register for this asset will be
unlinked as the assets asset type code has changed or the asset does not exist in
this version.

A10.14.6 Warning check: The ‘HEIGHT’, ‘WIDTH’ or ‘PIPE_DIA’ is less than an expected
minimum value of 50mm. Have you used the correct units?

A10.14.7 Warning check: The ‘HEIGHT’, ‘WIDTH’ or ‘PIPE_DIA’ is 900mm or greater and this
asset is not a culvert.

A10.14.8 Warning check: ‘DEPTH’, ‘UPSTR_DEPT’ or ‘DOWNSTR_DE’ is greater than an


expected minimum value of 20m. Have you used the correct units?

A10.14.9 Warning check: ‘LENGTH’ of a continuous asset is greater than an expected


maximum of 300m. Have you used the correct units?

A10.14.10 Warning check: The continuous ‘LENGTH’ attribute is more than 10% higher than
the actual geometric length of the asset

A10.14.11 Warning check: ‘PIPE_U_LEN’ is less than an expected minimum value of 100mm
or greater than an expected maximum value of 10000mm. Have you used the
correct units?

A10.14.12 Warning check: ‘UPSTR_INVE’ is less than an expected minimum level of -


50mAOD or greater than an expected maximum level of 500mAOD.

A10.14.13 Warning check: ‘DOWNSTR_IN’ is less than an expected minimum level of -


50mAOD or greater than an expected maximum level of 500mAOD.

A10.14.14 Warning check: ‘UPSTR_BACK’ is less than an expected minimum level of -


50mAOD or greater than an expected maximum level of 500mAOD.

A10.14.15 Warning check: ‘DOWNSTR_BA’ is less than an expected minimum level of -


50mAOD or greater than an expected maximum level of 500mAOD.

A10.14.16 Warning check: ‘COVER_LEVEL’ is less than an expected minimum level of -


50mAOD or greater than an expected maximum level of 500mAOD.

A10.14.17 Warning check: ‘INVERT_LEV’ is less than an expected minimum level of -50mAOD
or greater than an expected maximum level of 500mAOD.

A10.14.18 Warning check: The ‘LENGTH’, ‘WIDTH’, ‘COVER_WIDT’, ‘COVER_LENG’,


‘CHAM_WIDT’ or ‘CHAM_LENGT’ of the point asset is greater than the expected
maximum value of 10m. Have you used the correct units?

A10.14.19 Warning check: An Outfall Register assessed as Z1 classification will be deleted.

Table 8-1 - HADDMS check report code definitions.

Asset Data Management Manual Page 96 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
8.4 Drainage Condition Defect Scoring Criteria

Inspection Observation Codes


These observations relate to information specific to the inspection, they apply to all
asset types and are not scored.
Observation Type Description/Quantification HADDMS Code
Not Inspected Extent of continuous asset not inspected BLOS
Additional Details General photograph GP
General remark REM
Inspection Abandoned Unspecified Reason SA
Due to Obstruction SAOB
Due to High Water Level SAWL
Due to equipment failure EQ
Due to other reasons Z
Water Level Water level WL
Clear WLC
Turbid WLT
Flow from Incoming Asset Flow from incoming asset FW
Clear flow from incoming asset FWC
Wrong surface water flow from incoming foul asset FWCS
Turbid flow from incoming asset FWT
Wrong foul flow from incoming surface water asset FWTF
Flow from incoming asset not visible FWYY
Hazardous Atmosphere Oxygen deficiency OD
Hydrogen sulphide HS
Methane ME
Other GZ
Pollutants Presence of pollutants PZ
Loss of Vision Camera under water CUW
Silt CUD
Steam CUS
Other CUZ
Start of Survey START
End of Survey END
Sediment Depth (mm) SD
Cross-Section General photograph CSGP
Table 8-2 – Inspection observation codes.

Note: The Cross-Section observation type is only applicable to the following assets –
Combined Kerb and Drainage Channel (DGCK), Combined Pipe and Channel
(DGCS), Linear Drainage Channel (DGLI), Swale (DGSC), Surface Water Channel
(DGSC), Drainage Channel Block (DGDB), Edge Channel (DGEC), Ditch (DGDI), Grip
(DGGP).

Asset Data Management Manual Page 97 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Inventory Observation Codes
These observations relate to a detailed aspect of the asset’s inventory and are not
scored.
Observation Type Description/Quantification HADDMS Code
Connections Junction (having prefabricated connection) JN
Junction closed JNC
Connection other than junction CN
Connection other than junction, closed CNC
Curvature of Pipe Deviates left LL
Deviates left and up LLU
Deviates left and down LLD
Deviates right LR
Deviates right and up LRU
Deviates right and down LRD
Deviates up LU
Deviates down LD
Start Node Type Manhole MH
Inspection Chamber IC
Rodding Eye RE
Lamphole LH
Outfall to Watercourses OF
Start node type, major connection (branch) without
manhole BR
Gully GY
Catchpit CP
Soakaway SK
Oil Separator OS
Other Node Type OC
Finish Node Type Manhole MHF
Inspection Chamber ICF
Rodding Eye REF
Lamphole LHF
Outfall to Watercourses OFF
Finish node type, major connection (branch) without
manhole BRF
Gully GYF
Catchpit CPF
Soakaway SKF
Oil Separator OSF
Other Node Type OCF
Cross-Section Invert level on left side CSILL
Invert level on right side CSILR
Crest level on left side CSCLL
Crest level on right side CSCLR
General level (position on cross-section to be defined in
notes) CSGL
Gradient Maximum (%) GRMAX
Minimum (%) GRMIN

Asset Data Management Manual Page 98 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Average (%) GRAVE
Maximum deflection from optional gradient (mm) GRDEF
Table 8-3 – Inventory observation codes.

Note: The Cross-Section observation type is only applicable to the following assets –
Combined Kerb and Drainage Channel (DGCK), Combined Pipe and Channel
(DGCS), Linear Drainage Channel (DGLI), Swale (DGSC), Surface Water Channel
(DGSC), Drainage Channel Block (DGDB), Edge Channel (DGEC), Ditch (DGDI), Grip
(DGGP).

Structural and Service Observation Codes


These observations relate to the structural and service condition of the asset and are
scored.
Applicable assets: All
Structural Condition
HADDMS
Defect Type Description/Quantification Score Code
No Defects Asset fully inspected, and no structural defects SOUND
present 1
Table 8-4 – Structural observation code and score (no defects).

Service Condition
HADDMS
Defect Type Description/Quantification Score Code
Asset fully inspected, and no service defects
No Defects present 0.5 CLEAN
Table 8-5 – Service observation code and score (no defects).

Applicable assets: Pipework (DGPW), Gravity Drain (DGGD), Rising Main (DGRM),
Combined (sub) Surface FD (DGCF), Land Drain (DGLD), Culvert (DGCU), Syphon
(DGSY).
Structural Condition
HADDMS
Defect Type Description/Quantification Score Code
Deformation Flexible Material: 6-10% 20 D
Flexible Material: 11-20% 40
Flexible Material: 21-33% 80
Flexible Material: >33% 165
Rigid Material: 1-5% 40
Rigid Material: 6-10% 80
Rigid Material: >10 165
Surface Crack Longitudinal (at joint) 2 HFL(J)
Circumferential (at joint) 2 HFC(J)
Multiple/Complex (at joint) 2 HFM(J)
Spiral/Helical (at joint) 2 HFS(J)
Cracked Longitudinal (at joint) 10 CL(J)
Circumferential (at joint) 10 CC(J)

Asset Data Management Manual Page 99 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Multiple/Complex (at joint) 40 CM(J)
Spiral/Helical (at joint) 40 CS(J)
Puncture in internal wall (at joint) - Flexible
material 40 CPU(J)
Fractured Longitudinal (at joint) 40 FL(J)
Circumferential (at joint) 40 FC(J)
Multiple/Complex (at joint) 80 FM(J)
Spiral/Helical (at joint) 80 FS(J)
Split in internal wall (at joint) - Flexible Material 80 FSP(J)
Broken Broken (at joint) 80 B(J)
Hole Hole (at joint) - Radial Extent <1/4 80 H(J)
Hole (at joint) - Radial Extent > 1/4 165
Collapsed Collapsed (at joint) 165 X/XP(J)
Surface Damage Increased roughness due to wear 10 SW
Surface wear, slight 10 SWS
Increased roughness due to spalling 10 SS
Slight spalling 10 SSS
Visible aggregate 40 SAV
Medium spalling 40 SSM
Surface wear, medium 40 SWM
Aggregate projecting from surface 40 SAP
Missing aggregate 120 SAM
Large spalling 120 SSL
Surface wear, large 120 SWL
Visible reinforcement 120 SRV
Reinforcement projecting from surface 165 SRP
Corroded reinforcement 165 SRC
Porous due to manufacturing or other defect 40 PP
Connection/Junction Defective connection 165 CX
Intruding connection 165 CXI
Defective junction 165 JX
Defective connection, position incorrect 165 CXP
Intruding connection, position incorrect 165 CXPI
Defective junction, position incorrect 165 JXP
Defective connection, gap 165 CXG
Intruding connection, gap 165 CXGI
Defective connection, partial gap 165 CXH
Intruding connection, partial gap 165 CXHI
Defective connection, connecting pipe damaged 165 CXD
Intruding connection, connecting pipe damaged 165 CXDI
Defective junction, connecting pipe damaged 165 JXD
Sealing Material Sealing ring intruding 40 SR
Visible but not intruding 10 SRN
Hanging loop above centre 80 SRHA
Hanging loop below centre 120 SRHB
Broken 80 SRB
Other sealant intruding 40 SO
Displaced/Open Medium 10 OJM
Joint Large 40 OJL

Asset Data Management Manual Page 100 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Radially Displaced Medium (1-1.5x wall thickness) 10 JDM
Joint Large (greater than 1.5x wall thickness) 40 JDL
Angular Displaced
Joint Angular 10 AJ
Lining Detached lining 165 LXD
Discoloured lining 1 LXC
Defective end of lining 120 LXE
Longitudinal wrinkled lining 40 LXWL
Circumferential wrinkled lining 40 LXWC
Spiral wrinkled lining 40 LXWS
Blistered lining 80 LXB
Other lining defect 40 LXZ
Defective Repair Radial extent < 1/4 80 RX
Radial extent > 1/4 165
Weld Failure Longitudinal (flexible material) 40 WXL
Circumferential (flexible material) 40 WXC
Spiral/helical (flexible material) 80 WXS
Soil Visible Soil outside the asset is visible through a defect 165 SV
Void Visible Void outside the asset is visible through a defect 165 VV
Point Repair Pipe replaced 20 RPR
Localised lining 20 RPL
Injected mortar (pipes) or sealant (chambers) 20 RPI
Other injected sealing material 20 RPS
Hole repaired 20 RPH
Other trenchless method 20 RPZ
Lining Lining material inserted as remedial measure 20 RCL
Service Condition
HADDMS
Defect Type Description/Quantification Score Code
Roots Fine (at joint) 1 RF(J)
Tap (at joint) 5 RT(J)
Mass (at joint) - Range 0%-4% 2 RM(J)
Mass (at joint) - Range 5%-19% 4
Mass (at joint) - Range 20%-49% 6
Mass (at joint) - Range 50%-74% 10
Mass (at joint) - Range >74% 20
Attached Deposits Encrustation (at joint) - Range 0%-4% 1 DEE(J)
Encrustation (at joint) - Range 5%-19% 2
Encrustation (at joint) - Range >19% 5
Grease (at joint) - Range 0%-4% 2 DEG(J)
Grease (at joint) - Range 5%-19% 4
Grease (at joint) - Range 20%-49% 10
Grease (at joint) - 50%-74% 15
Grease (at joint) - Range >74% 20
Fouling (at joint) 0 DEF(J)
Other (at joint) - Range 0%-4% 1 DEZ(J)
Other (at joint) - Range 5%-19% 2
Other (at joint) - Range >19% 5
Blocked perforations 10 DEPB

Asset Data Management Manual Page 101 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Settled Deposits Fine (at joint) - Range 0%-4% 1 DES(J)
Fine (at joint) - Range 5%-19% 2
Fine (at joint) - Range 20%-49% 5
Fine (at joint) - Range 50%-74% 8
Fine (at joint) - Range >74% 10
Coarse (at joint) - Range 0%-4% 1 DER(J)
Coarse (at joint) - Range 5%-19% 2
Coarse (at joint) - Range 20%-49% 5
Coarse (at joint) - Range 50%-74% 8
Coarse (at joint) - Range >74% 10
Hard or compacted (at joint) - Range 0%-4% 1 DEC(J)
Hard or compacted (at joint) - Range 5%-19% 2
Hard or compacted (at joint) - Range 20%-49% 5
Hard or compacted (at joint) - Range 50%-74% 8
Hard or compacted (at joint) - Range >74% 10
Other (at joint) - Range 0%-4% 1 DEX(J)
Other (at joint) - Range 5%-19% 2
Other (at joint) - Range 20%-49% 5
Other (at joint) - Range 50%-74% 8
Other (at joint) - Range >74% 10
Intruding Lateral Intrusion Percentage - Range 0%-4% 1 CNI
Intrusion Percentage - Range 5%-19% 2
Intrusion Percentage - Range 20%-49% 5
Intrusion Percentage - Range 50%-74% 8
Intrusion Percentage - Range >74% 10
Blocked Connection Defective 20 CXB
Connection/Junction Connection Intruding 20 CXBI
Junction Defective 20 JXB
Ingress of Soil Sand (at joint) - Range 0%-4% 1 INGS(J)
Sand (at joint) - Range 5%-19% 2
Sand (at joint) - Range 20%-49% 5
Sand (at joint) - Range 50%-74% 8
Sand (at joint) - Range >74% 10
Peat (at joint) - Range 0%-4% 1 INGP(J)
Peat (at joint) - Range 5%-19% 2
Peat (at joint) - Range 20%-49% 5
Peat (at joint) - Range 50%-74% 8
Peat (at joint) - Range >74% 10
Other Fine Material (at joint) - Range 0%-4% 1 INGF(J)
Other Fine Material (at joint) - Range 5%-19% 2
Other Fine Material (at joint) - Range 20%-49% 5
Other Fine Material (at joint) - Range 50%-74% 8
Other Fine Material (at joint) - Range >74% 10
Gravel (at joint) - Range 0%-4% 1 INGG(J)
Gravel (at joint) - Range 5%-19% 2
Gravel (at joint) - Range 20%-49% 5
Gravel (at joint) - Range 50%-74% 8
Gravel (at joint) - Range >74% 10
Other (at joint) - Range 0%-4% 1 INGZ(J)

Asset Data Management Manual Page 102 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Other (at joint) - Range 5%-19% 2
Other (at joint) - Range 20%-49% 5
Other (at joint) - Range 50%-74% 8
Other (at joint) - Range >74% 10
Other Obstacles Brick or masonry in invert (at joint) 10 OBB(J)
Pipe material in invert (at joint) 10 OBM(J)
Other object in invert (at joint) 10 OBX(J)
Protruding through wall (at joint) 10 OBI(J)
Wedged in joint (at joint) 10 OBJ(J)
Through connection/junction (at joint) 10 OBC(J)
External pipe/cable (at joint) 20 OBP(J)
Built into structure (at joint) 20 OBS(J)
Other (at joint) 10 OBZ(J)
Infiltration Seeping (at joint) 2 IS(J)
Dripping (at joint) 5 ID(J)
Running (at joint) 10 IR(J)
Gushing (at joint) 20 IG(J)
Exfiltration (at joint) 5 EX(J)
Vermin Rat 1 VR
Other vermin 1 VZ
Standing Water due to Standing water percentage - Range 0%-19% 1 WLS
Pipe Deviation Standing water percentage - Range 20%-49% 5
Standing water percentage - Range 50%-74% 8
Standing water percentage - Range >74% 10
Table 8-6– Structural and Service observation codes and scores for above applicable assets.

Applicable assets: Ditch (DGDI), Grip (DGGP).


Structural Condition
HADDMS
Defect Type Description/Quantification Score Code
Slope Stability
No slope erosion 1 QDAA
Slight slope erosion - evidence of scour, exposed subsoil 20 QDAB
Holes in channel side and loose soil 40 QDAC
Slippage - failure of channel side obstructing channel 80 QDAD
Slippage - failure channel side blocking channel 165 QDAE
Burrows No evidence of burrowing 1 QDBA
Evidence of burrowing, exposed subsoil 20 QDBB
Established burrowing with flow slightly impeded 40 QDBC
Burrowing with spoil obstructing flow 80 QDBD
Severe burrowing causing failure of channel side blocking
channel 165 QDBE
Lining No exposure of lining 1 QDCA
Lining exposed at top of bank 20 QDCB
Displaced joints in lining 20 QDCC
Lining (non-concrete) exposed in slope side 40 QDCD
Displaced concrete liner 40 QDCE

Asset Data Management Manual Page 103 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Lining exposed in channel. Lining torn or broken above top
water level 80 QDCF
Concrete liner broken but not blocking channel 80 QDCG
Lining torn or broken below top water level 165 QDCH
Concrete liner collapsed and blocking channel 165 QDCI
Service Condition
HADDMS
Defect Type Description/Quantification Score Code
Sedimentation No sediment or detritus 0.5 QDPA
Minor accumulation causing no loss of flow 1 QDPB
Accumulation causing some loss of flow or pooling 3 QDPC
Heavy causing obstruction of flow 5 QDPD
Channel full 10 QDPE
Vegetation Short grass - stands in flow 0.5 QDQA
Long grass - folds in flow 1 QDQB
Weed growth - plants established in channel 1 QDQC
Reeds - established in channel 1 QDQD
Rushes - invasive growth in channel 2 QDQE
Shrub or brambles - low growing dense plant greater than
300mm 4 QDQF
Sapling tree - <100mm girth 5 QDQG
Mature tree - >100mm girth 10 QDQH
Debris No debris 0.5 QDRA
Litter - individual pieces 1 QDRB
Litter - accumulation 2 QDRC
Debris - vehicle component 4 QDRD
Debris - building products 4 QDRE
Debris - multiple vehicle components 8 QDRF
Debris requiring mechanical removal (vehicle) 10 QDRG
Table 8-7– Structural and Service observation codes and scores for above applicable assets.

Applicable assets: Closed Kerb & Drainage (DGCK), Combined Pipe & Channel
(DGCS), Linear Drainage Channel (DGLI).
Structural Condition
HADDMS
Defect Type Description/Quantification Score Code
General No structural defects 1 QLAA
Surface damage, e.g. chipped, weathered or corrosion. 10 QLAB
Cracked kerb-drain unit 40 QLAC
Displaced unit 80 QLAD
Broken kerb-drain unit 165 QLAE
Defective Cracked 40 QLAF
Integral Cover Broken 165 QLAG
Defective Damaged 40 QLAH
Removable
Cover Missing 165 QLAI
Service Condition
HADDMS
Defect Type Description/Quantification Score Code

Asset Data Management Manual Page 104 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Sedimentation No sediment or detritus 0.5 QLPA
Minor accumulation causing no loss of flow 1 QLPB
Accumulation causing some loss of flow 2 QLPC
Heavy causing obstruction of flow 5 QLPD
Channel full 10 QLPE
Debris/ No litter/debris 0.5 QLQA
Vegetation Minor accumulation causing no loss of flow 1 QLQB
Accumulation blocking individual waterway 2 QLQC
Heavy causing obstruction of multiple waterways 5 QLQD
Blocking outlets 10 QLQE
Table 8-8 – Structural and Service observation codes and scores for above applicable assets.

Applicable assets: Surface Water Channel (DGCH), Drainage Channel Block (DGDB),
Edge Channel (DGEC).
Structural Condition
HADDMS
Defect Type Description/Quantification Score Code
General No structural defects 1 QCAA
Surface cracking or weathering 20 QCAB
Missing sealant 40 QCAC
Displaced pre-cast concrete blocks 80 QCAD
Spalling concrete 80 QCAE
Fractured or broken 165 QCAF
Service Condition
HADDMS
Defect Type Description/Quantification Score Code
Sedimentation No sediment or detritus 0.5 QCPA
Minor accumulation causing no loss of flow 1 QCFB
Accumulation causing some loss of flow or ponding in invert 2 QCPC
Heavy causing obstruction of flow 5 QCPD
Channel full 10 QCPE
Debris No litter/debris 0.5 QCQA
Minor accumulation causing no loss of flow 1 QCQB
Accumulation causing some loss of flow and/or ponding 2 QCQC
Heavy causing obstruction of flow 5 QCQD
Blocking channel 10 QCQE
Table 8-9 – Structural and Service observation codes and scores for above applicable assets.

Applicable assets: Swale (DGSC).


Structural Condition
HADDMS
Defect Type Description/Quantification Score Code
General No structural defects 1 QVAA
Shallow rut or depression with no impact on flow 20 QVAB
Shallow wheel rut or depression slightly impeding flow 40 QVAC

Asset Data Management Manual Page 105 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Deep wheel rut or depression severely impeding flow 80 QVAD
Multiple wheel ruts or displaced soil forming ridges 165 QVAE
Lining and Displaced or exposed geogrid 80 QVAF
Geogrid Exposed impermeable lining 165 QVAG
Service Condition
HADDMS
Defect Type Description/Quantification Score Code
Sedimentation No sediment or detritus 0.5 QVPA
Minor accumulation causing no loss of flow 1 QVPB
Accumulation causing some loss of flow or ponding 2 QVPC
Heavy causing obstruction of flow 5 QVPD
Filling channel 10 QVPE
Debris No litter/debris 0.5 QVQA
Minor accumulation causing no loss of flow 1 QVQB
Accumulation causing some loss of flow and/or ponding 2 QVQC
Heavy causing obstruction of flow 5 QVQD
Filling channel 10 QVQE
Vegetation Short grass 0.5 QVRA
Long grass 1 QVRB
Intrusive 2 QVRC
Raised grass strip at pavement edge 2 QVRD
Patches of bare ground 2 QVRE
Extensive bare ground 5 QVRF
Completely bare ground 10 QVRG
Extensive blocking flow 10 QVRH
Contamination No contamination 0.5 QVSA
Causing isolated damage 5 QVSB
Causing extensive damage 10 QVSC
Table 8-10 – Structural and Service observation codes and scores for above applicable assets.

Applicable assets: Combined (sub) Surface FD (DGCF), Counterfort Drain (DGCD),


Filter Drain (DGFD), Soakaway Trench (DGST).
Structural Condition
HADDMS
Defect Type Description/Quantification Score Code
General No structural defects 1 QFAA
Individual displacement of stones 20 QFAB
Individual wheel rut with scattered medium 40 QFAC
Earthworks encroached on filter drain 80 QFAD
Surface obscured (no treatment) 80 QFAE
Multiple wheel ruts with major displacement of medium onto
carriageway 80 QFAF
Design, Inappropriate medium (Type A in carriageway drain) 80 QFAG
Construction
or
Maintenance Combined surface & sub-surface drain remote from
Defects pavement edge 165 QFAH
Service Condition
HADDMS
Defect Type Description/Quantification Score Code

Asset Data Management Manual Page 106 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
General Clean 0.5 QFPA
Sediment present on surface 1 QFPB
Sediment build up at pavement edge 1 QFPC
Vegetation growth at pavement edge 2 QFPD
Vegetation established in medium 4 QFPE
Filter medium surface crusted 5 QFPF
Standing water at surface 10 QFPG
Filter medium blocked 10 QFPH
Table 8-11 – Structural and Service observation codes and scores for above applicable assets.

Applicable Assets: Combined (sub) Surface FD (DGCF), Counterfort Drain (DGCD),


Filter Drain (DGFD), Fin Drain (DGFN), Narrow Filter Drain (DGND), Soakaway
Trench (DGST).
Service Condition
HADDMS
Defect Type Description/Quantification Score Code
Ground Interpreted void ratio good 0.5 QFQA
Penetrating Interpreted void ratio adequate 2 QFQB
Radar
Interpreted void ratio poor 10 QFQC
Interpreted void ratio standing water 10 QFQD
Table 8-12 – Service observation codes and scores for above applicable assets.

Applicable assets: Bifurcation or Storm Overflow (DGBI), Catchpit (DGCP), Inspection


Chamber (DGIC), Lamphole (DGLH), Manhole (DGMH), Rodding Eye (DGRE),
Soakaway Borehole (DGSB), Soakaway Chamber (DGSO), Other Special Chamber
(DGOC).
Structural Condition
HADDMS
Defect Type Description/Quantification Score Code
Deformation Localised (affecting small proportion of asset wall) 80 DS
General (affecting large proportion of asset wall) 165 DL
Surface Crack Vertical 5 HFV
Horizontal 5 HFH
Inclined 5 HFIN
Multiple/complex 5 HFM
Cracked Vertical 20 CV
Horizontal 20 CH
Inclined 20 CIN
Multiple/complex 40 CM
Fractured Vertical 40 FV
Horizontal (chambers) (finish survey legacy code) 40 FH
Inclined 40 FIN
Multiple/complex 80 FM
Break Broken 40 B
Hole 80 H
Collapsed with complete loss of structural integrity 165 XPV
Units displaced from original position 20 DB

Asset Data Management Manual Page 107 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Defective Units missing 80 MB
Brickwork/Mas
onry Collapsed with complete loss of structural integrity 165 XB
Missing Mortar Missing mortar 20 MM
Surface Increased roughness due to wear 10 SW
Damage Increased roughness due to spalling 20 SS
Visible aggregate 20 SAV
Aggregate projecting from surface 20 SAP
Missing aggregate 40 SAM
Visible reinforcement 40 SRV
Reinforcement projecting from surface 80 SRP
Corroded reinforcement 80 SRC
Missing wall 165 SH
Corrosion products on surface 20 SCP
Defective Intruding 20 CXI
Connection Position incorrect 20 CXP
Gap 80 CXG
Partial gap 80 CXH
Connecting pipe damaged 80 CXD
Intruding Seal Visible but not intruding 40 SRN
Hanging but not broken 80 SRH
Broken 80 SRB
Defective Joint Unpointed 10 UJ
Units displaced vertically 20 OJ
Units displaced horizontally 80 JD
Angular displaced units 80 AJ
Repair Intact replacement of asset material 10 RPR
Intact localised lining 10 RPL
Injected of sealant 10 RPI
Missing part of wall 80 RXM
Defective patch sealing hole 80 RXP
Defects (other) Porous due to manufacturing or other defect 40 PP
Soil outside the asset is visible through a defect 165 SV
Void outside the asset is visible through a defect 165 VV
Defective Step Broken plastic encapsulation 20 SXP
or Ladder Step corroded 80 SXC
Step bent 80 SXB
Step loose 165 SXL
Step missing (where provided) 165 SXM
Ladder handrail corroded 20 SXH
Ladder runner corroded 40 SXRC
Ladder support loose 80 SXSL
Ladder support missing 80 SXSM
Ladder support corroded 80 SXSC
Ladder handrail loose 165 SXHL
Ladder handrail missing 165 SXHM
Defective toe hold 40 SXT
Defective hand hold 80 SXQ
Rocking cover 20 TXCR

Asset Data Management Manual Page 108 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Cover below surface level 20 TXCD
Cover above surface level 20 TXCU
Defective Unpointed lifting holes 20 TXCP
Cover Broken cover 80 TXCB
Seized cover 80 TXCS
Missing cover 165 TXCM
Defective Loose frame 40 TXFL
Frame Broken frame 80 TXFB
Missing frame 165 TXFM
Benching Benching defective (e.g. spalling) 40 BEX
Channel Channel defective 40 CHX
Safety Feature Safety chain - missing with evidence of attachments 165 SFCM
Safety chain defective 165 SFCX
Safety bar - missing with evidence of attachments 165 SFBM
Safety bar defective 165 SFBX
Slit Pit Silt pit defective 165 CPX
Service Condition
HADDMS
Defect Type Description/Quantification Score Code
Roots Fine 2 RF
Tap 5 RT
Mass 10 RM
Attached Encrustation 1 DEE
Deposits Grease 1 DEG
Fouling 2 DEF
Settled Fine - Range 0%-4% 1 DES
Deposits Fine - Range 5%-19% 2
Fine - Range 20%-49% 5
Fine - Range 50%-74% 8
Fine - Range >74% 10
Coarse - Range 0%-4% 1 DER
Coarse - Range 5%-19% 2
Coarse - Range 20%-49% 5
Coarse - Range 50%-74% 8
Coarse - Range >74% 10
Hard or compacted - Range 0%-4% 1 DEC
Hard or compacted - Range 5%-19% 2
Hard or compacted - Range 20%-49% 5
Hard or compacted - Range 50%-74% 8
Hard or compacted - Range >74% 10
Other - Range 0%-4% 1 DEX
Other - Range 5%-19% 2
Other - Range 20%-49% 5
Other - Range 50%-74% 8
Other - Range >74% 10
Settled Filling Catchpit sump 4 OBDA
Deposits Obstructing flow less than 50% pipe diameter 8 OBDB
(Catchpit)
Obstructing flow 50% of pipe diameter or more 10 OBDC
Soakaway part full of sediment 5 OBDD

Asset Data Management Manual Page 109 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Settled
Deposits
(soakaways) Soakaway full of sediment or water 10 OBDE
Intruding Above flow level 0.5 CNIA
Connection Into flow or through benching 10 CNIX
Blocked
Connection Connecting pipe blocked 10 CXB
Obstacles and Brick or masonry in invert 2 OBB
Debris Pipe material in invert 2 OBM
Other 2 OBZ
Protruding through wall 1 OBI
Wedged in joint 1 OBJ
Through connection/junction 5 OBC
External pipe/cable 5 OBP
Built into structure 5 OBS
Infiltration Seeping 1 IS
Dripping 2 ID
Running 5 IR
Gushing 5 IG
Sealed Pipe
Through
Chamber Access cover missing 20 SPM
Contamination Oil or other contaminant present 10 OIL
Table 8-13 – Structural and Service observation codes and scores for above applicable assets.

Applicable assets: Gully (DGGU).


Structural Condition
HADDMS
Defect Type Description/Quantification Score Code
Grating and Intact 1 QGAA
Frame Rocking 20 QGAB
Missing frame bedding 20 QGAC
Cracked 40 QGAD
Void forming adjacent to frame 80 QGAE
Failure of surrounding pavement 80 QGAF
Missing bar 80 QGAG
Broken or collapsed 165 QGAH
Missing grating 165 QGAI
Missing frame and grating 165 QGAJ
Grating bars parallel to road 165 QGAK
Adjustment Intact 1 QGBA
Course Missing mortar 20 QGBB
Broken or fractured brick 40 QGBC
Missing brick 80 QGBD
Broken section 80 QGBE
Unsuitable material (slate, timber etc) 80 QGBF
Pot Intact 1 QGCA
Missing stopper 20 QGCB
Cracked 20 QGCC
Fractured 40 QGCD

Asset Data Management Manual Page 110 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Broken 80 QGCE
Leaking 80 QGCF
Collapsed 165 QGCG
Position In channel 1 QGDA
Above surface level 10 QGDB
> 25mm below surface level 40 QGDC
75-125mm in front of kerb line or channel edge 80 QGDD
> 125mm in front of kerb line or channel edge 165 QGDE
Service Condition
HADDMS
Defect Type Description/Quantification Score Code
Grating & Clear 0.5 QGPA
Frame Partially obstructed by leaves or litter 2 QGPB
Completely obstructed by leaves or litter 5 QGPC
Blocked by sediment 10 QGPD
Sediment No sediment 0.5 QGQA
Some within sump 1 QGQB
Filling sump but outlet not obstructed 2 QGQC
Obstructing outlet but no water 5 QGQD
To grating level and pot full 10 QGQE
Contamination Thick layer of oil 5 QGRA
Table 8-14 – Structural and Service observation codes and scores for above applicable asets.

Applicable assets: Grip Inlet (DGGI), Inlet (DGIT), Outfall (DGOU), Outlet (DGOL)
Structural Condition
HADDMS
Defect Type Description/Quantification Score Code
General No structural defects 1 QIAA
Settlement of piped outlet 20 QIAB
Fractured pipe 40 QIAC
Displaced pipe (differential settlement) 80 QIAD
Collapsed pipe 165 QIAE
Formal Cracked mortar joints 20 QIBA
Loose concrete 20 QIBB
Insecure bagwork or gabions 40 QIBC
Cracked brickwork 40 QIBD
Missing bricks 40 QIBE
Spalling concrete 40 QIBF
Exposed reinforcement 40 QIBG
Displaced bagwork or gabions 80 QIBH
Fractured concrete or brickwork 80 QIBI
Differential settlement 80 QIBJ
Collapsed 165 QIBK
Banks Erosion 40 QICA
Collapsing around pipe 80 QICB
Failure 165 QICC
Screen Inclined to outlet 1 QIDA

Asset Data Management Manual Page 111 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Inclined to inlet 10 QIDB
Loose fixing 20 QIDC
Free standing 20 QIDD
Deformed bars 40 QIDE
Vertical screen to outlet 40 QIDF
Buckled or broken 80 QIDG
Vertical to inlet (unsafe) 165 QIDH
Safety No safety-related defects 1 QIEA
Features Safety feature remote from structure 10 QIEB
Loose rails 80 QIEC
Loose or insecure guardrail posts 80 QIED
Missing guardrail 165 QIEE
Missing fence 165 QIEF
Missing harness eye 165 QIEG
Missing access path 165 QIEH
Service Condition
HADDMS
Defect Type Description/Quantification Score Code
Sediment No sediment, and invert is above channel bed 0.5 QIPA
Up to pipe invert 1 QIPB
<25% pipe diameter 2 QIPC
25%-75% pipe diameter 5 QIPD
>75% pipe diameter 10 QIPE
Debris No debris 0.5 QIQA
Light not obstructing flow 1 QIQB
Causing standing water 2 QIQC
Obstructing flow or partially blocked screen 5 QIQD
Flow blocked or surcharging 10 QIQE
Table 8-15 – Structural and Service observation codes and scores for above applicable assets.

Applicable assets: Flow Control Device (DGFC), Interceptor (DGIN), Oil Separator
(DGOS), Pumping Station (DGPS).

Structural Condition
HADDMS
Defect Type Description/Quantification Score Code
General No defect within general structure 1 QAAA
Structure Surface cracking or rust 10 QAAB
Structural crack 40 QAAC
Fractured 80 QAAD
Poor condition but functioning 80 QAAE
Broken 165 QAAF
Unsafe 165 QAAG
Component Damaged baffle 40 QABA
Specific Loose or unseated flap valve 80 QABB
Missing vent pipe from oil separator 80 QABC
Missing weir sections 80 QABD

Asset Data Management Manual Page 112 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Seized flap valve 165 QABE
Missing handrail where required for safety 165 QABF
Service Condition
HADDMS
Defect Type Description/Quantification Score Code
General Unobstructed 0.5 QAPA
Service Minor accumulation of litter, sediment or vegetation 1 QAPB
Condition Flow slightly impeded 2 QAPC
Flow severely impeded 5 QAPD
Blocked causing surcharge 10 QAPE
Contamination Asset poses a pollution risk 10 QAQA
Oil separator full 10 QAQB
Table 8-16 – Structural and Service observation codes and scores for above applicable assets.

Applicable assets: Detention Pond (DGDP), Infiltration Basin (DGIB), Pollution


Containment Pond (DGPC), Reed Bed (DGRB), Retention Pond (DGRP), Sediment
Pond (DGSP), Wetlands (DGWL), Pond (DGPU).
Structural Condition
HADDMS
Defect Type Description/Quantification Score Code
Stability No slope defects 1 QPAA
Slope disturbance 20 QPAB
Slope movement 40 QPAC
Slope slippage 80 QPAD
Slope failure 165 QPAE
Burrows No burrowing 1 QPBA
Minor burrows on non-water-retaining slope 40 QPBB
Large burrows on non-water-retaining slope 80 QPBC
Burrows on water-retaining slope 165 QPBD
Linear Liner visible in bank 40 QPCA
Liner exposed and displaced in bank 80 QPCB
Liner torn or split 165 QPCC
Access Vehicular access unobstructed 1 QPDA
Vehicular access difficult 20 QPDB
Vehicular access track obstructed 40 QPDC
No constructed vehicular access 80 QPDD
No vehicular access 165 QPDE
Safety Intact and secure fence 1 QPEA
Insecure security fence 80 QPEB
No security fence 165 QPEC
Missing safety equipment (e.g. lifebelt) where required 165 QPED
Pond has vertical sides with no means of escape 165 QPEE
Ovality Flexible material - Range 6%-10% 20 OVLP
Flexible Material - Range 11%-20% 40
Flexible Material - Range 21%-33% 80
Flexible Material - Range >33%-33% 165
Rigid Material - Range 1%-5% 40
Rigid Material - Range 6%-10% 80

Asset Data Management Manual Page 113 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Rigid Material - Range >10%-10% 165
Service Condition
HADDMS
Defect Type Description/Quantification Score Code
Sediment No sediment 0.5 QPPA
Visible sediment not impeding flow 1 QPPB
Sediment levels less than 25% inlet/outlet diameter 2 QPPC
Pools formed due to sediment 5 QPPD
Sediment levels greater than 25% inlet/outlet diameter 5 QPPE
Sediment blocking inlet/outlet 10 QPPF
Vegetation No invasive vegetation 0.5 QPQA
Invasive vegetation on banks 1 QPQB
Invasive vegetation in pond 2 QPQC
Invasive shrubs in pond 5 QPQD
Tree(s) in pond that may affect liner 10 QPQE
Debris No litter or debris 0.5 QPRA
Litter accumulation 2 QPRB
Building products 4 QPRC
Other large items not requiring mechanical removal (e.g.
due to fly-tipping) 8 QPRD
Items requiring mechanical removal (due to size or location) 10 QPRE
Table 8-17 – Structural and Service observation codes and scores for above applicable assets.

Asset Data Management Manual Page 114 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
9 Environmental
9.1 Environmental Data Types
The environmental data specification is designed to facilitate the collection, transfer,
storage and sharing of consistent environmental asset data across the Company and
its service providers. This in turn enables visualisation and analysis of spatial data via
the EnvIS application within HAGIS, the interactive mapping system for the Company.
The Company has a licence commitment to: ‘Maintain high quality and readily
accessible information about the assets held, operated and managed by the Licence
holder’ (Asset Management 5.9, Highways England: Licence)
With a requirement to then: ‘Consider the cumulative environmental impact of its
activities across its network and identify holistic approaches to mitigate such impacts
and improve environmental performance’ (Environment 5.23, Highways England:
Licence)
This confirms the need for the Company to collect data of a consistent quality to
understand what and where our environmental assets are, to understand the condition
of those assets and whether they are performing as they were designed to, and to
identify opportunities to produce better environmental outcomes across the Strategic
Road Network.
Environmental data is categorised as Environmental which provides key detail on the
composition of the soft estate, what condition those assets are in and how they should
be managed. Environmental inventory data describes each environmental asset in
terms of what it is, where it is and what it does.

9.2 Environmental Inventory Data


The environmental inventory contains data collected by Major Projects, and Asset
Delivery:
• Detail of an assets sub-class relating to the environmental topics of:
o Landscape
o Biodiversity
o Cultural Heritage
o Noise
• Detail of the asset’s precise geographic location.
• Detail of the assets intended objective, recorded as:
o National Highways objective(s), and
o Environmental objective(s)

Environmental Inventory Tables

Asset Data Management Manual Page 115 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Submissions of environmental inventory asset data should be broken down by
point/line/polygon feature into GIS tables. Table 9-1 specifies the required GIS table
name for the corresponding environmental asset.

GIS Table Names Applicable Asset Names


Amenity Grassland
Grass Reinforced Walls
Grassland with Bulbs
Heath and Moorland
ENVIS_LAND_GRASS_POLY
Open Grassland
Rock and Scree
Species Rich Grassland
Splay/Swathe
ENVIS_LAND_VEGETATION_POINT Individual Trees
Linear Woodland Belt
Scrub
Shrubs
ENVIS_LAND_VEGETATION_POLY
Woodland
Climbers or Trailers
Groundcover
Injurious Weeds
Invasive Weeds
ENVIS_LAND_HEDGES_LINE Hedgerows
Marsh and Wet Grassland
ENVIS_LAND_WATER_POLY
Ecological/Wildlife Pond
ENVIS_NCE_HABITAT_LINE Habitat Boundaries
ENVIS_NCE_HABITAT_POLY Habitat Areas
ENVIS_NCE_SPECIES_POLY Species Areas
ENVIS_NCE_WILDLIFE_STRUCTURES_LINE Wildlife Underpass
ENVIS_NCE_WILDLIFE_STRUCTURE_POINT Wildlife Housing
Conservation Area
Historic Battlefields
Historic Wreck
Listed Building
ENVIS_CULT_HERIT_POLY
Non-Designated
Parks or Gardens of Specific Historic Interest
Scheduled Ancient Monument
World Heritage Site
Formal Surveys
ENVIS_STUDY_SURVEY Incidental Observations (Fauna)
Incidental Observations (Flora)

Table 9-1 - Translation of Environmental assets in Part 3 – Data Dictionary to their


corresponding GIS layer name.

Asset Objectives
To effectively design and manage the strategic road network towards achieving
the desired environmental outcomes, there is a need to state the purpose of

Asset Data Management Manual Page 116 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
various assets, i.e. why they are there and what they are intended to achieve.
An asset’s intended objective can be recorded as either a National Highways
objective(s) and/or an environmental objective(s).
National Highways Objectives: The descriptive text used for these objectives
enables the attachment of National Highways objectives to assets, where
appropriate, within and surrounding the strategic road network. These
demonstrate how an asset may assist in supporting and achieving National
Highways environmental strategic aims. It is possible that an asset may
contribute to several objectives e.g. the implementation of a combined
hedgerow and wall, could assist in demonstrating both noise and landscape
objectives. In such cases, all relevant objectives appropriate to an asset
must be submitted.
Environmental Objectives: The descriptive text used for these objectives
enables the attachment of environmental objectives, where appropriate, to
the various assets of the strategic road network that will adequately
describe the expected characteristics and performance of that asset. In this
way environmental objectives assist in ensuring assets are managed
effectively to fulfil these objectives in the medium and long term. Most
existing assets will have multiple objectives e.g. a noise barrier may be
designed to achieve both visual screening and noise attenuation. In these
cases, all relevant environmental objectives must be submitted to prioritise
the design and / or maintenance requirement of that asset.

9.3 Submission of Data


Environmental data will be collected and amended over time in a cycle of continual
improvement as an integral part of the Company’s licence obligation to maintain high
quality and readily accessible information about the assets we hold, operate and
manage. This will enable us to consider the cumulative impact of those activities
across the strategic road network to identify holistic approaches to mitigate such
impacts and improve environmental performance.
Achieving this continual improvement requires adherence to regular and specific data
submission milestones, ensuring those data submissions are of the required standard
specified in Part 3 - Data Dictionary, and submitted in the correct format to the right
location. Any new or changed environmental inventory should be submitted to the
central database at the end of each quarter.
For Major Projects the Project Control Framework (PCF) identifies two key milestones
when major schemes should submit new environmental data to reflect the work that
is/has been undertaken.
• Stage 3 Outline Environmental Management Plan (OEMP): Species survey
data is produced during PCF Stages 2/3 and is a valuable record of species,
habitats and cultural heritage assets found on the soft estate. However, there
is no guarantee that it will be passed onto subsequent contractors and
eventually reach EnvIS when the scheme is complete. Submission of

Asset Data Management Manual Page 117 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
environmental data at PCF Stage 3 will ensure it is retained for the benefit of
the business instead of being lost in the handover from design to construction
and eventual handover.
• This is reinforced in the revised Environmental Management Plan PCF
product (See section 5 of the EMP structure document under Forms and
Guidance). To be clear, we only expect species data and cultural
heritage data if survey work has identified previously unknown assets.
• Stage 6/7 Handover Environmental Management Plan (HEMP): Final As-
built environmental inventory should be submitted by the end of PCF Stages
6/7. The HEMP will not be signed off by the Environment Group regional
environmental advisor without confirmation that environmental data has been
submitted and fully validated.
Prior to the preparation and submission of as-built data at Stage 6/7 the major scheme
must request an extract of the existing environmental data by supplying a shapefile
polygon of the scheme extents to the EnvIS Support Mailbox in section 2.1.6. This
extract should then be used to identify any assets that have been removed or amended
by the scheme to inform the central database accordingly.

Data Identifiers
All environmental record types include two key National Highways assigned identifiers:
• 10-digit unique identifiers (HAID, DOCID/CONTID/ATTACH_ID, HACOMID)
- these are 10-character text fields containing only numeric values to identify
any single asset/document record submitted and accepted following validation.
The identifier (HAID) assigned to an inventory record means that it can occur
only once on the network. All subsequently supplied records will reference this
unique identifier. DOCID/CONTID/ATTACH_ID is the unique identifier attached
to document records and HACOMID is the unique identifier attached to
commitment records.
• Agent ID – A unique ID assigned to each Area / Service Provider / Scheme
supplying environmental data. The purpose is to link this identifier with the
organisation supplied asset Unique ID to make a reasonably secure key by
which to identify environmental inventory items. Each major scheme will be
assigned a new Agent ID available on request from the EnvIS Support mailbox
in section 2.1.6.

Data Validation
To ensure the quality of environment data is maintained in accordance with the ADMM
specification each individual layer goes through an automated validated process
before finally being loaded onto the central database.
If a layer passes validation, then that data will be loaded onto EnvIS and a HAID will
be created for each record. This is a unique identifier that is detailed in a HAID report
and forwarded on to the data supplier for them to add those HAIDs against the
corresponding records in their local database.

Asset Data Management Manual Page 118 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
If a layer does not pass validation, then an Error report will be created detailing exactly
which records have failed and why. The Error report will be forwarded on to the data
supplier who should correct the errors before resubmitting for re-validation.
Once all layers from a major scheme submission have passed validation then a copy
of that data will be passed to the operational area for them to load onto their system
and manage accordingly.
Validation errors can be categorised as critical, spatial and inventory errors.
Critical Errors - the validation tool will cease validating any individual layer upon
discovery of a critical error. Therefore, further spatial and/or inventory validation errors
may exist within that layer but will only be highlighted once the critical errors have been
addressed and the layer resubmitted.
Critical errors can be avoided by obtaining a set of shapefile templates from the EnvIS
Support mailbox in section 2.1.6. This will avoid the following errors:
• Incorrect shapefile names – shapefiles that are incorrectly named will not be
“seen” by the validation tool and won’t be processed.
• Invalid field names – all field names must correspond exactly with those
specified within Part 3 - Data Dictionary.
• Additional fields – the number of fields must correspond with the exact
number specified within the Part 3 - Data Dictionary. Additional unspecified
fields will cause the layer to fail validation.
Spatial Errors - assuming there are no critical errors, the validation tool will scan each
layer for the following spatial errors:
• Landscape polygons combined must provide continuous mosaic coverage of
the entire soft estate.
• Polygons within an individual layer must not overlap each other.
• All polygon features must be closed, with coincident start and end vertices.
• Any self-intersections must be removed from polygon features.
Inventory Errors - assuming there are no critical errors, the validation tool will scan
each layer for the inventory errors. These errors result from the submission of a look-
up value that is not permitted against a particular attribute.

Submission Process
Environmental data can be submitted in numerous ways:
• National Highways Supply Chain Portal:
o Major Projects consultants and external service providers can submit
Environmental data to the supply chain portal. Access to the SCP can
be obtained by requesting an application form from and returning it to
the Digital Communications inbox.
• OneDrive:
o Asset Delivery areas can submit Environmental data by uploading it to
their OneDrive.

Asset Data Management Manual Page 119 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
• Compact Disc / Hard Drive
o EnvIS Management Team
National Highways
Lateral
8 City Walk
Leeds
LS11 9AT
All submissions should be saved in a zip file (encrypted with a password if submitting
via compact disc / hard drive). An email giving notification that a submission has been
made should then be sent the EnvIS Support mailbox in section 2.1.6 detailing the
Agent ID and a list of which layers have been submitted.

Asset Data Management Manual Page 120 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
10 Geotechnical
A geotechnical asset is defined as the man-made or natural earthworks below the road
pavement layers and the adjacent land beside the road.
CS 641 provides the overarching approach to the management of geotechnical assets,
it details:
• The role of organisations and people in the management of geotechnical
assets.
• Planning and risk management of activities undertaken on geotechnical assets
throughout their life cycle (inspection, monitoring and interventions).
• The information requirements for the management of geotechnical assets.
It does not cover the data management of geotechnical asset information.
The data requirements for the geotechnical asset are to be used in association with
the requirements in CS 641.
The asset information system for geotechnical assets for the Company maintains the
prime data set for geotechnical asset inventory, construction, and condition data. The
asset information system is defined in Section 2.1.42.1.4 of this document.
The requirements for transfer of data relating to geotechnical assets are described in
the following locations:
• CS 641 describes asset Principal Inspections, and the method of transfer of
such data is described in the user documentation for the asset information
system.
• The process for the handover of geotechnical as-built data is described in detail
in the Handover of Geotechnical As-Built Data Guidance Document, available
for download from the asset information system, or by contacting the support
email address shown in Section 2.1.4 of this document.
• The data and file format requirements for the transfer of geotechnical asset data
are formally laid out alongside the attributes for Geotechnical assets in Part 3
– Data Dictionary.
Advice or support on all aspects of data transfer for geotechnical assets is available
from the support email address shown in Section 2.1.4 of this document.

Asset Data Management Manual Page 121 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
11 Lighting
The Company requires accurate lighting inventory data to ensure they have the correct
energy consumption data for billing purposes. Energy procurement and asset
management support is an integral part of this function.
Electricity trading for unmetered road lighting is governed by the Balancing and
Settlement Code (BSC Procedure) for Unmetered Supplies Registered in SMRS
(BSCP520). It is a requirement to comply with BSCP520. BSCP520 uses the
Operational Information Document “A Guide to Unmetered Supplies under the BSC”
to define the standard file format for lighting inventories that is the minimum needed
to achieve billing settlement.
The following requirements shall also be met:
• Inventories should reflect changes to the asset as soon as practical. National
Highways, through the EPS project, provides monthly updates to the DNOs. A
complete inventory, including all normal changes occurring in the previous
month, should be submitted on the 1st day of every month.
• Inventory submission details, including file identifier and inventory specification
format are provided in this document.
• At the earliest opportunity any major planned changes to the network should be
notified to the EPS System Administrator e.g. the opening of a new road or de-
trunking of an existing road. Advanced information should be provided so that
DNO’s may be informed at the earliest opportunity.
• Where a Photo Electric Control Unit (PECU) Array is used to record the
switching times of the lighting, the photocells in these arrays must be
representative of those on the road, i.e. similar age, type, switching levels /
mode etc. As such any significant change in switching regime, e.g. a major
change in photocell manufacturer/type will require similar changes to the
population of photocells employed in the PECU array. To initiate this change,
the EPS System Administrator should be informed in advance of any major
changes.
• Electricity supply invoices for equipment not covered by the unmetered supplies
Balancing and Settlement Code Process should continue to be paid in the usual
way. The billed items should be entered on the lighting inventory as “metered”
to ensure they are filtered out of the asset database by the EPS Administrator
and therefore not submitted to the DNO to prevent double billing.
• All data shall be stored electronically in a format that can be read, copied, and
recorded.
• Storage conditions and handling processes shall be designed and implemented
to protect data from unauthorised access, loss or destruction, and from theft
and disaster.
• Data systems shall be designed so that data remains accessible, authentic,
reliable and useable through any kind of system change, for the entire period
of their retention. This may include migration to different software, re-

Asset Data Management Manual Page 122 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
presentation in emulation formats or any other future ways of re-presenting
data. Where such changes occur, evidence should be kept, along with details
of any variation in design and format.

11.1 Data Transfer Requirements for Standard Lighting


Billing Inventory
The first fifteen fields align with the Operational Information Document (OID) standard
file format for unmetered energy trading. These fields describe the data to be reported
monthly to comply with the energy trading requirements. It also serves as the minimum
dataset needed to derive the condition indicators that quantify the condition of the
lighting asset under the GN 22 (ILP) “Asset-Management Toolkit: Minor Structures
(ATOMS). This information plays an increasingly important role in requesting funding
to maintain the lighting asset outside of the scope of lump sum maintenance and in
predicting future budget needs for the asset.
Transfer of billing inventory data
To enable the EPS System Administrator to handle the data from different areas
efficiently, the inventory should be issued to the EPS System Administrator under the
cover of a unique file which must be formed as detailed below.
File naming convention: AADDMMYY.csv
Where: AA are two digits forming the Area Number (e.g. 01 for Area 1, 02
for Area 2)
DD are two digits forming the day (e.g. 01 – first, 02 – second)
MM are two digits forming the month (e.g. 01 – January)
YY are the last two digits forming the year (e.g. 16 for 2016)
The fifteen fields that are required to be sent to the EPS System Administrator are
listed in the order that they must be formed. This file format is subject to amendment
by Elexon. If the OID is revised, any changes to the standard file format will take
precedence over the following requirements:
• Agent Record Number
• Parish
• Road Name
• Feature Location
• Item Class Code
• Lamp Equivalent Number
• CMS Unit Reference Number
• Charge Code
• Number of Lamps
• Switch Regime

Asset Data Management Manual Page 123 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
• Number of PECUs
• Control Charge Code
• Grid Reference East
• Grid Reference North
• Exit Point

11.2 Data Transfer Requirements for Variable Lighting


Billing Inventory
Data for lighting assets affected by variable lighting for carbon reduction purposes are
to be submitted 1st day of every month in a format agreed with the EPS System
Administrator.

Figure 11-1 - Interaction of Main Parties.

Asset Data Management Manual Page 124 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
12 Pavements
The asset data requirements for the assessment of maintenance at a network level
are set out in CS 229. The procedures for using this data are detailed in CS 230.

12.1 Pavement Condition Surveys


This section describes the strategy for Pavement Condition Surveys, which is
supported by the facilities provided in the Company’s Pavement Data Management
System.
For clarity, a differentiation is made between surveys and inspections.
Surveys
Defined as the collection of data either by machine or visually. Machine surveys are
the collection by machine of measurements. Visual surveys are a mixture of
assessments and measurements, with data capture possibly by hand-held computer.
Inspections
Defined as viewing of the relevant length of road, either on foot or from a slow-moving
vehicle, to apply and to record judgements but not to collect data.

Pavement Condition Survey Strategy


Network Visual Surveys and Pavement Visual Surveys should be carried out in
accordance with the provisions of the HAPMS Visual Survey Manual available through
National Highways Extranet http://hawacphap013/hapms/.
Procedures and methods for carrying out Visual Condition Surveys (VCS) for concrete
surfaced pavements (including CRCP) are fully described in the CS 229 and CS 230.
There are two levels of pavement condition survey:
• Network level
• Scheme level
All network level pavement issues (for example, network level reporting, budget
planning, targeting of priority lengths for treatment) will be based on the data collected
by the Network level surveys.
Any additional data required to define/design individual maintenance scheme will be
collected by the scheme level surveys. The actual scheme level condition surveys
required to be undertaken for each individual scheme will vary from scheme to
scheme.
Lengths of road that will be candidates for treatment will be defined by the relevant
maintenance engineer and will include those lengths identified by the Network surveys
and any other lengths that the maintenance engineer wishes to consider for other
reasons.
After the Network level surveys, and prior to the confirmation that any length of road
is considered a candidate for treatment and subject to scheme level surveys, an

Asset Data Management Manual Page 125 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
inspection must be carried out by an engineer (or experienced Inspector). This
inspection must formally confirm that the length identified from the Network surveys,
or by other means, is a proper candidate for treatment and give the engineer or
Inspector’s considered views of other elements of the proposed work, which are
currently considered as part of the Value Management exercise.

Network Level Surveys


The network level machine surveys are:
• TRACS
• Skid Resistance survey
• TRASS (TSD)
Surveys are undertaken in accordance with CS 228 and CS 229.

Scheme Level Surveys


See relevant contract requirements boxes for more information on specific local
surveys.
Surveys are undertaken in accordance with CS 228 and CS 229.

12.2 Emergency Areas


Emergency Areas (EAs) are recorded as part of the Pavements asset data
requirement. EAs have been defined as a pre-defined lookup (Table 12-1) value
pertaining to XSP Function; an attribute assigned to XSP Detail Data.

Value Description

Acceleration -L9 to -L1, +L1 to +L9, +R9 to +R1, -R1 to -R9


Lane

Bus Lane -L9 to -L1, +L1 to +L9, CL1 to CL9, CR9 to CR1, +R9 to +R1, -R1 to -R9

Deceleration -L9 to -L1, +L1 to +L9, +R9 to +R1, -R1 to -R9


Lane

Dynamic Hard -L1


Shoulder

Edge Strip LH, RH

Emergency LH
Area

Hard Shoulder LH, RH

Lay-by -L9 to -L1, +L1 to +L9, +R9 to +R1, -R1 to -R9

Asset Data Management Manual Page 126 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
Not Specified LH, RH

Other LA, L9 to L1, -L9 to -L1, +L1 to +L9, +R9 to +R1, -R1 to -R9, R1 to R9, RA

Permanent CL1 to CL9, CR9 to CR1


Lane

Table 12-1– Pre-defined lookup vales for PV_XSPDET_FUNCTION.

When new EAs are installed or existing EAs are changed an obligation now exists to
ensure that the associated location data is updated accordingly.
An aspiration exists for this initial data requirement to be refined with further detail in
the future.

Asset Data Management Manual Page 127 of 164 Date of Issue: October 2021
Part 2 - Requirements and Additional Information
13 Road Restraint
The road restraint assets concern Safety Barriers and related items installed on the
highways network. Note:
• Temporary Barrier Assets – the inventory requirements do not include the
recording of any temporary barrier products used for traffic management, or
safety purposes.
• Road Restraint Assets & Structures Assets – the inventory requirements do not
include the recording of bridge parapets (these products are recorded as
components of the structure, within the structures asset class). However, where
safety barriers are installed on the bridge deck (for example in front of a non-
compliant bridge parapet), these are to be included in the road restraint
inventory.

Asset Data Management Manual Page 128 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
14 Structures
The DMRB provides the overarching approach for the management of existing
highway structures, including their inspection, maintenance, repair, and assessment.
More specifically, the overarching principles and requirements for the provision and
maintenance of records and inspections for trunk road structures are set out in the
following key documents:
• CG 302 ‘As Built, operational and maintenance records for highway structures’,
• CS 450 ‘Inspection of highway structures’, and
• CS 452 ‘Inspection and records for road tunnels’.
Although this list is not exhaustive, these and other similar documents do now cover
the Company’s data requirements for structures.

14.1 Structures Information Tables


The following tables describe reference information essential to the Structures asset
data requirement in Part 3 – Data Dictionary. The information below describes the
intrinsic relationship between values in the tables. These are referenced in the
following tables in Part 3 – Data Dictionary:
• Assessment Location
• Activity Sub-Type
• Defect Severity
• Defect Type

Assessment Location

Activity Location Description Activity Location Type

All Traffic Lanes Carriageway

Lane 1 Carriageway

Lane 2 Carriageway

Lane 3 Carriageway

Lane 4 Carriageway

Lane 5 Carriageway

Lane 6 Carriageway

Hard Shoulder Carriageway

Verge Cantilever Non-Carriageway

Asset Data Management Manual Page 129 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Verge Main Deck Non-Carriageway

Central Reserve Non-Carriageway

Table 14-1 – Additional information for Assessment Location.

Activity Sub-Type

Activity Sub-Type Description Activity Type

Confirmation Appraisal

Departure Appraisal Actions Appraisal

Half-joint agree interim measure Appraisal

Half-joint Interim Appraisal Appraisal

Hinge Deck agree interim measure Appraisal

Hinge Deck Interim Appraisal Appraisal

Pending Appraisal

Review Need for Assessment Appraisal

Road/Rail BA37/92 Summary Appraisal

Road/Rail Confirm need for mitigation sheet Appraisal

Road/Rail Decision to Proceed with Assessment Appraisal

Road/Rail Optional Risk Ranking, and Decision Appraisal

Road/Rail Questionnaire for a corner Appraisal

Road/Rail Risk Ranking Questionnaire Appraisal

Area Scheme Related Asbestos Appraisal

Major Projects Asbestos Appraisal

Part of Initial MA/MAC Area Annual Target Asbestos Appraisal

Review of AAP Asbestos Appraisal

Third Party Asbestos Appraisal

1st Assessment Assessment

2nd Assessment Assessment

Assessment Data Verification Assessment

Asset Data Management Manual Page 130 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Parapet Assessment Assessment

Pier Assessment Assessment

Primary Load Assessment Assessment

Data Data Capture

Designer Input Completed Data Capture

Detrunking Scheme Detrunking Scheme

End of Defects Liability Period Inspection

General Inspection

M & E General Inspection

M & E Principal Inspection

Monitoring Inspection

Pre-Opening Inspection Inspection

Principal Inspection

Special Inspection

Opt Out Opt Out

Add Kilometerage Post-New Structure

Check As built Data for a New Structure Post-New Structure

Check As built Data for an Existing Structure Post-New Structure

Confirm End of Construction Contract Post-New Structure

Confirm Structure is Commissioned Post-New Structure

Programme Completed Programme Completed

Sign Off by HA Sign Off by HA

N/A Work

Table 14-2 – Additional information for Activity Sub-Type.

Defect Severity

Defect Severity Description Keycode Defect Severity Type Value

Defect in tolerable condition A1 Appearance related defects 1

Asset Data Management Manual Page 131 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Defect in low tolerability condition A2 Appearance related defects 1.1

Defect in unacceptable condition A3 Appearance related defects 2

Defect in offensive condition A4 Appearance related defects 3

Defect is definitely not causing damage to element D1 Damage causing defects 1


or structure

Minor: Defect is unlikely to be causing damage to D2 Damage causing defects 2


the element or structure now or unlikely to do so in
the near future

Moderate: Defect is probably causing damage to D3 Damage causing defects 3


element or structure, or is likely to do so in the near
future

Moderate: Defect may present a danger to the D3S Damage causing defects 3.1
public in the near future

Severe: Defect is clearly causing damage to D4 Damage causing defects 4


element or structure

Severe: Defect is presenting a danger to the public D4S Damage causing defects 4.2

Defect is causing element to be non-functional D5 Damage causing defects 5

Adjacent element will not be affected X1 Defects affecting adjacent 1


areas

Defects unlikely to affect condition of adjacent X2 Defects affecting adjacent 1


elements now or in the near future areas

Defect probably is affecting condition of adjacent X3 Defects affecting adjacent 2


elements or is likely to in near future areas

Defect clearly affecting condition of adjacent X4 Defects affecting adjacent 3


elements areas

Defect likely to affect safety of adjacent elements X4S Defects affecting adjacent 3.1
in near future areas

Defect creating danger to the public from defect or X5 Defects affecting adjacent 4
adjacent elements areas

Minor loss of protection likely in the near future P2 Paint coating and protective 2
system defects

Significant loss of protection in the near future P3 Paint coating and protective 3
system defects

Significant loss of protection occurring P4 Paint coating and protective 4


system defects

Asset Data Management Manual Page 132 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Loss of protection may be creating a danger to the P4S Paint coating and protective 4.1
public system defects

Defect definitely creating a danger to the public P5 Paint coating and protective 5
system defects

No significant defect 1 0

Minor defects of a non-urgent nature 2 0

Defects which should be included for attention 3 0


within the next annual maintenance period

Defects where urgent action is required 4 0

Table 14-3 – Additional information for Defect Severity.

Defect Type

Defect Type Description Keycode Message Defect Filter Defect


Description Severity Type

Blowholes (appearance only) BHA Concrete Appearance


workmanship related defects

Cold joint (appearance only) CJA Concrete Appearance


workmanship related defects

Foreign object (appearance FOA Material - Concrete Appearance


only) (S)teel, (T)imber, workmanship related defects
(P)olystyrene

Grout loss (appearance only) GLA Concrete Appearance


workmanship related defects

Honeycombing (appearance HCA Maximum depth Concrete Appearance


only) (mm) workmanship related defects

Irregular shuttering IrSh Concrete Appearance


(appearance only) workmanship related defects

Poor compaction PCA Concrete Appearance


(appearance only) workmanship related defects

Rusty nails/tie wire etc. RNA Concrete Appearance


(appearance only) workmanship related defects

Sand pocket or streak SPockA Concrete Appearance


(appearance only) workmanship related defects

Segregation of concrete SegA Concrete Appearance


(appearance only) workmanship related defects

Asset Data Management Manual Page 133 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Shuttering left in place ShA Material - Concrete Appearance
(appearance only) (S)teel, (T)imber, workmanship related defects
(P)olystyrene

Surface void (appearance SVoidA Concrete Appearance


only) workmanship related defects

Water runs (appearance WRA Concrete Appearance


only) workmanship related defects

Bird or animal excrement on ExA General defects Appearance


the structure (appearance related defects
only)

Graffiti Graf General defects Appearance


related defects

Score or scratch Scr General defects Appearance


related defects

Running water (appearance WRA Leaching/Staining Appearance


only) related defects

Algal growth (appearance AlA Leaching/Staining Appearance


only) related defects

Efflorescence (appearance EffA Colour - (R)ed, Leaching/Staining Appearance


only) (B)rown, (W)hite, related defects
(G)rey

Exuded gel (appearance GelA Leaching/Staining Appearance


only) related defects

Iron pyrites stains IPA Leaching/Staining Appearance


(appearance only) related defects

Mould or fungus (appearance FungA Leaching/Staining Appearance


only) related defects

Rust stain/streak/spot RStA Leaching/Staining Appearance


(appearance only) related defects

Smoke staining (appearance SStA Leaching/Staining Appearance


only) related defects

Stalactite/Stalagmite StalA Leaching/Staining Appearance


(appearance only) related defects

Water stain (appearance WStA Leaching/Staining Appearance


only) related defects

Blowholes BH Concrete Damage


workmanship causing
defects

Asset Data Management Manual Page 134 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Cold joint CJ Concrete Damage
workmanship causing
defects

Foreign object FO Material - Concrete Damage


(S)teel, (T)imber, workmanship causing
(P)olystyrene defects

Grout loss GL Concrete Damage


workmanship causing
defects

Honeycombing HC Maximum depth Concrete Damage


(mm) workmanship causing
defects

Irregular shuttering IrSh Concrete Damage


workmanship causing
defects

Poor compaction PC Concrete Damage


workmanship causing
defects

Rusty nails/Tie wire etc. RN Concrete Damage


workmanship causing
defects

Sand pocket or streak SPock Concrete Damage


workmanship causing
defects

Segregation of concrete Seg Concrete Damage


workmanship causing
defects

Shuttering left in place Sh Material - Concrete Damage


(S)teel, (T)imber, workmanship causing
(P)olystyrene defects

Surface void SVoid Concrete Damage


workmanship causing
defects

Water runs WR Concrete Damage


workmanship causing
defects

Construction joint crack CJCr Maximum width Cracks in Damage


(and depth (mm) concrete or causing
for masonry) masonry defects

Crack along line of TendCr Maximum width Cracks in Damage


prestressing tendon (and depth (mm) concrete or causing
for masonry) masonry defects

Asset Data Management Manual Page 135 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Crack in mortar only MorCr Maximum width Cracks in Damage
(and depth (mm) concrete or causing
for masonry) masonry defects

Crack of uncertain origin or a Cr Maximum width Cracks in Damage


combination of causes (and depth (mm) concrete or causing
for masonry) masonry defects

Crazing Cg Maximum width Cracks in Damage


(and depth (mm) concrete or causing
for masonry) masonry defects

Drying shrinkage crack DSCr Maximum width Cracks in Damage


(and depth (mm) concrete or causing
for masonry) masonry defects

Early thermal crack ETCr Maximum width Cracks in Damage


(and depth (mm) concrete or causing
for masonry) masonry defects

Flexural crack FlCr Maximum width Cracks in Damage


(and depth (mm) concrete or causing
for masonry) masonry defects

Formwork movement crack FMCr Maximum width Cracks in Damage


(and depth (mm) concrete or causing
for masonry) masonry defects

Frost damage crack FDCr Maximum width Cracks in Damage


(and depth (mm) concrete or causing
for masonry) masonry defects

Impact (accident) damage ACr Maximum width Cracks in Damage


crack (and depth (mm) concrete or causing
for masonry) masonry defects

Map cracking MCr Maximum width Cracks in Damage


(and depth (mm) concrete or causing
for masonry) masonry defects

Plastic settlement PDCr Maximum width Cracks in Damage


(displacement) crack (and depth (mm) concrete or causing
for masonry) masonry defects

Plastic shrinkage crack PSCr Maximum width Cracks in Damage


(and depth (mm) concrete or causing
for masonry) masonry defects

Reinforcement corrosion RCCr Maximum width Cracks in Damage


crack (and depth (mm) concrete or causing
for masonry) masonry defects

Settlement crack SeCr Maximum width Cracks in Damage


(and depth (mm) concrete or causing
for masonry) masonry defects

Asset Data Management Manual Page 136 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Shear crack SCr Maximum width Cracks in Damage
(and depth (mm) concrete or causing
for masonry) masonry defects

Tension crack TenCr Maximum width Cracks in Damage


(and depth (mm) concrete or causing
for masonry) masonry defects

Torsion crack TorCr Maximum width Cracks in Damage


(and depth (mm) concrete or causing
for masonry) masonry defects

Anchor slip AncSl Defects in Damage


components causing
defects

Broken or fractured FrCo Defects in Damage


components causing
defects

Cracked CrCo Defects in Damage


components causing
defects

Debonding Debo Defects in Damage


components causing
defects

Degraded Deg Defects in Damage


components causing
defects

Loose Lse Defects in Damage


components causing
defects

Missing MissCo Defects in Damage


components causing
defects

Pothole PH Defects in Damage


components causing
defects

Rusty/Corroded RCo Defects in Damage


components causing
defects

Rutted Rut Defects in Damage


components causing
defects

Seized Sz Defects in Damage


components causing
defects

Asset Data Management Manual Page 137 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Split Spl Defects in Damage
components causing
defects

Bird or animal excrement on Exc General defects Damage


the structure causing
defects

Deformed DefG General defects Damage


causing
defects

Displaced or misaligned Disp General defects Damage


causing
defects

Distorted DistG General defects Damage


causing
defects

Friable or degraded concrete Fri General defects Damage


or mortar causing
defects

Insect attack Ins General defects Damage


causing
defects

Leaning or tilted Lean General defects Damage


causing
defects

Ponding (causing damage to Pond General defects Damage


element) causing
defects

Rotation of element Rotn General defects Damage


causing
defects

Rotten or decayed Rot General defects Damage


causing
defects

Settlement Setl General defects Damage


causing
defects

Sliding or slipped Slid General defects Damage


causing
defects

Algal growth Al Leaching/Staining Damage


causing
defects

Asset Data Management Manual Page 138 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Calcite Leaching CLe Leaching/Staining Damage
causing
defects

Efflorescence Eff Leaching/Staining Damage


causing
defects

Exuded gel Gel Leaching/Staining Damage


causing
defects

Iron pyrites stains IP Leaching/Staining Damage


causing
defects

Mould or fungus Fung Leaching/Staining Damage


causing
defects

Running water WR Leaching/Staining Damage


causing
defects

Rust stain/streak/spot RSt Leaching/Staining Damage


causing
defects

Stalactite/Stalagmite Stal Leaching/Staining Damage


causing
defects

Water stain WS Leaching/Staining Damage


causing
defects

Concrete Softening CSoft Loss of concrete Damage


or masonry causing
defects

Exposed aggregate EA Loss of concrete Damage


or masonry causing
defects

Exposed reinforcement ER Reinforcement Loss of concrete Damage


Section Lost (%) or masonry causing
defects

Fire damage FD Maximum Depth Loss of concrete Damage


of Material Lost or masonry causing
(mm) defects

Frost attack FA Maximum Depth Loss of concrete Damage


of Material Lost or masonry causing
(mm) defects

Asset Data Management Manual Page 139 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Hollow (delaminated) area Holl Loss of concrete Damage
or masonry causing
defects

Impact (accident) damage AD Maximum Depth Loss of concrete Damage


of Material Lost or masonry causing
(mm) defects

Incipient spall ISp Loss of concrete Damage


or masonry causing
defects

Peeling Peel Maximum Depth Loss of concrete Damage


of Material Lost or masonry causing
(mm) defects

Scaling Sc Maximum Depth Loss of concrete Damage


of Material Lost or masonry causing
(mm) defects

Spalled area Sp Maximum Depth Loss of concrete Damage


of Material Lost or masonry causing
(mm) defects

Bulging Bulg Masonry defects Damage


causing
defects

Dropped unit in arch Drop Masonry defects Damage


causing
defects

Erosion by water ErWa Masonry defects Damage


causing
defects

Erosion by wind ErWi Masonry defects Damage


causing
defects

Friable mortar Fri Depth (mm) Masonry defects Damage


causing
defects

Missing masonry unit MissM Masonry defects Damage


causing
defects

Mortar loss MorL Depth (mm) Masonry defects Damage


causing
defects

Soft mortar MorS Depth (mm) Masonry defects Damage


causing
defects

Asset Data Management Manual Page 140 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Failed repair FRep Material - Repairs to Damage
(M)ortar,(C)oncr concrete or causing
ete,(R)ubbing masonry defects
Up,
(I)njection,(S)ton
e,(B)rickwork,
(G) Sprayed
Concrete,
(P)Pointing

Repair Rep Material - Repairs to Damage


(M)ortar,(C)oncr concrete or causing
ete,(R)ubbing masonry defects
Up,
(I)njection,(S)ton
e,(B)rickwork,
(G) Sprayed
Concrete,
(P)Pointing

Corroded/Rusting RS Steelwork defects Damage


causing
defects

Corrosion - loss of section RLoS Steel section lost Steelwork defects Damage
(mm) causing
defects

Crack Cr Length (mm) Steelwork defects Damage


and maximum causing
width (mm) defects

Deformation DefS Maximum Steelwork defects Damage


Deformation causing
(mm) defects

Deformation due to corrosion RDef Maximum Steelwork defects Damage


deformation causing
(mm) defects

Distortion DistS Steelwork defects Damage


causing
defects

Fatigue crack FCr Length (mm) Steelwork defects Damage


and maximum causing
width (mm) defects

Fire damage FDS Steelwork defects Damage


causing
defects

Fracture FrS Steelwork defects Damage


causing
defects

Asset Data Management Manual Page 141 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Impact (accident) damage ACrS Length (mm) Steelwork defects Damage
crack and maximum causing
width (mm) defects

Impact (accident) damage AD Steelwork defects Damage


other causing
defects

Lamination Lam Steelwork defects Damage


causing
defects

Pitting Pit Steelwork defects Damage


causing
defects

Separation steel/concrete SCSep Maximum width Steelwork defects Damage


(mm) causing
defects

Separation steel/other SOSep Maximum width Steelwork defects Damage


material (mm) causing
defects

Separation steel/steel SSSep Maximum width Steelwork defects Damage


(mm) causing
defects

Wear Wea Steelwork defects Damage


causing
defects

Corroded/Rusting RX Steelwork joint Damage


and connection causing
defects defects

Distorted DistX Steelwork joint Damage


and connection causing
defects defects

Fractured connector FrX Type - Steelwork joint Damage


(H)SFG,(B)olt,(N and connection causing
)ut,(R)ivet,(W)el defects defects
d

Joint movement JMov Type - (S)lip, Steelwork joint Damage


(R)ubbing and connection causing
defects defects

Long bolt or stud LB Steelwork joint Damage


and connection causing
defects defects

Loose connector Lse Steelwork joint Damage


and connection causing
defects defects

Asset Data Management Manual Page 142 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Missing connector/weld MissX Type - Steelwork joint Damage
(H)SFG,(B)olt,(N and connection causing
)ut,(R)ivet,(W)el defects defects
d

Poorly installed connector CPoor Steelwork joint Damage


and connection causing
defects defects

Short bolt or stud SB Steelwork joint Damage


and connection causing
defects defects

Weld crack WCr Length (mm) Steelwork joint Damage


and maximum and connection causing
width (mm) defects defects

Weld HAZ crack HAZCr Length (mm) Steelwork joint Damage


and maximum and connection causing
width (mm) defects defects

Weld porosity WP Steelwork joint Damage


and connection causing
defects defects

Weld undercut WU Steelwork joint Damage


and connection causing
defects defects

Blocked Bld General defects Defects


affecting
adjacent areas

Burrowing Bur General defects Defects


affecting
adjacent areas

Debris, rubbish, etc. on or Deb General defects Defects


adjacent to the structure affecting
adjacent areas

Excess fill on or adjacent to HiFl General defects Defects


structure affecting
adjacent areas

Lack of fill over or adjacent to LoFl General defects Defects


the structure affecting
adjacent areas

Ponding (affecting adjacent PondN General defects Defects


elements) affecting
adjacent areas

Scour or scour hole Sco General defects Defects


affecting
adjacent areas

Asset Data Management Manual Page 143 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Silt accumulation Silt General defects Defects
affecting
adjacent areas

Vegetation growth on the Veg General defects Defects


structure or encroaching on affecting
the structure adjacent areas

Blistering PBI Paints, coatings Paint coating


and protective and protective
systems system defects

Chalking PCh Paints, coatings Paint coating


and protective and protective
systems system defects

Cracking PCr Paints, coatings Paint coating


and protective and protective
systems system defects

Fading PFad Paints, coatings Paint coating


and protective and protective
systems system defects

Fire damage PFD Paints, coatings Paint coating


and protective and protective
systems system defects

Flaking PFI Paints, coatings Paint coating


and protective and protective
systems system defects

Other degradation or PDeg Paints, coatings Paint coating


breakdown and protective and protective
systems system defects

Peeling PPeel Paints, coatings Paint coating


and protective and protective
systems system defects

Rusting or rust staining from PR Paints, coatings Paint coating


substrate and protective and protective
systems system defects

Scored or scratched PScr Paints, coatings Paint coating


and protective and protective
systems system defects

White deposits (zinc based?) PZ Paints, coatings Paint coating


and protective and protective
systems system defects

Table 14-4 – Additional information for Defect Types.

Asset Data Management Manual Page 144 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Appendix A: Condition Grading Guide
The following section clarifies which assets should be assessed using a 1-5 condition
grade or a 1, 3, 5 condition grade and provides detailed condition grading criteria for
the application of the 5-point condition grading scale to each relevant asset.
5-Point Condition
Asset Class Asset Name Grading

1 2 3 4 5
Ancillary Bridleway     

Ancillary Combined Cycle Track and Footway   

Ancillary Crisis Signage     

Ancillary Crossover   

Ancillary Cycle Track     

Ancillary Footway   

Ancillary Handrail     

Ancillary Non-Carriageway Surface   

Ancillary Pedestrian Crossing     

Ancillary Salt Bin     

Ancillary Spill Kit     

Ancillary Steps   

Ancillary Stile     

Ancillary Street Furniture     


Carriageway
Anti-Glare Barrier     
Control
Carriageway
Block Wall     
Control
Carriageway
Bollard     
Control
Carriageway
Brick Wall     
Control
Carriageway
Carriageway Gate     
Control
Carriageway
Cattle Grid     
Control
Carriageway
Fence     
Control
Carriageway
Fence Gate     
Control
Carriageway
Hatched Road Markings     
Control
Carriageway
Kerb   
Control
Carriageway
Longitudinal Road Markings     
Control
Carriageway
Node Studs     
Control
Carriageway
Post (Signs)     
Control

Asset Data Management Manual Page 145 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Carriageway
Post (Traffic Signal)     
Control
Carriageway
Reference Marker     
Control
Carriageway
Road Studs     
Control
Carriageway
Sign Face     
Control
Carriageway
Snow Gate     
Control
Carriageway
Stone Wall     
Control
Carriageway Transverse and Special Road
    
Control Markings
Carriageway
Utility Marker Post     
Control
Environmental Amenity Grassland     

Environmental Climbers or Trailers     

Environmental Ecological/Wildlife Pond     


Environmental Grass Reinforced Wall     

Environmental Grassland with Bulbs     

Environmental Groundcover     

Environmental Heath and Moorland     

Environmental Hedgerow   

Environmental Individual Trees     

Environmental Linear Woodland Belt   

Environmental Marsh and Wet Grassland     

Environmental Open Grassland     

Environmental Rock and Scree     

Environmental Scrub     

Environmental Shrubs   

Environmental Species Rich Grassland     

Environmental Splay/Swath     

Environmental Wildlife Housing     


Environmental Wildlife Underpass     

Environmental Woodland     

Pavement Pavement Section     

Road Restraint Crash Cushion     

Road Restraint End Terminal     

Road Restraint Inspection Cover     

Road Restraint Pedestrian Guard Rail     


Road Restraint Safety Barrier (Concrete) TBC
Road Restraint Safety Barrier (Steel)     

Road Restraint Safety Barrier Gate (Steel)     

Asset Data Management Manual Page 146 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Road Restraint Transition (Steel)     

Road Restraint VRS Add On Motorcycle Protection     

A.1 Ancillary
Combined Cycle Track and Footway/Cycle Track/Footway
Grade Condition Criteria

• No defects
1 As New/ No deterioration/Meeting
• Structurally sound
management plan
• Some minor signs of aging (e.g. minor/ hairline
2 Superficial damage / deterioration with
cracking)
no loss of performance

• Isolated defects such as loose/ cracked paving slabs


3 Some damage / deterioration and
and concrete.
performance may be slightly reduced

• Extensive loose/ cracked paving slabs and concrete.


4 Significant damage / deterioration and
• Potential trip hazard.
performance may be severely reduced
• Asset unstable.
• Unmaintainable.

• Structural failure / collapsed


5 Significant damage / deterioration /
• Asset missing
missing / failed and no longer fulfils its
intended purpose

Handrails
Grade Condition Criteria

• No defects
1 As New/ No deterioration/Meeting
• Structurally sound with no visible damage.
management plan
• Localised surface rust and corrosion, up to 25% of
2 Superficial damage / deterioration with
asset length.
no loss of performance
• Superficial damage/ deterioration.
• Signs of wood rot.
3 Some damage / deterioration and
• Significant signs of rust and corrosion, up to 50% of
performance may be slightly reduced
asset length.
• Extensive signs of wood rot, rust or corrosion, up to
4 Significant damage / deterioration and
75% of asset length.
performance may be severely reduced
• Localised rust and corrosion resulting in visible holes
or cracking.
• Bent, leaning or unstable which could potentially result
in collapse.
• Any missing component.
• Unmaintainable.
• Structural failure / collapsed
5 Significant damage / deterioration /
• Asset missing
missing / failed and no longer fulfils its
intended purpose

Steps

Asset Data Management Manual Page 147 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Grade Condition Criteria

• No defects
1 As New/ No deterioration/Meeting
• Structurally sound with no visible damage.
management plan
• Some minor signs of aging (e.g. minor/ hairline
2 Superficial damage / deterioration with
cracking, localised surface rot, rust or corrosion).
no loss of performance

• Significant surface rust, or wood rot.


3 Some damage / deterioration and
• Isolated defects such as loose/ cracked flags or
performance may be slightly reduced
concrete.
• Extensive signs of surface rust, or wood rot resulting
4 Significant damage / deterioration and
in visible holes or cracking.
performance may be severely reduced
• Extensive loose/ cracked flags or concrete.
• Potential trip hazard.
• Asset unstable.
• Structural failure / collapsed
5 Significant damage / deterioration /
• Asset missing
missing / failed and no longer fulfils its
intended purpose

Stiles
Grade Condition Criteria

• No defects
1 As New/ No deterioration/Meeting
• Structurally sound with no visible damage.
management plan
• Minor signs of aging.
2 Superficial damage / deterioration with
no loss of performance
• Signs of wood rot.
3 Some damage / deterioration and
• Cracked or loose rails or posts.
performance may be slightly reduced
• Asset bent or leaning.

• Extensive signs of wood rot.


4 Significant damage / deterioration and
• Missing posts or rails.
performance may be severely reduced
• Asset bent, leaning or unstable which could
potentially result in collapse.
• Structural failure / collapsed
5 Significant damage / deterioration /
• Asset missing
missing / failed and no longer fulfils its
intended purpose

A.2 Carriageway Control

Fence
Grade Condition Criteria

• No defects.
1 As New/ No deterioration/Meeting
• Structurally sound with no visible damage.
management plan
• Minor signs of aging e.g. localised surface rust and
2 Superficial damage/ Deterioration with
corrosion.
no loss of performance

Asset Data Management Manual Page 148 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
• Signs of wood rot.
3 Some damage/ Deterioration and
• Cracked or loose rails or panels.
performance may be slightly reduced
• Asset bent or leaning.
• Extensive signs of wood rot.
4 Significant damage/ Deterioration and
• Missing posts, rails or panels.
performance may be severely reduced
• Asset bent, leaning or unstable which could
potentially result in collapse.
• Unmaintainable.

• Structural failure / collapsed.


5 Significant damage/ Deterioration/
• Asset missing.
Missing/ Failed and no longer fulfils its
intended purpose

Posts (Signs)
Grade Condition Criteria

• No defects.
1 As New/ No deterioration/Meeting
• Structurally sound with no visible damage.
management plan

• Localised surface rust, paint peeling / cracking, up to


2 Superficial damage/ Deterioration with
25% of post length.
no loss of performance

• Surface rust, plastic coating bubbling / peeling off, up


3 Some damage/ Deterioration and
to 50% of post length.
performance may be slightly reduced
• Post bent of leaning.
• Localised rust resulting in visible holes or cracking
4 Significant damage/ Deterioration and
which could potentially lead to collapse.
performance may be severely reduced
• High levels of surface rust, plastic coating peeling off,
up to 75% of post length.
• Post bent or leaning which could potentially result in
collapse.
• Structural failure of post / collapsed.
5 Significant damage/ Deterioration/
• Asset missing.
Missing/ Failed and no longer fulfils its
intended purpose

Sign Face
Grade Condition Criteria

• No defects.
1 As New/ No deterioration/Meeting
• Structurally sound with no visible damage.
management plan

• Minor dents of scratches affecting up to 25% of sign


2 Superficial damage/ Deterioration with
face.
no loss of performance
• Minor dents or scratches affecting up to 50% of the
3 Some damage/ Deterioration and
sign face.
performance may be slightly reduced
• Missing rivet covers.
• Sign face may have been patched.
• Evidence of graffiti removal.

• Minor dents or scratches affecting up to 75% of the


4 Significant damage/ Deterioration and
sign face.
performance may be severely reduced
• Sign face damaged or fading so unclear to road
users.
• Major damage.
• Peeling sign patches.

Asset Data Management Manual Page 149 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
• Failure of the sign plate / collapsed.
5 Significant damage/ Deterioration/
• Asset missing.
Missing/ Failed and no longer fulfils its
intended purpose

A.3 Environmental
Amenity Grassland
Grade Condition Criteria

1 As New/ No deterioration/Meeting
management plan • Coverage across more than 90% of the area.

2 Superficial damage/ Deterioration with


• Coverage across 70-90% of the area.
no loss of performance

3 Some damage/ Deterioration and


• Coverage across 50-70% of the area.
performance may be slightly reduced

4 Significant damage/ Deterioration and


• Coverage across 30-50% of the area.
performance may be severely reduced

5 Significant damage/ Deterioration/


Missing/ Failed and no longer fulfils its • Less than 30% grass covering the remaining area.
intended purpose

Climbers or Trailers
Grade Condition Criteria

1 As New/ No deterioration/Meeting
management plan • Over 90% coverage across the length of the asset.

2 Superficial damage/ Deterioration with • Between 70-90% coverage across the length of the
no loss of performance asset.

3 Some damage/ Deterioration and • Between 50-70% coverage across the length of the
performance may be slightly reduced asset.

4 Significant damage/ Deterioration and • Between 30-50% coverage across the length of the
performance may be severely reduced asset.

5 Significant damage/ Deterioration/


• Less than 30% coverage across the length of the
Missing/ Failed and no longer fulfils its
asset.
intended purpose

Ecological/Wildlife Pond
Grade Condition Criteria

• No encroachment and/or colonisation by


1 As New/ No deterioration/Meeting
inappropriate species.
management plan
• Clear water area.

Asset Data Management Manual Page 150 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
• No silting/drying up of pond.

• Superficial encroachment and/or colonisation by


2 Superficial damage/ Deterioration with
inappropriate species.
no loss of performance
• Some silting/drying up of pond.
• Moderate encroachment and/or colonisation by
3 Some damage/ Deterioration and
inappropriate species.
performance may be slightly reduced
• Moderate silting/drying up of pond.
• Significant encroachment and/or colonisation by
4 Significant damage/ Deterioration and
inappropriate species.
performance may be severely reduced
• Significant silting/drying up of pond.
• Critical encroachment and/or colonisation by
5 Significant damage/ Deterioration/
inappropriate species.
Missing/ Failed and no longer fulfils its
• Water is not clear.
intended purpose
• Critical silting/drying up of pond.

Grass Reinforced Walls


Grade Condition Criteria

1 As New/ No deterioration/Meeting
management plan • Coverage across more than 90% of the area.

2 Superficial damage/ Deterioration with


• Coverage across 70-90% of the area.
no loss of performance

3 Some damage/ Deterioration and


• Coverage across 50-70% of the area.
performance may be slightly reduced

4 Significant damage/ Deterioration and


• Coverage across 30-50% of the area.
performance may be severely reduced

5 Significant damage/ Deterioration/


Missing/ Failed and no longer fulfils its • Less than 30% grass covering the remaining area.
intended purpose

Grassland with Bulbs


Grade Condition Criteria

• Grassland coverage across more than 90% of the


1 As New/ No deterioration/Meeting
area.
management plan
• Bulb coverage across more than 90% of the
intended design or distribution.
• Grassland coverage across 70-90% of the area.
2 Superficial damage/ Deterioration with
• Bulb coverage across 70-90% of the intended
no loss of performance
design and distribution.
• Grassland coverage across 50-70% of the area.
3 Some damage/ Deterioration and
• Bulb coverage across 50-70% of the intended
performance may be slightly reduced
design and distribution.
• Grassland coverage across 30-50% of the area.
4 Significant damage/ Deterioration and
• Bulb coverage across 30-50% of the intended
performance may be severely reduced
design and distribution.
5 Significant damage/ Deterioration/ • Less than 30% grass covering the remaining area.
Missing/ Failed and no longer fulfils its • Bulb coverage across less than 30% of the
intended purpose intended design or distribution.

Asset Data Management Manual Page 151 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Groundcover
Grade Condition Criteria

1 As New/ No deterioration/Meeting
management plan • Coverage across more than 90% of the area.

2 Superficial damage/ Deterioration with


• Coverage across 70-90% of the area.
no loss of performance

3 Some damage/ Deterioration and


• Coverage across 50-70% of the area.
performance may be slightly reduced

4 Significant damage/ Deterioration and


• Coverage across 30-50% of the area.
performance may be severely reduced

5 Significant damage/ Deterioration/


• Less than 30% coverage across the remaining
Missing/ Failed and no longer fulfils its
area.
intended purpose

Heath and Moorland


Grade Condition Criteria

1 As New/ No deterioration/Meeting
management plan • Coverage across more than 90% of the area.

2 Superficial damage/ Deterioration with


• Coverage across 70-90% of the area.
no loss of performance

3 Some damage/ Deterioration and


• Coverage across 50-70% of the area.
performance may be slightly reduced

4 Significant damage/ Deterioration and


• Coverage across 30-50% of the area.
performance may be severely reduced

5 Significant damage/ Deterioration/


• Less than 30% coverage across the remaining
Missing/ Failed and no longer fulfils its
area.
intended purpose

Hedgerow
Grade Condition Criteria

1 As New/ No deterioration/Meeting
management plan • No significant gaps in the hedgerow.

3 Some damage/ Deterioration and


• Gaps in sections of the hedgerow.
performance may be slightly reduced

5 Significant damage/ Deterioration/


Missing/ Failed and no longer fulfils its • Large gaps in the hedgerow.
intended purpose

Individual Trees

Asset Data Management Manual Page 152 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Grade Condition Criteria

1 As New/ No deterioration/Meeting • Tree present with no apparent decay or dieback.


management plan • A good specimen of its species.

2 Superficial damage/ Deterioration with • Tree has some obvious decay or dieback.
no loss of performance • Is a reasonable specimen of its species.
• Tree is showing obvious signs or decay or dieback.
3 Some damage/ Deterioration and
• Is a poor specimen.
performance may be slightly reduced
• Is not a hazard to property or the road user.
4 Significant damage/ Deterioration and • Tree has died or has serious dieback.
performance may be severely reduced • Is not a hazard to property or the road user.

5 Significant damage/ Deterioration/


• Trees has failed.
Missing/ Failed and no longer fulfils its
• Tree is no longer present.
intended purpose

Linear Woodland Belt


Grade Condition Criteria

1 As New/ No deterioration/Meeting
management plan • No significant gaps in the belt of trees and shrubs

3 Some damage/ Deterioration and


• Gaps in sections of the trees and shrubs.
performance may be slightly reduced

5 Significant damage/ Deterioration/


Missing/ Failed and no longer fulfils its • Large gaps in the belt of trees and shrubs.
intended purpose

Marsh and Wet Grassland


Grade Condition Criteria

1 As New/ No deterioration/Meeting
management plan • Coverage across more than 90% of the area.

2 Superficial damage/ Deterioration with


• Coverage across 70-90% of the area.
no loss of performance

3 Some damage/ Deterioration and


• Coverage across 50-70% of the area.
performance may be slightly reduced

4 Significant damage/ Deterioration and


• Coverage across 30-50% of the area.
performance may be severely reduced

5 Significant damage/ Deterioration/


• Less than 30% coverage across the remaining
Missing/ Failed and no longer fulfils its
area.
intended purpose

Open Grassland

Asset Data Management Manual Page 153 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Grade Condition Criteria

1 As New/ No deterioration/Meeting
management plan • Coverage across more than 90% of the area.

2 Superficial damage/ Deterioration with


• Coverage across 70-90% of the area.
no loss of performance

3 Some damage/ Deterioration and


• Coverage across 50-70% of the area.
performance may be slightly reduced

4 Significant damage/ Deterioration and


• Coverage across 30-50% of the area.
performance may be severely reduced

5 Significant damage/ Deterioration/


Missing/ Failed and no longer fulfils its • Less than 30% grass covering the remaining area.
intended purpose

Rock and Scree


Grade Condition Criteria

1 As New/ No deterioration/Meeting • Less than 10% colonisation by unsuitable


management plan vegetation across the area.

2 Superficial damage/ Deterioration with • Colonisation by unsuitable vegetation across 10-


no loss of performance 30% of the area.

3 Some damage/ Deterioration and • Colonisation by unsuitable vegetation across 30-


performance may be slightly reduced 50% of the area.

4 Significant damage/ Deterioration and • Colonisation by unsuitable vegetation across 50-


performance may be severely reduced 70% of the area.

5 Significant damage/ Deterioration/


• More than 70% colonisation by unsuitable
Missing/ Failed and no longer fulfils its
vegetation across the area.
intended purpose

Scrub
Grade Condition Criteria

1 As New/ No deterioration/Meeting
management plan • Coverage across more than 90% of the area.

2 Superficial damage/ Deterioration with


• Coverage across 70-90% of the area.
no loss of performance

3 Some damage/ Deterioration and


• Coverage across 50-70% of the area.
performance may be slightly reduced

4 Significant damage/ Deterioration and


• Coverage across 30-50% of the area.
performance may be severely reduced

Asset Data Management Manual Page 154 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
5 Significant damage/ Deterioration/
• Less than 30% coverage across the remaining
Missing/ Failed and no longer fulfils its
area.
intended purpose

Shrubs
Grade Condition Criteria

1 As New/ No deterioration/Meeting
management plan • Low and multi-stemmed structure.

3 Some damage/ Deterioration and • Becoming trees or losing shape.


performance may be slightly reduced • Self-setting or losing coherence.

5 Significant damage/ Deterioration/ • Recognised as trees.


Missing/ Failed and no longer fulfils its • Dense and becoming dominant or becoming
intended purpose indistinct from woodland.

Species Rich Grassland


Grade Condition Criteria

1 As New/ No deterioration/Meeting
management plan • Coverage across more than 90% of the area.

2 Superficial damage/ Deterioration with


• Coverage across 70-90% of the area.
no loss of performance

3 Some damage/ Deterioration and


• Coverage across 50-70% of the area.
performance may be slightly reduced

4 Significant damage/ Deterioration and


• Coverage across 30-50% of the area.
performance may be severely reduced

5 Significant damage/ Deterioration/


Missing/ Failed and no longer fulfils its • Less than 30% grass covering the remaining area.
intended purpose

Wildlife Housing
Grade Condition Criteria

1 As New/ No deterioration/Meeting
management plan • Excellent physical condition.

2 Superficial damage/ Deterioration with


• Good physical condition.
no loss of performance

3 Some damage/ Deterioration and


• Moderate physical condition (i.e. signs of wear).
performance may be slightly reduced

4 Significant damage/ Deterioration and


• Poor physical condition.
performance may be severely reduced

Asset Data Management Manual Page 155 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
5 Significant damage/ Deterioration/
Missing/ Failed and no longer fulfils its • Destroyed or missing.
intended purpose

Wildlife Underpass
Grade Condition Criteria

1 As New/ No deterioration/Meeting
management plan • Excellent physical condition.

2 Superficial damage/ Deterioration with


• Good physical condition.
no loss of performance

3 Some damage/ Deterioration and


• Moderate physical condition (i.e. signs of wear).
performance may be slightly reduced

4 Significant damage/ Deterioration and


• Poor physical condition.
performance may be severely reduced

5 Significant damage/ Deterioration/


Missing/ Failed and no longer fulfils its • Destroyed, broken or missing.
intended purpose

Woodland
Grade Condition Criteria

• Over 90% canopy cover.


1 As New/ No deterioration/Meeting
management plan • Good density and age structure.
• Is typical for the location/habitat.
• Between 70-90% canopy cover.
2 Superficial damage/ Deterioration with
• Reasonable density.
no loss of performance
• Normally distributed age structure.
• Between 50-60% canopy cover.
3 Some damage/ Deterioration and
• Dense density.
performance may be slightly reduced
• Missing age classes.
• Between 30-50% canopy cover.
4 Significant damage/ Deterioration and
• Thin density.
performance may be severely reduced
• Single age class.
5 Significant damage/ Deterioration/ • Less than 30% canopy cover.
Missing/ Failed and no longer fulfils its • Sparse density.
intended purpose • No age structure.

A.4 Pavements

Grade Condition Criteria

1 As New/ No deterioration/Meeting • No defects


management plan • Structurally sound with no visible damage

Asset Data Management Manual Page 156 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
3 Some damage / deterioration and
performance may be slightly reduced
• Some damage / deterioration

5 Significant damage / deterioration /


missing / failed and no longer fulfils its
intended purpose • Structural failure / collapsed
• Asset missing

A.5 Road Restraint

End Terminals
Grade Condition Criteria

• No defects
1 As New/ No deterioration/Meeting
• Structurally sound with no visible damage
management plan
• Localised surface rust, up to 25% of asset length
2 Superficial damage / deterioration with
• Superficial damage / deterioration
no loss of performance

• Surface rust, up to 50% of asset length


3 Some damage / deterioration and
• Any rust that is likely result in holes by next
performance may be slightly reduced
inspection
• Bent or leaning

• High levels of surface rust, up to 75% of asset


4 Significant damage / deterioration and
length
performance may be severely reduced
• Localised rust resulting in visible holes or cracking
in a beam or post
• Bent or leaning which could potentially result in
collapse
• Any missing component
• Structural failure / collapsed
5 Significant damage / deterioration /
• Asset missing
missing / failed and no longer fulfils its
intended purpose

Pedestrian Guardrail
Grade Condition Criteria

• No defects.
1 As New/ No deterioration/Meeting
• Structurally sound with no visible damage.
management plan

• Localised surface rust, up to 25% of asset length.


2 Superficial damage / deterioration with
• Superficial damage / deterioration.
no loss of performance
• Signs of wood rot.
3 Some damage / deterioration and
• Surface rust, up to 50% of asset length.
performance may be slightly reduced
• Any rust that is likely to result in holes by next
inspection.
• Bent or leaning.

Asset Data Management Manual Page 157 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
• High levels of surface rust, up to 75% of asset
4 Significant damage / deterioration and
length.
performance may be severely reduced
• Localised rust resulting in visible holes or cracking.
• Bent or leaning which could potentially result in
collapse.
• Any missing component.
• Structural failure / collapsed.
5 Significant damage / deterioration /
• Asset missing.
missing / failed and no longer fulfils its
intended purpose

Safety Barriers (Steel)


Grade Condition Criteria

• No defects.
1 As New/ No deterioration/Meeting
• Structurally sound with no visible damage.
management plan

• Localised surface rust, up to 25% of asset length.


2 Superficial damage / deterioration with
• Superficial damage / deterioration.
no loss of performance
• Surface rust, up to 50% of asset length.
3 Some damage / deterioration and
• Any rust that is likely to result in holes by next
performance may be slightly reduced
inspection.
• Bent or leaning.

• High levels of surface rust, up to 75% of asset


4 Significant damage / deterioration and
length.
performance may be severely reduced
• Localised rust resulting in visible holes or cracking
in beam or post.
• Bent or leaning which could potentially result in
collapse.
• Any missing component.
• Structural failure / collapsed.
5 Significant damage / deterioration /
• Asset missing.
missing / failed and no longer fulfils its
intended purpose

Asset Data Management Manual Page 158 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Appendix B: Cyclic Maintenance Activities
The following table lists the cyclic maintenance activity record tables, the applicable
activity defined in GM 701 and which assets they apply to in the ADMM.
GM 701 GM 701 Cyclic ADMM Cyclic Maintenance Applicable ADMM
Asset Type Maintenance Activity Activity Record Table Assets
0400 - Road Tighten or replace screws and Tension and Tighten Activity Safety Barrier (Steel)
Restraint bolts and re-tension barrier. Record
Systems
0500 - Clean surface by hydro Surface Cleaning Activity Reservoir Pavements
Drainage and mechanical means – (high Record
Service Ducts pressure rotating water jets and
powerful suction to recover
disturbed silt).
Clear all material that could Clearing Material (Drainage) Bifurcation or Storm
impair operation and ensure fit Activity Record Overflow
for operation. Catchpit
Flow Control Device
Inlet
Interceptor
Manholes
Oil Separator
Other Special
Chamber
Outfall
Outlet
Syphon
Vortex Separator
Low pressure/high volume Cleaning, Jetting and Sweeping Combined Kerb &
combined kerb and drainage Activity Record Drainage Channel
system jetting and proving. Combined Pipe &
Clear slot drains. Sweep/clear Channel
concrete 'V' channel. Drainage Channel
Block
Edge Channel
Linear Drainage
Channel
Surface Water
Channel
Clear/re-cut grips and Clear Grips and Drains Activity Counterfort Drain
counterfort drains, clear weed Record
Grip
growth and debris.
Grip Inlet
Clear ditches by removing all Clear Ditches Activity Record Ditch
material that could impair
operation.
Clear outfalls by removing all Clear Outfalls Activity Record Infiltration Basin
material that could impair
Outfall
operation.

Asset Data Management Manual Page 159 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Clean priority soakaways/Clean Clear Soakaway Activity Soakaway Borehole
non-priority soakaways. Record
Soakaway Chamber
Soakaway Trench
Remove any accumulated silt Remove Silt Activity Record Wetlands
that is impairing the drainage
operation.
Clear silt and all material that Clear Silt and Material Activity Pollution Containment
could impair operation. Record Pond
Pond
Retention Pond
Sediment Pond
Cycle isolation valves. Cycle Isolation Valves Activity Pollution Containment
Record Pond
Pond
Retention Pond
Sediment Pond
Interceptor
Vortex Separator
Clear/empty silt and debris from Clear Silt and Debris Activity Catchpit
catch pits. Record
De-silt and remove all material De-Silt Culvert Activity Record Culvert
that could impair operation.
Gully emptying including Empty Gully Activity Record Gully
clearing of covers.
Gully covers cleared.
Clean / empty trapped material Clean Interceptor Activity Interceptor
from interceptors. Record
Clear manholes by removing all Clear Manholes Activity Record Manholes
material that could impair
operation.
Edge scrapes and cut back and Material Removal Activity Combined Sub
remove all build up from edge of Record Surface (FD)
carriageway through to filter Filter Drain
material that could impair
Narrow Filter Drain
operation.
Weed Spray. Weed Spray Activity Record Combined Sub
Surface (FD)
Filter Drain
Narrow Filter Drain
Undertake a grass cut of all Grassed Surface Water Cut Grassed Surface
areas of the grassed surface Activity Record Water Channel
water drainage system to
maintain the grass sward at a
maximum of 75mm in height.
Remove any litter, debris and Remove Litter/Grass Cut Detention Basin
sediment that could impair Activity Record
Infiltration Basin
operation Undertake a grass cut
of the swale to maintain the Swale
grass sward between 100 mm
and 200mm in height.
1200 - Traffic Clean bollards. Clean Bollard Activity Record Bollard
Signs and Road
Clean all post faces and Clean Reference Marker Reference Marker
Markings
reference numbers. Activity Record
Clean all traffic sign faces and Clean Sign Face Activity Sign Face
reference numbers. Record
Bulk lamp clean and change. Lamp Replacement/Cleaning Lighting Unit
1300 - Lighting Activity Record

Asset Data Management Manual Page 160 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
3000 - Remove all material that could Cleaning Material Wildlife Housing
Landscape and impair operation. (Environmental) Activity Record
Wildlife Underpass
Ecology
Maintain affected property to Control Spread of Injurious Amenity Grassland
control the spread or increase of Weeds Activity Record
Bridleway
identified instances of Injurious
Weeds. Combined Cycle
Track and Footway
Cycle Tracks
Footway
Grass Reinforced
Walls
Grassland with Bulbs
Groundcover
Heath and Moorland
Hedgerow
Individual Trees
Linear Woodland Belt
Non-Carriageway
Surface
Open Grassland
Rock and Scree
Scrub
Shrubs
Species Rich
Grassland
Splay/Swath
Steps
Woodland
Maintain affected property to Control Spread of Invasive Amenity Grassland
control the spread or increase of Weeds Activity Record
Bridleway
identified instances of invasive
plant species Combined Cycle
Track and Footway
Cycle Tracks
Footway
Grass Reinforced
Walls
Grassland with Bulbs
Groundcover
Heath and Moorland
Hedgerow
Individual Trees
Linear Woodland Belt
Non-Carriageway
Surface
Open Grassland
Rock and Scree
Scrub
Shrubs

Asset Data Management Manual Page 161 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
Species Rich
Grassland
Splay/Swath
Steps
Woodland
Trim hedgerows, maintain and Hedgerow Cut Activity Record Hedgerow
preserve clear carriageway
width, sight lines and stopping
distance, including junctions,
access points, curves and
bends.
Maintain habitat integrity, Maintain Habitat Integrity Ecological/Wildlife
vegetation clearance to the (Water Bodies) Activity Record Ponds
maximum level of water storage, Marsh and Wet
seek guidance of an ecologist. Grassland
Maintain in line with current Maintain Habitat Habitat Area
statutory body requirements Area/Boundaries Activity
Habitat Boundaries
Record
Maintain habitat integrity, Remove Undesirable Species Hedgerows
including removal of undesirable Activity Record
species.
Maintain habitat integrity, Remove Scrub Encroachment Woodland
including removal of scrub Activity Record
encroachment.
Maintain in line with EMP. Maintain with EMP Activity Linear Woodland Belt
Record
Woodland
Maintain design requirements / Maintain Shrubs Activity Shrubs
amenity function. Record
Maintain in line with current Maintain Species Species Areas
species-specific legislation and Areas/Locations Activity
Species Locations
current mitigation guidance Record
Maintain habitat integrity, Maintain Heath and Moorland Heath and Moorland
including removal of scrub Activity Record
encroachment and tree saplings
throughout.
Maintain habitat integrity, Maintain Habitat Integrity Amenity Grassland
including removal of scrub (Grassland/Vegetation) Activity
Grass Reinforced
encroachment. Record
Walls
Grassland with Bulbs
Open Grassland
Shrubs
Removal of scrub Remove Scrub Encroachment Rock and Scree
encroachment. (Rock and Scree) Activity
Record
Maintain habitat integrity Maintain Habitat Integrity of Species Rich
including removal of scrub Grassland Activity Record Grassland
encroachment and undesirable
weed species.
Thin / coppice. Thin/Coppice Activity Record Woodland
Undertake amenity cut of Amenity Grass Cut Activity Splay/Swath
amenity grass areas, including Record
gate way features, village
verges and special landscape
features.
Maintain and preserve sight Sight Line Cut Activity Record Hedgerow
lines and stopping distance,
Linear Woodland Belt
including junctions, access
Scrub

Asset Data Management Manual Page 162 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
points, curves, bends and Shrubs
central reserve.
Splay/Swath
Woodland
Maintain and preserve CCTV CCTV Visibility Splay Cut Hedgerow
camera operational visibility Activity Record
Linear Woodland Belt
splays.
Scrub
Shrubs
Splay/Swath
Woodland
Maintain and preserve road Signs and Signals Visibility Cut Hedgerow
users visibility of road traffic Activity Record
Individual Trees
signs and signals.
Linear Woodland Belt
Scrub
Shrubs
Splay/Swath
Woodland
Ensure illumination/lumination Illumination Grass Cut Activity Hedgerow
from lighting is not obscured. Record
Individual Trees
Linear Woodland Belt
Scrub
Shrubs
Splay/Swath
Woodland
Remove obstructions and / or Access to Electronic Equipment Scrub
maintain vegetation to facilitate Cut Activity Record
Shrubs
safe access for inspection and
maintenance of feeder pillars Splay/Swath
and technology equipment.
Grass cut the central reserve. Central Reserve Cut Activity Splay/Swath
Record
Remove obstructions and Access to Non-Motorised Areas Hedgerows
maintain vegetation to provide Cut Activity Record
Individual Trees
safe access to and use of
footways, cycle tracks, Linear Woodland Belt
bridleways, footpaths and paved
Scrub
pedestrian areas.
Shrubs
Splay/Swath
Woodland
Remove obstructions and/or Access to Customer Facilities Hedgerows
maintain vegetation to facilitate Cut Activity Record
Individual Trees
safe use of customer facilities.
This includes but not limited to Linear Woodland Belt
emergency roadside telephones
Scrub
and emergency refuge areas.
Shrubs
Splay/Swath
Woodland
Undertake 2m wide swathe cut Swathe Cut Activity Record Splay/Swath
of all highway verges to ensure

Asset Data Management Manual Page 163 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information
strip remains unobstructed by
vegetation throughout the year
(in addition to visibility splay
maintenance).
Remove vegetation affecting the Structure of Property Cut Hedgerows
stability, integrity or operation of Activity Record
Individual Trees
structures or other affected
property assets. Linear Woodland Belt
Scrub
Shrubs
Splay/Swath
Woodland
4000 - Full sweep. Sweeping Activity Record Pavement Section
Sweeping and
Non-Carriageway
Cleaning
Surface
Litter pick to maintain to grade Litter Cleaning (Non- Non-Carriageway
A. Carriageway Surface) Activity Surface
Record
Litter pick to maintain to grade Litter Cleaning Amenity Grassland
A. (Grassland/Vegetation) Activity
Grass Reinforced
Record
Walls
Grassland with Bulbs
Groundcover
Heath and Moorland
Hedgerows
Individual Trees
Linear Woodland Belt
Open Grassland
Rock and Scree
Scrub
Shrubs
Species Rich
Grassland
Splay/Swath
Woodland
Clean and maintain toilet blocks. Clean Toilet Block Activity Toilet Block
Record

Asset Data Management Manual Page 164 of 164 Date of Issue: October 2021
Part 2 – Requirements and Additional Information