Project Connect

The Project Connect aims to provide equal internet connectivity of 10Mbps to all employees of Bayawan National High School. It will establish a wireless local network and provide one teacher account per employee for teaching, learning, administration, and online transactions. The project has four phases from July 2021 to ongoing maintenance. It has a budget of PHP 0 since needed equipment was already provided by previous projects. Key stakeholders are school employees and administrators. The system will be monitored and evaluated through tracking documents and a user questionnaire.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views

Project Connect

The Project Connect aims to provide equal internet connectivity of 10Mbps to all employees of Bayawan National High School. It will establish a wireless local network and provide one teacher account per employee for teaching, learning, administration, and online transactions. The project has four phases from July 2021 to ongoing maintenance. It has a budget of PHP 0 since needed equipment was already provided by previous projects. Key stakeholders are school employees and administrators. The system will be monitored and evaluated through tracking documents and a user questionnaire.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Republic of the Philippines

Department of Education
SCHOOLS DIVISION OF BAYAWAN CITY

PROJECT NAME: Project Connect

BACKGROUND:

During this World Pandemic Learning Continuity is a must, by providing an online


Connectivity for easy communication in a virtual world, with this Bayawan National High School
ICT Team Headed by the Principal Christine Lorraine T. Tijing provide an Equal Internet
Connectivity to all Employees of the School as Stated on Deped Order No. 95, S 2010.

OBJECTIVES:
 To Provide All Employees Equal Internet Usage at 10MBps each
 To Provide a Wireless Local Network Internet Connectivity
 To Provide 1 Teacher 1 account in the usage of Internet Usage
SCOPE:
Project Connect provides Free In-Campus Internet Connectivity and Online flatform
through a Managed Log-in Portal to which One Employee One Account is to be utilized for
Teaching and learning Purposes, Administrative use, Financial online Transactions and Others
but not limited to Online training, Virtual Meeting, Online Class, Online Banking, etc.
TIMEFRAME:

Task Start Date End Date


Phase One Planning Stage July 1, 2021 August 6, 2021
Phase Two Development Stage July7, 2021 September 3, 2021
Phase Three Testing and August 13, 2021 July 14, 2022
Implementation
Stage
Phase Four Maintenance Stage August 15, 2021, onwards
PROJECT BUDGET:
Materials / Equipment
No. Qty Unit Budget Remarks
Specification
1 Access Point 4 units 16 000 Already Provided in The
AIP ICT Projects

2 Mikrotik Routers 4 units 14 000 Already Provided in The


AIP ICT Projects

3. Point to point (Broadcast 8 units 20 000 Already Provided in The


and receiver) AIP ICT Projects

4 Network Peripherals 1 set 6 000 Already available in the


School Computer
Laboratory

TOTAL Php 0

KEY STAKEHOLDERS:

Clients/ Users BNHS Employees

Sponsor DepEd, Bayawan National High School

Bayawan National High School ICT Coordinators, Department


Project Managers
Heads, Principal

MONITORING AND EVALUATION:


The monitoring of the system will be measured through its capability of tracking a
certain document. On the other hand, system evaluation is done by the users through a
standard questionnaire (see Annex A).

REFERENCES:
Fred D. Davis, Perceived Usefulness, Perceived Ease of Use, and User Acceptance of
Information Technology, 1989
Project Proponents:

GEORGE VINCENT T. TULAYBA


Schools ICT Coordinator ( Programs and Project)

ROLINN T. SICO
Schools ICT Coordinator (Data Management)

CHRISTINE LORRAINE T. TIJING


Principal I- Bayawan National High School

Noted by:

JORGE A. PRAC
PSDS District 3

Approved:

LELANIE T. CABRERA
Schools Division Superintendent
ANNEX
Project ConnetSystem Evaluation Questionnaire

Name (optional):_____________________________ Date:________________


School:________________________ Gender:____________

Instruction: Please accomplish this questionnaire by putting a check mark on each item
below.

Perceived Usefulness
Neithe
Extremely Quite Quite Extremely
r
Indicator Likely Likely Unlikely Unlikely
(5) (4) (2) (1)
(3)
Using the Project ConnetSystem would
enable me to accomplish my task more
quickly.
Using the Project ConnetSystem would
improve my job performance.
Using the Project ConnetSystem would
enhance my effectiveness on the job.
Using the Project ConnetSystem would
make it easier to do my job.
I would find Project ConnetSystem useful to
my job.

Perceived Ease of Use


Neithe
Extremely Quite Quite Extremely
r
Indicator Likely Likely Unlikely Unlikely
(5) (4) (2) (1)
(3)
Learning to operate Project ConnetSystem
would be easy for me.
I would find it easy to get Project
ConnetSystem to do what I want to do.
My interaction with Project ConnetSystem
would be clear and understandable.
I would find Project ConnetSystem to be
flexible to interact with.
It would be easy for me to become skillful at
using Project ConnetSystem.
It would find Project ConnetSystem easy to
use.