0% found this document useful (0 votes)
59 views1 page

Al Finned Tube (2111209) 2

This document is a quotation from Dae Ryung Technology Corp. in Seoul, Korea for copper alloy tubes and pipes to be shipped to Iraq. It includes three line items for embedded copper alloy tubes with specifications and pricing for a total of 10,000 kg costing $749,000. The terms are CIF delivery to Um Qasr, Iraq, with 30% payment after purchase order and 70% after third-party inspection, within an 18-20 week production time.

Uploaded by

Ammar Khaleel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views1 page

Al Finned Tube (2111209) 2

This document is a quotation from Dae Ryung Technology Corp. in Seoul, Korea for copper alloy tubes and pipes to be shipped to Iraq. It includes three line items for embedded copper alloy tubes with specifications and pricing for a total of 10,000 kg costing $749,000. The terms are CIF delivery to Um Qasr, Iraq, with 30% payment after purchase order and 70% after third-party inspection, within an 18-20 week production time.

Uploaded by

Ammar Khaleel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

"WORLD METAL HUB"

Dae Ryung Technology Corp.


SEOULFOREST DONG JIN IT TOWER Bldg 1005, Sangwon 12 gil 30, Seongdong-gu, Seoul, Korea ///TEL. +82 02 6952 0107
Copper Alloy tube&pipe, Aluminum/Copper fin tube, Low&High fin tube, Stainless steel tube, Carbon steel tube, Stainless steel Plate

Quotation To. Bean AlAmar General Contracting & Trade Date. Dec.09, 2021
Attn. : Mr.Ammar Khaleeel Ibraheem Quotation No. Q-P2111209-2/rev.0
Address : Your ref no. Inquire NO:34212185

We are pleased to offer you for below mentioned product according to following terms and condition
Page 1 of 1
Bare tube(mm) Fin specification(mm)

No. Type Th'k Fin Th'k Finned Q'ty Wt(Kg) USD/PC Amount(USD)
Material OD Length Material FPI Height Plain ends
(min) (ave) OD

1) Embedded SA179 25.0 3.0 9,150 SB209 A1060 8 15.6 0.4 56.2 ? 5,000 99,653 $68.00 $340,000.00

2) Embedded SA79 25.4 2.77 9,144 SB209 A1060 8 15.9 0.4 57.2 ? 5,000 94,343 $66.00 $330,000.00

3) TPI cost and others $2,000.00

Ocean freight cost and othersd $77,000.00


Total 10,000 193,996 $749,000.00
■Terms&Conditon ■Note & Diviation
- Origin : Korea - ASME SA179 Seamless Steel Tubes
- Delivery condition : CIF Um Qasr, Iraq - MTC to be issued in accordance with EN10204 3.2
- Shipment : within 18 to 20weeks ex-works Korea
- Payment : 30% t/t after your PO and balalnce(70%) after TPI
- Validity : 60days from date of quotation
- Packing : Export standard packing(Wooden box packing)