0% found this document useful (0 votes)
28 views

Rev E

The document discusses a complex topic with many factors to consider and various perspectives to take into account, requiring nuanced analysis and balancing of trade-offs.

Uploaded by

Ali Eynie
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views

Rev E

The document discusses a complex topic with many factors to consider and various perspectives to take into account, requiring nuanced analysis and balancing of trade-offs.

Uploaded by

Ali Eynie
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

N

K
V

A
W

B
L

J
T

I
HOLD
11
11

NOTE 6
CEMS PORTS : 2 PORTS , DN100

OPACITY PORTS : 2 PORTS , DN 80

8 PROVISIONAL PORTS FOR PERFO TEST * N3 AND 16 MEASUREMENTS VELOCITY PORTS : 4 PORTS , DN150

EPA TEST PORTS : 4 PORTS , DN150


TE TE TE TE TE TE TE TE
XX HNE10 CT416 XX HNE10 CT415 XX HNE10 CT414 XX HNE10 CT413 XX HNE10 CT412 XX HNE10 CT411 XX HNE10 CT410 XX HNE10 CT409

TE TE TE TE TE TE TE TE
10
10

XX HNE10 CT408 XX HNE10 CT407 XX HNE10 CT406 XX HNE10 CT405 XX HNE10 CT404 XX HNE10 CT403 XX HNE10 CT402 XX HNE10 CT401
XX HNE10
BS001

SILENCER

ZS ZS
XX HNE10 CG005 XX HNE10 CG008

ZS ZS
XX HNE10 CG004 XX HNE10 CG007 9
9

2X6 PROVISIONAL PORTS FOR PERFO TEST * N3 AND 24 MEASUREMENTS ZS ZS


XX HNE10 CG003 XX HNE10 CG006

TE TE TE TE
XX HNA10 CT421 XX HNA10 CT422 XX HNA10 CT423 XX HNA10 CT424

WEATHER DAMPER

TE TE TE TE
XX HNA10 CT417 XX HNA10 CT418 XX HNA10 CT419 XX HNA10 CT420

XXHNE10
AA101

XX HNE10 BR401

XX HNE10 BR403
XX HNE10
TE TE TE TE AA300
8

DN80 - 1C

DN80 - 1C
8

XX HNA10 CT413 XX HNA10 CT414 XX HNA10 CT415 XX HNA10 CT416

TE TE TE TE
XX HNA10 CT409 XX HNA10 CT410 XX HNA10 CT411 XX HNA10 CT412 ZS

XX HNE10 BR402

XX HNE10 BR404
XX HNE10 CG002

ZS

DN50 - 1C

DN50 - 1C
XX HNE10 CG001
TE TE TE TE
XX HNA10 CT405 XX HNA10 CT406 XX HNA10 CT407 XX HNA10 CT408

DN50 DN50
DN80 DN80

TE TE TE TE 7
7

XX HNA10 CT401 XX HNA10 CT402 XX HNA10 CT403 XX HNA10 CT404

TT TT TT TT
TT
XX HNA10 CT102 XX HNA10 CT103 XX HNA10 CT104 XX HNA10 CT105
XX HNA10 CT101
NOTE 1 (N1) NOTE 1 (N1) NOTE 1 (N1) NOTE 1 (N1)
NOTE 1 (N1)

6
NOTE 1 (N2) NOTE 1 (N2) NOTE 1 (N2) NOTE 1 (N2) NOTE 1 (N2)
6

NOTE 1 (N4)
PE
XX HNA10 CP402

PE PE
NOTES :

XX HNE10 BR405
XX HNA10 CP401 XX HNA10 CP403
NOTE 1 (N4) NOTE 1 (N4)
BUNDLE #1 HBK 10 BUNDLE #2 HBK20 BUNDLE #3 HBK30 BUNDLE #4 HBK 40 BUNDLE #5 HBK 50 --------------------------------------------------------------------------------------------------------------------------------------------------------------------

- GENERAL NOTES :

DN80 - 1C
- KKS NUMBERING ON P&ID : UNIT DESIGNATION XX IS USED FOR EQUIPMENT ASSOCIATED WITH
UNIT 10 AND UNIT 20

- INSTRUMENT NUMBERS BETWEEN 401 AND 499 ARE USED FOR PERFORMANCE TEST MEASUREMENTS

HP ECONOMIZER 1_3/IP ECONOMIZER 1_3

HP ECONOMIZER 1_2/IP ECONOMIZER 1_2

HP ECONOMIZER 1_1/IP ECONOMIZER 1_1


OTHERS CMI
- INSTRUMENT NUMBERS BETWEEN 201 AND 299 ARE USED FOR TEMPORARY MEASUREMENTS

- MISSING PIPE DIAMETER AND MATERIAL WILL BE CONFIRMED LATER


5
5

- NOTE 1 :

NOTE 1 (N1) - FOR NOZZLE TYPE DESIGN (N1, N2, N3, N4), REFER TO DRAWING :
HP ECONOMIZER 3-1

HP ECONOMIZER 2-1
HP ECONOMIZER 3-2

HP ECONOMIZER 2-3

HP ECONOMIZER 2-2
HP ECONOMIZER 2-4
HP SUPERHEATER 4

HP SUPERHEATER 1
HP SUPERHEATER 3

HP SUPERHEATER 2

LP EVAPORATOR 3

LP EVAPORATOR 2

LP EVAPORATOR 1
HP EVAPORATOR 3

HP EVAPORATOR 2

HP EVAPORATOR 1

- FOR INLET DUCT AND CASING : 69014/30041

IP EVAPORATOR 2

IP EVAPORATOR 1

LP SUPERHEATER
IP SUPERHEATER

TT - FOR CHIMNEY : 69014/33041

PREHEATER 1
PREHEATER 2
PREHEATER 5

PREHEATER 4

PREHEATER 3
REHEATER 3

REHEATER 2

REHEATER 1

XX HNE10 CT102 - NOTE 3 :


XX HNA10
BS002 TT
- THREADED AND CAPPED
XX HNE10 CT101
- NOTE 6:

- INTERFACE TO BE SUPPLIED BY CEMS SUPPLIER

E 30-03-16 UPDATED KVH ER TS


XX HNA10 D 20-11-15 UPDATED VR ER TS
4
BS001
4

C 03-07-15 UPDATED VR ER TS
B 26-03-15 UPDATED VR ER TS
A 19-01-15 FIRST ISSUE VR ER TS
REV DATE Modifications D raft. C heck . E ngin.

CLIENT :
UPDATED

OWNERS ENGINEER :

XX HNE10 BR406
DN50 - 1C
XX HNA10 BR401

XX HNA10 BR402

XX HNA10 BR410

XX HNA10 BR403

XX HNA10 BR404

XX HNA10 BR405

XX HNA10 BR406

XX HNA10 BR407
3
3

EPC CONTRACTOR :
XX HNA10 DN15 - 1C

XX HNA10 DN50 - 1C

DN50 - 1C

DN15 - 1C

DN15 - 1C

DN15 - 1C

DN15 - 1C

DN15 - 1C

XX HNE10
PE PE

AA401
XX HNA10 CP404 XX HNA10 CP405
XX HNA10

XX HNA10

XX HNA10

XX HNA10

XX HNA10
AA401

AA402

AA403

AA404

AA405

AA406

AA407
NOTE 1 (N4) NOTE 1 (N4) SITE/PROJECT :
PT
XX HNA10 CP106
HAMITABAT COMBINED CYCLE PROJECT

TO SEWER
69014/00007/6 D8
NOTE 1 (N4)
STATUS REVISIONS
NOTE 3 NOTE 3 NOTE 3 NOTE 3 NOTE 3 NOTE 3 NOTE 3 PRELIMINARY A B C
FOR LAYOUT B004E.00062
FOR CONSTRUCTION D E ORDER N° ISO
FOR CONSTRUCTION EXCEPT HOLD
AS BUILT 2
Engineer STREEL
2

Destination Checker RADERMECKER

HAMITABAT COMBINED CYCLE PROJECT Draftman RIZZO


Name Signature
Designation

HRSG FLUE GAS SYSTEM


P&I Diagram

N D raw
This drawing and the design it covers are the property of C.M.I. They are merely loaned
on the borrower's express agreement that they will not be reproduced, copied, loaned, 69014/00002/6
exhibited or used, except in the limited way of and private use permitted by any written
consent given by C.M.I to the borrower. Scale : Sheet : 1 1
GAMA DRAWING NO. REV. 1
1

JOB NO.

- HMT-PR-DW-CMI-0002 E
W V U T S R Q P O N M L K J I H G F E D C B A

You might also like