ITP For Testing & Commissioning Switchgear

This inspection and test plan outlines the medium-voltage switchgear testing and commissioning process. It specifies documentation review, material approval, and method statement approval activities. Testing will include pre-commissioning and commissioning according to specifications, submittals, manufacturer recommendations, and approved shop drawings. The contractor and consultant must sign off to approve the inspection test plan after work completion.

Uploaded by

guspriy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
319 views

ITP For Testing & Commissioning Switchgear

This inspection and test plan outlines the medium-voltage switchgear testing and commissioning process. It specifies documentation review, material approval, and method statement approval activities. Testing will include pre-commissioning and commissioning according to specifications, submittals, manufacturer recommendations, and approved shop drawings. The contractor and consultant must sign off to approve the inspection test plan after work completion.

Uploaded by

guspriy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

INSPECTION & TEST PLAN

PROJECT DETAILS REF. NO.

REV. NO. 0
DATE :
PAGE : 1 OF 1

ACTIVITY: MEDIUM-VOLTAGE SWITCHGEAR TESTING AND COMMISSIONING

AREA/LOCATION:

ITP approved by CONTRACTOR's QA/QC: ITP approved by Consultant:


Signature: Signature:
Date: Date:
INSPECTION LEVEL
SERIAL NO. DESCRIPTION FREQUENCY SPECIFICATION / CRITERIA VERIFICATION RECORD
ITL CONTRACTOR Consultant

1 DOCUMENTATION

Specs, material submittal & Manufacturer


1.1 Shop Drawing Approval Each Shop Drawing -- R R
recommendations.

Each MAR ( prior to Specs, material submittal & Manufacturer


1.2 Material Approval -- H H
order the material). recommendations.

Once (Approval prior to


1.3 Method Statement Approval -- H H
start of activity)

2 Testing and Commissioning


Specs, material submittal & Manufacturer
2.1 Pre-commissioning HV Room -- H W
recommendations.
Specs, functional Tests, Manufacturer
2.2 Testing and commissioning HV Room -- W W
recommendations, Approved Shop drawings.
LEGEND: H: HOLD W: WITNESS S: SURVEILLANCE R: REVIEW
ITP Sign-Off post completion of Works
CONTRACTOR APPROVAL Consultant APPROVAL

NAME : NAME :

SIGN : SIGN :
DATE: DATE:

PAGE 1 of 1