Format no:01 Determination of Field Density by Sand replacement method Method Report No: FDD/01 7/14/2023
Client : APMSIDC PMC : Tata Consultancy Engineers Ltd. Date : EPC Contractor : KMV Projects Ltd.
1 Weight of cylinder +sand before pouring W1 in gms 7075 7075 7250 7250 7250 7250 7250 7250 7250
2 Weight of sand in cone W3 in gms 400 400 400 400 400 400 400 400 400
3 DLBD of sand (gm/cc) 1.47 1.47 1.47 1.47 1.47 1.47 1.47 1.47 1.47
4 Weight of Cylinder +Sand after pouring in W2 gms 5140.00 5140.00 5100.00 5100.00 5100.00 5100.00 5100.00 5100.00 5100.00
5 Volume of hole V= (W1-W2-W3)/DLBD of sand in cc 1044.22 1044.22 1190.48 1190.48 1190.48 1190.48 1190.48 1190.48 1190.48
6 Weight of soil excavated from hole =W in gms 1964.00 1979.00 2526.00 2585.00 2585.00 2585.00 2585.00 2585.00 2585.00
7 Field bulk density gm/cc, Yb = W / V 1.88 1.90 2.12 2.17 2.17 2.17 2.17 2.17 2.17
Water content By Rapid Moisture Meter Method
8 Rapid Moisture Meter Reading in (%) 6.00 6.00 8.00 8.50
9 % of moisture, m 6.38 6.38 8.70 9.29 0.00 0.00 0.00 0.00 0.00
Field Dry Density of sample in gm/cc,
10 1.77 1.78 1.95 1.99 2.17 2.17 2.17 2.17 2.17
Yd=Yb/(100+w)x100
11 % Compaction 86.24 86.90 95.22 96.92 105.92 105.92 105.92 105.92 105.92
12 Avg. % Compaction 99.4
Remarks :
IVRCL Geo-tech Engineer IVRCL Quality In-charge Test Witnessed by - TPI Foster Wheeler
CALIBRATION OF SAND POURING CYLINDER
Determination No. 1 2 3
Determination No. 1 2 3
Weight of Cylinder+Sand (After Pouring in calibrating container) W4 in (gm) 5100 5150 5100
QA/QC Engg (KMV) PMC (TCE) AEE/TA (APMSIDC) DEE (APMSIDC) EE/Higher Officials (APMSIDC)
Project ::Establishment of New Government Medical College at Adoni in Kurnool District.
Format no:01 Determination of Field Density by Sand replacement method Method Report No: FDD/01
Client : APMSIDC PMC : Tata Consultancy Engineers Ltd. EPC Contractor : KMV Projects Ltd.
9 % of moisture, m
11 % Compaction
12 Avg. % Compaction
Remarks :
Format no:01 Determination of Field Density by Sand replacement method Method Report No: FDD/01
Client : APMSIDC PMC : Tata Consultancy Engineers Ltd. EPC Contractor : KMV Projects Ltd.