100% found this document useful (1 vote)
896 views5 pages

Sand Replacement RMM

This document provides a report on the determination of field density by the sand replacement method for a project to establish a new government medical college in Adoni, Kurnool District. The report details the location, materials, measurements, and results from 9 separate determinations of field density using the sand replacement method. On average, the field determinations showed a compaction of 99.4% relative to the maximum dry density of 2.05 gm/cc and optimum moisture content of 8.48%.

Uploaded by

Shesha Shayan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
896 views5 pages

Sand Replacement RMM

This document provides a report on the determination of field density by the sand replacement method for a project to establish a new government medical college in Adoni, Kurnool District. The report details the location, materials, measurements, and results from 9 separate determinations of field density using the sand replacement method. On average, the field determinations showed a compaction of 99.4% relative to the maximum dry density of 2.05 gm/cc and optimum moisture content of 8.48%.

Uploaded by

Shesha Shayan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Project ::Establishment of New Government Medical College at Adoni in Kurnool District.

Format no:01 Determination of Field Density by Sand replacement method Method Report No: FDD/01 7/14/2023
Client : APMSIDC PMC : Tata Consultancy Engineers Ltd. Date : EPC Contractor : KMV Projects Ltd.

Location MDD (gm/CC) =2.05 OMC(%)=8.48


Sl.No. Determination
Sand Pouring Cylinder No. 1 1 1 1 1 1 1 1 1

1 Weight of cylinder +sand before pouring W1 in gms 7075 7075 7250 7250 7250 7250 7250 7250 7250
2 Weight of sand in cone W3 in gms 400 400 400 400 400 400 400 400 400
3 DLBD of sand (gm/cc) 1.47 1.47 1.47 1.47 1.47 1.47 1.47 1.47 1.47
4 Weight of Cylinder +Sand after pouring in W2 gms 5140.00 5140.00 5100.00 5100.00 5100.00 5100.00 5100.00 5100.00 5100.00
5 Volume of hole V= (W1-W2-W3)/DLBD of sand in cc 1044.22 1044.22 1190.48 1190.48 1190.48 1190.48 1190.48 1190.48 1190.48
6 Weight of soil excavated from hole =W in gms 1964.00 1979.00 2526.00 2585.00 2585.00 2585.00 2585.00 2585.00 2585.00
7 Field bulk density gm/cc, Yb = W / V 1.88 1.90 2.12 2.17 2.17 2.17 2.17 2.17 2.17
Water content By Rapid Moisture Meter Method
8 Rapid Moisture Meter Reading in (%) 6.00 6.00 8.00 8.50
9 % of moisture, m 6.38 6.38 8.70 9.29 0.00 0.00 0.00 0.00 0.00
Field Dry Density of sample in gm/cc,
10 1.77 1.78 1.95 1.99 2.17 2.17 2.17 2.17 2.17
Yd=Yb/(100+w)x100
11 % Compaction 86.24 86.90 95.22 96.92 105.92 105.92 105.92 105.92 105.92
12 Avg. % Compaction 99.4
Remarks :
IVRCL Geo-tech Engineer IVRCL Quality In-charge Test Witnessed by - TPI Foster Wheeler
CALIBRATION OF SAND POURING CYLINDER

(As per IS: 2720 part 28)

Date of Calibration 10/4/2023

Due date of Calibration 10/3/2024

Calibrating Container No. O1

Sieve of Sand Used 1mm passing -600mic retained

DLBD of sand in (gm/cc) 1.47

Determination of the weight of sand in cone

Determination No. 1 2 3

Weight of Cylinder+Sand (Before Pouring) W1 in (gm) 7250 7250 7250

Weight of Cylinder+Sand (After Pouring) W2 in (gm) 6850 6850 6850

Weight of Sand In Cone W3=(W1-W2) in (gm) 400 400 400

Average weight of sand in cone in (gm) 400

Determination of Bulk Density of sand

Determination No. 1 2 3

Weight of Cylinder+Sand (Before Pouring) W1 in (gm) 7250 7250 7250

Weight of Cylinder+Sand (After Pouring in calibrating container) W4 in (gm) 5100 5150 5100

Average weight of sand in cone W3 in (gm) 400 400 400

Weight of sand in calibrating container W5=(W1-W4)-W3 in (gm) 1750 1700 1750

Volume of Calibrating Container V in (cc) 1178.57 1178.57 1178.57

Bulk Density of Sand W5/V in (gm/cc) 1.48 1.44 1.48

Average Bulk Density of Sand in (gm/cc) 1.47

Test By Witness By Approved By Approved By Approved By

QA/QC Engg (KMV) PMC (TCE) AEE/TA (APMSIDC) DEE (APMSIDC) EE/Higher Officials (APMSIDC)
Project ::Establishment of New Government Medical College at Adoni in Kurnool District.

Format no:01 Determination of Field Density by Sand replacement method Method Report No: FDD/01
Client : APMSIDC PMC : Tata Consultancy Engineers Ltd. EPC Contractor : KMV Projects Ltd.

Location Chainage: RL : MDD (gm/CC) =2.05 OMC(%)=8.48


Sl.No.
Determination

A Sand Pouring Cylinder No. 1 1 1 1 1 1 1 1 1 1

1 Weight of cylinder +sand before pouring W1 in gms

2 Weight of sand in cone W3 in gms

3 DLBD of sand (gm/cc)

4 Weight of Cylinder +Sand after pouring in W2 gms

5 Volume of hole V= (W1-W2-W3)/DLBD of sand in cc

6 Weight of soil excavated from hole =W in gms

7 Field bulk density gm/cc, Yb = W / V

B Moisture Content By Rapid Moisture Meter method

8 Rapid Moisture Meter Reading in (%)

9 % of moisture, m

Field Dry Density of sample in gm/cc,


10
Yd=Yb/(100+w)x100

11 % Compaction

12 Avg. % Compaction

Remarks :

TEST By WITNESS BY APPROVED BY APPROVED BY APPROVED BY


KMV QC Engg PMC (TCE) AEE/TA APMSIDC DEE APMSIDC EE/HIGHER OFFICIALS APMSIDC
Project ::Establishment of New Government Medical College at Adoni in Kurnool District.

Format no:01 Determination of Field Density by Sand replacement method Method Report No: FDD/01
Client : APMSIDC PMC : Tata Consultancy Engineers Ltd. EPC Contractor : KMV Projects Ltd.

Location Chainage: RL : MDD (gm/CC) =2.05 OMC(%)=8.48