0% found this document useful (0 votes)
28 views

Project 1

The document is a project task list showing details of tasks across 3 projects, including task names, estimated start and end dates, priorities, and progress metrics. Project 1 has 2 tasks, one of which is 50% complete and slightly delayed. Project 2 has 2 tasks, one completed on time and one slightly delayed and only 30% done. Project 3 has 3 future tasks scheduled to begin in February and March.

Uploaded by

Xx Xx
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views

Project 1

The document is a project task list showing details of tasks across 3 projects, including task names, estimated start and end dates, priorities, and progress metrics. Project 1 has 2 tasks, one of which is 50% complete and slightly delayed. Project 2 has 2 tasks, one completed on time and one slightly delayed and only 30% done. Project 3 has 3 future tasks scheduled to begin in February and March.

Uploaded by

Xx Xx
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

PROJECT TASK LIST

{42}

Project Start 01/01/2017


%
Days to Plan
PROJECT TASK PRIORITY START PLAN END ACTUAL END COMPLET Project Start Complete Incomplete Slippage
Start Days
E

Project 1 Task 1 Description HIGH 05/01/2017 15/01/2017 15/01/2017 50% 01/01/2017 4 5 5 0 10


MEDIU
Task 2 Description M
10/01/2017 17/01/2017 23/01/2017 100% 01/01/2017 9 7 0 6 7

Project 2 Task 1 Title LOW 15/02/2017 28/02/2017 10/03/2017 30% 01/01/2017 45 3.9 9.1 10 13

Task 2 Title HIGH 07/01/2017 01/02/2017 05/02/2017 50% 01/01/2017 6 12.5 12.5 4 25

Project 3 Task A LOW 15/02/2017 18/02/2017 30% 01/01/2017 45 0.9 2.1 0 3

Task B LOW 25/02/2017 07/03/2017 01/01/2017 55 0 10 0 10

Task C LOW 10/03/2017 22/03/2017 01/01/2017 68 0 12 0 12

01/01/2017 0 0 0 0 0

01/01/2017 0 0 0 0 0

Insert new rows above this one

PROJECT TASK LIST Project Start Days to Start


[42]

Jan 1, 2017 Jan 29, 2017 Feb 26, 2017 Mar 26, 2017
Project 1

Task 1 Description

Task 2 Description
Project 2

Task 1 Title

Task 2 Title

Task A

Task B
Project 3

Task C

https://www.vertex42.com/ExcelTemplates/task-list-template.html Project Task List Template © 2017 by Vertex42.com

You might also like