The document is a take-out report from BCC Homes for the month of October 2023 listing materials costs and construction progress for 10 housing units across different blocks and lots. It includes details of material and labor costs as well as percentage of construction completed for each unit.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
9 views
BCC Take Out Report For The Month of October 2023
The document is a take-out report from BCC Homes for the month of October 2023 listing materials costs and construction progress for 10 housing units across different blocks and lots. It includes details of material and labor costs as well as percentage of construction completed for each unit.
Inventory Remarks The BT unit is completed, While FT unit is still pending This unit is unable to proceed with construction due to a post in its vicinity. The unit has already been completed The unit has already been completed The unit has already been completed The unit has already been completed
The BT unit is completed, While FT
unit is still pending The unit has already been completed