Rincian Progres VO 2 & 3

The document provides a progress report on landscaping works in three sections. It details the quantities, units, previous progress and current progress of various landscaping and hardscaping tasks such as installing plants, pots, synthetic grass and natural stone. All current progress is reported at 100% completed with a total project progress of 100%.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views

Rincian Progres VO 2 & 3

The document provides a progress report on landscaping works in three sections. It details the quantities, units, previous progress and current progress of various landscaping and hardscaping tasks such as installing plants, pots, synthetic grass and natural stone. All current progress is reported at 100% completed with a total project progress of 100%.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 14

RINCIAN PROGRES PEKERJAAN SOFTSCAPE VO.

Previous Progress Current Progress


No Pekerjaan Quantity Unit
Quantity Prosentase Bobot Quantity

I 782-PCP-SI-LMM-PMHCO_P
Parsial 3 dan Parsial 4 Gate A
1 Parsial 3
- Philodendron selloum ( Phillo Jari ) 50.00 nos - 0.00% 0.000% 50.00
2 Parsial 4 gate A
- Costus spicatus 250.00 m2 - 0.00% 0.000% 250.00
- Philodendron selloum ( Phillo Jari ) 150.00 m2 - 0.00% 0.000% 150.00

II 795-PCP-SI-LMM-PMHCO_P
Area Courtyard
Artificial bambu
1 Pohon Bambu sintetis (courtyard) L 4.00 unit - 0.00% 0.000% 4.00
2 Monstera sintetis 3.00 bh - 0.00% 0.000% 3.00
3 Pot teraso coklat - kerucut (Tinggi 60cm, Dia.40cm) 3.00 unit - 0.00% 0.000% 3.00
4 Pot Kotak Panjang Teraso hitam (P: 115cm, L:20cm, T:20cm) 4.00 unit - 0.00% 0.000% 4.00
5 Tanaman sintetis + pot (h:1m) 4.00 ls - 0.00% 0.000% 4.00
6 Biaya pengiriman 1.00 ls - 0.00% 0.000% 1.00

III 860-PCP-SI-LMM-PMHCO_P
Penambahan Grading Level Tanah Subur

1 Lansir tanah 608.38 m3 - 0.00% 0.000% 608.38


2 Perataan tanah 608.38 m3 - 0.00% 0.000% 608.38

Jumlah Total Bobot Pekerjaan Landscape 0.000%


Current Progress To Date Progress

Prosentase Bobot Quantity Prosentase Bobot

100.00% 100.00% 50.00 100.00% 100.00%

100.00% 100.00% 250.00 100.00% 100.00%


100.00% 100.00% 150.00 100.00% 100.00%

100.00% 100.00% 4.00 100.00% 100.00%


100.00% 100.00% 3.00 100.00% 100.00%
100.00% 100.00% 3.00 100.00% 100.00%
100.00% 100.00% 4.00 100.00% 100.00%
100.00% 100.00% 4.00 100.00% 100.00%
100.00% 100.00% 1.00 100.00% 100.00%

100.00% 100.00% 608.38 100.00% 100.00%


100.00% 100.00% 608.38 100.00% 100.00%

100.00% 100.00%
RINCIAN PROGRES PEKERJAAN HARDSCAPE VO.2

Previous Progress Current Progress


No Pekerjaan Quantity Unit
Quantity Prosentase Bobot Quantity

I 788-PCP-SI-LMM-PMHCO_P
Perubahan Wiremesh M10 ke M6 di walkway dan saluran drainase
Pekerjaan Tambah
1 Walkway
- wiremesh M10
- wiremesh M6 (2 Layer) 4,521.36 kg - 0.00% 0.00% 4,521.36

2 Saluran drainase
- wiremesh M10
- wiremesh M6 1,616.17 kg - 0.00% 0.00% 1,616.17

II 795-PCP-SI-LMM-PMHCO_P
Area Courtyard Lt..1
1 Finishing aci dinding parapet 51.00 m' - 0.00% 0.00% 51.00

III 846-PCP-SI-LMM-PMHCO_P
Penambahan Grading Level Tanah Dasar
1 Grading level tanah dasar
- Lansir tanah & alat berat 80.00 jam - 0.00% 0.00% 80.00
2 Pengecoran lantai playground
- galian tanah dan pemadatan 20.00 m3 - 0.00% 0.00% 20.00
- pasir urug 50mm 2.00 m3 - 0.00% 0.00% 2.00
- lantai kerja 50mm 2.00 m3 - 0.00% 0.00% 2.00
- beton K250 t=15cm 6.00 m3 - 0.00% 0.00% 6.00
- besi D13 1 layer 780.00 kg - 0.00% 0.00% 780.00
- bekisting 7.80 m2 - 0.00% 0.00% 7.80
- Screeding tebal 2.5cm 40.00 m2 - 0.00% 0.00% 40.00
IV 877-PCP-SI-LMM-PMHCO_P
Pemasangan Natural Stone
1 Area Central Park
- Boulder besar (manual orang) 4 ttk - 0.00% 0.00% 4.00
- Boulder kecil 10 ttk - 0.00% 0.00% 10.00
2 Area Ex ruko
- Boulder besar (truk crane + orang) 2 ttk - 0.00% 0.00% 2.00
- Boulder kecil 4 ttk - 0.00% 0.00% 4.00

Jumlah Total Bobot Pekerjaan Landscape 0.00%


Current Progress To Date Progress

Prosentase Bobot Quantity Prosentase Bobot

100.00% 100.00% 4,521.36 100.00% 100.00%

100.00% 100.00% 1,616.17 100.00% 100.00%

100.00% 100.00% 51.00 100.00% 100.00%

100.00% 100.00% 80.00 100.00% 100.00%

100.00% 100.00% 20.00 100.00% 100.00%


100.00% 100.00% 2.00 100.00% 100.00%
100.00% 100.00% 2.00 100.00% 100.00%
100.00% 100.00% 6.00 100.00% 100.00%
100.00% 100.00% 780.00 100.00% 100.00%
100.00% 100.00% 7.80 100.00% 100.00%
100.00% 100.00% 40.00 100.00% 100.00%
100.00% 100.00% 4.00 100.00% 100.00%
100.00% 100.00% 10.00 100.00% 100.00%

100.00% 100.00% 2.00 100.00% 100.00%


100.00% 100.00% 4.00 100.00% 100.00%

100.00% 100.00%
RINCIAN PROGRES PEKERJAAN SOFTSCAPE VO.3

Previous Progress Current Progress


No Pekerjaan Quantity Unit
Quantity Prosentase Bobot Quantity

I 931-PCP-SI-LMM-PMHCO_P
SS-rumput sintetis lantai 7 & lantai 8
1 Rumput Sintetis Lt.7 & Lt.8 116.00 m2 - 0.00% 0.000% 116.00
2 Instalasi drainsel 116.00 m2 - 0.00% 0.000% 116.00

II 925-PCP-SI-LMM-PMHCO_P
SS-pot & tanaman semak pengisi
1 Pot kotak Semen 81.00 unit - 0.00% 0.000% 81.00
2 Pot bulat Semen Pendek 50/60cm x 40/45cm = 8 bh & tinggi 70/80 x 35/40cm 15.00 unit - 0.00% 0.000% 15.00
3 =Pot
7 pot
teraso 80x550cm + tatakan. 7.00 unit - 0.00% 0.000% 7.00
4 Pot teraso kotak 100x60x40cm 14.00 unit - 0.00% 0.000% 14.00
5 Pot teraso bulat 50x40cm + tatakan. 4.00 unit - 0.00% 0.000% 4.00
6 Media tanam pot + pemupukan 121.00 pot - 0.00% 0.000% 121.00
8 Lagerstroemia 500.00 nos - 0.00% 0.000% 500.00
9 Russelia equisetiformis 150.00 nos - 0.00% 0.000% 150.00
10 Bougenville t = 500-700mm 15.00 nos - 0.00% 0.000% 15.00
11 Anthurium jemani t =600-800mm 7.00 nos - 0.00% 0.000% 7.00
12 Philodendron selloum 150.00 nos - 0.00% 0.000% 150.00
13 Anthurium bunga merah t=300-400mm 10.00 nos - 0.00% 0.000% 10.00
14 Monstera t=700mm 4.00 nos - 0.00% 0.000% 4.00
15 Sansiviera 6-7/pot 4.00 set - 0.00% 0.000% 4.00
16 Pot plastik untuk di pot teraso + media tanam + pemupukan 8.00 unit - 0.00% 0.000% 8.00
III 858-PCP-SI-LMM-PMHCO_P
Tanaman sintetis di planter SB & planter lobby
1 Tanaman sintetis di planter parkiran SB 11.00 m1 - 0.00% 0.000% 11.00
2 Tanaman sintetis di planter depan lobby hotel 14.00 m1 - 0.00% 0.000% 14.00
3 Biaya kirim 1.00 ls - 0.00% 0.000% 1.00

Jumlah Total Bobot Pekerjaan Landscape 0.000%


Current Progress To Date Progress

Prosentase Bobot Quantity Prosentase Bobot

100.00% 100.00% 116.00 100.00% 100.00%


100.00% 100.00% 116.00 100.00% 100.00%

100.00% 100.00% 81.00 100.00% 100.00%


100.00% 100.00% 15.00 100.00% 100.00%
100.00% 100.00% 7.00 100.00% 100.00%
100.00% 100.00% 14.00 100.00% 100.00%
100.00% 100.00% 4.00 100.00% 100.00%
100.00% 100.00% 121.00 100.00% 100.00%
100.00% 100.00% 500.00 100.00% 100.00%
100.00% 100.00% 150.00 100.00% 100.00%
100.00% 100.00% 15.00 100.00% 100.00%
100.00% 100.00% 7.00 100.00% 100.00%
100.00% 100.00% 150.00 100.00% 100.00%
100.00% 100.00% 10.00 100.00% 100.00%
100.00% 100.00% 4.00 100.00% 100.00%
100.00% 100.00% 4.00 100.00% 100.00%
100.00% 100.00% 8.00 100.00% 100.00%
100.00% 100.00% 11.00 100.00% 100.00%
100.00% 100.00% 14.00 100.00% 100.00%
100.00% 100.00% 1.00 100.00% 100.00%

100.00% 100.00%
RINCIAN PROGRES PEKERJAAN HARDSCAPE VO.3

Previous Progress Current Progress


No Pekerjaan Quantity Unit
Quantity Prosentase Bobot Quantity

I SI.889-PCP-SI-LMM-PMHCO_P
Akses menuju plaza VIP Lounge
Pekerjaan Tambah
1 Pembuatan walkway
a Galian tanah dan pemadatan sesuai Elevasi rencana 10.54 m3 - 0.00% 0.000% 10.54
b Pasir urug dibawah Concrete (tebal 50mm) 2.63 m3 - 0.00% 0.000% 2.63
c Lantai kerja (tebal 50mm) 2.63 m3 - 0.00% 0.000% 2.63
d Concrete
-Beton K250 5.27 m3 - 0.00% 0.000% 5.27
-Besi waremesh M6 (2 Layer) 379.54 kg - 0.00% 0.000% 379.54
-Bekisting 6.32 m2 - 0.00% 0.000% 6.32
e Pasang granit roman, kombinasi list 48.62 m2 - 0.00% 0.000% 48.62
Fin, Combinasi (granite roman type dkilimanjaro
2 Volcanic,dTambora
Pembuatan parapet/DPTCharcoal, List Border Walk Way Ex
Roman dFuji Dark)
a Galian 5.61 m3 - 0.00% 0.000% 5.61
b Pasir urug t = 10 cm 1.12 m3 - 0.00% 0.000% 1.12
c Lantai Kerja t = 5 cm 0.56 m3 - 0.00% 0.000% 0.56
d Bekisting 18.70 m2 - 0.00% 0.000% 18.70
e Besi D13 -100 (2 Layer) 2692.80 kg - 0.00% 0.000% 2,692.80
f Beton Mutu K-250 16.83 m3 - 0.00% 0.000% 16.83
g Finishing dinding andesit uk. 60 x 20 x 2 cm 11.22 m2 - 0.00% 0.000% 11.22
h Copping Andesit uk. 60 x 30 x 2 cm 18.70 m' - 0.00% 0.000% 18.70

II SI.874-PCP-SI-LMM-PMHCO_P
Modifikasi akses-3 dan Pek. Tambah kansteen
Pekerjaan Tambah
1 Kansteen / penahan tanah
a Bekisting 4.00 m2 - 0.00% 0.000% 4.00
b Pembesian 24.00 kg - 0.00% 0.000% 24.00
c Stek besi d13 - 600mm 20.00 ttk - 0.00% 0.000% 20.00
d Pengecoran 0.40 m3 - 0.00% 0.000% 0.40
2 Saluran beton tertutup & bak kontrol
a Galian 2.00 m3 - 0.00% 0.000% 2.00
b Pasir urug t = 10 cm 0.40 m3 - 0.00% 0.000% 0.40
c Lantai Kerja t = 5 cm 0.20 m3 - 0.00% 0.000% 0.20
d Bekisting 12.90 m2 - 0.00% 0.000% 12.90
e Pembesian 105.66 kg - 0.00% 0.000% 105.66
f Pengecoran 1.76 m3 - 0.00% 0.000% 1.76

III SI.919-PCP-SI-LMM-PMHCO_P
Pekerjaan Tambah Kurang kayu ulin di courtyard
Pekerjaan Kurang
1 woodbench kayu 2.00 bh - 0.00% 0.000% 2.00
Pekerjaan Tambah
2 Pembuatan bridge/jembatan kayu ulin fin. Natural coating
0.48 m3 - 0.00% 0.000% 0.48
termasuk aksesoris dan alat bantu lainnya.

VI SI.909-PCP-SI-LMM-PMHCO_P
Pekerjaan Tambah Perapihan Dinding Samping Ramp
Pekerjaan Tambah
1 Bobokan dinding 15.00 m2 - 0.00% 0.000% 15.00
2 Plesteran 42.00 m2 - 0.00% 0.000% 42.00
3 Acian 99.50 m2 - 0.00% 0.000% 99.50
4 Pengecatan exterior ex.Jotun 142.00 m2 - 0.00% 0.000% 142.00

Jumlah Total Bobot Pekerjaan Landscape 0.000%


Current Progress To Date Progress

Prosentase Bobot Quantity Prosentase Bobot

100.00% 100.00% 10.54 100.00% 100.00%


100.00% 100.00% 2.63 100.00% 100.00%
100.00% 100.00% 2.63 100.00% 100.00%

100.00% 100.00% 5.27 100.00% 100.00%


100.00% 100.00% 379.54 100.00% 100.00%
100.00% 100.00% 6.32 100.00% 100.00%
100.00% 100.00% 48.62 100.00% 100.00%

100.00% 100.00% 5.61 100.00% 100.00%


100.00% 100.00% 1.12 100.00% 100.00%
100.00% 100.00% 0.56 100.00% 100.00%
100.00% 100.00% 18.70 100.00% 100.00%
100.00% 100.00% 2,692.80 100.00% 100.00%
100.00% 100.00% 16.83 100.00% 100.00%
100.00% 100.00% 11.22 100.00% 100.00%
100.00% 100.00% 18.70 100.00% 100.00%

100.00% 100.00% 4.00 100.00% 100.00%


100.00% 100.00% 24.00 100.00% 100.00%
100.00% 100.00% 20.00 100.00% 100.00%
100.00% 100.00% 0.40 100.00% 100.00%

100.00% 100.00% 2.00 100.00% 100.00%


100.00% 100.00% 0.40 100.00% 100.00%
100.00% 100.00% 0.20 100.00% 100.00%
100.00% 100.00% 12.90 100.00% 100.00%
100.00% 100.00% 105.66 100.00% 100.00%
100.00% 100.00% 1.76 100.00% 100.00%

100.00% 100.00% 2.00 100.00% 100.00%


100.00% 100.00% 0.48 100.00% 100.00%

100.00% 100.00% 15.00 100.00% 100.00%


100.00% 100.00% 42.00 100.00% 100.00%
100.00% 100.00% 99.50 100.00% 100.00%
100.00% 100.00% 142.00 100.00% 100.00%

100.00% 100.00%