Open Ended Lab 2023
Open Ended Lab 2023
Engineering drawings are used to communicate design ideas and technical information to
engineers and other professionals throughout the design process. An engineering drawing
represents a complex three-dimensional object on a two-dimensional piece of paper or computer
screen by a process called projection. Engineers use drawings as part of the design and
development of a product. Drawings can show how the different parts of a product or design
interact with each other. Drawings can also give clients an idea of what the finished products
look like, which is helpful during a project's approval stage. These drawings can be useful for
showing the development history of a project.
You are supposed to fabricate a wooden model of any mechanical part of your choice and draw
its projections on a standard regular drawing sheet with exact dimensions according to any angle
of projection method of your choice.
Constraints:
Wooden Model
Drawing Sheet Size A2
Assumptions:
Angle of Projection Method
Dimensioning Units
Scale
Attribute:
Depth of engineering knowledge
Instructions:
You are supposed to submit your wooden piece with your drawing sheet.
Deadline of submission = 20th of Nov 2023
Following Rubrics will be considered for the evaluation of this assessment.
Rubrics to Evaluate the Drawing sheets
Basic Knowledge CLO1 PLO1 Have a sound knowledge of Have a less knowledge of Have a poor knowledge of
of Lines different kinds types of different kinds types of lines different kinds types of lines
lines
Basic Knowledge CLO1 PLO1 Have a good knowledge of Have a average knowledge of Have a less knowledge of
of lead different shades of lead different shades of lead different shades of lead
Concept of Angle CLO1 PLO1 Have a good knowledge of Have some knowledge of Have less knowledge of
of Projection correct positioning of views correct positioning of views correct positioning of views
according to angle of according to angle of according to angle of
projection in frame of projection in frame of reference projection in frame of
reference reference
Neatness CLO2 PLO9 Sheet is very tidy and Work Sheet is untidy Sheet is so dirty and work is
is done neatly and willingly done quite roughly
Time Management CLO2 PLO9 Sheet is submitted in time Sheet is submitted after Lab Sheet is submitted late after
time on the same day the whole week
Grading Scheme
46-50 A+
41 to 45 A
36 to 40 B+
31 to 35 B
26 to 30 C+
21 to 25 C
11 to 20 D
0 to 10 F