DESCRIPTI ION OF W WORK OLCM Job Vibration collection a analysis. b. and . Started w writing daily work rep port. Worked on SKF Mach analyst for PL-1 an PL-2, Em n hine nd merson PL-3 OLCM. Ma aintained Da aily Stoppages report. Main ntained Wee stoppag report. ekly ges *Attended Office Mee eting. Today's SK readings (abnormalit KF ties): PL-1 and P PL-2 OLCM Checked. OLCM for PL-1 and PL is down M L-2 n. Pinion CM DR-1 Pin Bearing NDE-H pt#10 6.602mm/s befo 6.732mm M-1 nion g p ore m/s Pinion CM DR-2 Pin Bearing DE-H pt# 9 M-1 nion g # 6.071mm/s Bef fore 6.211mm m/s Pinion CM DR-2 Pin Bearing NDE-H pt# 10 6.084mm/s yest M-1 nion g p terday 6.951mm/s 551-SR1-G input sh vibration is 6.303mm/s. GB1 haft 552-MD1 G i/p sha H vibrati is 6.084m GB1 aft ion mm/s. 442-FN1 f bearing t fan temperature is 3.2mm/s and is show spectru like cont s wing um taminated impeller. N Needs cleanin ng. Today's Em merson read dings (abnormalities): Checked E Emerson OL LCM for PL-3. Compare values on Excel shee with old record. ed n et Main Fans Vibration readings: Kiln Main fa PL-1 421 fan 1-FN1: DE pt#3 2.006mm/ /s and y yesterday wa 1.968mm as m/s NDE pt#4 1.683mm/ 4 /s and y yesterday wa 1.682mm as m/s Kiln Main fa PL-2 462 fan 2-FN1: DE pt#3 0.568mm/ /s and y yesterday wa 0.587mm as m/s NDE pt#4 0.888mm/ 4 /s and y yesterday wa -----mm/s as s Kiln Main fa PL-3 443 fan 3-FN1: DE 1.770mm/s s and yesterday was 2.625mm w m/s NDE 2.209mm/s s and yesterday was 3.532mm w m/s CM-4 main drive 564-M MD1-M1: NDE 2.054mm/s s and yesterday was 3.044mm w m/s DE 3.514mm/s s and yesterday was 3.471mm w m/s Connected 462-FN1 NDE side bearing OLCM conn d e O nector to a acceleromet which w ter was detached. Collected v vibrations fo all critical drives. or
Superintendent
Chief
RE Dep EP pt.
DESCRIPTI ION OF W WORK PL-2 Plant Inspection. (Clinker tra t . ansport Area). Cement mill 3 area. Started w writing daily work rep port.
*Attended Office Mee eting. Performed PL-2 Kiln a clinker transport ar inspectio d and rea on. Checked C CM-3 area. Worked on PL-2 JDE account. Re n eleased and accepted wo orders. ork Vibration r reading colle ected for mo otors. Checked tr ransformers rooms, MC room. Fo CC ound norma al. Worked on JDE and closed all SP conditio monitori work or n PM on ing rders for PL and dele L-2 eted frequencies and last co s ompleted dates from its PM to keep those from further gen p m neration.
Superintendent
Chief