0% found this document useful (0 votes)
44 views

Daily Work Report 111010

The daily work report summarizes the work of a vibration engineer on October 1, 2011. The engineer collected vibration readings from machines at different areas, maintained daily and weekly stoppage reports, and attended an office meeting. Abnormal vibration readings were found on some machines. The engineer also inspected various areas of a cement plant, including the clinker transport area and Cement Mill 3 area. Work was performed on maintenance management systems and preventative maintenance orders were updated.

Uploaded by

nagarajasarma
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views

Daily Work Report 111010

The daily work report summarizes the work of a vibration engineer on October 1, 2011. The engineer collected vibration readings from machines at different areas, maintained daily and weekly stoppage reports, and attended an office meeting. Abnormal vibration readings were found on some machines. The engineer also inspected various areas of a cement plant, including the clinker transport area and Cement Mill 3 area. Work was performed on maintenance management systems and preventative maintenance orders were updated.

Uploaded by

nagarajasarma
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

RE Dep EP pt.

Dail Work Repor (Relia ly k rt ability)


1 October 2011 10

Vibratio Enginee Malek J on er: Jahanzeb Time


Area to be Visited

DESCRIPTI ION OF W WORK OLCM Job Vibration collection a analysis. b. and . Started w writing daily work rep port. Worked on SKF Mach analyst for PL-1 an PL-2, Em n hine nd merson PL-3 OLCM. Ma aintained Da aily Stoppages report. Main ntained Wee stoppag report. ekly ges *Attended Office Mee eting. Today's SK readings (abnormalit KF ties): PL-1 and P PL-2 OLCM Checked. OLCM for PL-1 and PL is down M L-2 n. Pinion CM DR-1 Pin Bearing NDE-H pt#10 6.602mm/s befo 6.732mm M-1 nion g p ore m/s Pinion CM DR-2 Pin Bearing DE-H pt# 9 M-1 nion g # 6.071mm/s Bef fore 6.211mm m/s Pinion CM DR-2 Pin Bearing NDE-H pt# 10 6.084mm/s yest M-1 nion g p terday 6.951mm/s 551-SR1-G input sh vibration is 6.303mm/s. GB1 haft 552-MD1 G i/p sha H vibrati is 6.084m GB1 aft ion mm/s. 442-FN1 f bearing t fan temperature is 3.2mm/s and is show spectru like cont s wing um taminated impeller. N Needs cleanin ng. Today's Em merson read dings (abnormalities): Checked E Emerson OL LCM for PL-3. Compare values on Excel shee with old record. ed n et Main Fans Vibration readings: Kiln Main fa PL-1 421 fan 1-FN1: DE pt#3 2.006mm/ /s and y yesterday wa 1.968mm as m/s NDE pt#4 1.683mm/ 4 /s and y yesterday wa 1.682mm as m/s Kiln Main fa PL-2 462 fan 2-FN1: DE pt#3 0.568mm/ /s and y yesterday wa 0.587mm as m/s NDE pt#4 0.888mm/ 4 /s and y yesterday wa -----mm/s as s Kiln Main fa PL-3 443 fan 3-FN1: DE 1.770mm/s s and yesterday was 2.625mm w m/s NDE 2.209mm/s s and yesterday was 3.532mm w m/s CM-4 main drive 564-M MD1-M1: NDE 2.054mm/s s and yesterday was 3.044mm w m/s DE 3.514mm/s s and yesterday was 3.471mm w m/s Connected 462-FN1 NDE side bearing OLCM conn d e O nector to a acceleromet which w ter was detached. Collected v vibrations fo all critical drives. or

6:30 To 8:00 8:00 To 8:30

Vibr ration Engin neer

Superintendent

Chief

RE Dep EP pt.

Dail Work Repor (Inspe ly k rt ection)


1 October 2011 10

Electric Engineer: Malek J cal Jahanzeb Time


Area to be Visited

DESCRIPTI ION OF W WORK PL-2 Plant Inspection. (Clinker tra t . ansport Area). Cement mill 3 area. Started w writing daily work rep port.

6:30 To 8:00 8:00 To 8:30

*Attended Office Mee eting. Performed PL-2 Kiln a clinker transport ar inspectio d and rea on. Checked C CM-3 area. Worked on PL-2 JDE account. Re n eleased and accepted wo orders. ork Vibration r reading colle ected for mo otors. Checked tr ransformers rooms, MC room. Fo CC ound norma al. Worked on JDE and closed all SP conditio monitori work or n PM on ing rders for PL and dele L-2 eted frequencies and last co s ompleted dates from its PM to keep those from further gen p m neration.

Elec ctrical Engin neer

Superintendent