UGRD-CS6302 Application Lifecycle Management FINAL EXAM

- The document is a record of the completion of an online exam on ALM Essentials consisting of 28 multiple choice questions. - The exam was started on December 18, 2022 at 12:12 AM and completed in 26 minutes and 45 seconds, with a total score of 109 out of 109 points. - The questions covered various topics relating to application lifecycle management processes, including testing cycles, requirements management, defect tracking, and ALM modules.

Uploaded by

patricia gemina
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
602 views

UGRD-CS6302 Application Lifecycle Management FINAL EXAM

- The document is a record of the completion of an online exam on ALM Essentials consisting of 28 multiple choice questions. - The exam was started on December 18, 2022 at 12:12 AM and completed in 26 minutes and 45 seconds, with a total score of 109 out of 109 points. - The questions covered various topics relating to application lifecycle management processes, including testing cycles, requirements management, defect tracking, and ALM modules.

Uploaded by

patricia gemina
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 66

Started on Sunday, 18 December 2022, 12:12 AM

State Finished
Completed on Sunday, 18 December 2022, 12:39 AM
Time taken 26 mins 45 secs
Marks 109.00/109.00
Grade 100.00 out of 100.00
Question 1
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Sprinter is not available for ALM Essentials Edition or Performance Center Edition.

Select one:
True
False

Question 2
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Contains the Dashboard tree in which you organize dashboard pages.

Select one:

a.
Live Analysis graphs

b.
Live Analysis graphs
c.
Dashboard View module

d.
Analysis Menus tab
Feedback
Your answer is correct.

Question 3
Complete
Mark 1.00 out of 1.00

Flag question

Question text
This section enables you to open the ALM documentation library and other online resources.

Select one:

a.
Ask section

b.
Guide section

c.
Help section

d.
Action section
Feedback
Your answer is correct.

Question 4
Complete
Mark 1.00 out of 1.00
Flag question

Question text
What is the module that enables you to manage resources used by your tests?

Select one:

a.
Test Components

b.
Test Procedure

c.
Testing Resources

d.
Test Resources
Feedback
Your answer is correct.

Question 5
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Enables you to view your requirements hierarchically in a tree.

Select one:

a.
Requirement Tree
b.
Coverage Analysis

c.
Requirements Grid

d.
Requirement Details
Feedback
Your answer is correct.

Question 6
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Tests the performance of the application for criteria such as number of concurrent users that the
application supports and the response time of the application.

Select one:

a.
Cycle 4-User Acceptance Testing

b.
Cycle 2-Integrated System Testing

c.
Cycle 3-Performance Testing

d.
Cycle 1- New Features
Feedback
Your answer is correct.
Question 7
Complete
Mark 1.00 out of 1.00

Flag question

Question text
A document-centric viewing mode that enables you to see a list of requirements in a single
document view and allows for quick editing of descriptions. This helps you to better understand
the big picture.

Select one:

a.
Category Views

b.
Authorization view

c.
Requirement View

d.
Author mode
Feedback
Your answer is correct.

Question 8
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Enables you to record additional details about the actual test execution results.
Select one:

a.
Compact View Button

b.
Actual Field

c.
None of the choices

d.
Status Column
Feedback
Your answer is correct.

Question 9
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Enable you to create and display a dynamic graphic representation of data related to test plans
and test sets.

Select one:

a.
Analysis View module

b.
Dashboard View module

c.
Analysis Menus tab

d.
Live Analysis graphs
Feedback
Your answer is correct.

Question 10
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Refreshes the scorecard table, so that it displays the most up-to-date information.

Select one:

a.
Scoreboard

b.
Generate

c.
Scorecard layout

d.
None of the choices
Feedback
Your answer is correct.

Question 11
Complete
Mark 1.00 out of 1.00
Flag question

Question text
This cycle ensures that the new features meet the expectations of the business.

Select one:

a.
Cycle 2-Integrated System Testing

b.
Cycle 4-User Acceptance Testing

c.
Cycle 3-Performance Testing

d.
Cycle 1-New Features
Feedback
Your answer is correct.

Question 12
Complete
Mark 1.00 out of 1.00

Flag question

Question text
You can view a list of all entities in the current module that you have checked out, and check in
or undo the check out for selected entities.

Select one:
True
False

Question 13
Complete
Mark 1.00 out of 1.00

Flag question

Question text
After you make changes to an entity, you _____ the entity.

Select one:

a.
Check in

b.
Check out

c.
None of the choices

d.
Check in and out
Feedback
Your answer is correct.

Question 14
Complete
Mark 1.00 out of 1.00

Flag question
Question text
You can use the Project Report reporting tool, available in the Analysis View module, to design
and generate comprehensive reports of project data.

Select one:
True
False

Question 15
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Enables you to instruct ALM to automatically send a status alert email to the author when the
test set completes execution.

Select one:

a.
Develop the Test Sets tree

b.
Run the tests

c.
Set automation options

d.
Organize test runs
Feedback
Your answer is correct.
Question 16
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Change is constant for applications.

Select one:
True
False

Question 17
Complete
Mark 1.00 out of 1.00

Flag question

Question text
You run tests ________ from ALM using HP Sprinter.

Select one:

a.
None of the choices

b.
Manually

c.
Automatically

d.
Manually and Automatically
Feedback
Your answer is correct.

Question 18
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Provides a tabular list of the defects logged for a project.

Select one:

a.
Attachment tab

b.
Description tab

c.
History tab

d.
Defects grid
Feedback
Your answer is correct.

Question 19
Complete
Mark 1.00 out of 1.00

Flag question

Question text
It empowers IT to manage the core application life cycle, from requirements through
deployment, granting application trams the crucial visibility and collaboration needed for
predictable, repeatable, and adaptable delivery of modern applications.
ALM
Answer:

Question 20
Complete
Mark 1.00 out of 1.00

Flag question

Question text
This cycle tests the new features with existing features that might have been impacted by the
changes.

Select one:

a.
Cycle 4-User Acceptance Testing

b.
Cycle 2-Integrated System Testing

c.
Cycle 3-Performance Testing

d.
Cycle 1- New Features
Feedback
Your answer is correct.

Question 21
Complete
Mark 1.00 out of 1.00

Flag question
Question text
What is the third stage of the testing process?

Select one:

a.
Test Execution

b.
Test Control

c.
Test Planning

d.
None of the choices
Feedback
Your answer is correct.

Question 22
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Enables you to increase the number of parallel calculations performed on an entire site.

Select one:

a.
Purge Area

b.
Scheduling Area
c.
None of the choices

d.
Advanced Area
Feedback
Your answer is correct.

Question 23
Complete
Mark 1.00 out of 1.00

Flag question

Question text
After adding a cycle to a release, you specify the details for the cycle using the _____.

Select one:

a.
Attachment

b.
Details tab

c.
Button

d.
Cycle tab
Feedback
Your answer is correct.

Question 24
Complete
Mark 1.00 out of 1.00
Flag question

Question text
To compare two versions, press the Alt key and select each version. Click the Compare button.

Select one:
True
False

Question 25
Complete
Mark 1.00 out of 1.00

Flag question

Question text
A group of tests designed to achieve specific testing goals.

Select one:

a.
Test Sets Tree

b.
Test Set folder

c.
Test Set

d.
None of the choices
Feedback
Your answer is correct.

Question 26
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Enables quality assurance managers to track application readiness by defining goals for activities
of an application release.

Select one:

a.
Smart Card Authentication

b.
Common Access Card

c.
ALM project planning and tracking (PPT)

d.
Requirements Management
Feedback
Your answer is correct.

Question 27
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Enables you to create and edit tests or components directly in Sprinter and save them to ALM.
Select one:

a.
Button Plan mode

b.
ALM Plan mode

c.
Sprinter's Plan mode

d.
None of the choices
Feedback
Your answer is correct.

Question 28
Complete
Mark 1.00 out of 1.00

Flag question

Question text
A session/user authentication process that permits a user to enter one name and password to
access multiple applications.

Select one:

a.
Common Access Card

b.
Smart Card Authentication

c.
Single Sign-on

d.
Requirements Management
Feedback
Your answer is correct.

Question 29
Complete
Mark 1.00 out of 1.00

Flag question

Question text
You convert requirements to tests to automatically create a one-to-one mapping between
____________ and ______.

Select one:

a.
Activity and tests

b.
Requirements and tests

c.
Requirements and activities

d.
Planning and activity
Feedback
Your answer is correct.

Question 30
Complete
Mark 1.00 out of 1.00
Flag question

Question text
Contains tests that you can assign to cycles in the Management module. This association allows
you to review the progress of tests, determine the number of resolved and outstanding defects,
and enhance your reporting ability.

Select one:

a.
Test Set

b.
None of the choices

c.
Test Set folder

d.
Test Sets Tree
Feedback
Your answer is correct.

Question 31
Complete
Mark 1.00 out of 1.00

Flag question

Question text
You can _____graphs for viewing in a web browser without downloading an ALM client.

Select one:
a.
None of the choices

b.
Share and Download

c.
Download

d.
Share
Feedback
Your answer is correct.

Question 32
Complete
Mark 10.00 out of 10.00

Flag question

Question text
Match the missing word/details to complete each statement.

Instead of a set of _______________________ working in a vacuum to


define the vision and requirements, handing off the design to the
developers, handing off the code to the testers, handing off the product Answer 1
to the IT support team to deploy and maintain, you now have a single business analysts
ALM process spanning all these elements continuously delivering
new features every X weeks.
___________________ should have functionality that helps you make
Answer 2
sense of your requirements and ideally the tools should be adaptable to
ALM tools
your methodology and processes rather than the other way around.
In the past, before the ________________ was published and before
organizations realized that their previous waterfall approach to
software development was inefficient and prone to scope creep, cost Answer 3
Agile Manifesto
overruns and missed deadlines, each of the disciplines that made up the
overall software process was completely separate.
__________________ is basically the fusing together of the Answer 4
disciplines concerned with all aspects of the software delivery process: ALM
Once organizations realized how much more efficient they can be
having _________________ that collaboratively define the
Answer 5
requirements, plan the releases and sprints, test the product during
integrated teams
development and deploy the latest update in a seamless way, the old
separate processes didn’t make sense.
Feedback
Your answer is correct.

Question 33
Complete
Mark 1.00 out of 1.00

Flag question

Question text
______ are the means for setting objectives on Project Planning and Tracking releases and for
planning and tracking release progress towards these objectives throughout its duration.

Select one:

a.
Scoreboard

b.
Scope items

c.
Thresholds

d.
Analysis
Feedback
Your answer is correct.

Question 34
Complete
Mark 1.00 out of 1.00
Flag question

Question text
A _______ contains the actions that must be performed during test execution.

Select one:

a.
Designing test

b.
None of the choices

c.
Test planning

d.
Test script
Feedback
Your answer is correct.

Question 35
Complete
Mark 1.00 out of 1.00

Flag question

Question text
A dynamic hierarchical structure based on virtual folders allows for flexibility in manipulating the
Requirements view.

Select one:

a.
Author mode

b.
Author views

c.
Category mode

d.
Category views
Feedback
Your answer is correct.

Question 36
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Contains the Dashboard tree in which you organize dashboard pages.

Select one:

a.
Dashboard view module

b.
Analysis graphs

c.
Analysis view module

d.
Dashboard modules
Feedback
Your answer is correct.

Question 37
Complete
Mark 1.00 out of 1.00

Flag question

Question text
The project administrator for your organization can _______ version control through ALM Site
Administration.

Select one:

a.
Disable

b.
Enable

c.
None of the choices

d.
Enable or Disable
Feedback
Your answer is correct.

Question 38
Complete
Mark 1.00 out of 1.00

Flag question
Question text
Managing and tracking defects is a critical step in the testing process because it involves a lot of
time and money.

Select one:
True
False

Question 39
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Baselining
Answer allows you to capture a group of requirements, test, or test assets at
strategic points in the project lifecycle to mark specific milestones.

Question 40
Complete
Mark 1.00 out of 1.00

Flag question

Question text
You can define what data appear in a graph and how the data are organized.

Select one:
True
False

Question 41
Complete
Mark 1.00 out of 1.00
Flag question

Question text
The ______ module allows you to view all test runs for your project in a grid.

Select one:

a.
Test Set Tree

b.
Test Runs

c.
None of the choices

d.
Test Set
Feedback
Your answer is correct.

Question 42
Complete
Mark 1.00 out of 1.00

Flag question

Question text
This tab enables you to determine the business criticality, failure probability, and functional
complexity of a requirement by assigning it values directly or by assigning values to a set of
criteria.
Select one:

a.
Assessment Questions tab

b.
Assessment plan tab

c.
Assessment Results tab

d.
Assessment tab
Feedback
Your answer is correct.

Question 43
Complete
Mark 1.00 out of 1.00

Flag question

Question text
The Defect Management module enables subject matter expert to work with Business Process
testing, the HP test automation solution.

Select one:
True
False

Question 44
Complete
Mark 1.00 out of 1.00

Flag question

Question text
After finalizing the testing policy for your requirements, you can ______ a risk report that details
your testing strategy for the analysis requirement.

Select one:

a.
Generate

b.
None of the choices

c.
Plan

d.
Start
Feedback
Your answer is correct.

Question 45
Complete
Mark 1.00 out of 1.00

Flag question

Question text
The ________ module addresses the need for a stronger connection between business process
modeling, quality assurance management, and requirement definition.

Select one:

a.
Mailing Requirements

b.
ALM Business Models

c.
Linked Defects

d.
Application LifeCycle Intelligence (ALI)
Feedback
Your answer is correct.

Question 46
Complete
Mark 1.00 out of 1.00

Flag question

Question text
SCA is a session/user authentication process that permits a user to enter one name and
password to access multiple applications.

Select one:
True
False

Question 47
Complete
Mark 1.00 out of 1.00

Flag question

Question text
In the dashboard pages, you can arrange and view multiple graphs on a single page.

Select one:
True
False

Question 48
Complete
Mark 1.00 out of 1.00

Flag question

Question text
A test can cover more than one______ and a requirement can be covered by more than one test.

Select one:

a.
None of the choices

b.
Plan

c.
Requirement

d.
Activity
Feedback
Your answer is correct.

Question 49
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Clearly defined requirements help developers set a target for themselves and the testing team
to identify their testing priorities.

Select one:

a.
Helps prevent scope creep

b.
Aids development and testing

c.
Saves time and money

d.
Sets clear expectations between teams
Feedback
Your answer is correct.

Question 50
Complete
Mark 1.00 out of 1.00

Flag question

Question text
In a version control-enabled project, you can only make changes to an entity by checking it in.

Select one:
True
False

Question 51
Complete
Mark 1.00 out of 1.00
Flag question

Question text
You run tests ________ from ALM using HP Sprinter.

Select one:

a.
Manually and Automatically

b.
Automatically

c.
Manually

d.
None of the choices
Feedback
Your answer is correct.

Question 52
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Enables you to manage resources used by your tests. You can organize your resources by
defining a hierarchical Test Resource tree containing resource folders and resources.

Select one:

a.
Test Plan

b.
Risk-based Quality Management

c.
Test Resources

d.
Business Components module
Feedback
Your answer is correct.

Question 53
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Indicates whether the scheduled calculation is currently running.

Select one:

a.
Set Refresh Rate

b.
Apply settings

c.
Enabled/Disabled

d.
Active/Inactive
Feedback
Your answer is correct.
Question 54
Complete
Mark 1.00 out of 1.00

Flag question

Question text
_______are checkpoints on a release timeline used to verify that the release and its interim
deliverables are progressing as planned.

Select one:

a.
Milestones

b.
Scoreboard

c.
Thresholds

d.
Analysis
Feedback
Your answer is correct.

Question 55
Complete
Mark 1.00 out of 1.00

Flag question

Question text
If you begin to make changes to an entity in a version control-enabled project, you are
prompted to check in the entity.
Select one:
True
False

Question 56
Complete
Mark 1.00 out of 1.00

Flag question

Question text
A physical devices used to identify users in secure systems.

Select one:

a.
Smart Card Authentication

b.
Single Sign-on

c.
Requirement Management

d.
Common Access Card
Feedback
Your answer is correct.

Question 57
Complete
Mark 1.00 out of 1.00

Flag question
Question text
Enables you to schedule PPT calculations for your entire site.

Select one:

a.
Scheduling Area

b.
Purge Area

c.
Advanced Area

d.
None of the choices
Feedback
Your answer is correct.

Question 58
Complete
Mark 1.00 out of 1.00

Flag question

Question text
A group of tests designed to achieve specific testing goals.

Select one:

a.
None of the choices

b.
Test Sets Tree
c.
Test Set

d.
Test Set folder
Feedback
Your answer is correct.

Question 59
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Provides a clear picture of the test building blocks and assists in the execution of the actual
tests.

Select one:

a.
Organize test runs

b.
Set automation options

c.
Develop the Test Sets tree

d.
Run the tests
Feedback
Your answer is correct.

Question 60
Complete
Mark 1.00 out of 1.00

Flag question

Question text
If you know that a test in your test set might fail, but you want to make sure that subsequent
tests in the test set still execute, which of the following should you do?

Select one:

a.
Ensure that the execution condition for the arrow running into the test is set to Finished.

b.
Disconnect the test from the flow.

c.
All of the choices

d.
Ensure that the execution condition for the arrow running out from the test is set to Finished.

Feedback
Your answer is correct.

Question 61
Complete
Mark 1.00 out of 1.00
Flag question

Question text
Evaluating defects and defect trends helps you make effective go/no-go decisions.

Select one:
True
False

Question 62
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Displays KPI calculations that enable you to determine the status of your release.

Select one:

a.
Detailed tab

b.
Scorecard tab

c.
Content tab

d.
General tab
Feedback
Your answer is correct.

Question 63
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Using the _____, you can report flaws in your application and track their repair during all stages
of the application management process.

Select one:

a.
ALM Web client

b.
CAC

c.
Web client

d.
SSO
Feedback
Your answer is correct.

Question 64
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Version control enables you to create and manage ALM entities while maintaining previous
versions of these entities.
Select one:
True
False

Question 65
Complete
Mark 1.00 out of 1.00

Flag question

Question text
It is a translating business goals/objectives into a realized software-enabled business process.

Select one:

a.
Creating requirements

b.
Creating action plan

c.
Creating application

d.
Creating plan
Feedback
Your answer is correct.

Question 66
Complete
Mark 1.00 out of 1.00

Flag question
Question text
Enables subject matter experts (SMEs) to work with Business Process Testing (BPT), the HP test
automation solution.

Select one:

a.
Test Plan

b.
Risk-based Quality Management

c.
Business Components module

d.
Test Resources
Feedback
Your answer is correct.

Question 67
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Enables you to control the execution of automated tests by setting test run conditions and
creating a schedule.

Select one:

a.
Develop the Test Set Tree

b.
Run the tests
c.
Organize test runs

d.
Set automation options
Feedback
Your answer is correct.

Question 68
Complete
Mark 1.00 out of 1.00

Flag question

Question text
A _______ is an independent business unit within an organization, with its own set of rules,
standards, resources, objectives, and applications.

Select one:

a.
Releases and Cycles throughout ALM

b.
Line of business (LOB)

c.
Sample Release Tree

d.
Release Module Icons
Feedback
Your answer is correct.

Question 69
Complete
Mark 1.00 out of 1.00
Flag question

Question text
If you would like to revert an entity to a previous version, which of the following actions would
you take?

Select one:

a.
Promote the entity

b.
Check out the entity

c.
Change the history of the entity

d.
Check in the entity
Feedback
Your answer is correct.

Question 70
Complete
Mark 1.00 out of 1.00

Flag question

Question text
This is the two modules that have been completely redesigned as part of this release of ALM
12.0.

Select one:
a.
Lifecycle Management and Requirements Management

b.
Requirements Management and Defects Management

c.
Application Management and Defect Management

d.
Access Management and Action Management
Feedback
Your answer is correct.

Question 71
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Enables you to purge calculations after a specific time period.

Select one:

a.
Advanced Area

b.
Purge Area

c.
None of the choices

d.
Scheduling Area
Feedback
Your answer is correct.

Question 72
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Enables you to associate the selected requirement with other requirements in the requirements
tree

Select one:

a.
Test Coverage

b.
Risk assessment

c.
Details

d.
Requirements Traceability
Feedback
Your answer is correct.

Question 73
Complete
Mark 1.00 out of 1.00

Flag question

Question text
You can create and manage entities in a version control-enabled project in both tree and grid
views.

Select one:
True
False

Question 74
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Tests the new features of the application implemented in the release.

Select one:

a.
Cycle 4-User Acceptance Testing

b.
Cycle 3-Performance Testing

c.
Cycle 1-New Features

d.
Cycle 2-Integrated System Testing
Feedback
Your answer is correct.

Question 75
Complete
Mark 1.00 out of 1.00
Flag question

Question text
Module addresses the need for a stronger connection between business process modeling,
quality assurance management, and requirements definition.

Select one:

a.
ALM Business Models

b.
PPT Business Models

c.
CAC Business Models

d.
SOS Business Models
Feedback
Your answer is correct.

Question 76
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Models
The ALM Business Answer module addresses the need for a stronger connection
between business process modeling, quality assurance management, and requirements
definition.

Question 77
Complete
Mark 1.00 out of 1.00
Flag question

Question text
A group of tests designed to achieve specific testing goals.

Select one:

a.
None of the choices

b.
Test Set

c.
Test Set folder

d.
Test Sets Tree
Feedback
Your answer is correct.

Question 78
Complete
Mark 1.00 out of 1.00

Flag question

Question text
After the _____, the release goes through further testing cycles to test aspects, such as
functionality and performance of the application.

Select one:
a.
second cycle

b.
third cycle

c.
first cycle

d.
fourth cycle
Feedback
Your answer is correct.

Question 79
Complete
Mark 1.00 out of 1.00

Flag question

Question text
It supports you through all the phases of application lifecycle management. By integrating the
tasks involved in application management.

Select one:

a.
Activity Lifecycle Management

b.
Action Lifecycle Management

c.
Addition Lifecycle Management

d.
Application Lifecycle Management
Feedback
Your answer is correct.

Question 80
Complete
Mark 1.00 out of 1.00

Flag question

Question text
You can add ______ to a cycle.

Select one:

a.
Tabs

b.
Links

c.
Tests

d.
Attachments
Feedback
Your answer is correct.

Question 81
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Enables you to manage the execution of manual and automated tests and document their
results.
Select one:

a.
Set automation options

b.
Run the tests

c.
Organize test runs

d.
Develop the Test Set Tree
Feedback
Your answer is correct.

Question 82
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Provides filter fields from where you can define criteria for filtering the data listed in the Defects
grid.

Select one:

a.
Defects grid

b.
Grid filter
c.
Description tab

d.
Attachment tab
Feedback
Your answer is correct.

Question 83
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Contains the Analysis tree in which you organize all of your analysis items.

Select one:

a.
Dashboard view module

b.
Analysis View module

c.
Live Analysis graphs

d.
Analysis Menus tab
Feedback
Your answer is correct.

Question 84
Complete
Mark 1.00 out of 1.00
Flag question

Question text
The HP’s strategy and software approach for modern application delivery starts with a what?

Select one:

a.
Unified classroom

b.
Unified platform

c.
Unified information

d.
Unified application
Feedback
Your answer is correct.

Question 85
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Allows you to capture a group of requirements, tests, or test assets at strategic points in the
project lifecycle to mark specific milestones.

Select one:

a.
Key Capabilities
b.
Tracking

c.
Baselining

d.
Key Benefits
Feedback
Your answer is correct.

Question 86
Complete
Mark 1.00 out of 1.00

Flag question

Question text
What are the physical devices used to identify users in secure system?

Select one:

a.
Single-sign On

b.
ATM

c.
Smart Cards

d.
Card
Feedback
Your answer is correct.

Question 87
Complete
Mark 1.00 out of 1.00

Flag question

Question text
You use the Graph wizard to generate an old graph.

Select one:
True
False

Question 88
Complete
Mark 1.00 out of 1.00

Flag question

Question text
If you want to make changes to an entity in a version control enabled project, what is the first
thing you must do?

Select one:

a.
Check in the entity

b.
Promote the entity

c.
Check out the entity
d.
Turn off version control
Feedback
Your answer is correct.

Question 89
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Provides an audit trail of changes made to each defect.

Select one:

a.
Attachment tab

b.
Description tab

c.
History tab

d.
Defects grid
Feedback
Your answer is correct.

Question 90
Complete
Mark 1.00 out of 1.00

Flag question
Question text
Contains tests that you can assign to cycles in the Management module. This association allows
you to review the progress of tests, determine the number of resolved and outstanding defects,
and enhance your reporting ability.

Select one:

a.
Test Set

b.
None of the choices

c.
Test Set folder

d.
Test Sets Tree
Feedback
Your answer is correct.

Question 91
Complete
Mark 1.00 out of 1.00

Flag question

Question text
A _______ is a variable that can be assigned a value during test execution.

Select one:

a.
Test
b.
Test planning

c.
Template

d.
Parameter
Feedback
Your answer is correct.

Question 92
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Changes the speed that it takes for ALM to calculate the KPI data.

Select one:

a.
Override Settings

b.
Engines Throttle

c.
Advance area

d.
Scoreboard
Feedback
Your answer is correct.

Question 93
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Enabled for requirements, tests, and test assets to allow distributed teams to collaborate and
manage multiple versions of assets in parallel while maintaining data integrity and providing an
audit history of changes throughout the project lifecycle.

Select one:

a.
Test Resources

b.
Version control

c.
Risk-based Quality Management

d.
Test Plan
Feedback
Your answer is correct.

Question 94
Complete
Mark 1.00 out of 1.00

Flag question

Question text
The foundation of the Management module is the ______.

Select one:
a.
Release tree

b.
Cycles

c.
Modules

d.
Line of business
Feedback
Your answer is correct.

Question 95
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Displays the progress of a release in a Gantt chart.

Select one:

a.
Scorecard tab

b.
Master Plan tab

c.
Detailed tab

d.
Content tab
Feedback
Your answer is correct.

Question 96
Complete
Mark 1.00 out of 1.00

Flag question

Question text
ALM support you through ____.

Select one:

a.
All phases of Application Lifecycle Management

b.
The implementing phase

c.
The development phase

d.
None of the choices
Feedback
Your answer is correct.

Question 97
Complete
Mark 1.00 out of 1.00

Flag question

Question text
Before you create a report, you can add sub-reports. A sub-report adds an extra layer of
information related to the parent report.
Select one:
True
False

Question 98
Complete
Mark 1.00 out of 1.00

Flag question

Question text
The Test Plan module enables you to ____ your application according to functionality.

Select one:

a.
Divide

b.
Multiply

c.
None of the choices

d.
Plan
Feedback
Your answer is correct.

Question 99
Complete
Mark 1.00 out of 1.00
Flag question

Question text
Enables you to create links between requirements and other entities.

Select one:

a.
Requirements Details

b.
Coverage Analysis

c.
Requirement Tree

d.
Requirements Grid
Feedback
Your answer is correct.

Question 100
Complete
Mark 1.00 out of 1.00

Flag question

Question text
You create a _____ to define the hierarchical framework of releases.

Select one:

a.
Details tab
b.
Link

c.
Attachments

d.
Release tree
Feedback
Your answer is correct.