Work Capacity in ManHour

This document contains a list of construction materials, their units of measurement, man-hours rates, and manpower requirements. It includes items for concrete work like rebar, formworks, and concrete mixing and pouring. It also lists electrical items like conductors, rigid and flexible conduit, and panel boards. The document provides a detailed cost breakdown of construction labor and materials.

Uploaded by

bcdc.maro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views

Work Capacity in ManHour

This document contains a list of construction materials, their units of measurement, man-hours rates, and manpower requirements. It includes items for concrete work like rebar, formworks, and concrete mixing and pouring. It also lists electrical items like conductors, rigid and flexible conduit, and panel boards. The document provides a detailed cost breakdown of construction labor and materials.

Uploaded by

bcdc.maro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 23

DESCRIPTION UNIT MH RATE MANPOWER

Concrete Curb l.m. 2.660 1


2
1
Ready Mix Concrete cu.m. 1.450 3
2
Rebar kg. 0.050 5
5
Formworks sq.m. 3.200 8
2
Curing using Compound sq.m. 0.200 2
Hardener, Iron Base sq.m. 0.540 2
Joints & Reinforcements in Concrete Pavement
Joint Filler l.m. 0.130 2
Primer, Asphalt sq.m. 0.100 2
Liquid Joint Sealant l.m. 0.130 2
Coated Dowel Bars ea. 0.140 5
5
Rebars kg. 0.050 5
5
Welded Wire Mesh sq.m. 0.060 5
5
Bituminous Prime Coat
Emulsified Asphalt sq.m. 0.030 2

Subgrade Preparation sq.m. 0.050 5


Base Course, 100mm cu.m. 0.040 2
Cast in Place Concrete
Formworks
Foundation & Footing sq.m. 3.200 8
2
Slab Wooden Forms, Elevated sq.m. 4.170 8
2
Slab Steel Forms, Elevated sq.m. 3.200 8
2
Slab Wooden Forms, Ground Floor sq.m. 4.170 8
2
Retaining Wall Forms sq.m. 4.170 8
2
Building Wall Forms sq.m. 4.170 8
2
Column Wood Forms sq.m. 4.170 8
2
Column Fiberboard Forms, Circular sq.m. 2.000 8
2
Beams & Girders sq.m. 4.170 8
2
Concrete Stair Forms sq.m. 8.000 8
2
Parapet Wall Forms sq.m. 6.000 8
2
Lintel Beam Wooden Forms sq.m. 4.170 8
2
Lintel Column Wooden Forms sq.m. 4.170 8
2
Hand Guard Rail l.m. 0.600 8
2
Reinforcement
Grade 60 Rebar kg. 0.050 5
5
Grade 40 Rebar kg. 0.050 5
5
Grade 33 Rebar kg. 0.050 5
5
Tie Wire
Bar Welding kg. 0.010 1
Wire Mesh sq.m. 0.060 5
5
Dowels ea. 0.140 5
5
Concrete, 2000, 3000, 3500, 4000 & 5000 psi
1 or 2 Bagger Mixed, Direct Pour or by Chute
Slab on Ground cu.m. 4.200 3
6
1
Footing & Tie Beam cu.m. 4.600 3
6
1
Suspended Slab cu.m. 5.000 3
6
1
Columns & Beams cu.m. 5.500 3
6
1
1 or 2 Bagger Mixed, using Buggies
Slab on Ground cu.m. 5.050 3
8
1
Footing & Tie Beam cu.m. 5.550 3
8
1
Suspended Slab cu.m. 6.050 3
8
1
1 or 2 Bagger Mixed, using Porta Lift & Buggies
Slab on Ground cu.m. 7.750 3
8
2
Columns & Beams cu.m. 10.100 3
8
2
Ready Mixed Concrete
Direct Pour or by Chute cu.m. 1.450 3
2
Using Buggies cu.m. 2.300 3
4
Using Porta Lift & Chute cu.m. 2.800 3
4
Using Porta Lift & Buggies cu.m. 3.600 3
6
Using Concrete Pump cu.m. 1.300 3
7
Using Crane & Bucket cu.m. 2.800 3
8
Conductors
2.0 mm2 Solid Wire (cu.) l.m. 0.033 1
3.5 mm2 Solid Wire (cu.) l.m. 0.045 1
3.5 mm2 Solid Wire (cu.) l.m. 0.041 1
5.5 mm2 Solid Wire (cu.) l.m. 0.069 1
5.5 mm2 Solid Wire (cu.) l.m. 0.062 1
8.0 mm2 Solid Wire (cu.) l.m. 0.111 1
8.0 mm2 Solid Wire (cu.) l.m. 0.099 1
14 mm2 Strd. Wire (cu.) l.m. 0.173 1
22 mm2 Strd. Wire (cu.) l.m. 0.205 1
26 mm2 Strd. Wire (cu.) l.m. 0.228 1
30 mm2 Strd. Wire (cu.) l.m. 0.253 1
38 mm2 Strd. Wire (cu.) l.m. 0.281 1
50 mm2 Strd. Wire (cu.) l.m. 0.313 1
60 mm2 Strd. Wire (cu.) l.m. 0.347 1
80 mm2 Strd. Wire (cu.) l.m. 0.386 1
100 mm2 Strd. Wire (cu.) l.m. 0.429 1
125 mm2 Strd. Wire (cu.) l.m. 0.476 1
150 mm2 Strd. Wire (cu.) l.m. 0.529 1
175 mm2 Strd. Wire (cu.) l.m. 0.580 1
200 mm2 Strd. Wire (cu.) l.m. 0.653 1
250 mm2 Strd. Wire (cu.) l.m. 0.726 1
300 mm2 Strd. Wire (cu.) l.m. 0.807 1
350 mm2 Strd. Wire (cu.) l.m. 0.897 1
500 mm2 Strd. Wire (cu.) l.m. 0.996 1
Conduit
Conduit Rigid Steel, 19mm dia. l.m. 0.410 1
Conduit Rigid Steel, 25mm dia. l.m. 0.500 1
Conduit Rigid Steel, 32mm dia. l.m. 0.540 1
Conduit Rigid Steel, 38mm dia. l.m. 0.590 1
Conduit Rigid Steel, 50mm dia. l.m. 0.720 1
Conduit Rigid Steel, 63mm dia. l.m. 0.930 1
Conduit Rigid Steel, 75mm dia. l.m. 1.310 1
Conduit Rigid Steel, 90mm dia. l.m. 1.490 1
Conduit Rigid Steel, 100mm dia. l.m. 1.640 1
Conduit Rigid Steel, 125mm dia. l.m. 1.820 1
Conduit Rigid Steel, 150mm dia. l.m. 2.050 1
PVC Conduit, 13mm dia. l.m. 0.120 1
PVC Conduit, 19mm dia. l.m. 0.140 1
PVC Conduit, 25mm dia. l.m. 0.160 1
PVC Conduit, 32mm dia. l.m. 0.190 1
PVC Conduit, 38mm dia. l.m. 0.230 1
PVC Conduit, 50mm dia. l.m. 0.270 1
PVC Conduit, 63mm dia. l.m. 0.310 1
PVC Conduit, 75mm dia. l.m. 0.360 1
PVC Conduit, 90mm dia. l.m. 0.400 1
PVC Conduit, 100mm dia. l.m. 0.430 1
PVC Conduit, 125mm dia. l.m. 0.500 1
PVC Conduit, 150mm dia. l.m. 0.560 1
PVC Conduit, 200mm dia. l.m. 0.667 1
Flexible Conduit, 13mm dia. l.m. 0.360 1
Flexible Conduit, 19mm dia. l.m. 0.410 1
Flexible Conduit, 25mm dia. l.m. 0.500 1
Flexible Conduit, 32mm dia. l.m. 0.540 1
Flexible Conduit, 38mm dia. l.m. 0.590 1
Flexible Conduit, 50mm dia. l.m. 0.720 1
Flexible Conduit, 63mm dia. l.m. 0.930 1
Flexible Conduit, 75mm dia. l.m. 1.310 1
Flexible Conduit, 100mm dia. l.m. 1.640 1
Panel Boards
4 CKT, 650A Panel Boards ea. 9.148 1
10 CKT, 200A Panel Boards ea. 9.630 1
10 CKT, 400A Panel Boards ea. 10.137 1
12 CKT, 100A Panel Boards ea. 10.670 1
12 CKT, 225A Panel Boards ea. 11.940 1
16 CKT, 300A Panel Boards ea. 12.537 1
18 CKT, 400A Panel Boards ea. 13.330 1
20 CKT, 250A Panel Boards ea. 14.663 1
24 CKT, 100A Panel Boards ea. 16.670 1
24 CKT, 225A Panel Boards ea. 17.770 1
24 CKT, 500A Panel Boards ea. 18.659 1
26 CKT, 350A Panel Boards ea. 18.659 1
29 CKT, 350A Panel Boards ea. 18.659 1
30 CKT, 400A Panel Boards ea. 19.040 1
31 CKT, 250A Panel Boards ea. 19.040 1
36 CKT, 100A Panel Boards ea. 25.000 1
36 CKT, 225A Panel Boards ea. 27.580 1
42 CKT, 225A Panel Boards ea. 30.760 1
42 CKT, 400A Panel Boards ea. 40.000 1
54 CKT, 400A Panel Boards ea. 50.000 1
60 CKT, 100A Panel Boards ea. 57.140 1
60 CKT, 225A Panel Boards ea. 66.670 1
78 CKT, 400A Panel Boards ea. 100.000 1
84 CKT, 100A Panel Boards ea. 133.330 1
84 CKT, 225A Panel Boards ea. 200.000 1
Emergency Generators & Generator Transfer Swithes
30 KW Emergency Genrtr & Genrtr Transfer Switch ea. 45.450 2
75 KW Emergency Genrtr & Genrtr Transfer Switch ea. 71.420 2
115 KW Emergency Genrtr & Genrtr Transfer Switch ea. 83.330 2
200 KW Emergency Genrtr & Genrtr Transfer Switch ea. 105.260 2
500 KW Emergency Genrtr & Genrtr Transfer Switch ea. 142.850 2
30 KW (40A) Transfer Switches ea. 3.125 2
115 KW (40A) Transfer Switches ea. 6.250 2
200 KW (40A) Transfer Switches ea. 7.610 1
400 KW (40A) Transfer Switches ea. 14.200 1
500 KW (40A) Transfer Switches ea. 17.780 1
Transformer Dry Type Low Voltage
1/2 KVA Transformer ea. 4.340 1
1 KVA Transformer ea. 5.000 1
1-1/2 KVA Transformer ea. 5.560 1
2 KVA Transformer ea. 6.250 1
5 KVA Transformer ea. 8.330 1
7-1/2 KVA Transformer ea. 9.090 1
10 KVA Transformer ea. 12.500 1
15 KVA Transformer ea. 16.670 2
25 KVA Transformer ea. 20.000 2
37-1/2 KVA Transformer ea. 25.000 2
50 KVA Transformer ea. 28.570 2
75 KVA Transformer ea. 30.770 2
100 KVA Transformer ea. 25.640 2
112-1/2 KVA Transformer ea. 27.780 2
150 KVA Transformer ea. 29.110 2
225 KVA Transformer ea. 38.460 2
300 KVA Transformer ea. 44.450 2
500 KVA Transformer ea. 55.560 2
750 KVA Transformer ea. 71.420 2
1000 KVA Transformer ea. 100.000 2
1500 KVA Transformer ea. 111.110 2
2000 KVA Transformer ea. 125.000 2
2500 KVA Transformer ea. 142.850 2
3000 KVA Transformer ea. 166.670 2
3750 KVA Transformer ea. 200.000 2
Circuit Breakers
15A-30A 1P NEMA Circuit Breaker ea. 2.500 1
35A-40A 1P NEMA Circuit Breaker ea. 2.710 1
45A-50A 1P NEMA Circuit Breaker ea. 2.860 1
300A 1P NEMA Circuit Breaker ea. 5.000 1
15A-30A 2P NEMA Circuit Breaker ea. 2.940 1
35A-40A 2P NEMA Circuit Breaker ea. 3.125 1
45A-50A 2P NEMA Circuit Breaker ea. 3.380 1
60A 2P NEMA Circuit Breaker ea. 3.570 1
70A 2P NEMA Circuit Breaker ea. 3.840 1
80A-90A 2P NEMA Circuit Breaker ea. 4.170 1
100A 2P NEMA Circuit Breaker ea. 4.340 1
20A-30A 3P NEMA Circuit Breaker ea. 2.850 1
40A 3P NEMA Circuit Breaker ea. 2.940 1
50A 3P NEMA Circuit Breaker ea. 3.125 1
60A 3P NEMA Circuit Breaker ea. 3.380 1
70A 3P NEMA Circuit Breaker ea. 3.570 1
80A-90A 3P NEMA Circuit Breaker ea. 4.170 1
100A 3P NEMA Circuit Breaker ea. 4.800 1
150A-250A 3P NEMA Circuit Breaker ea. 5.500 1
400A 3P NEMA Circuit Breaker ea. 6.000 1
600A 3P NEMA Circuit Breaker ea. 6.800 1

Trenching, Common Soil, Mech'l cu.m. 0.100 1


Trenching, Sand & Gravel, Mech'l cu.m. 0.120 1
Structural Fill, Compacted cu.m. 2.840 1
Struct'l Fill, Compacted, Manual Tamping cu.m. 2.000 5
Structural Fill, Uncompacted cu.m. 1.000 1
Structural Fill, Compacted, Mech'l cu.m. 0.010 1

Structural Fill, Uncompacted, Mech'l cu.m. 0.010 1


MANPOWER EQUIPMENT PROD RATE

Carp 1 Bagger Mixer 1.504


Laborer
Mason
Mason 1 Conc. Vibrator 3.448
Laborer
Stlmen 1 Bar Cutter 200.000
Helper
Carp 3.125
Laborer
Laborer 10.000
Mason 3.704

Mason 15.385
Mason 20.000
Mason 15.385
Stlmen 71.429
Laborer
Stlmen 200.000
Laborer
Stlmen 166.667
Laborer

Laborer 1 Asphalt Distributor 66.667


1 Power Broom
Laborer 1 Dozer/Grader 100.000
Laborer 1 Grader Roller 50.000

Carp 3.125
Laborer
Carp 2.398
Laborer
Carp 3.125
Laborer
Carp 2.398
Laborer
Carp 2.398
Laborer
Carp 2.398
Laborer
Carp 2.398
Laborer
Carp 5.000
Laborer
Carp 2.398
Laborer
Carp 1.250
Laborer
Carp 1.667
Laborer
Carp 2.398
Laborer
Carp 2.398
Laborer
Carp 16.667
Laborer

Stlmen Bar Cutter 200.000


Helper
Stlmen Bar Cutter 200.000
Helper
Stlmen Bar Cutter 200.000
Helper

Welder Welding Machine 100.000


Stlmen 166.667
Helper
Stlmen 71.429
Helper

Mason Conc. Vibrator 2.381


Laborer
Opetr
Mason Conc. Vibrator 2.174
Laborer
Opetr
Mason Conc. Vibrator 2.000
Laborer
Opetr
Mason Conc. Vibrator 1.818
Laborer
Opetr

Mason Conc. Vibrator 2.376


Laborer
Opetr
Mason Conc. Vibrator 2.162
Laborer
Opetr
Mason Conc. Vibrator 1.983
Laborer
Opetr
Mason Conc. Vibrator 1.677
Laborer
Opetr
Mason Conc. Vibrator 1.287
Laborer
Opetr

Mason 1 Conc. Vibrator 3.448


Laborer
Mason 1 Conc. Vibrator 3.043
Laborer
Mason 1 Conc. Vibrator 2.500
Laborer
Mason 1 Conc. Vibrator 2.500
Laborer
Mason 1 Conc. Vibrator 10.000
Laborer
Mason 1 Conc. Vibrator 5.000
Laborer

Electrician 30.303
Electrician 22.222
Electrician 24.390
Electrician 14.493
Electrician 16.129
Electrician 9.009
Electrician 10.101
Electrician 5.780
Electrician 4.878
Electrician 4.386
Electrician 3.953
Electrician 3.559
Electrician 3.195
Electrician 2.882
Electrician 2.591
Electrician 2.331
Electrician 2.101
Electrician 1.890
Electrician 1.724
Electrician 1.531
Electrician 1.377
Electrician 1.239
Electrician 1.115
Electrician 1.004

Electrician 2.439
Electrician 2.000
Electrician 1.852
Electrician 1.695
Electrician 1.389
Electrician 1.075
Electrician 0.763
Electrician 0.671
Electrician 0.610
Electrician 0.549
Electrician 0.488
Electrician 8.333
Electrician 7.143
Electrician 6.250
Electrician 5.263
Electrician 4.348
Electrician 3.704
Electrician 3.226
Electrician 2.778
Electrician 2.500
Electrician 2.326
Electrician 2.000
Electrician 1.786
Electrician 1.500
Electrician 2.778
Electrician 2.439
Electrician 2.000
Electrician 1.852
Electrician 1.695
Electrician 1.389
Electrician 1.075
Electrician 0.763
Electrician 0.610

Electrician 0.109
Electrician 0.104
Electrician 0.099
Electrician 0.094
Electrician 0.084
Electrician 0.080
Electrician 0.075
Electrician 0.068
Electrician 0.060
Electrician 0.056
Electrician 0.054
Electrician 0.054
Electrician 0.054
Electrician 0.053
Electrician 0.053
Electrician 0.040
Electrician 0.036
Electrician 0.033
Electrician 0.025
Electrician 0.020
Electrician 0.018
Electrician 0.015
Electrician 0.010
Electrician 0.008
Electrician 0.005

Electrician 1 Crane 0.044


Electrician 1 Crane 0.028
Electrician 1 Crane 0.024
Electrician 1 Crane 0.019
Electrician 1 Crane 0.014
Electrician 0.640
Electrician 0.320
Electrician 0.131
Electrician 0.070
Electrician 0.056

Electrician 0.230
Electrician 0.200
Electrician 0.180
Electrician 0.160
Electrician 0.120
Electrician 0.110
Electrician 0.080
Electrician 0.120
Electrician 0.100
Electrician 0.080
Electrician 0.070
Electrician 0.065
Electrician 1 Crane 0.078
Electrician 1 Crane 0.072
Electrician 1 Crane 0.069
Electrician 1 Crane 0.052
Electrician 1 Crane 0.045
Electrician 1 Crane 0.036
Electrician 1 Crane 0.028
Electrician 1 Crane 0.020
Electrician 1 Crane 0.018
Electrician 1 Crane 0.016
Electrician 1 Crane 0.014
Electrician 1 Crane 0.012
Electrician 1 Crane 0.010

Electrician 0.400
Electrician 0.369
Electrician 0.350
Electrician 0.200
Electrician 0.340
Electrician 0.320
Electrician 0.296
Electrician 0.280
Electrician 0.260
Electrician 0.240
Electrician 0.230
Electrician 0.351
Electrician 0.340
Electrician 0.320
Electrician 0.296
Electrician 0.280
Electrician 0.240
Electrician 0.208
Electrician 0.182
Electrician 0.167
Electrician 0.147

Laborer 1 Backhoe 10.000


Laborer 1 Backhoe 8.333
Laborer 1 Plate Compactor 0.352
Laborer 2.500
Laborer 1.000
Laborer 1 Compactor 100.000
1 Grader
1 H2O Truck
Laborer 1 Dozer 180 Hp 100.000
Man-Hours
Work Element Unit
Per Unit
Labor Installing Conduit in Buildings
Rigid galvanized conduit
1/2" 100 L.F. 6.9
3/4" 100 L.F. 9.3
1" 100 L.F. 11.5
1 1/4" 100 L.F. 16.2
1 1/2" 100 L.F. 18.5
2" 100 L.F. 22.0
2 1/2" 100 L.F. 29.0
3" 100 L.F. 30.0
3 1/2" 100 L.F. 40.0
4" 100 L.F. 50.0
5" 100 L.F. 95.0
6" 100 L.F. 122.0
Aluminum conduit
1/2" 100 L.F. 6.8
3/4" 100 L.F. 8.1
1" 100 L.F. 9.3
1 1/4" 100 L.F. 11.5
1 1/2" 100 L.F. 13.8
2" 100 L.F. 16.0
2 1/2" 100 L.F. 18.5
3" 100 L.F. 25.0
3 1/2" 100 L.F. 28.0
4" 100 L.F. 35.0
5" 100 L.F. 58.0
6" 100 L.F. 80.0
Electric metallic tubing
1/2" 100 L.F. 6.8
3/4" 100 L.F. 8.1
1" 100 L.F. 9.3
1 1/4" 100 L.F. 11.6
1 1/2" 100 L.F. 13.8
2" 100 L.F. 16.0
2 1/2" 100 L.F. 18.0
3" 100 L.F. 21.0
4" 100 L.F. 31.0
Labor for handling, securing, cleanup and repairs as needed
for conduit installed under an exposed ceiling up to 15' high
and icluding installation of hangars at 8 foot intervals, fittings,
and supports. Conduit over 1" assumes installation of 3
elbows and 3 couplings each 100 feet, Aluminum conduit
over 2" assumes
Suggested Crew:rigid steel fittings.
1 electrician and 1 helper
Labor Installing Busway
Copper conductance busway in
steel case
225 AMP 10 L.F. 4.7 75 352.50
400 AMP 10 L.F. 5.7 75 427.50
600 AMP 10 L.F. 6.8 75 510.00
800 AMP 10 L.F. 8.1 75 607.50
1000 AMP 10 L.F. 9.0 75 675.00
1350 AMP 10 L.F. 11.5 75 862.50
1600 AMP 10 L.F. 16.9 75 1,267.50
2000 AMP 10 L.F. 24.0 75 1,800.00
2500 AMP 10 L.F. 28.0 75 2,100.00
3000 AMP 10 L.F. 34.0 75 2,550.00
4000 AMP 10 L.F. 46.0 75 3,450.00
5000 AMP 10 L.F. 58.0 75 4,350.00
Deduct for aluminum bus % 15.0
Cable tap boxes
225 AMP Each 6.5 75 487.50
400 AMP Each 9.1 75 682.50
600 AMP Each 13.2 75 990.00
800 AMP Each 21.0 75 1,575.00
1000 AMP Each 25.0 75 1,875.00
1350 AMP Each 30.0 75 2,250.00
1600 AMP Each 32.0 75 2,400.00
2000 AMP Each 36.0 75 2,700.00
2500 AMP Each 41.0 75 3,075.00
3000 AMP Each 44.0 75 3,300.00
4000 AMP Each 48.0 75 3,600.00
5000 AMP Each 53.0 75 3,975.00
Add for 4 wire boxes % 10.0
Bus duct plug-in circuit breakers
60 Each 2.9 75 217.50
100 Each 3.6 75 270.00
225 Each 4.6 75 345.00
400 Each 6.8 75 510.00
600 Each 9.7 75 727.50
800 Each 15.0 75 1,125.00
Busway labor includes handling materials into place, surface
installation of 3 or 4 wire busway including supports and
fittings to 15' height, cleanup and repairs as needed.

Suggested Crew: 1 electrician and 1 helper


Labor Installing Grounding Systems
Grounding rods, 10' long
1/2" Each 1.1 75 82.50
3/8" Each 1.2 75 90.00
3/4" Each 1.3 75 97.50
Grounding rod clamps 75 -
1/2", 2 strand Each 0.4 75 30.00
3/8", 1 strand Each 0.4 75 30.00
3/4", 2 strand Each 0.4 75 30.00
Cold water main clamps 75 -
2" Each 0.6 75 45.00
3" Each 0.9 75 67.50
4" Each 1.2 75 90.00
5" Each 1.6 75 120.00
6" Each 1.8 75 135.00
Copper ground bar, 1/4" 75 -
2" wide 10 L.F. 1.0 75 75.00
3" wide 10 L.F. 1.6 75 120.00
4" wide 10 L.F. 2.1 75 157.50
Thermoweld coupling Each 1.0 75 75.00
Labor includes handling and placing materials, connection,
cleanup and repairs as needed.
Suggested Crew: 1 electrician
Man-Hours
Work Element Unit
Per Unit
Labor Installing Industrial Fixtures
Suspended striplights
1 or 2 tube, 40 watt Each 0.5 75 37.50
2 75 watt tubes Each 0.7 75 52.50
3 75 watt tubes Each 0.8 75 60.00
4 75 watt tubes Each 1.0 75 75.00
Labor includes handling, hanging and connecting fixture,
cleanup and repairs as needed.
Suggested Crew: 1 electrician and 1 helper
Labor Installing Flourescent Fixtures
Recess mounted in grid ceiling
1' x 2', 2 20 watt tubes Each 1.0 75 75.00
1' x 4', 2 40 watt tubes Each 1.0 75 75.00
2' x 4', 4 40 watt tubes Each 2.6 75 195.00
3' x 3', 4 30 watt tubes Each 3.3 75 247.50
3' x 3', 6 30 watt tubes Each 3.0 75 225.00
4' x 4', 6 40 watt tubes Each 6.7 75 502.50
4' x 4', 8 40 watt tubes Each 8.0 75 600.00

Surface mounted on grid or ceiling


1' x 4', 2 40 watt tubes Each 1.6 75 120.00
1' x 8', 4 40 watt tubes Each 3.1 75 232.50
16" x 4', 4 40 watt tubes Each 1.6 75 120.00
16" x 8', 4 40 watt tubes Each 2.1 75 157.50
2' x 4', 4 40 watt tubes Each 1.7 75 127.50
2' x 2', 4 20 watt tubes Each 3.5 75 262.50
4' x 4', 6 20 watt tubes Each 3.5 75 262.50
Add for installation in a concealed
grid ceiling
% 15.0
Pendant mounted commercial
fixtures
1' x 4', 2 40 watt tubes Each 1.6 75 120.00
16" x 4', 4 40 watt tubes Each 2.0 75 150.00
Air handling with boot for grid
mounting
1' x 4', 2 40 watt tubes Each 1.0 75 75.00
2' x 2', 4 40 watt tubes Each 1.0 75 75.00
2' x 4', 4 20 watt tubes Each 1.5 75 112.50
3' x 3', 6 30 watt tubes Each 3.2 75 240.00
4' x 4', 8 40 watt tubes Each 4.3 75 322.50
Explosion proof fixtures
1' x 4', 2 40 watt tubes Each 4.2 75 315.00
1' x 4', 2 100 watt tubes Each 6.5 75 487.50
Dust and vapor proof fixtures
1' x 4', 2 40 watt tubes Each 2.0 75 150.00
1' x 8', 4 40 watt tubes Each 3.0 75 225.00
Labor includes handling fixture into position, installing and
connecting in a prepared location, cleanup and repairs as
needed. Tube installation not included.

Suggested Crew: 1 electrician and 1 helper


Labor Installing Incandescent Fixtures
Ceiling mounted fixtures
Recessed Each 1.0 75 75.00
Surface mounted Each 0.7 75 52.50
Pendant mounted Each 1.0 75 75.00
Wall mounted fixture Each 0.7 75 52.50
Specialty fixtutres
Vapor tight Each 2.0 75 150.00
Explosion proof Each 3.1 75 232.50
Mercury vapor ceiling fixtures
250 watt single lamp Each 3.2 75 240.00
400 watt single lamp Each 3.2 75 240.00
400 watt twin lamp Each 4.2 75 315.00
1000 watt single unit Each 4.2 75 315.00
Mercury vapor wall fixtures
175 watt Each 2.0 75 150.00
Exit lights
Ceiling mounted Each 1.0 75 75.00
End mounted Each 1.0 75 75.00
Pendant mounted Each 1.6 75 120.00
75
Emergency 2 lamp battery fixture Each 4.3 322.50
Labor includes handling, hanging and connecting fixture,
cleanup and repairs as needed.
Suggested Crew: 1 electrician and 1 helper
EQUIPMENT CAPABILITES
Type of equipment Average Capabilities
1.Bulldozer (D8) a.) Clearing 500 sq.m./hr.b.) Stripping 200 sq.m./hr c.) Excavation1.) Common Soil 45 cu.m/hr.2.)

108 Aggregates 40 cu.m./hr.Boulders 15 cu.m./hr.200 Needs Screeninge.) Pushing 3 cu.m./hr.2. R

(6 passes – 20 cm. lift)b.) Vibratory Rolling 72 cu.m./hr.(6 passes – 60 cm. lift)9.) 6 – T Dump Truc
ommon Soil 45 cu.m/hr.2.) Slightly hard Materials 25 cu.m./hr.d.) Quarrying107 Common Materials 50 cu.m./hr.

ge.) Pushing 3 cu.m./hr.2. Road Grader a.) Sub grading 300 cu.m./hr.b.) Spreading 50 cu.m./hr.3. Payloader Loading 30 cu.m./hr.4. Crane S

m. lift)9.) 6 – T Dump Truck a.) Hauling Common Borrow 3.5 cu.m./hr.Base Courseb.) Hauling Selected Borrow 5.0 cu.m./hr.c.) Hauling Con
Loading 30 cu.m./hr.4. Crane Shovel Loading 35 cu.m./hr.5. Sheep Foot Roller a.) Static Rolling 15 cu.m./hr.(12 passes – 15 cm. lift)b.) Vibra

ow 5.0 cu.m./hr.c.) Hauling Concrete Batch 2 Batch/trip‘Class A’10. 2 ½ T – Dump Truck a.) Hauling Common Borrow 2.5 cu.m./tripBase Cou
12 passes – 15 cm. lift)b.) Vibratory Rolling 135 cu.m./hr.(6 passes – 20 cm. lift)6. 3 – Wheel Road Roller a.) Static Rolling 24 cu.m./hr.(6 pas

Borrow 2.5 cu.m./tripBase Courseb.) Hauling Selected Borrow 4.0 cu.m./tripBase Concrete Batch 1.0 Batch/trip‘ Class A ‘11. Buggy a.) Hau
tatic Rolling 24 cu.m./hr.(6 passes – 20 cm. lift)7. Tractor Drawn Roller a.) Vibratory Rolling 24 cu.m./hr.(6 passes – 20 cm. lift)8. Tandem R

trip‘ Class A ‘11. Buggy a.) Hauling Concrete Mix 0.17 cu.m./trip
asses – 20 cm. lift)8. Tandem Roller a.) Static Rolling 24 cu.m./hr.