Engine Management Slow Speed Engine
Engine Management Slow Speed Engine
Page 1/14
Wrong answer summary
What would be a typical set point for emergency shut down of a large slow speed diesel
engine due to "lubricating oil inlet to camshaft" low pressure?
Selected answer (score 0):
Don't know
Correct answer:
1.5 bar
Page 2/14
Wrong answer summary
Page 3/14
Wrong answer summary
Correct answer:
Turbulent fluid flow generally increases heat transfer efficiency.
Page 4/14
Wrong answer summary
Correct answer:
15 ppm
Page 5/14
Wrong answer summary
Correct answer:
The International Convention on Standards of Training, Certification and Watchkeeping of
Seafarers
Page 6/14
Wrong answer summary
Page 7/14
Wrong answer summary
Page 8/14
Wrong answer summary
Correct answer:
To avoid the introduction of non-indigenous species of marine life from one area to
another.
Page 9/14
Wrong answer summary
A water heating system with automatic temperature control uses steam as the heating
medium and the temperature is controlled by a pneumatically operated valve? What
would be an acceptable start up procedure of the system from cold state?
Selected answer (score 0):
Don't know
Correct answer:
Start the system up in manual mode and gradually increase the controller output signal
until the temperature reaches the required value before changing over to automatic
control.
Page 10/14
Wrong answer summary
A plate type heat exchanger in a central cooling system has seawater leaking around the
edges of some of the titanium plates. After inspection and reassembly following the
manufacturer's instructions the problem still exists. What action, from the options given,
should be taken to rectify the problem?
Selected answer (score 0):
Don't know
Correct answer:
Fit new gaskets to the each of the plates.
Page 11/14
Wrong answer summary
Page 12/14
Wrong answer summary
Page 13/14
Wrong answer summary
Onboard training should be organised in such a way that:
Selected answer (score 0):
Don't know
Correct answer:
It is an integral part of the overall training plan