02-Pre-Concreting Inspection Request

This document contains: 1) A pre-concreting inspection request form for a construction project, listing items like rebar, joints, and embeds to inspect before pouring concrete. 2) A report form to document the final inspection of all works by the contractor and personnel from the organization, with sections to comment on civil, architectural, plumbing, electrical, and other elements. 3) Signatures from the contractor's project supervisor, quality control team, and vice president of construction operations to recommend acceptance once all works pass final inspection.

Uploaded by

Anthony Serrano
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
102 views

02-Pre-Concreting Inspection Request

This document contains: 1) A pre-concreting inspection request form for a construction project, listing items like rebar, joints, and embeds to inspect before pouring concrete. 2) A report form to document the final inspection of all works by the contractor and personnel from the organization, with sections to comment on civil, architectural, plumbing, electrical, and other elements. 3) Signatures from the contractor's project supervisor, quality control team, and vice president of construction operations to recommend acceptance once all works pass final inspection.

Uploaded by

Anthony Serrano
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

F - ABCD - 43FLBLDG - 02

ABC Construction Corporation


Project :
TYPE YOUR PROJECT NAME

Date Prepared PCIR No.


PRE-CONCRETING
INSPECTION REQUEST Date of Pouring

REQUESTED BY : Name/ Designation :

Contractor : Signature :

PRE REQUISITE INSPECTIONS: Inspected and Approved INSPECTED BY


Rebar Name of Inspector

Certified by Date Inspected


AREA (Pls. enclose key plan) GRIDLINE/LOCATION LEVEL STRUCTURE

INSPECTION CERTIFIED &


PREPARED BY CHECKED BY INSPECTED BY
APPROVED BY
CHECK ITEMS
CONTRACTOR PROJECT SUPERVISOR QC VP-CONSTRUCTION OPERATIONS

1.0 Shape & Dimension, Line


and Grade.
2.0 Chamfer Strips
3.0 Mortar Tightness
4.0 Construction/Control /
Expansion Joints.
5.0 Block-outs / Embedments
6.0 Joint Filler / Waterstops
7.0 Shoring / Supports
8.0 Embeds for Electrical
9.0 Embeds for Mechanical
10.0 Embeds for Plumbing
11.0 Embeds for Fire-Protection
12.0 Embeds for windows
13.0 Others
REMARKS :

CHECKED BY : RECOMMENDING APPROVAL :

PROJECT SUPERVISOR QC

APPROVED BY : NOTED BY:

VP-CONSTRUCTION OPERATIONS

NOTE : This form must be submited to The QC TEAM, duly accomplished including the work inspection report for the
pre-concreting and signed by the corresponding Contractor's Personnel-in-Charge at least 24 hours before
actual pouring.

Rev. 0 August 27, 2019


F - ABCD - 43FLBLDG - 02
ABC Construction Corporation
Project :
TYPE YOUR PROJECT NAME

Date of Contractor's Notice of Completion of the Works:

INSPECTION OF THE WORKS REPORT Area to be Inspection:

CONTRACTOR: Date of Inspection:

Attendees:
Name of Representatives Name of Organization

As a result of the final inspection of the works conducted by the above personnel, it was agreed that the contractor had
completed all works in accordance with the terms and conditions of the contract.

A. CIVIL / STRUCTURAL:

B. ARCHITECTURAL:

C. PLUMBING / SANITARY:

D. ELECTRICAL:

E. FIRE PROTECTION:

F. MECHANICAL:

G. FDAS:

FOR CONTRACTOR: FOR QC:

RECOMMENDED FOR ACCEPTANCE: ACCEPTED BY:

PROJECT SUPERVISOR VP-CONSTRUCTION OPERATIONS

Rev. 0 August 27, 2019