Enrick Gazebo Site Development
Enrick Gazebo Site Development
15
1.8000
T OR
LLEC
E CO
BAG
GAR ETAIL
D
SEE
ETE
NCR
T CO RBS
CAS U
PRE S OR C
B
CUR
NPT.= + 0.15 ES
RILL
AL G
MET ETAIL
D
SEE
NPT.= + 0.65
Cº.
Col. 5
.1
R= 0 Cº.
Col. 5
.1 Cº.
R= 0 Col. 5
.2
TOR R= 0
LEC AIL
COL T
AGE SEE DE ction ver NPT.= + 0.65 ET E
ARB proje Co NCR
G Axis Access T CO RBS
1.9623
CAS U
Cº. Main RILL
ES PRE S OR C
Col. 5 B
AL G CUR
.1 MET ETAIL
R= 0 D
SEE
NT
UME
MON ETAIL
D
SEE
0.79
TOR
LLEC
E CO
Cº. BAG
Col. 5 0.79 GAR DETAIL
R= 0
.1
NPT.= + 1.15 SEE
0.79
Pe
NPT.= + 1.15
.
Pend n d.
0.79
NPT.= + 0.65
S
BAR
.
nd
IC
ALL
Pe
.
MET
Pend
ETE
NCR S
T CO CURB
CAS R NPT.= + 1.15
PRE URBS O
C
.
Pend
0.79
R
CTO
.
LLE
nd
IL S NPT.= + 1.65
E CO E DETA BAR LLIC
Pe
BAG SE A
GAR MET
Pe
NPT.= + 1.15 nd
. Cº.
Col. 5
0.79 .2
R= 0
0.79
0.79
ES
RILL IL
AL G A
MET EE DET
S
Cº. TOR
Col. 5 LLEC
.1 E CO
R= 0 BAG
GAR ETAIL
D
TION SEE
JEC COVER
NPT.= + 1.65 PRO S
AXIS ACCES
MAIN
Cº.
Col. 5
.1
R= 0
NPT.= + 1.65
AL NPT.= + 2.15
MET ES
L
GRIL ETAIL
D
NPT.= + 3.25 SEE
NPT.= + 3.25
NPT.= + 2.15
OR
ECT IL
OLL A
GE C EE DET
GARBA S
AL
MET S
LE ETE
GRIL AIL NCR
DET T CO RBS
SEE CAS U
PRE S OR C
B
CUR