0% found this document useful (0 votes)
63 views

Manpower Saifudden PO

This document is a purchase order from Finishing Services Contracting Co. Ltd. to VISSION AL ARAB CONTRACTION CO. for manpower for the Riyadh Metro Project 3K1 Station. It requests 1 helper at a rate of 14 Saudi Riyals per hour and 1 gypsum board fixer at a rate of 18 Saudi Riyals per hour. It outlines terms including normal 10 hour work days, overtime rates being the same as normal rates, the supplier providing food, accommodation, and transportation, and payment within 20 days of invoice submission.

Uploaded by

Shaheen sadekeen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views

Manpower Saifudden PO

This document is a purchase order from Finishing Services Contracting Co. Ltd. to VISSION AL ARAB CONTRACTION CO. for manpower for the Riyadh Metro Project 3K1 Station. It requests 1 helper at a rate of 14 Saudi Riyals per hour and 1 gypsum board fixer at a rate of 18 Saudi Riyals per hour. It outlines terms including normal 10 hour work days, overtime rates being the same as normal rates, the supplier providing food, accommodation, and transportation, and payment within 20 days of invoice submission.

Uploaded by

Shaheen sadekeen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

‫شـركـة خدمـات التــشــطيـب للمـقـاوالت المـحدودة‬

Finishing Services Contracting Co. Ltd.

PURCHASE ORDER

P.O Number : PO//023//39


Supplier : VISSION AL ARAB CONTRACTION CO. Date :14/06/2023
Contact : SAIFUL ISLAM email : [email protected]
Mobile : 057 807 5516 Fax :

Project : Riyadh Metro Project 3K1 Station MOBILE : 0553929935


Requested By : MR. Ayman Bou Reslan TEL: 011-476519
MSR # : FAX: 0114780770

Serial # Manpower Categories Person Rate/Hr. Amount Sr.


1 Helper 1.00 14.00 14.00
1 Gypsum Board Fixer 1.00 18.00 18.00
NOTE:- Essential Terms and Conditions:

- Normal working hours shall be 10hrs per day. 6 Days a week.


- Any excess hour including Fridays shall be considered as overtime and
it will be paid of normal rates.
- Same above rate is Applicable for Overtime Also.
- Emergency Medical (First Aid): Scope Of First Party
- Second Party will provide food, accomodation and transportation
(VISSION AL ARAB CONTRACTION CO.)
- Payment shall be paid within 20 days from the submitting of "VISSION
AL ARAB CONTRACTION CO." invoice.

Prepared By Requested By Approved By


Name: Aiman Bou Reslan Name : Mr.Simon Alnajjar Name : Mr.Fayssa A.Ibrahim
Sing: Sing: Sing: