Srirampura

The document provides details of 7 proposed line clear requests from BESCOM in the month of November 2023. It includes information such as the dates and times of the proposed line clear, the affected feeders and areas, reasons for the requests, and the duration and load affected. The requests are for maintenance work such as road widening, jungle clearing, and water supply works in various areas served by different substations across BESCOM circles like Davanagere, Chitradurga, and Nelamangala.

Uploaded by

augustinejoel92
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views2 pages

Srirampura

The document provides details of 7 proposed line clear requests from BESCOM in the month of November 2023. It includes information such as the dates and times of the proposed line clear, the affected feeders and areas, reasons for the requests, and the duration and load affected. The requests are for maintenance work such as road widening, jungle clearing, and water supply works in various areas served by different substations across BESCOM circles like Davanagere, Chitradurga, and Nelamangala.

Uploaded by

augustinejoel92
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

BESCOM for Line Clear proposal for the month of November -2023

Name of the Name of the Duration of LC request


Date on which last LC was Load Affected
Sl No BESCOM BESCOM Sub Division O&M Name of the station/Line Feeder Date Time Reason for availing LC Areas Affected
NF-1 Smart approved (MW)
Circle Division From To From To Duration
Value
Gollahalli(GP). Gopalapura(GP),
NF-17 Ramco
Mylanahalli, Vajrakattepalya, Islmpura,
Biotech
Kannegowdanahalli, Hyadalu, Josco,
220/ 66/11 KV NF-28 State Hiway-74 Road widening
1 BRC Nelamangala Nelamangala O&M-2 15.11.2023 15.11.2023 11:00 18:00 7:00 K.G Srinivasapura,Bolamaranahalli,
Nelamangala MUSSs Gopalapura Works
Thotagere, Kukkanahalli,
NF-20
Arjunabettahalli, Guttepalya,
Gopalapura
KSSIDC,Machonayakanahalli
NF-27 Postal
Telecom
Davanagere 66/11 kV F05- Jalasiri 24*7 Water Supply Mouneshwara Badavane, Jayanagara &
2 Davanagere DAVANAGERE CSD-1 Unit-1 11/15/2023 11/15/2023 10:00 16:00 6:00 25.10.2023 1.2 MW
Substation Mouneshwara Work its surrounding Areas.

F3 F4 F9 F10 S.Neralkere G.P, Kainodyu G.P,


3 Davanagere Chitradurga Srirampura Kanchipura Garga 66/11KV 11/15/2023 11/15/2023 10:00 15:00 5:00 Maintainance & Jungle cutting 25.10.2023 0.12
F2 Srirampura G.P

Kanchipura /
4 Davanagere Chitradurga Srirampura Mathod 66/11KV F5 F7 F8 11/15/2023 11/15/2023 11:00 15:00 4:00 Maintainance & Jungle cutting 25.10.2023 Mathod G.P , KAREHALLI G.P 0.144
Mathod

F10
Adavigollarahal
15-11-2023 to 17-11- 15-11-2023 to 17-11-
5 Davanagere Chitradurga RSD CTA Sirigere Sirigere li, F7 10:00 16:00 6:00 Jungle clearance 25.10.2023 Basavanashivakere, hirekabbigere 2.1
2023 2023
Shivanakere, F6
Vijapura

F12 Hosahalli,
15-11-2023 to 17-11- 15-11-2023 to 17-11-
6 Davanagere Chitradurga RSD CTA Hireguntanuru Hireguntanuru F4 10:00 16:00 6:00 Jungle clearance 25.10.2023 Hireguntanuru 2.1
2023 2023
Hireguntanuru

LINK LINE FROM


CHITRADURG HOLALKER MALLADIH F7- 10-11-2023 TO 18-11- 10-11-2023 TO 18-11- GUNDIMADU, AGRAHARA,
7 Davanagere MALLADIHALLI 10:00 16:00 6:00 MALLADIHALLI MUSS TO 25.10.2023 3 MW
A E ALLI HULEMALALI 2023 2023 KUNAGALI
AGRAHARA

LINK LINE FROM


CHITRADURG HOLALKER MALLADIH F8- 12-11-2023 TO 18-11- 12-11-2023 TO 18-11- BASAPURA, MALLADIHALLI,R
8 Davanagere MALLADIHALLI 10:00 16:00 6:00 MALLADIHALLI MUSS TO 25.10.2023 2.8 MW
A E ALLI AGRAHARA 2023 2023 NULENUR
BASAPURA

CHITRADURG HOLALKER HOLALKER F2- 15-11-2023 TO 22-11- 15-11-2023 TO 22-11- LINK LINE FROM N G HALLI
9 Davanagere N G HALLI 10:00 16:00 6:00 25.10.2023 GIWDIHALLI, GOLLARAHALLI 3 MW
A E E GOWDIHALLI 2023 2023 MUSS TO GOWDIHALLI

CHITRADURG HOLALKER SHIVAGANG 12-11-2023 TO 18-11- 12-11-2023 TO 18-11- TALYA TO TALYA,VENKATESHAPURA,HULIK


10 Davanagere H D PURA F5-TALYA 10:00 16:00 6:00 25.10.2023 2.7 MW
A E A 2023 2023 VENKATESHAPURA ERE

CHITRADURG HOLALKER SHIVAGANG 15-11-2023 TO 25-11- 15-11-2023 TO 25-11- CHITRALLI MUSS TO B G HALLI, THODRANAL, T
11 Davanagere CHITRALLI F3-B G HALLI 10:00 16:00 6:00 25.10.2023 3.0 MW
A E A 2023 2023 GALIMARAMMA TEMPLE NULENUR
F-02
Govindarajapur Evacuation of New link line
a IP,F,10 from Hebbur MUSS to
Sirivara NJY,F- Kembalalu and
Sirivara, Govindarajapura,
17 Rayapura Thimmegowdanapalya to
08-11-2023 to 20-11- 08-11-2023 to 20-11- ramegowdanapalya,Thimmegowdanapaly
12 Tumkur Tumkur RSD-2 Hebbur Hebbur 66/11kv IP,F11-R M 10:00 17:00 7:00 Bommanahalli palya and 26.11.2023
2023 2023 a, Rayapura, Bommanahalli, R.M Halli,
halli,F07- Sirivara petrol bunk to
D.S Palya,, Lingapura
Nagavalli Kollapuradamma temple limits
IP,F12- for load bifurcation due to over
Bommanahalli load.
IP,F16-Hebbur
Wheather
alteranate
Power Supply Remarks
Arranged or
not

Partially
arranged

Partially
arranged

NO

NO

NO

NO

NO