Srirampura
Srirampura
Kanchipura /
4 Davanagere Chitradurga Srirampura Mathod 66/11KV F5 F7 F8 11/15/2023 11/15/2023 11:00 15:00 4:00 Maintainance & Jungle cutting 25.10.2023 Mathod G.P , KAREHALLI G.P 0.144
Mathod
F10
Adavigollarahal
15-11-2023 to 17-11- 15-11-2023 to 17-11-
5 Davanagere Chitradurga RSD CTA Sirigere Sirigere li, F7 10:00 16:00 6:00 Jungle clearance 25.10.2023 Basavanashivakere, hirekabbigere 2.1
2023 2023
Shivanakere, F6
Vijapura
F12 Hosahalli,
15-11-2023 to 17-11- 15-11-2023 to 17-11-
6 Davanagere Chitradurga RSD CTA Hireguntanuru Hireguntanuru F4 10:00 16:00 6:00 Jungle clearance 25.10.2023 Hireguntanuru 2.1
2023 2023
Hireguntanuru
CHITRADURG HOLALKER HOLALKER F2- 15-11-2023 TO 22-11- 15-11-2023 TO 22-11- LINK LINE FROM N G HALLI
9 Davanagere N G HALLI 10:00 16:00 6:00 25.10.2023 GIWDIHALLI, GOLLARAHALLI 3 MW
A E E GOWDIHALLI 2023 2023 MUSS TO GOWDIHALLI
CHITRADURG HOLALKER SHIVAGANG 15-11-2023 TO 25-11- 15-11-2023 TO 25-11- CHITRALLI MUSS TO B G HALLI, THODRANAL, T
11 Davanagere CHITRALLI F3-B G HALLI 10:00 16:00 6:00 25.10.2023 3.0 MW
A E A 2023 2023 GALIMARAMMA TEMPLE NULENUR
F-02
Govindarajapur Evacuation of New link line
a IP,F,10 from Hebbur MUSS to
Sirivara NJY,F- Kembalalu and
Sirivara, Govindarajapura,
17 Rayapura Thimmegowdanapalya to
08-11-2023 to 20-11- 08-11-2023 to 20-11- ramegowdanapalya,Thimmegowdanapaly
12 Tumkur Tumkur RSD-2 Hebbur Hebbur 66/11kv IP,F11-R M 10:00 17:00 7:00 Bommanahalli palya and 26.11.2023
2023 2023 a, Rayapura, Bommanahalli, R.M Halli,
halli,F07- Sirivara petrol bunk to
D.S Palya,, Lingapura
Nagavalli Kollapuradamma temple limits
IP,F12- for load bifurcation due to over
Bommanahalli load.
IP,F16-Hebbur
Wheather
alteranate
Power Supply Remarks
Arranged or
not
Partially
arranged
Partially
arranged
NO
NO
NO
NO
NO
NO
NO