The document is an inspection and test plan for the installation of static equipment at the Mina Abdullah Refinery in Kuwait. It was submitted by Petrofac, Samsung, and CB&I to Kuwait National Petroleum Company for review and approval. The document details the inspection and testing requirements and procedures to ensure the proper installation of static equipment.

Uploaded by

hussiena
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
98 views

Static Itp

The document is an inspection and test plan for the installation of static equipment at the Mina Abdullah Refinery in Kuwait. It was submitted by Petrofac, Samsung, and CB&I to Kuwait National Petroleum Company for review and approval. The document details the inspection and testing requirements and procedures to ensure the proper installation of static equipment.

Uploaded by

hussiena
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 29

4~

Kuwait National Petroleum Company (K.S.C)


Clean Fuels Project (CFP) SII.MSUNG
(., ·)ii...:i.,·""•li....Ob· 11J· '' ·11= '·
'"" .. ..- .. .. s-. #"' {t' KNPC Contract No. CFP/EPC/0054-MAB1 Petrofac ...'fillii..'ITHIIJI"
ENGINEERING
':'t.:*~""~::..,-·:.;:c:..=~ KNPC -.. PSCJ Job No. Jl-2025

RESPONSE SHEET
Sub-contractor I Vendor Document No: P6012MAB .000.1 0.03.439 Rev No.: 07 Status Code : 2

Company Transmittal No: SX4750


CCCM-PS CJ - CFP- MABl-T- 7463 Received Date: 05-03-2018
I
Document Title : ITP- Installation of Static Equipments

Serial No. CONTRACTOR Comments


COMPANY COMMENTS Sub-Contractor ResponseNendor Response Action Code CONTRACTOR Response
Add Item No.9 (Inspection ITR P6012MAB.000.10.03.002.QCF.130- I
01 . Attach the TML form for review & approval GX and change company intervention from R to SIW) A I

Serial No. COMPANY Comments Sub-Contractor Response I Vendor Response Action Code COMPANY Response
- - --- - - - - - - - - - - - -- - -

Action Code: A-Accepted , N-Not accepted

P6012MAB .000 .10.03 .QCF.013, Rev 01


,.

INSPECTION AND TEST PLAN

FOR

INSTALLATION OF STATIC EQUIPMENTS

MINA ABDULLAH REFINERY


A APPROVED WITHOUT COMMENT - WORK MAY PROCEED
APPROVED WITH MINOR COMMENTS– WORK MAY
B PROCEED -REVISE AND RESUBMIT
REVISE AND RESUBMIT – WORK MAY PROCEED SUBJECT
C TO INCORPORATION OF COMMENTS INDICATED
APPROVAL NOT REQUIRED. INFORMATION ONLY. WORK
D MAY PROCEED
F AS-BUILT / ACCEPTED AS FINAL 2 PSM SQC 11-04-2018
REJECTED - REVISE AND RESUBMIT. WORK NOT TO
R PROCEED.
V VOID (DOCUMENT HAS BEEN CANCELLED / DELETED)
Without prejudice to Contractor's right under the Sub-Contract,
Contractor's review of this document does not relieve Sub-
Contractor of the responsibility for correctness under the sub
contract. Permission to proceed does not constitute acceptance of
design, detail and calculations, test methods or material developed All formats latest revision and and legible copy to be

\~ 9
or selected by the Sub-Contractor and does not relieve the Sub-
Contractor from full compliance with its obligations under the Sub-
Contract.
attached.
Name/Signature Date
Krishna Ojha 31 April 2018
~
Thickness survey correct format shall be used.
~/
______________________________________ ______________
For Petrofac-Samsung-CB&I Joint Venture

08 25-Mar-2018 Issued for Approval ~R'- y/oH /AA


07 13-Feb-2018 Issued for Approval VR OH AA
06 12-Mar-2017 Issued for Approval VR OH AA •

05 31-July-2016 Issued for Approval VR DB AA :

04 23-June-2016 Issued for Approval VR OH AA I

03 30-Mar-2016 Issued for Approval VR VI AA


02 01-Nov-2015 Issued for Approval MZ DB AA
01 15-Nov-2015 Issued for Approval WA MZ MIJ
Rev. Date Description Originator Checked By Approved By

Kuwait National Petroleum Company (K.S.C.)


Clean Fuels Project (._ ·)~~IKNPC ~~
. ""
~"''·~'
.. .. .. J,;,JI;;,;
. •
I"'
Kuwait ,,.h...;;.....,.~.. ,no~
.. ~·
....r,r""f'•"•"
•• - , ~

~
SAMSUNG
Petrofac I Samsung I CB&I
PSCJ Job No. Jl-2025
Petrofac @ .-111~U 1 W" ENGINEERING

CONTRACT NO. CONTRACTOR JOB NO. DOCUMENT NO. REV

CFPIEPCI0054-MAB1 Jl-2025 P6012MAB.000.1 0.03.439 08


Kuwait National Petroleum Company (K.S.C)

!. c;l~.i,:loti.Jt,;,lioi'
/. . - ,. ~
::::::-..::-~ ~ KNPC ~
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. Jl-2025
Petrofac ~_ - SAMSUNG
EHGIH!!RING
A
Document Title: ITP FOR INSTALLATION OF STATIC EQUIPMENTS
Document No#: P6012MAB.000.10.03.439; Rev 08

REVISION DESCRIPTION SHEET

Rev. Para. Revision Description


- -· . - - - - - - .

08 All Issued for Approval

07 All Issued for Approval

06 All Issued for Approval

os All Issued for Approval

04 All Issued for Approval

03 All Issued for Approval

02 All Issued for Approval


-----· --·-----·
01 All Issued for Approval
-------·- --··-·-·---- ··-·------···-···----·--- - - -·--···------·· ·---··-·-

Hold No. Para. Description of Hold


Kuwait National Petroleum Company (K.S.C)

t.,;I~~Jt,;,li:i~
::.:-::=-~::::
KNPC
~l ~
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1 Petrofac ®- SAMSUNG
!HGIN!ERING
A
Document Title:
.
PSCJ Job No. Jl-2025

ITP FOR INSTALLATION OF STATIC EQUIPMENTS


Document No#: P6012MAB.000.10.03.439; Rev 08

1. Reference Documents

S.R Document Title Document No.


1. Project Quality Plan P6012MAB.000.10.03.375

2. QCP- Control of Inspection, Measuring and Test P6012MAB.000.10.03.412


Equipment
3. QCP- Preservation of of Material and Equipment P6012MAB.000.1 0.03.473

4. QCP- Installation of Static and Package Equipment P6012MAB.000.1 0.03.415

5. Grouting Of Equipment And Structure Bases DEP 34.19.19.11

6. QCP-Ciosed Loop RFI & Inspection Control P6012MAB.000.1 0.05.410

7. Preservation of New and Old Equipment Standing DEP 70.10.70.410


Idle
List of Verifying Documents:
1 Installation of Pressure Vessel P6012MAB.000.10.03.002.QCF.199-MA
2 Installation of Heat Exchanger P6012MAB.000.10.03.002.QCF.200-MA
3 Vertical Alignment for Static Equipment P6012MAB.000.10.03.002.QCF.203-MA
4 Horizontal Alignment of Static Equipment P6012MAB.000.10.03.002.QCF.204-MA
5 Filling of Catalyst/Filtering/Separation Medium P6012MAB.000.10.03 .002.QCF. 205-MA
6 Box-up of Static Equipment P6012MAB.000.10.03.002.QCF.206-MA
7 Installation of Davit Arm/Winch P6012MAB.000.10.03.002.QCF.207-MX
8 Installation of Column P6012MAB.000.10.03.002.QCF.208-MA
9 Mechanical Equipment Installation P6012MAB.000.10.03.002.QCF.046-MA
10 Installation of Filter/Strainer P6012MAB.000.10.03.002.QCF.202-MA
11 Installation of Prefabricated Tank P6012MAB.000.10.03.002.QCF.201-MA
12 Installation of Internals in Column P6012MAB.000.10.03.002.QCF.214-MA
13 Installation of Flare Stack & Flare Tip P6012MAB.000.10.03.002.QCF.213-MA
14 Checklist for Receiving Stationary Equipment at
P6012MAB.000.10.03 .002.QCF.114-GX
Site
15 Record of Dimensional Inspection P6012MAB.000.10.03.002.QCF.049-MA
16 Area Structural Completion Certificate P6012MAB.000.10.03.002.QCF.190-CA
17 Visual inspection checklist for installation of
FM-1146-050 Rev. 01
man ifold/frame/stanchion .
18 Concrete Work Survey Record P6012MAB.000.10.03.002.QCF.165-CX
. 19 Thickness Survey of Existing Pipeline Before
P6012MAB.000.10.03.002.QCF.130-GX
Executing Tie In.
Kuwait National Petroleum Company (K.S.C)

ld~i.:l.tJJt.:.li:l'
I • • - ~

::::.-..=::.::::c KNPC
~
'7fi:!'
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. Jl-2025
Petrofac ~. - SAIASUNG
!IIGIHEERING
A
Document Title: ITP FOR INSTALLATION OF STATIC EQUIPMENTS
Document No#: P6012MAB.000.10.03.439; Rev 08

2. Definitions & Abbreviations:

Symbol Abbreviation Definition


American Society for Testing and N/A
ASTM
Materials
BS British Standard N/A

ITP Inspection and Test Plan N/A

MAR Material Approval Request N/A

N/A Not Applicable N/A

BOM Bill Of Material N/A


Kuwait National Petroleum N/A
Company
Company
Petrofac-Samsung-CBI Joint N/A
Contractor
Venture
QCP Quality Control Procedure N/A
se Sub-Contractor N/A
VDR Vendor N/A
Prior notice, attendance and clearance by
H Hold concerned party before next activity. RFI is
required
A stage during construction activity where only
R Review
review of documents/records will be done.
Inspection during construction activity, but, work
s Surveillance may
Proceed.
Prior notice required, but, work may proceed
w Witness without waiting for acceptance of the concerned .
RFI is required
Approval is required prior to proceed of the next
A Approval
activity.
(M) Monitor In process inspection
(R) Review Check of documentation
Kuwait National Petroleum Company (K.S.C)
-)~~J~·
(.,.,- -
- • . .•
~::::.:::-.::.:!::.::::!
KNPC ._.:.
. ~
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1 Petrofac $ e1Mf1liH» SAMSUNG
ENGINEERING ~
PSCJ Job No. Jl-2025
Document Title: ITP FOR INSTALLATION OF STATIC EQUIPMENTS
Document No#: P6012MAB.000.10.03.439; Rev 08

Acceptance Responsible Inspection Point


Reference Verifying
SN Description of activity Action to be verified Criteria for Testing I Party/ Sub- Contract
Document Document Company
inspections Personnel Cont. or

• List of latest revision of


Drawings and • Review of applicable drawings/documents and ensure • Complies with AFC Site Document
1 applicable drawings Site Engineer R R R
Documents status that latest revision is available at site document register Register
• Vendor Documents

• Visual inspection to ensure no physical damages and all • Project Material


Material
Site equipment accessories are in accordance with project requirements Receiving report
• Comply with data P6012MAB.000.10.03 . Controller
2 Receiving Inspection • Verify Name Plate • Packing List
sheet and specification 002 .QCF.114-GX QC Inspector
H R w
• Document Review. • Vendor GA Drawing
Equipment
• Drawings and Document Status • Vendor manual
• Meets Vendor
• Vendor manual
recommendations
• Preservation as per vendor recommendation I Project • Preservation procedure Preservation Site
3 Preservation
P6012MAB .000.10.03.5
• Meet Project
Procedure Engineer
H w s
Specification
Preservation
64
requirement
• Verify Civil/Structural release notice
• Verify lay out correct marking on foundation, dimension,
spacing & quantity
• Verify elevation, levelness, location of shim padding.
• P6012MAB.000.10.0
• Grout Gap (minimum 25mm; and max. SOmm-DEP
• Complies with 3.002.QCF.046-MA-
Foundation Shim Pad 34.19.19.11; vendor requirements met) • Civil Foundation
Installation details, Site Engineer
Installation and • Firmly anchored to foundation, grouted & cured Drawing MA
4
Anchor Bolt (hammer test), clean & non-greasy • Vendor GA Drawing
layout drawing and QC Inspector H w S/W
vendor • P6012MAB.000.10.0
Equipment
D04imensional check • Surface chipping • Vendor manual
recommendations 3.002.QCF.049-MA
• Verify correct shim size and material
• Verify bolts, nuts according to correct grades, size,
length) . Check anchor bolt projection/elevation .
• Visual inspection
• Any other vendc>r recommendation

A Page 5 ofJ
.----------------,--------.:K~u-;;-w

<.,..._.,~pn~JJJ~c..;. ·{ f
;;:a;:;;i:.-

:-.::::::::::.:::-.::.::::..:..=.!
t iiN~

KNPC
atiti~o;;;nal
4~
--=
Petroleum Company (K.S.C)
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. Jl-2025
Petrofac
-
$1fl9tlwl,..
·SAMSUNG
ENGINEERING a_
Document Title: I ITP FOR INSTALLATION OF STATIC EQUIPMENTS
Document No#: I P6012MAB.000.10.03.439; Rev 08

Reference
Acceptance
Verifying I Responsible
SN Description of activity Action to be verified Criteria for Testing I Party/
Document Document
inspections I Personnel
• Conformity to
specified erection
tolerances (1 mm per
• Verticality and horizontal levelness as applicable
meter; maximum 25
• Confirm orientation, elevation of base reference
mm)
• Washer plate welding (if applicable)
• Vendor tolerance in
• Equipment base plate and steel base bolts tightened
the installation manual • P6012MAB .OOO.l0.0
• No gap between shim pad & bottom of base-plate, bo lts
• Vendor GA Drawings if any Site Engineer
80% tightened, released for grouting 3.002.QCF.203-MA
• Project Specification • Vendor tolerance QC
5 Al ignment • Correct flange gap, parallelism & gasket, bolts fully
• Vendor installation sheet for ARDS
• P6012MAB.OOO.l0.0
Equipment
I H H I w
tightened 3.002.QCF.204-MA
manual Reactor: Deviation Inspector
• Check sliding end if applicable and sliding saddle no
from stra ight line (
obstruction to movement.
15mm in any 5000 mm
• Completeness of assembly
Length with Maximum
• Levelness of flange with machin ist level for installation of
0.3% of total Vessel
agitator/mixer if applicable
length, between any
two points on entire
vessel (including skirt).
• Check form work and cleanliness
Site Engineer
Grouting of Base • Completion of grouting activity • Vendor GA Drawing
6
Plates/Skirt • Visual inspection • Civil Drawing
• Project Specification As per Grouting ITP QC Inspector I w I s I R
Civil
• Approved type of grout.

Page 6 of9
Kuwait National Petroleum Company (K.S.C)
·) &. : . .o· " '".i . .:.b·•J-~~·•c. •. 4~
(.,_ • _,....... .. ,... I-" ...
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1 Petrofac $1PillJ!ifi"'"
SAMSUNG
,ENGINEERING
-:-.:.::::~.::::::::.::.:.=.t 1
K NPC -
PSCJ Job No. Jl-2025
Document Title: ITP FOR INSTALLATION OF STATIC EQUIPMENTS
Document No#: P6012MAB.000.10.03.439; Rev 08

Acceptance Responsible Inspection Point


Reference Verifying
iN Description of activity Action to be verified Criteria for Testing/ Party/ Sub- Contract
Document Document Company
inspections Personnel Cont. or
• P6012MAB.000.10.0
3 .002.QCF .199-MA
• P6012MAB .000.10.0
3.002.QCF .200-MA
• Correct washers, locknuts & full tightening/torquing as • P6012MAB .000.10.0 Site Engineer
Anchor Bolt • Vendor installaion
7 required (after grout cure) • Drawing requirements QC Inspector H w w
Tightening after manual/ Drawings 3.002.QCF.208-MA
• Washer plate welding as applicable Equ ipment
grouting • Anchor Bolt Drawing • P6012MAB.000 .10.0
• Visual inspection
• Project Specification 3.002.QCF.202-MA
• P6012MAB.000 .10.0
3.002.QCF.201-MA

• P6012MAB.000 .10.0
3.002.QCF .214-MA
• Conformity to vendor drawings and specified tolerances • Vendor installation
Installation of • No damage, no rust, clean and no foreign substances • P6012MAB.000.10.0 Site Engineer
manual/ Drawings
~ internals • Desiccant bags removed • Specified tolerances 3 .002.QCF .208-MA QC Inspector H w w
• Data Sheet
• Welding if any as per correct & approved WPS • P6012MAB .000.10.0 Equipment
• Correct bolting materials 3.002.QCF.202-MA

I • P6012MAB.OO
Site Engineer
Thickness Measuring 0.10 .03.002.Q
w w
> • Visual Inspection • IFC Drawing • Drawing requirement QC Inspector S/W
Location (TML) check. CF.130-GX
Equipment

Visual inspection for Instrument


• Conformity to vendor drawings/IFC drawing. • Vendor installation • FM-1146-050 Rev.
installation of Site Engineer
.0 • Conformity to project specification manual/ Drawings • Drawing requirements 01 H w w
manifold/frame/stanc Instrument QC
• Visual inspection
hion (if applicable). Inspector
Catalyst, Filtering & • Filling operation & quantity as per Vendor instructions • Vendor Installation • P6012MAB.000.10.0 Site Engineer
• Conformity to Vendor
.1 Separation Medium, • Cleanliness of vessel interior prior to start manual/ Drawings
Drawings
3 .002.QCF .205-MA QC Inspector H w w
etc • No damage, correct installation & Limiter installed • Catalyst data sheet Equipment
-- - -

A Page 7 of9
,...;l~pll~J~a:...;.· .•
(...
:-~::::::-.::::.::.:.::.:

Document Title:
Document No#:
KNPC -
Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. Jl-2025
ITP FOR INSTALLATION OF STATIC EQUIPMENTS
P6012MAB.000.10.03.439; Rev 08
Petrofac ~ •11U1ll1_. SAMSUNG
ENGINEERING
--
Acceptance Responsible Inspection Point
Reference Verifying
iN Description of activity Action to be verified Criteria for Testing I Party/ Sub- Contract
Document Document Company
inspections Personnel Cont. or
• As per P&ID, data sheet & GA Drawing installed
• Correct fasteners
• Internals installation • P6012MAB.000.10.0
• completed & witnessed by required disciplines (including • Vendor Installation
Box-up/After • Conformity to 3.002.QCF .206-MA Site Engineer
Commissioning) manual I Drawings
l2 obtaining closure
• Data Sheet
drawing/data sheet Final closure permit QC Inspector H H w
• Clean and dry
permit requirements Equipment
• No damage on man-way flange face, correct gasket & • P&ID I GA Drawing
bolts
• Openings/nozzles blinded
• Torqu ing/tensioning as applicable
• Correct alignment & bolting • P6012MAB.000.10.0
• Vendor Installation • Complies with vendor Site Engineer
Installation of • Lubrication
l3
Davit/Winch
Manual I Drawing installation manual. 3.002.QCF.207-MX QC Equipment H w w
• Locking arrangement
• Detail Drawing • DEP 34.28.00.33 Gen Inspector
• Load Test as applicable
• P6012MAB.000.10.0
3 .002.QCF .199-MA
• P6012MAB.000.10.0
3.002.QCF.200-MA
• Correct alignment & bolting
Verify Installation of • P6012MAB.000.10.0
• Safety gates, kick plates around grating penetrations,
Platforms, Ladders,
grating clips installed & unused holes plugged • Vendo r Installation • Conformity to AFC 3 .002.QCF .208 -MA
handrails and grating Site Engineer
L4
associated with
• Expansion joints if any Manual I Drawings Drawings & project • P6012MAB .000.10.0
QC Inspector
w w s
• Insulation Blocks (for vessels with cold • Detatils Drawing standard requirements 3.002.QCF.202-MA
equipment and bolt
insulation/applicable as per drawing) • P6012MAB.000.10.0
tightening
• Fasteners installed as per drawings I Project specification
3.002.QCF.201-MA
• P6012MAB.OOO.l0.0
3.002.QCF.l90-CA

Page 8 of9
Kuwait National Petroleum Company (K.S.C)
-).o...:;..pJJa..lotJJ~c.·
<.,..,. -- -
Document Title:
Document No#:
KNPC
:-c·:::-= .=::: :..=!
. ~ .•
--=
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. Jl-2025
ITP FOR INSTALLATION OF STATIC EQUIPMENTS
P6012M_t.B.000.10.03.439; Rev 08
Petrofac ® .-111n11UI11
-
SA.MStiNG
ENGINEERING

"'-
Acceptance Responsible Inspection Point
Reference Verifying
5N Description of activity Action to be verified Criteria for Testing I Party/ Sub- Contract
Document Document Company
inspections Personnel Cont. or
• P6012MAB.OOO.l0.0
• Installation as per P&ID, GA drawing and Project 3.002.QCF.199-CA
Specification • P&ID, GA & Details • P6012MAB.000.10.0
• Painting, Insulation & Fire proofing as per dedicated & drawing 3.002.QCF.200-MA
approved ITPs • Process flow details • Conformity to
• P6012MAB.000.10.0 Site Engineer
• Verify conformity to drawings/other requirements, • Data Sheets drawings, data sheet &
15 Final Visual Inspection
appurtenances installed • Proj ect Specifications specifications 3 .002.QCF .208-MA QC Inspector H H w
• P6012MAB .000.10.0 Equipment
• Punch list if any • Vendor installation &
• Completion of documentation operation manual 3.002.QCF.202-MA
• Instrument installation earthing • Vendor drawing • P6012MAB .000.10.0
• NCR or Quality related issue 3 .002.QCF .201-MA
-

Page 9 of9
Kuwait National Petroleum Company (K.S.C)

~
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1

~ ~~· ~-~~~~m~~~ I1
PSCJ Job No. Jl-2025
1.,,·IO¥Ii.:b,I,J,l,l;,
•- • . I"''
. ... . .,.,.. KNPC
,~ : ~ ~
ITR NO. : P6012MAB.000.10.03.002 .QCF.199-MA ~etmfa(
<<Bar code I tern>>
,..,....,. J t,oool,tL.- L-="'""" ~

INSPECTION & TEST RECORD· MECHANICAL


INSTALLATION OF PRESSURE VESSEL
Client Name : Project Name :
Contractor : Project No:
Sub-contractor : Report No:
Equipment Tag No : Date:
Sub-System No : Plant/Unit :
Drawing No: Rev:

SI. No: Checks to be performed Result


1 Confirm nameplate details are correct & in accordance with data sheeUdrawings.
2 Check for no transit damage to vessel, trims, etc.
Confirm that the equipment has been installed as per design drawings & manufacturer's
4
instructions (verticality/horizontal level achieved).
5 Confirm that the preservation sheet is generated (as applicable) .
6 Check that the holdings down bolts are tight, grouting completed and trimmed.
7 Confirm that sliding feet are free & bolts are locked .
8 Check that test holes in reinforcement plates are open .
9 Check that dewatering holes are located in appropriate positions.
10 Earthing Strap installed.
'
11 Confirm that the internal coating is undamaged. (If app licable).
'
I
12 Confirm that Internals are installed as per latest vendor/design drawing (as applicable). .

13 Confirm that internal of vessel is clean and desiccants removed.


14 Confirm that access through man way is per drawing & correct gasket is used .
'

15 Confirm that vessel fittings and trims are complete.


16 Confirm that all valves & gauges are accessible & as per drawing.
17 Confirm that all vents & drains are complete.
Confirm that all access ladders and platforms are complete (Cold insulation
18
blocks/expansion joints as applicable).
19 Confirm the access for removal of internals (as applicable) per drawing .
20 Confirm that all bolting is torqued up to specification.
21 Confirm that the vessel is boxed-up for Mechanical Completion.
Check that all nozzles which are specified to be blinded are completed in accordance with
22
requirements .
23 Check and inspect visually the welds of stiffening rings , especially for vacuum equipment.
24 Davit installed and tested (as applicable).
Remarks:
- - ------ -- ·-

Witness Signatories Subcontractor QC Contractor QC Company

Name

Signature i
i

Date
I
Page 1 of 1 P6012MAB.000.10.03.002 .QCF.199-MA, Rev A 1
i;.
Kuwait National Petroleum Company (K.S.C)

~ fOIU.~J.,;,IiO.
Clean Fuels Project (CFP)

~~ A .- ·'
~~~~~m~~b 1
KNPC Contract No. CFP/EPC/0054-MAB1
·l ... PSCJ Job No. Jl-2025
etro ~~ w
,., • .. • . jlll
... KNPC
,~;:,.... ..., •• ." •• ~! ~
ITR NO.: P6012MAB .000.1 0.03.002.QCF.200-MA •
\~.t . ,Jr,, ,. ,~,;. , .. r"'=''""' ~

<<Bar code Item>>


INSPECTION & TEST RECORD-MECHANICAL

INSTALLATION HEAT EXCHANGER

Client Name: Project Name :


Contractor : Project No:
Sub-contractor : Report No:
Equipment Tag No : Date:
Sub-System No : Plant/Unit :
Drawing No: Rev:

SI. No: Checks to be performed Result

1 Confirm nameplate details are correct & in accordance with data sheet/drawing.
2 Confirm that the equipment has been supplied as per data sheet.
3 Check for transit damage.
Confirm that the equipment has been installed to design drawings & manufacturer's instructions
4
(verticality/horizontal levelness achieved/SLOPE as required).
5 Confirm that the pressure relief facilities are correct as per drawing .

6 Confirm that the internals are clean. (where accessible) .


7 Confirm site erected internals are installed correctly (if applicable).
Check that test holes in reinforcement plates are open and that dewatering holes are located in
8 appropriate positions.
9 Bellows are not overloaded with temporary attachments (as applicable) .
10 Check gaskets condition (if applicable).
11 Confirm that the holding down bolts are secure, grouting completed and trimmed.
Confirm that the sliding feet are free & nuts locked. Ensure sliding plates greased or Teflon pad
12 installed.
13 Check support steel is level.
14 Check all vessel trims and fittings are complete as per drawing.
15 Check access to valves and gauges is per drawing .
Check that all access ladders and platforms are secure (cold insulation blocks/expansion joints as
16
per drawing/as applicable).
17 Check that all bolting is torqued up to specification.
18 Confirm that the unit is externally clean and all apertures are covered.
19 Confirm that preservation has been carried out where specified.
20 Check earthing is installed as per drawing.
21 Check whether anodes/sacrificial plates have been installed where specified & are secure.

Remarks:

L___ ---

Witness Signatories Sub-Contractor QC Contractor QC Company

Name

Signature

Date

Page 1 of 1 P6012MAB.000.10.03.002 .QCF.200-MA, Rev A1


Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)

~
KNPC Contract No. CFP/EPC/0054-MAB1

~ - ~~~~~!t~~~~
-~ I•
PSCJ Job No. Jl-2025

~,,,
-- - .. J,;,J<i.
(.~"'·lo.:o,.no.:b .
.. . ~,..._~, .. _, KNPC ~
,.. ITR NO.: P6012MAB .000.1 0.03.002.QCF.203-MA ~etrofa(
\..,.,... . .~ c,. ,., ,.. ,. r'"~""- ~

<<Bar code Item>>


INSPECTION & TEST RECORD-MECHANICAL
VERTICAL ALIGNMENT OF STATIC EQUIPMENT
Client Name : Project Name:
Contractor : Project No:
Sub-contractor : Report No:
Equipment Tag No : Date:
Sub-System No : Plant/Unit :
Drawing No: Rev:

I Top Ref. Point


I ( ~ I Top Ref. Point I
X I TL I ~

~ 1'1
I

I I
- l - - f..-- Top Ref. Point
TL
I I- ·-

"'-- -- V \
r"- 1- ...
I

e ® 8 (±)
\
j
I

Position
ON STEEL STRUCTURE
Plumb
Elevation
Tolerance
///
L --
1'\.t.Lt"'L'\t. il"_cc-rc
_J
I
Bottom Ref. Point

1
Design Actual

goo
oo
315° Il 450

270· ~ X
180°
270°
Instrument type/serial no: goo

X Y..
Calibration expiry date:

Surveyor Name:

Surveyor Signature: 1 ::J


Date:
1 oo
Note: Vertical Alignment readings to be taken when effect of sub is minimal

Witness Signatories Sub-Contractor QC Contractor QC Company


Name
Signature

Date

Page 1 of 1 P6012MAB.000.1 0.03.002.QCF.203-MA Rev A 1


Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)

" _,....., " ,.. ~·...jlll'


6'1,;·)""·"'i.Ob·'J·•
. ,(·:,.. . .,..~, ..., KNPC ~
4J.
{t
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. Jl-2025
ITR NO. : P6012MAB.000.1 0.03.002 .QCF.204-MA
A·• !M
mNu
~etrofac lUJ . ,.. !NuiNmiN~
/ih
u
<<Bar code I tern>>
l~ " til,.. ,. ),oJ. o• f-,. - ~

INSPECTION & TEST RECORD-MECHANICAL


HORIZONTAL ALIGNMENT OF STATIC EQUIPMENT
Client Name : Project Name :
Contractor : Project No:
Sub-contractor : Report No:
Equipment Tag No : Date:
Sub-System No : Plant/Unit:
Drawing No: Rev:

e
~m
· ., _0
A
e+~ -··· -· H-®
. .. . .... . .0

0
DETAIL "X"

D I E

t---'"11 I 11
ELEVATION DATA
Elevation
Tolerance
Design Dimension Actual Dimension Difference
B
c
D
E

HORIZONTAL LEVEL
Data Inclination Tolerance
(8-C)/A /1000
(D-E)/A /1000

FLANGE LEVELNESS FOR INSTALLATION OF ROTATING MACHINERY


(Required only when applicable)

e Location Reading Tolerance

l.

ffi
"!21 0
(3---f-L.. }-}-(±)
Q ... 0

(±)

Witness Signatories Sub-Contractor QC Contractor QC Company

Name

Signature

Date

Page 1 of 1 P6012MAB.000.1 0.03.002 .QCF.204-MA, Rev A 1


Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)

~
KNPC Contract No. CFP/EPC/0054-MAB1

61,;·l .......
•- i.:!.,JJ,;,Ji<
• 0
.
I"'
. . . . .. ..., KNPC ...._..
~ ~, ~, ~,
PSCJ Job No. Jl-2025
ITR NO.: P6012MAB.000.10.03.002.QCF.205-MA ~etrofac
®. , !AMlijH~ liD
[H~~[fPJH~ •
•I.IW•••"" .. '.......(.... ,..,~

<<Barcodeitem>>
INSPECTION & TEST RECORD-MECHANICAL
FILLING OF CATALYST/FILTERING/SEPARATION MEDIUM
Client Name : Project Name :
Contractor : Project No:
Sub-contractor : Report No:
Equipment Tag No : Date:
Sub-System No : Plant/Unit :
Drawing No: Rev:

SI. No: Checks to be performed Result

1 Confirm that nameplate details are correct & in accordance with data sheet/drawing .

2 Check for transit and handling damage to flange faces & internal components.

3 Confirm that the internal coating is undamaged (if applicable) .

4 Confirm that internals are installed as per manufacturer/design drawing.

5 Confirm that interior of vessel is clean.

6 Confirm that access through man way is per drawing.

7 Confirm that there is access for removal of internals (as per drawing) .

8 All exits sealed & nozzles openings correctly blinded.

9 Orientation of distribution nozzle is correct (as applicable).

Installation of medium carried out as per approved procedure using correct equipment (fall
10
height/chute/funnel/etc.).

11 Grade/specification/type of medium installed is per drawing/requirement.

12 Determine correct level/loading height of filled medium as per drawing/requirement.

13 Bed limiter, mesh stopper, etc. installed as per drawing.

14 Post fill purge gas installed and nozzles closed (as applicable).

Remarks:

Witness Signatories Sub-Contractor QC Contractor QC Company

Name

Signature

Date
Page 1 of 1 P6012MAB.000 .10.03.002.QCF.205-MA, Rev A1
Kuwait National Petroleum Company (K.S.C)

(.,.,l.......
•-
~.~;
i.:b,JJ
• ......
• J"l. t(.
...,....;....... _,.,_, KNPC ~
~w. ; :. L,. (oo:-o,..; ~
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. Jl-2025
ITR NO.: P6012MAB.000.10.03.002 .QCF.206-MA Petrofac ®- SAMSUNG
!NGIN!ffiiNs
I •

<<Barcodeitem>>
INSPECTION & TEST RECORD-MECHANICAL
BOX-UP OF STATIC EQUIPMENT

Client Name: Project Name:

Contractor : Project No:

Sub-contractor : Report No:

Equipment Tag No : Date:

Sub-System No : Plant/Unit :

Drawing No: Rev:

SI. No. Checks to be performed Result

1 Internals installed as per drawing requirements/specifications.

2 Painting & Lining as per drawing.

3 Internal Cleanliness acceptable (for site fabricated tanks : after hydro-test) .

4 Flanged connections inspected and tightened with permanent gaskets & correct bolts/studs.

5 All punch list items pertaining to internals completed and closed (as applicable).

6 Released for Box-up.


Remarks:

L_- --- ---

Note: The signatories below certify that the PRESSURE VESSELfTANK has been inspected & the box-up shall proceed.

Sub-Contractor Contractor Company


Witness Signatories
QC Construction QC Commissioning Mechanical Commissioning

Name

Signature

Date
Page 1 of 1 P6012MAB.000.1 0.03.002.QCF.206-MA, Rev A 1
' ;,;);,;pi .... .<;l;;,l
..~;."'""··•· ·- KNPC ~
IW.,.. II,.,_ '.U.!W"o;o!W
f
~
Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)

KNPC Contract No. CFP/EPC/0054-MAB1


PSCJ Job No. Jl-2025
Petrofac ~ - SAMSUNG
ENGINEERING
A

INSPECTION & TEST RECORD-MECHANICAL


INSTALLATION OF DAVIT ARM/WINCH
Client Name : Project Name :
Contractor: Project No:
Sub-contractor : Report No:
Equipment Tag No : Date:
Sub-System No : Plant/Unit :
Drawing No: Rev:
- -·· - - -

SI. No: Checks to be performed Result

1 Erected steel works, vessel , and foundation is complete.

2 Verify installation of all davit/winch components is in accordance with drawing(s).

3 Verify travel clearance of loads.

Verify that identification tag no. and Safe Working Load (SWL) have been painted/stenciled on run
4
way beam/davit.

5 Components greased/lubricated (including wire rope as applicable) .

6 Bolts tightened as required & bolting arrangement is secure/correct as per drawing.

7 Locking arrangement is in working condition .

8 Pulley/sheaves, reeving in accordance with drawing .

9 Load Test to meet required regulations/specifications carried out successfully.

Remarks:

Witness Signatories Sub-Contractor QC Contractor QC Company

Name

Signature

Date

Page 1 of 1 P6012MAB .000.10.03.002.QCF.207-MX, Rev A1


Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)

~ A
KNPC Contract No. CFP/EPC/0054-MAB1

~etrOfaC ~ - !NGINmi
!ij!~NGNG
PSCJ Job No. Jl-2025
{,""·) ...... i.;b,JJ....• ;.. ITR NO.: P6012MAB.000.10.03.002.QCF.208-MA
-- -
,._~, .,.:
I"'
.,o;.,, ...,.t,.l.,.{oo;oo- KNPC ~ I
1'-"'H•·Il.. ~

<<Barcodeitem>>
INSPECTION & TEST RECORD-MECHANICAL
INSTALLATION OF COLUMN

Client Name: Project Name :


Contractor : Project No:
Sub-contractor : Report No:
Equipment Tag No : Date:
Sub-System No : Plant/Unit:
Drawing No: Rev:

SI. No. Checks to be performed Result


1 Confirm nameplate details are correct & in accordance with data sheet/drawings.

2 Check for no transit/handling damage to vessel, trims, etc.

3 Check that the holdings down bolts are tight, grouting completed and trimmed .
Check that test holes/weep holes in reinforcement plates are open (anti-rust
4
applied/nipple fitted as applicable) .
5 Earthing strap installed.

6 Confirm that internal trays are installed correctly and leak tested as applicable.
Confirm that other internals & appurtenances are installed as per latest vendor/design
7
drawing (as applicable).
8 Confirm that internal of vessel is clean and desiccants removed.

9 Confirm that access through man way is per drawing & correct gasket is used.

10 Packed bed/s installed (metal, random, grid, structured packing as applicable).

11 Filtering medium installed as applicable.

12 Confirm that vessel fittings and trims are complete.

13 Confirm that all valves & gauges are as per drawing.

14 Confirm that all vents & drains are complete per drawing.

15 Confirm that all access ladders and platforms are complete per drawing.

16 Confirm that all bolting is torqued up to specification.

17 Confirm tray man-ways are closed with Commissioning intervention (as applicable).
Check that all nozzles which are specified to be blinded are completed in accordance
18
with requirements.
Check and inspect visually the welds of stiffening rings, especially for vacuum
19
equipment.
20 Davit installed and tested (as applicable) .

21 Cathodic protection installed (if applicable).

Remarks: Vessel box-up will be done by commissioning after inspection by the client.

Witness Signatories Sub-Contractor QC Contractor QC Company

Name

Signature

Date

Page 1 of 1 P6012MAB.000.10.03.002.QCF.208-MA, Rev A1


Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)

4~
KNPC Contract No. CFP/EPC/0054-MAB1

""' ~· ~ Q" PSCJ Job No. Jl-2025 A ·• !ij !ij~~ 1,1\


~etrofac W. ,. ~~~~~f i~~~ 111
(A •)ii...:;..•-'"ii..ob·'(J•"·•O£.
.. _,_,1 -
A
:I'.,
ITR NO.: P6012MAB .000.1 0.03.002 .QCF.046-MA
:-.:.::.:::·:.":":;:;,:;::: KNPC -::=
<<Bar code Item>>
INSPECTION & TEST RECORD-MECHANICAL
MECHANICAL EQUIPMENT INSTALLATION INSPECTION REPORT

Client Project
Contractor Project No.
Sub-contractor Report No.
Tag No. Date
Item Description Drawing No.
Location Rev. No.

INSPECTION DESCRIPTION

Signature I Date
No. Description Contractor I Company Remarks
By I Date I By I Date

1 I Verification of Name Plate & Tag No.

Foundation Check
-···-------· -----j I -1 - - - I

- Anchor bolt location & levelling


l- - - · -1- ·- -- - - -·-·-·-·-·--·----

2 1 - Padding elevation & levelling


----··· 1------- - I ····--1

Slide plate greased/visually


_____ifJ..~f!.ected _ _· · ---·· 1-- -l -~--- 1 ~ I

- Expansion direction free


movement

Erection
--4- -·- - -1 I ··---~-------

3 Check orientation
------ --l I l f.- I

- Check centering & alignment

4 I Grouting
5 I Anchor bolt tightening /lock nut installation
6 I Co- ordinates : North I East
7 I Survey instrument type :

8 I Serial No: I Calibration expiry date :

The installation of the above equipment has been Satisfactorily Completed in accordance with the Drawings and Specifications.

Witness Signatories Sub-Contractor QC Contractor QC Company


Name
Signature
Date
- -

Page 1 of 1 P6012MAB.000.1 0.03.002.QCF.046-MA, Rev A1


Kuwait National Petroleum Company (K.S.C)

~
Clean Fuels Project (CFP)

",,·1"¥1
- - i,;bjl.I!,;,J;;
- . 1'•
. . . .. . ,.,,.... KNPC
~: ~
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. Jl-2025
ITR NO.: P6012MAB.000.10.03.002.QCF.202-MA ~etrofac
~ ., ~AM~UN~
IN~INmiN~
I

1\olo.l•ii,,.,.,,..,,.r.o;oo,.; ~

<<Barcode I tern>>
INSPECTION & TEST RECORD-MECHANICAL
INSTALLATION OF FILTER I STRAINER
Client Name : Project Name :
Contractor : Project No:
Sub-contractor : Report No:
Equipment Tag No : Date:
Sub-System No : Plant/Unit :
Drawing No: Rev:

SI. No: Checks to be performed Result

1 Nameplate details are in accordance with data sheet/drawing.

2 Check for handling/transit damage if any.

3 Check that the installation is correct & as per drawing (orientation & elevation, grouting completed) .

4 Check that the holdings down bolts are fitted and torque settings are correct.

5 Check external fittings are correctly installed on filter as per drawing.

6 Check earthing is installed.

7 Check vent I drain valves are fitted correctly.

8 Check cross over valve is fitted correctly (as applicable).

9 Check balance line is fitted correctly (as applicable).

10 For media filters ensure correct amount is added & that the grids are secure .

11 Check filter is internally clean .

12 Check filter elements are fitted correctly as per drawing.

13 Check filter elements types are correct per drawing & record details.

14 Check filter access lid is fitted correctly with new seals .

15 Check access lid securing bolts are fitted and torque settings are correct.

16 For commissioning filter, record mesh size.

Remarks:

- -

Witness Signatories Sub-Contractor QC Contractor QC Company

Name

Signature
I
Date
I

Page 1 of 1 P6012MAB.000.1 0.03.002.QCF.202-MA, Rev A 1


f
Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)

~ -·, ~~~~~~~!~~ 6
KNPC Contract No. CFP/EPC/0054-MAB1

~etrofa~
bd PSCJ Job No. Jl-2025
' " ...
.. -pli.;btJJ""<;
" ' I'll' ITR NO. : P6012MAB.000.10.03.002.QCF.201-MA •
~,~:, . .,,_)..,....~ KNPC ~
l)j..J,,~t;~ tl frtit• loo;oo- ~

<<Bar code Item>>


INSPECTION & TEST RECORD-MECHANICAL
INSTALLATION OF PREFABRICATED TANK
Client Name : Project Name :
Contractor : Project No:
Sub-contractor : Report No:
Equipment Tag No : Date:
Sub-System No : Plant/Unit :
Drawing No: Rev: - -- -

SI. No: Checks to be performed Result

1 Nameplate details are correct & in accordance with data sheeUdrawings.


2 Check for damage if any.
3 Internal coatings are to correct specification and free from damage.

4 Tank is installed as per design drawings & vendor recommendations .

5 Confirm preservation sheet is generated as applicable.


6 Confirm that the Internals are fitted as per the drawing.
7 Confirm that the tank is clean internally.

8 Confirm that the man way is accessible per drawing.

9 Check that the man way lifting arrangement is in working condition .


10 Confirm that access ladders and platforms are correctly installed.

11 Confirm that access to valves & gauges is as per drawing.

12 Confirm that gaskets installed are correct to specification.


13 Confirm that all vessel trims are fitted and according to drawing .

14 Confirm that clearance as per drawing exists for removal of internals.

15 Confirm that all bolting is tight and to specification.

16 Check that manhole flush plates are in position (as applicable).

17 Check earthing connection is installed.


Check grouting is completed , trimmed and foundation bolts are tightened as per requirements
18 (washer plates welded , lock nuts, torquing ,.lubrication & corrosion protection as applicable).
Remarks:

Witness Signatories Sub-Contractor QC Contractor QC Company

Name

Signature

Date
L____

Page 1 of 1 P6012MAB.000.10.03.002.QCF.201-MA, Rev A1


Kuwait National Petroleum Company (K.S.C)

~
Clean Fuels Project (CFP)

I•""·i""pi..,...Jii'!l;,;
~.~:,
"" "
.
. I'll
. .,. .,.. ..,., KNPC
~, ~
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. Jl-2025
ITR NO. : P6012MAB.000.10.03.002.QCF.214-MA Petrofac
~ ,, SijSUHG
m~[!!JNG
I

, ~ .. ,l ... t..'""''"''"'f-:w- ~

<<Bar code I tern>>


INSPECTION & TEST RECORD-MECHANICAL
INSTALLATION OF INTERNALS IN COLUMN

Client Name: Project Name :


Contractor : Project No:
Sub-contractor : Report No:
Equipment Tag No : Date:
Sub-System No : Plant/Unit :
Drawing No: Rev:

SI. No. Checks to be performed Result

1 Verification of vessel name plate.

2 Confirm there is no handling/transit damage to components.

3 Support plate, support grid/beam installed correctly.

4 Distributors, orifice plates installed correctly and tested as applicable.

5 Demisters/Cyclones correct.

6 Baffle plates, vortex breaker installed correctly.

7 Impingement plates correct and thermo wells in correct position.

8 Trays weir height and down corner clearance.

9 Risers , stand pipes, seal P<:~n installed as per drawing .

10 Coalescer Pack correctly installed.

11 Welding works completed as applicable.

12 Filling of carbon/sand/ceramic balls/molecular sieves/etc as applicable.

13 Installation of metal, random, structured or grid packings .

14 Packings installed to correct height.

15 Bed limiter installed and secured.

16 Trays- conventionallhi-fi : Installed , leveled & leak tested as applicable.

17 Bolts on the internal components are correct type & tightened/torqued as applicable.

18 Chimney tray installed.

19 All internals work and installation of other appurtenances conform to drawing requirements .

20 Internally clean and tray man-ways closed .

Remarks:

L___

Witness Signatories Sub-Contractor QC Contractor QC Company


Name

Signature

Date
·-·

Page 1 of 1 P6012MAB.000.10.03.002 .QCF.214-MA, Rev A1


Kuwait National Petroleum Company (K.S.C)

~
Clean Fuels Project (CFP)

• •pli;b,l,j,;,,iio
"'. "'·J..
~.~ :,,~
• . 1'•1
. .,.. ... KNPC
~, ~ ~
.
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. Jl-2025
ITR NO.: P6012MAB.000.10.03.002.QCF.213-MA ~etrofaC ~ ., ~!UN~
INbiNURIN~ I I
'~'!"'"''" '~"··("'i'".... ~
<<Bar code I tern>>
INSPECTION & TEST RECORD-MECHANICAL
INSTALLATION OF FLARE STACK & FLARE TIP
Client Name: Project Name :
Contractor : Project No:
Sub-contractor : Report No:
Equipment Tag No : Date:
Sub-System No : Plant/Unit :
Drawing No: Rev:

SI. No. Checks to be performed Result

1 Check nameplate details are correct for flare & tip.

2 Confirm flare tower verticality, grouting of base-plates completed .

Confirm that the holdings down bolts are tight to the correct torque & have a lock nut fitted, washer
3
plates welded as applicable.

4 All riser segments jointed and bolted to required specification.

Confirm all ladders & landings are installed correctly & that safety chains are installed on each
5
landing.

6 Confirm that ladder hoop rings are as per drawing .

7 Guy wire installed and tensioned as applicable.

Confirm the Flare tip is installed as per the design drawings & vendor instructions (including correct
8 bolting & gasket).

9 Confirm that the wind shield is correctly orientated to drawings and specification.

10 Confirm that Flare pilot assembly is complete and secure.

11 Confirm that access for flare tip removal is as per drawing.

12 Check flare tip for damage.

13 Check (if applicable) heat shield correctly installed per drawing and to specification .

Confirm that the Flare tip removal equipment is available or installed (Davit Arm/Winch etc. as
14
applicable).

15 Confirm removal equipment has been load tested.

Remarks:

Note: Ensure that verticality is measured when effect of sun is minimal.

Witness Signatories Sub-Contractor QC Contractor QC Company

Name

Signature

Date
Page 1 of 1 P6012MAB.000.1 0.03.002.QCF.213-MA, Rev A 1
~
Kuwait National Petroleum Company (K.S.C)

Petrofac ®• ~m
Clean Fuels Project (CFP)
, !.'"'·iw.,oli.o!,,J,;,JC
• • • •

IIM
SAMSUNG
!NGINmiNG •
~,~:, . . . . .,.., .,~!
~ ~} ~""'" '"""'•(~....
KNPC
~
~
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. Jl-2025

CHECKLIST FOR RECEIVING STATIONARY EQUIPMENT AT SITE

Client Name: KNPC/AFWEL Project Name : CLEAN FUEL PROJECT (CFP)


Contractor : PSCJV Project No : Jl-2025
Sub-contractor : CCC Report No:
Cable Tag No : Date:
Sub-System No : Rev:
Drawing No: RFI#:

Equipment Tag Number: Date:

Equipment Name:

Part A: The following drawings I documents which are approved by Company shall be presented by EPC
Contractor along with inspection request.
Drawing I Document Yes No Remark
Copy of latest PO for the equipment
Copy of the latest PO for the spares of the equipment
Latest G.A. Drawing of the equipment
Latest name plate drawing for the equipment
Latest data sheet of the equipment
Installation & maintenance manuals, catalogue copies etc.
Inspection release certificate by TPI agency
Part 8: The following items shall be checked at site.

Description Status Remarks


Check the equipment with respect to approved G A drawing
& PO document
Check the equipment for any damages due to
transportation , handling etc.
Check the critical parts of the equipment
Check the name plate with respect to the drawing
Spares shall be checked for the following:
a. Spares list
b. Any damages
Other items, if any
a.
b.

Witness Signatories Sub- contractor QC Contractor QC Company


Name
Signature
Date

P6012MAB.000.10.03.002.QCF.114-GX, Rev A1
Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)

·)&.:;...pfl&..;.btllJ~Ic I
KNPC Contract No. CFP/EPC/0054-MAB1

~etrofac ~ - ~~~
(a~., - - -
~~:::·:.::-:.::.::.:,:::
KNPC
i..1
• •
I""
.....;:?
PSCJ Job No. Jl-2025
ITR NO. : P6012MAB .000.10.03.002.QCF.049-MA !N~IN!ffilN~ •
<<Bar code I tern>>
INSPECTION & TEST RECORD-MECHANICAL
RECORD OF DIMENSIONAL INSPECTION

Client Project

Contractor Project No.

Sub-contractor Report No.

Item No. Date


Item
Location
Description
Drawing Ref.

Rev.

VISUAL INSPECTION:-

DIMENSIONAL INSPECTION:-

RESULT OF INSPECTION:-

Witness Signatories Sub-Contractor QC Contractor QC Company

Name

Signature

Date
Page 1 of 1 P6012MAB.000.10 .03.002.QCF.049-MA, Rev A1
Kuwait National Petroleum Company (K.S.C)

~
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1

6"~.,..,..i.:bgJJ>.Ji>'
-- - . ~
. .~ ;.,. . . , _~, ..., KNPC ~
PSCJ Job No. Jl-2025
ITR NO. : P6012MAB.000.10.03.002.QCF.190-CA ~etrofac ®f' !MmN~
!N~IN !~,N~ ~

<<Barcodeitem>>
~~· " .... t•• £.,•\o:-,.. ~

INSPECTION & TEST RECORD-CIVIL


AREA STRUCTURAL COMPLETION CERTIFICATE

Client Name : Project Name :


Contractor : Project No:
Sub-contractor: Report No:
Tag No: Date:
Sub-System No : Rev:
Drawing No: RFI#:
Structure/member : Area:

SI. No. Description of check Result


Main structural members installed in accordance with Project Specifications and
1
Drawings, and all temporary aids I brackets removed .
Roof structures are installed in accordance with Project Specifications and
2
Drawings, and all temporary aids I brackets removed .
All platforms and walkways are installed in accordance with Project Specifications
3
and Drawings, and all temporary aids I brackets removed.

4 All gully gratings to drains installed and drains and sumps clean.

All penetrations installed, with sleeves I kick plates of specified size complete with
5
drain holes as required.

6 All grating installed, secured and no gaps exist.

All Packers used under uprights to be fabricated from good quality CS & to be
7
blasted & primed as a minimum.
Foundations and handrails installed in accordance with Project Specifications ,
8 ladder entrances have safety bar complete with protected landing end and portable
hand railings are secured .
All structural supports installed in accordance with drawings and all temporary aids I
9
brackets removed .

10 All bolting installed and tightened .

All maintenance I scaffolding lugs are installed in accordance with drawings with the
11
correct orientation.
Temporary steel work, to be removed at a later date, clearly marked and identified
12
on relevant drawings.

13 All Welding, Stress Relief and NOT work completed and cleared.

14 Confirm that all Quality Records have been completed and accepted .

15 Confirm that all Punch List items have been completed and accepted.
Remarks:

'-----~

Witness Signatories Sub-Contractor QC Contractor QC Company


Name
Signature
Date
. "'
~~~~ KNPC
J~-~ i...-(
Kuwait National Petroleum Company (K.S.C)

~etrofac ~ " :S A
Clean Fuels Project (CFP)
.. KNPC Contract No. CFP/EPC/0054-MAB1
~:::!=t.:.::.:.:= PSCJ Job No. Jl-2025

INSPECTION & TEST RECORD-INSTRUMENTATION


VISUAL INSPECTION CHECK LIST FOR INSTALLATION OF MANIFOLD I FRAME I STANCHION

Client Name Project Name

Contractor's Name Project No.

Sub-contractor Report No.

Tag No. mtte

Sub-system Nci. Rev. No.

RFI#
..
Drawing No.

Observation Inspection
Item No. Description of Inspected Items
Yes NQ Contractor Company

1. All Materials are as per project Spe_cifications and approved drawings

Check l099tion, orientation, elevation & mounting correct of manifold as


2 per drawings.

3 Check If any damaae noticed durina inspection.


4 Name plate I Tag No, Installed as per Dwg

5 Manifold i11stallation on column I st(!ndC!Ione acceptable

6 Overall quality Qfinstallalion accep~able

7 All dimensions as per hook Up drawing

8 Drain plugs installed

Remarks:

Witness Signatories S~b-Contractor QC Contractor QC Company

Name

Sign at~ re
Date
Page 1 Qf 1 FM-1146-050 ~ev. 01
~ ;..;.pn
·I
1.1 .. ..
iOI.j!W
..
a. ,.
• jll
~ Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)

KNPC Contract No. CFP/EPC/0054-MAB1


~ ., !!MW~
~etrofac w _ !NuiNff~I~G
A •
~.~ : . .,. .,.. ..,. KNPC
~, _ ~
~~~, ;:n.,.,, ,"J."'('";'•.i>~ ~ PSCJ Job No. Jl-2025

INSPECTION & TEST RECORD-CIVIL


CONCRETE WORK SURVEY RECORD

Client Name : Project Name :


Contractor : Project No:
Sub-contractor : Report No:
Tag No: Date:
Sub-System No : Rev:
Drawing No: RFI#:
Structure/member : Area:

Anchor
Blinding Footings Pedestals Columns bolts/Embedded Shims Slab/Roof Others
plates/Openings
I
1 - Coordinates
Ea sting
No.
Actual Tolerance Actual As per DWG. Tolerance

2 - Elevation
Top of concrete Anchor Bolts/Embedded Plates/Openings
No.
Actual As per DWG . Diff. Tolerance Actual As per DWG. Diff. Tolerances

Remarks:

Witness Signatories Sub-Contractor QC Contractor QC Company

Name

Signature i
I

I
Date
L__ - - - - I
Page 1 of 1 P6003SH U.000. 10. 03.002 .QCF .165-CX, Rev A 1
:.

i.:b~J,;,I<;. ~
Kuwait National Petroleum Company (K.S.C)

" ~~·l ......


"" "
~,,.:,,.. ..., •• ., .....1 KNPC
'"''"'" '""J"ti i,.J. ,•(oo;ootoo~
. I"'
~
~
.
Clean Fuels Project (CFP)

KNPC Contract No. CFP/EPC/0054-MAB1


PSCJ Job No. Jl-2025
Petrofac ®"' SAMSUNG
!NGINHRING
I •

THICKNESS SURVEY REPORT OF EXISTING PIPELINE BEFORE EXECUTING TIE IN

Client Name : Project Name : Drawing No: Report No:


Contractor : Project No: Rev: Date:
Sub-contractor : Sub-System No : Location:

Reqd. Actual wall thickness in mm


Reqd . Nom. (T- Top , B- Bottom, L- Left, R- Average
Tie in Line No. / min. Sign
SI. No. Material Dia I Size thickness in Riaht in the direction of flow) thk. in Sign PO Remarks
No. Equipment No. thickness Contractor
mm mm
--
in mm T I 8 I L I R

this format shall be as per Form No. 2 specified in the contract section
4.Exhibit H or other format if agreed by the company.

Witness Signatories Sub- contractor QC Contractor QC Company this is not


Name latest
Signature revision
Date

Page 1 of 1 P6012MAB.000.10.03.002.QCF .130-GX, Rev A1