RESPONSE SHEET
Sub-contractor I Vendor Document No: P6012MAB .000.1 0.03.439 Rev No.: 07 Status Code : 2
Serial No. COMPANY Comments Sub-Contractor Response I Vendor Response Action Code COMPANY Response
- - --- - - - - - - - - - - - -- - -
FOR
\~ 9
or selected by the Sub-Contractor and does not relieve the Sub-
Contractor from full compliance with its obligations under the Sub-
Contract.
attached.
Name/Signature Date
Krishna Ojha 31 April 2018
~
Thickness survey correct format shall be used.
~/
______________________________________ ______________
For Petrofac-Samsung-CB&I Joint Venture
~
SAMSUNG
Petrofac I Samsung I CB&I
PSCJ Job No. Jl-2025
Petrofac @ .-111~U 1 W" ENGINEERING
!. c;l~.i,:loti.Jt,;,lioi'
/. . - ,. ~
::::::-..::-~ ~ KNPC ~
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. Jl-2025
Petrofac ~_ - SAMSUNG
EHGIH!!RING
A
Document Title: ITP FOR INSTALLATION OF STATIC EQUIPMENTS
Document No#: P6012MAB.000.10.03.439; Rev 08
t.,;I~~Jt,;,li:i~
::.:-::=-~::::
KNPC
~l ~
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1 Petrofac ®- SAMSUNG
!HGIN!ERING
A
Document Title:
.
PSCJ Job No. Jl-2025
1. Reference Documents
ld~i.:l.tJJt.:.li:l'
I • • - ~
::::.-..=::.::::c KNPC
~
'7fi:!'
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. Jl-2025
Petrofac ~. - SAIASUNG
!IIGIHEERING
A
Document Title: ITP FOR INSTALLATION OF STATIC EQUIPMENTS
Document No#: P6012MAB.000.10.03.439; Rev 08
A Page 5 ofJ
.----------------,--------.:K~u-;;-w
<.,..._.,~pn~JJJ~c..;. ·{ f
;;:a;:;;i:.-
:-.::::::::::.:::-.::.::::..:..=.!
t iiN~
KNPC
atiti~o;;;nal
4~
--=
Petroleum Company (K.S.C)
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. Jl-2025
Petrofac
-
$1fl9tlwl,..
·SAMSUNG
ENGINEERING a_
Document Title: I ITP FOR INSTALLATION OF STATIC EQUIPMENTS
Document No#: I P6012MAB.000.10.03.439; Rev 08
Reference
Acceptance
Verifying I Responsible
SN Description of activity Action to be verified Criteria for Testing I Party/
Document Document
inspections I Personnel
• Conformity to
specified erection
tolerances (1 mm per
• Verticality and horizontal levelness as applicable
meter; maximum 25
• Confirm orientation, elevation of base reference
mm)
• Washer plate welding (if applicable)
• Vendor tolerance in
• Equipment base plate and steel base bolts tightened
the installation manual • P6012MAB .OOO.l0.0
• No gap between shim pad & bottom of base-plate, bo lts
• Vendor GA Drawings if any Site Engineer
80% tightened, released for grouting 3.002.QCF.203-MA
• Project Specification • Vendor tolerance QC
5 Al ignment • Correct flange gap, parallelism & gasket, bolts fully
• Vendor installation sheet for ARDS
• P6012MAB.OOO.l0.0
Equipment
I H H I w
tightened 3.002.QCF.204-MA
manual Reactor: Deviation Inspector
• Check sliding end if applicable and sliding saddle no
from stra ight line (
obstruction to movement.
15mm in any 5000 mm
• Completeness of assembly
Length with Maximum
• Levelness of flange with machin ist level for installation of
0.3% of total Vessel
agitator/mixer if applicable
length, between any
two points on entire
vessel (including skirt).
• Check form work and cleanliness
Site Engineer
Grouting of Base • Completion of grouting activity • Vendor GA Drawing
6
Plates/Skirt • Visual inspection • Civil Drawing
• Project Specification As per Grouting ITP QC Inspector I w I s I R
Civil
• Approved type of grout.
Page 6 of9
Kuwait National Petroleum Company (K.S.C)
·) &. : . .o· " '".i . .:.b·•J-~~·•c. •. 4~
(.,_ • _,....... .. ,... I-" ...
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1 Petrofac $1PillJ!ifi"'"
SAMSUNG
,ENGINEERING
-:-.:.::::~.::::::::.::.:.=.t 1
K NPC -
PSCJ Job No. Jl-2025
Document Title: ITP FOR INSTALLATION OF STATIC EQUIPMENTS
Document No#: P6012MAB.000.10.03.439; Rev 08
• P6012MAB.000 .10.0
3.002.QCF .214-MA
• Conformity to vendor drawings and specified tolerances • Vendor installation
Installation of • No damage, no rust, clean and no foreign substances • P6012MAB.000.10.0 Site Engineer
manual/ Drawings
~ internals • Desiccant bags removed • Specified tolerances 3 .002.QCF .208-MA QC Inspector H w w
• Data Sheet
• Welding if any as per correct & approved WPS • P6012MAB .000.10.0 Equipment
• Correct bolting materials 3.002.QCF.202-MA
I • P6012MAB.OO
Site Engineer
Thickness Measuring 0.10 .03.002.Q
w w
> • Visual Inspection • IFC Drawing • Drawing requirement QC Inspector S/W
Location (TML) check. CF.130-GX
Equipment
A Page 7 of9
,...;l~pll~J~a:...;.· .•
(...
:-~::::::-.::::.::.:.::.:
Document Title:
Document No#:
KNPC -
Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. Jl-2025
ITP FOR INSTALLATION OF STATIC EQUIPMENTS
P6012MAB.000.10.03.439; Rev 08
Petrofac ~ •11U1ll1_. SAMSUNG
ENGINEERING
--
Acceptance Responsible Inspection Point
Reference Verifying
iN Description of activity Action to be verified Criteria for Testing I Party/ Sub- Contract
Document Document Company
inspections Personnel Cont. or
• As per P&ID, data sheet & GA Drawing installed
• Correct fasteners
• Internals installation • P6012MAB.000.10.0
• completed & witnessed by required disciplines (including • Vendor Installation
Box-up/After • Conformity to 3.002.QCF .206-MA Site Engineer
Commissioning) manual I Drawings
l2 obtaining closure
• Data Sheet
drawing/data sheet Final closure permit QC Inspector H H w
• Clean and dry
permit requirements Equipment
• No damage on man-way flange face, correct gasket & • P&ID I GA Drawing
bolts
• Openings/nozzles blinded
• Torqu ing/tensioning as applicable
• Correct alignment & bolting • P6012MAB.000.10.0
• Vendor Installation • Complies with vendor Site Engineer
Installation of • Lubrication
l3
Davit/Winch
Manual I Drawing installation manual. 3.002.QCF.207-MX QC Equipment H w w
• Locking arrangement
• Detail Drawing • DEP 34.28.00.33 Gen Inspector
• Load Test as applicable
• P6012MAB.000.10.0
3 .002.QCF .199-MA
• P6012MAB.000.10.0
3.002.QCF.200-MA
• Correct alignment & bolting
Verify Installation of • P6012MAB.000.10.0
• Safety gates, kick plates around grating penetrations,
Platforms, Ladders,
grating clips installed & unused holes plugged • Vendo r Installation • Conformity to AFC 3 .002.QCF .208 -MA
handrails and grating Site Engineer
L4
associated with
• Expansion joints if any Manual I Drawings Drawings & project • P6012MAB .000.10.0
QC Inspector
w w s
• Insulation Blocks (for vessels with cold • Detatils Drawing standard requirements 3.002.QCF.202-MA
equipment and bolt
insulation/applicable as per drawing) • P6012MAB.000.10.0
tightening
• Fasteners installed as per drawings I Project specification
3.002.QCF.201-MA
• P6012MAB.OOO.l0.0
3.002.QCF.l90-CA
Page 8 of9
Kuwait National Petroleum Company (K.S.C)
-).o...:;..pJJa..lotJJ~c.·
<.,..,. -- -
Document Title:
Document No#:
KNPC
:-c·:::-= .=::: :..=!
. ~ .•
--=
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. Jl-2025
ITP FOR INSTALLATION OF STATIC EQUIPMENTS
P6012M_t.B.000.10.03.439; Rev 08
Petrofac ® .-111n11UI11
-
SA.MStiNG
ENGINEERING
"'-
Acceptance Responsible Inspection Point
Reference Verifying
5N Description of activity Action to be verified Criteria for Testing I Party/ Sub- Contract
Document Document Company
inspections Personnel Cont. or
• P6012MAB.OOO.l0.0
• Installation as per P&ID, GA drawing and Project 3.002.QCF.199-CA
Specification • P&ID, GA & Details • P6012MAB.000.10.0
• Painting, Insulation & Fire proofing as per dedicated & drawing 3.002.QCF.200-MA
approved ITPs • Process flow details • Conformity to
• P6012MAB.000.10.0 Site Engineer
• Verify conformity to drawings/other requirements, • Data Sheets drawings, data sheet &
15 Final Visual Inspection
appurtenances installed • Proj ect Specifications specifications 3 .002.QCF .208-MA QC Inspector H H w
• P6012MAB .000.10.0 Equipment
• Punch list if any • Vendor installation &
• Completion of documentation operation manual 3.002.QCF.202-MA
• Instrument installation earthing • Vendor drawing • P6012MAB .000.10.0
• NCR or Quality related issue 3 .002.QCF .201-MA
-
Page 9 of9
Kuwait National Petroleum Company (K.S.C)
~
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
~ ~~· ~-~~~~m~~~ I1
PSCJ Job No. Jl-2025
1.,,·IO¥Ii.:b,I,J,l,l;,
•- • . I"''
. ... . .,.,.. KNPC
,~ : ~ ~
ITR NO. : P6012MAB.000.10.03.002 .QCF.199-MA ~etmfa(
<<Bar code I tern>>
,..,....,. J t,oool,tL.- L-="'""" ~
Name
Signature i
i
Date
I
Page 1 of 1 P6012MAB.000.10.03.002 .QCF.199-MA, Rev A 1
i;.
Kuwait National Petroleum Company (K.S.C)
~ fOIU.~J.,;,IiO.
Clean Fuels Project (CFP)
~~ A .- ·'
~~~~~m~~b 1
KNPC Contract No. CFP/EPC/0054-MAB1
·l ... PSCJ Job No. Jl-2025
etro ~~ w
,., • .. • . jlll
... KNPC
,~;:,.... ..., •• ." •• ~! ~
ITR NO.: P6012MAB .000.1 0.03.002.QCF.200-MA •
\~.t . ,Jr,, ,. ,~,;. , .. r"'=''""' ~
1 Confirm nameplate details are correct & in accordance with data sheet/drawing.
2 Confirm that the equipment has been supplied as per data sheet.
3 Check for transit damage.
Confirm that the equipment has been installed to design drawings & manufacturer's instructions
4
(verticality/horizontal levelness achieved/SLOPE as required).
5 Confirm that the pressure relief facilities are correct as per drawing .
Remarks:
L___ ---
Name
Signature
Date
~
KNPC Contract No. CFP/EPC/0054-MAB1
~ - ~~~~~!t~~~~
-~ I•
PSCJ Job No. Jl-2025
~,,,
-- - .. J,;,J<i.
(.~"'·lo.:o,.no.:b .
.. . ~,..._~, .. _, KNPC ~
,.. ITR NO.: P6012MAB .000.1 0.03.002.QCF.203-MA ~etrofa(
\..,.,... . .~ c,. ,., ,.. ,. r'"~""- ~
~ 1'1
I
I I
- l - - f..-- Top Ref. Point
TL
I I- ·-
"'-- -- V \
r"- 1- ...
I
e ® 8 (±)
\
j
I
Position
ON STEEL STRUCTURE
Plumb
Elevation
Tolerance
///
L --
1'\.t.Lt"'L'\t. il"_cc-rc
_J
I
Bottom Ref. Point
o·
1
Design Actual
goo
oo
315° Il 450
270· ~ X
180°
270°
Instrument type/serial no: goo
X Y..
Calibration expiry date:
Surveyor Name:
Date
e
~m
· ., _0
A
e+~ -··· -· H-®
. .. . .... . .0
0
DETAIL "X"
D I E
t---'"11 I 11
ELEVATION DATA
Elevation
Tolerance
Design Dimension Actual Dimension Difference
B
c
D
E
HORIZONTAL LEVEL
Data Inclination Tolerance
(8-C)/A /1000
(D-E)/A /1000
l.
ffi
"!21 0
(3---f-L.. }-}-(±)
Q ... 0
(±)
Name
Signature
Date
~
KNPC Contract No. CFP/EPC/0054-MAB1
61,;·l .......
•- i.:!.,JJ,;,Ji<
• 0
.
I"'
. . . . .. ..., KNPC ...._..
~ ~, ~, ~,
PSCJ Job No. Jl-2025
ITR NO.: P6012MAB.000.10.03.002.QCF.205-MA ~etrofac
®. , !AMlijH~ liD
[H~~[fPJH~ •
•I.IW•••"" .. '.......(.... ,..,~
<<Barcodeitem>>
INSPECTION & TEST RECORD-MECHANICAL
FILLING OF CATALYST/FILTERING/SEPARATION MEDIUM
Client Name : Project Name :
Contractor : Project No:
Sub-contractor : Report No:
Equipment Tag No : Date:
Sub-System No : Plant/Unit :
Drawing No: Rev:
1 Confirm that nameplate details are correct & in accordance with data sheet/drawing .
2 Check for transit and handling damage to flange faces & internal components.
7 Confirm that there is access for removal of internals (as per drawing) .
Installation of medium carried out as per approved procedure using correct equipment (fall
10
height/chute/funnel/etc.).
14 Post fill purge gas installed and nozzles closed (as applicable).
Remarks:
Name
Signature
Date
Page 1 of 1 P6012MAB.000 .10.03.002.QCF.205-MA, Rev A1
Kuwait National Petroleum Company (K.S.C)
(.,.,l.......
•-
~.~;
i.:b,JJ
• ......
• J"l. t(.
...,....;....... _,.,_, KNPC ~
~w. ; :. L,. (oo:-o,..; ~
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. Jl-2025
ITR NO.: P6012MAB.000.10.03.002 .QCF.206-MA Petrofac ®- SAMSUNG
!NGIN!ffiiNs
I •
<<Barcodeitem>>
INSPECTION & TEST RECORD-MECHANICAL
BOX-UP OF STATIC EQUIPMENT
Sub-System No : Plant/Unit :
4 Flanged connections inspected and tightened with permanent gaskets & correct bolts/studs.
5 All punch list items pertaining to internals completed and closed (as applicable).
Note: The signatories below certify that the PRESSURE VESSELfTANK has been inspected & the box-up shall proceed.
Name
Signature
Date
Page 1 of 1 P6012MAB.000.1 0.03.002.QCF.206-MA, Rev A 1
' ;,;);,;pi .... .<;l;;,l
..~;."'""··•· ·- KNPC ~
IW.,.. II,.,_ '.U.!W"o;o!W
f
~
Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)
Verify that identification tag no. and Safe Working Load (SWL) have been painted/stenciled on run
4
way beam/davit.
Remarks:
Name
Signature
Date
~ A
KNPC Contract No. CFP/EPC/0054-MAB1
~etrOfaC ~ - !NGINmi
!ij!~NGNG
PSCJ Job No. Jl-2025
{,""·) ...... i.;b,JJ....• ;.. ITR NO.: P6012MAB.000.10.03.002.QCF.208-MA
-- -
,._~, .,.:
I"'
.,o;.,, ...,.t,.l.,.{oo;oo- KNPC ~ I
1'-"'H•·Il.. ~
<<Barcodeitem>>
INSPECTION & TEST RECORD-MECHANICAL
INSTALLATION OF COLUMN
3 Check that the holdings down bolts are tight, grouting completed and trimmed .
Check that test holes/weep holes in reinforcement plates are open (anti-rust
4
applied/nipple fitted as applicable) .
5 Earthing strap installed.
6 Confirm that internal trays are installed correctly and leak tested as applicable.
Confirm that other internals & appurtenances are installed as per latest vendor/design
7
drawing (as applicable).
8 Confirm that internal of vessel is clean and desiccants removed.
9 Confirm that access through man way is per drawing & correct gasket is used.
14 Confirm that all vents & drains are complete per drawing.
15 Confirm that all access ladders and platforms are complete per drawing.
17 Confirm tray man-ways are closed with Commissioning intervention (as applicable).
Check that all nozzles which are specified to be blinded are completed in accordance
18
with requirements.
Check and inspect visually the welds of stiffening rings, especially for vacuum
19
equipment.
20 Davit installed and tested (as applicable) .
Remarks: Vessel box-up will be done by commissioning after inspection by the client.
Name
Signature
Date
4~
KNPC Contract No. CFP/EPC/0054-MAB1
Client Project
Contractor Project No.
Sub-contractor Report No.
Tag No. Date
Item Description Drawing No.
Location Rev. No.
INSPECTION DESCRIPTION
Signature I Date
No. Description Contractor I Company Remarks
By I Date I By I Date
Foundation Check
-···-------· -----j I -1 - - - I
Erection
--4- -·- - -1 I ··---~-------
3 Check orientation
------ --l I l f.- I
4 I Grouting
5 I Anchor bolt tightening /lock nut installation
6 I Co- ordinates : North I East
7 I Survey instrument type :
The installation of the above equipment has been Satisfactorily Completed in accordance with the Drawings and Specifications.
~
Clean Fuels Project (CFP)
",,·1"¥1
- - i,;bjl.I!,;,J;;
- . 1'•
. . . .. . ,.,,.... KNPC
~: ~
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. Jl-2025
ITR NO.: P6012MAB.000.10.03.002.QCF.202-MA ~etrofac
~ ., ~AM~UN~
IN~INmiN~
I
•
1\olo.l•ii,,.,.,,..,,.r.o;oo,.; ~
<<Barcode I tern>>
INSPECTION & TEST RECORD-MECHANICAL
INSTALLATION OF FILTER I STRAINER
Client Name : Project Name :
Contractor : Project No:
Sub-contractor : Report No:
Equipment Tag No : Date:
Sub-System No : Plant/Unit :
Drawing No: Rev:
3 Check that the installation is correct & as per drawing (orientation & elevation, grouting completed) .
4 Check that the holdings down bolts are fitted and torque settings are correct.
10 For media filters ensure correct amount is added & that the grids are secure .
13 Check filter elements types are correct per drawing & record details.
15 Check access lid securing bolts are fitted and torque settings are correct.
Remarks:
- -
Name
Signature
I
Date
I
~ -·, ~~~~~~~!~~ 6
KNPC Contract No. CFP/EPC/0054-MAB1
~etrofa~
bd PSCJ Job No. Jl-2025
' " ...
.. -pli.;btJJ""<;
" ' I'll' ITR NO. : P6012MAB.000.10.03.002.QCF.201-MA •
~,~:, . .,,_)..,....~ KNPC ~
l)j..J,,~t;~ tl frtit• loo;oo- ~
Name
Signature
Date
L____
~
Clean Fuels Project (CFP)
I•""·i""pi..,...Jii'!l;,;
~.~:,
"" "
.
. I'll
. .,. .,.. ..,., KNPC
~, ~
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. Jl-2025
ITR NO. : P6012MAB.000.10.03.002.QCF.214-MA Petrofac
~ ,, SijSUHG
m~[!!JNG
I
•
, ~ .. ,l ... t..'""''"''"'f-:w- ~
5 Demisters/Cyclones correct.
17 Bolts on the internal components are correct type & tightened/torqued as applicable.
19 All internals work and installation of other appurtenances conform to drawing requirements .
Remarks:
L___
Signature
Date
·-·
~
Clean Fuels Project (CFP)
• •pli;b,l,j,;,,iio
"'. "'·J..
~.~ :,,~
• . 1'•1
. .,.. ... KNPC
~, ~ ~
.
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. Jl-2025
ITR NO.: P6012MAB.000.10.03.002.QCF.213-MA ~etrofaC ~ ., ~!UN~
INbiNURIN~ I I
'~'!"'"''" '~"··("'i'".... ~
<<Bar code I tern>>
INSPECTION & TEST RECORD-MECHANICAL
INSTALLATION OF FLARE STACK & FLARE TIP
Client Name: Project Name :
Contractor : Project No:
Sub-contractor : Report No:
Equipment Tag No : Date:
Sub-System No : Plant/Unit :
Drawing No: Rev:
Confirm that the holdings down bolts are tight to the correct torque & have a lock nut fitted, washer
3
plates welded as applicable.
Confirm all ladders & landings are installed correctly & that safety chains are installed on each
5
landing.
Confirm the Flare tip is installed as per the design drawings & vendor instructions (including correct
8 bolting & gasket).
9 Confirm that the wind shield is correctly orientated to drawings and specification.
13 Check (if applicable) heat shield correctly installed per drawing and to specification .
Confirm that the Flare tip removal equipment is available or installed (Davit Arm/Winch etc. as
14
applicable).
Remarks:
Name
Signature
Date
Page 1 of 1 P6012MAB.000.1 0.03.002.QCF.213-MA, Rev A 1
~
Kuwait National Petroleum Company (K.S.C)
Petrofac ®• ~m
Clean Fuels Project (CFP)
, !.'"'·iw.,oli.o!,,J,;,JC
• • • •
•
IIM
SAMSUNG
!NGINmiNG •
~,~:, . . . . .,.., .,~!
~ ~} ~""'" '"""'•(~....
KNPC
~
~
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. Jl-2025
Equipment Name:
Part A: The following drawings I documents which are approved by Company shall be presented by EPC
Contractor along with inspection request.
Drawing I Document Yes No Remark
Copy of latest PO for the equipment
Copy of the latest PO for the spares of the equipment
Latest G.A. Drawing of the equipment
Latest name plate drawing for the equipment
Latest data sheet of the equipment
Installation & maintenance manuals, catalogue copies etc.
Inspection release certificate by TPI agency
Part 8: The following items shall be checked at site.
P6012MAB.000.10.03.002.QCF.114-GX, Rev A1
Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)
·)&.:;...pfl&..;.btllJ~Ic I
KNPC Contract No. CFP/EPC/0054-MAB1
~etrofac ~ - ~~~
(a~., - - -
~~:::·:.::-:.::.::.:,:::
KNPC
i..1
• •
I""
.....;:?
PSCJ Job No. Jl-2025
ITR NO. : P6012MAB .000.10.03.002.QCF.049-MA !N~IN!ffilN~ •
<<Bar code I tern>>
INSPECTION & TEST RECORD-MECHANICAL
RECORD OF DIMENSIONAL INSPECTION
Client Project
Rev.
VISUAL INSPECTION:-
DIMENSIONAL INSPECTION:-
RESULT OF INSPECTION:-
Name
Signature
Date
Page 1 of 1 P6012MAB.000.10 .03.002.QCF.049-MA, Rev A1
Kuwait National Petroleum Company (K.S.C)
~
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
6"~.,..,..i.:bgJJ>.Ji>'
-- - . ~
. .~ ;.,. . . , _~, ..., KNPC ~
PSCJ Job No. Jl-2025
ITR NO. : P6012MAB.000.10.03.002.QCF.190-CA ~etrofac ®f' !MmN~
!N~IN !~,N~ ~
•
<<Barcodeitem>>
~~· " .... t•• £.,•\o:-,.. ~
4 All gully gratings to drains installed and drains and sumps clean.
All penetrations installed, with sleeves I kick plates of specified size complete with
5
drain holes as required.
All Packers used under uprights to be fabricated from good quality CS & to be
7
blasted & primed as a minimum.
Foundations and handrails installed in accordance with Project Specifications ,
8 ladder entrances have safety bar complete with protected landing end and portable
hand railings are secured .
All structural supports installed in accordance with drawings and all temporary aids I
9
brackets removed .
All maintenance I scaffolding lugs are installed in accordance with drawings with the
11
correct orientation.
Temporary steel work, to be removed at a later date, clearly marked and identified
12
on relevant drawings.
13 All Welding, Stress Relief and NOT work completed and cleared.
14 Confirm that all Quality Records have been completed and accepted .
15 Confirm that all Punch List items have been completed and accepted.
Remarks:
'-----~
~etrofac ~ " :S A
Clean Fuels Project (CFP)
.. KNPC Contract No. CFP/EPC/0054-MAB1
~:::!=t.:.::.:.:= PSCJ Job No. Jl-2025
RFI#
..
Drawing No.
Observation Inspection
Item No. Description of Inspected Items
Yes NQ Contractor Company
Remarks:
Name
Sign at~ re
Date
Page 1 Qf 1 FM-1146-050 ~ev. 01
~ ;..;.pn
·I
1.1 .. ..
iOI.j!W
..
a. ,.
• jll
~ Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)
Anchor
Blinding Footings Pedestals Columns bolts/Embedded Shims Slab/Roof Others
plates/Openings
I
1 - Coordinates
Ea sting
No.
Actual Tolerance Actual As per DWG. Tolerance
2 - Elevation
Top of concrete Anchor Bolts/Embedded Plates/Openings
No.
Actual As per DWG . Diff. Tolerance Actual As per DWG. Diff. Tolerances
Remarks:
Name
Signature i
I
I
Date
L__ - - - - I
Page 1 of 1 P6003SH U.000. 10. 03.002 .QCF .165-CX, Rev A 1
:.
i.:b~J,;,I<;. ~
Kuwait National Petroleum Company (K.S.C)
this format shall be as per Form No. 2 specified in the contract section