This document contains information for a building permit application, including: 1) A section for a design professional to provide measurements and details of proposed fencing. 2) A table to track the progress of an application through different approval stages. 3) Conditions and requirements that must be met for the permit to be issued, related to building codes, excavation notifications, and construction oversight.

Uploaded by

Zhardei Alyson
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views1 page

Fencing Permit (BACK)

This document contains information for a building permit application, including: 1) A section for a design professional to provide measurements and details of proposed fencing. 2) A table to track the progress of an application through different approval stages. 3) Conditions and requirements that must be met for the permit to be issued, related to building codes, excavation notifications, and construction oversight.

Uploaded by

Zhardei Alyson
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

BOX 6 (TO BE ACCOMPLISHED BY THE DESIGN PROFESSIONAL)

MEASUREMENTS : _______________________________ LENGTH IN METERS _______________________________ HEIGHT IN METERS


TYPE OF FENCING: INDIGENOUS MATERIALS R.C. STEEL MATTING
R.C. (Reinforced Concrete) R.C. BARBED WIRE
R.C. and CONC. HOLLOW BLOCKS OTHERS (Specify) ______________________________
R.C. and BRICKS _____________________________________________
R.C. and INTERLINK/CYCLONE WIRE _____________________________________________

BOX 7 (TO BE ACCOMPLISHED BY THE PROCESSING AND EVALUATION DIVISION)

PROGRESS FLOW
IN OUT
PROCESSED BY
DATE TIME DATE TIME

LINE AND GRADE (GEODETIC)


CIVIL/STRUCTURAL
ELECTRICAL

OTHERS (Specify)

ASSESSED FEES
Amount Due O. R. Number Date Paid Processed By
LINE AND GRADE (GEODETIC)

FENCING

ELECTRICAL (If any)

OTHERS (Specify)

TOTAL
BOX 8 (TO BE ACCOMPLISHED BY THE BUILDING OFFICIAL)

ACTION TAKEN:
PERMIT IS HEREBY ISSUED/GRANTED SUBJECT TO THE FOLLOWING CONDITIONS:

1. That under Article 1723 of the Civil Code of the Philippines, the engineer or architect who drew up the plans and specifications is liable for
damages if within fifteen (15) years from the completion of the structure, it should collapse due to defect in the plans or specifications or
defects in the ground. The engineer or architect who supervises the construction shall be solidarily liable with the contractor should the
edifice collapse due to defect in the construction or the use of inferior materials.
2. That the proposed construction/erection/addition, etc. shall be in conformity with the provisions of the “National Building Code” (P.D. 1096)
and its Implementing Rules and Regulations.
a. That prior to commencement of the proposed projects and construction an actual relocation survey shall be conducted by responsible
licensed Geodetic Engineer.
b. That before commencing the excavation the person making or causing the excavation to be made shall verify in writing the owner of
adjoining building not less than ten (10) days before such excavation is to be made and show how the adjoining building should be
protected.
c. That the owner of the fence shall engage the services of responsible licensed Architect or Civil Engineer to undertake the full time
inspection and supervision of the construction work.
d. That there shall be kept at the jobsite at all times a logbook wherein the actual progress of construction including test conducted,
weather condition and other pertinent data are to be recorded, same shall be made available for scrutiny and comments by the OBO
representative during the conduct of his/her inspection pursuant to Section 207 of the National Building Code.

PERMIT ISSUED BY: