The document outlines the work breakdown structure and schedule for constructing a 220kv substation. It involves structure work for a GIS building and DG building from foundation to roof slabs, as well as finishing work like blockwork, plastering, screeding and door/window fixing for both buildings. The project start date is November 4th 2022 and overall completion date is May 4th 2023, taking 181 days.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
56 views4 pages
Construction Project Schedule HO
The document outlines the work breakdown structure and schedule for constructing a 220kv substation. It involves structure work for a GIS building and DG building from foundation to roof slabs, as well as finishing work like blockwork, plastering, screeding and door/window fixing for both buildings. The project start date is November 4th 2022 and overall completion date is May 4th 2023, taking 181 days.