National Highways Authority of India
(Ministry of Road Transport and Highways, Government of India)
‘HS GH 6, 847-10, area, * feat - 110 075 & G-5 & 6, Sector-10, Dwarka, New Delhi-110075
"GONY/Phone : 91-11-25074100 / 25074200
NHAI/Policy Guidelines/ Road Safety/ 2023
Policy Circular No.12.33/ 2023 dated 06'" June, 2023
{Decision taken on E-Office File No, NHAI/ 11001 /RSC/2021/ NonTRW-BS (Comp. No. 81719)}
aA West UsTart oifeepet >
(aes ohare sre werent sara, are Ae) oy
Sub: Delegation of powers for rectification of Accident Spots through short term
measures - reg.
NHAI vide Policy Guidelines/Road Safety/2022 Circular No.12.25 dated 12.04.2022 issued
revised comprehensive guidelines on preparation of proposals, granting sanctions, execution of
works etc. for rectification of accident black spots notified by Ministry of Road, Transport &
Highways. A copy of the same is attached at Annexure 1
2. __ Depending upon the site condition/ requirement, the corrective measures could be short
term and/or long term. The suggestive short term measures may be as under:
(i) Pedestrian facilities like Zebra crossings with advance warning sign as per IRC
guidelines
(fi) Crash barriers/ railings
(iif) Solar tight Blinkers.
(iv) Junctions improvement.
(v) Road signs inter alia speed limits sign, pavement/road markings, delineators,
studs/cat eyes.
(vi) Traffic calming measures including road studs, solar studs, traffic impact attenuators,
rumble strip, etc.
(vii) Repairing/maintenance of _ unsafe road/appurtenance including filling of
berms/shoulder on National Highways.
(viit) Restriction of certain types of vehicles, one way streets, reversible lanes, bus lanes,
restriction on movement of different types of vehicles by time/ by lane etc. specially
in urban areas.
‘The provision of IRC SP-85: "Manual on Road Safety Audit” are also referred for
proposing safety measures/ analysis etc. appropriately.
3. _ In order to expedite the rectification of accident spots, duly identified & recommended by
the respective State Police Department or District Road Safety Committee (DRSC) in writing (other
than MoRTH identified black spots). Project Directors (PDs) are delegated powers to approve
rectification of these accident spots through short-term measures upto an amount of Rs 10 lakhs
er accident spot under Change of Scope (COS) or standalone basis. PDs shall devise mitigation
‘measures following provisions mentioned in Para 2 above. For short term rectification measures
costing more than Rs 10 lakhs but upto Rs 25 lakhs, case may be referred to concerned RO for
approval. Further, the procurement of the works to be carried out at various accident spots
pertaining to a project may be combined, if required.
Contd...2/2
4, The above delegation is applicable for entire NH network under construction & O&M.
5. Further, PIU shall mandatorily enter all the requisite data on datalake module (to be
developed by IT Division, HQ in next fortnight) i.e., recommendation of safety committee, copy of
estimate, location details, colour photographs of accidental spot, approval letter, etc.
6. Datalake module will generate a unique ID after entering the requisite data on the module
for each and every accidental spot. No payment will be permissible without the said unique ID.
7. This issues with the approval of Competent Authority.
Encl.: As stated above Ge we|23
(Sanjay Kumar Patel)
General Manager (Coord.)
To:
All Officers of NHAI HQ/ ROs/ PIUs/ CMUs/ Site Offices
Copy to:
1. Hindi Officer for translation in Hindi.
2. Library for hosting the circular on library site.
3. Web Admin for circulation.Arnesce- TL
BAW Phone -91-1-25074400725074200
Bre Fax 94-41 2500507 ¥ 2soma 8
aredta ogta usta snferemeot
ope Siar ae a ae
National Highways Authority of India
(iinisty of Road Transport an Highways)
‘ot-5 i 6, Saet-10, aren, ae fReett~110075
65.46, Sector-10, Dwarka, New Delhi-110075
NHAI/Policy Guidelines/ Road Safety/2022
Policy Circular No. 12.25/2022 dated 12" April, 2022
[Decision taken on E-Office File No. NHAI/RO/PAT/ RoadSafety/2013/1 (Comp.No. 86653)}
(This circular is in supersession to earlier Circular No. 1.1.31/2019 dated 19.12.2019)
Sub: Rectification of Accident Blackspots - Guidelines on preparation of proposals,
granting sanctions, execution of works, etc.- reg.
Ref: (f) Circular No- RW/NH-15017/1092015-P&M (RSCE) dated 08.10.2015
(il) Circular No- RWINH-290111212 )15-PEM (RSCE) dated 07.12.2015
(ii) Circutar No- RWINH-290111212 J15-P&M (RSCE) dated 02.09.2016
liv) Circular No- RWINH-29011 12/1 J15-P&M (RSCE) dated 14.09.2016
(v) NHA’s Circular no. 1.1.29/2019 dated 05.08.2019 (in modification of Circular
no. 1.1.25 dated 21.12.2017)
(ui) NHAI’s circular no. 1.1.31/2019 dated 19.12.2019
Precious lives of several road users are lost due to road accidents in India. Road
accidents impose a huge social and economic cost in terms of untimely deaths, injuries,
disabilities and loss of potential income, The costs of road accidents are borne not only by the
victims and their families, but by society and the economy also.
2. Toreduce the road accidents, Ministry/ NHAI earlier issued several guidetines/ circulars,
as mentioned in above references, for rectification of blackspots. The revised comprehensive
guidelines, in supersession of above circulars/ guidelines, have now been issued for strict
compliance by all concerned.
3. The definition of road accident blackspot on National Highway as given in Mintstry’s OM
No. RW/NH-15017/109/2015-PEM(RSCE) dated 28.10.2015 is as under:
“Road Accident Blackspot is a stretch of National Highway of about 500m in length in
which either 5 road accidents (in all three years put together involving fatalities!
grievous injuries) took place during the last 3 calendar years or 10 fatalities (in all three
years put together) took place during the last 3 calendar years.”
4, Reporting of Accident Data: Based on the above definition of blackspot, the Transport
Research Wing, MoRTH compiles and analyses road accident data on NHs for a particular
calendar year and furnishes the blackspots details along with accidents and fatalities data to
WoRTH/ NHAI.
Contd...2/-6
64
Inspection and Framing of Proposals:
5.1 The Regional Officers (ROs) alongwith their Road Safety Officer (RSO),Road Safety
Consultant, Road Safety Expert of IE/AE, etc. have to inspect each blackspot on
National Highways under their jurisdictions, analyze the reasons of accidents with
respect to geometry and other features of Highways, the cross roads and other
reasons. Local enquiry and discussion with local authorities including Police
Authorities may also be duly considered in identifying the reasons/ remedial
measures for repeated accidents/ fatalities,
5.2, Depending upon the site condition! requirement, the corrective measures could
bbe short- term (Ref. Annexure-A) and/or long-term (Ref. Annexure-B). Based on
site inspection, preliminary survey, etc. the type of interventions required may be
‘identified and accordingly the action for taking corrective measures, i.e., short-
term measures and long-term measures may be initiated at Regional Office level.
In case, it is concluded that the accidents are not due to engineering deficiencies,
a certificate in this regard may be issued by the Regional Officer.
5.3, Where services of Road Safety Consultants/Road Safety Expert of IE/AE are not
available for developing proposal for long-term measures, a consultants may be
engaged (if so required) for detailed survey, investigation, preparation of DPR, RFP.
document, etc. by obtaining sealed offers from the Consultants working nearby
(minimum three) with notice period of 07 days for consultancy works. RO may
award work for consultancy upto an amount of RS.10 lacs. In case the cost of
consultancy 1s exceeding Rs.10 lacs, the consultancy may be awarded with the
approval of Member concerned,
Sanction of Scheme:
Short-term measures
6.1.1 Project Directors (PDs) are delegated powers to approve rectification of
MORTH notified blackspots through short-term measures upto an amount of
Rs, 25 Lakhs per blackspot under Change of Scope (CoS) or Standalone basts.
1 Contd...3/-6.2
ma
12
81
PDs shall devise mitigation measures following provisions of Para-5 above. For
Short term rectification measures costing more than Rs.25 lacs fora blackspot,
‘case may be referred to concerned Member in HQ through RO for approval.
Long-term measures
62.1 Regional Officers shall devise mitigation measures following provisions of
Para-S above. ROs are delegated powers to approve estimate for rectification
Of MORTH notified blacispots through tong-term measures upto an amount of
Rs.50 crore per blackspet (including the cost of land acquisition), carry out
necessary procurement and execute the works including all centages, on COS
‘F Standalone basis, under intimation to the cancerned Technical Division and
Road Safety Cell at HO.
6.2.2 All MoRTH notified blackspots’ mitigation works costing more than Rs.50
crores shall be submitted to the concerned Technical Division for approval by
the concerned Member with the concurrence of Member ().
Priority to Execute Blackspots Works:
For awarded projects, ROs/ PDs should give priority to execute mitigation works at
blackspot stretches.
Cases other than covered in Para-7.1 above, blackspot rectification measures may be
taken up on stand-alone basis.
Implementation of Remedial Measure:
‘The execution of the remedial measures after the sanction/ approval maybe carried
ut through a contract to be awarded through bidding as mentioned above. Execution
through COS can also be examined. A view in this regard is to be taken by the RO
depending upon state of execution of work, performance of the contractor, nature
of work, etc. In addition, while taking up such works, ROs/ PDs must take judicious
decision to go for COS or Standalone basis, duly considering all pros & cons, ROs/PDs
shall also ensure that the cited mitigation measures under COS/Standatone for the
respective blackspot ID are uploaded to Datalake portal simultaneously
Contd,9. Monitoring the Effectiveness of Remedial Measures Taken:
9.1 Efficacy of the Road Safety Engineering measures is ensured only when road
accidents/ fatalities related to road and road environment are eliminated as
reflected in feedback on accidents/ fatalities at the improved location for at least 3
years. Therefore, PDs shalt collect accident/ fatality data at the improved locations
from the police authorities and upload the accident/fatality data at the improved
location(s) on Datalake portal regularly.
9.2 in view of the highest importance for road safety works, it is requested that all
concerned should take the actions as mentioned above in a strictly time bound
manner.
10. Annual Road Safety Work Plan: ROs/PDs are directed to analyze the entire NH network
Under construction and O&M in their jurisdiction based on safety audits/ inspections and
authentic accident data for last 2-3 years and submit a consolidated report in the beginning of
the year in the month of April, latest by 30th April, on additional measures/ works required on
each project section to make the entire road network safe for commuters. Member concemed
‘may examine & approve these reports and finalize a safety work plan for each Financial Year
with a copy to Road Safety Cell. This exercise be undertaken in April every year.
‘This issues with the approval of Competent Authority.
Encl.: As stated above
(Sanjay Kumar Patel)
General Manager (Coord.)
Te:
AL Officers of NHAI HQ/ ROs/ PIUs/ CMUs/ Site Offices
Copy to:
1. Hindi Officer for transtation in Hindi.
2. Library for hosting the circular on library site.
3. Web Admin for circulation.(A) The suggestive short-term measures:
(i) Pedestrian facilities like Zebra crossings with advance warning sign as per IRC
guidelines,
(ii) Crash barriers/ railings.
(ii) Solar light
(iv) Junctions improvement.
(¥) Road signs inter-alia speed limits sign, pavement/road markings, delineators,
studs/cats eye,
(vi) Traffic calming measures including rumble strip,
(wil) Repairing/maintenance of unsafe road/appurtenance including filling of
berms/shoulder on National Highways.
(vill) Restriction of certain types of vehicles, one way streets, reversible lanes,
bus lanes, restriction on movement of different types of vehicles by time/ by lane
tc. specially in urban areas.
The provision of IRC SP-88: “Manual on Road Safety Audit” may also be referred
for proposing safety measures/ analysis etc, appropriatelyAnnexure-B
‘The suggestive tong-term measures:
fased on inspection, survey ete. if it is concls
ided that the spot require tong term
measures, a detailed estimate may have to be prepared for the same. In such
situations some of the short-term measure as mentioned in Annexure-A and following,
cautionary measures may aiso be carried out.
‘The signages for cautionary/alerting road users may be as under
(i) Cautionary accident black spot signs at both ends.
(ii) Solar red blinking signals at both the ends,
(iif) Rumble strips together with rumble strip sign.
(iv) “Restriction ends" sign,
(v) Traffic Calming Measures
An indicative sketch showing the locations and shapes of the above signs is at
Annexure-C. Sizes, shapes, locations and other specifications of all the cautionary
signs indicated at (I) above shall be as per IRC-67-2012 or its latest edition.
Some of the long term suggestive measures depending upon the location of black spot
are as under:
| Location of Black spat
| Corrective/remedial measures
Obstacles stich as trees, poles, structure, etc. | Shifting/removal of these obstacles or
within the clear zone, encroachments etc. | providing other safety measures including
crash barr ete further et bck distance at |
all locations should Invariably be achieved
oe [eee
[Fiyover, underpasses,
At-grade junction ‘overpasses junction
Deficient geometry
ee er
GF Rarzonialverticat |
| | improvement ete.
——
| [susrfnatre or ater ey
|
measures including crash barrier ete. |
Tied waffle Proving Service Tane, Footpath, crash barfier
fas
Distressed/narrow Bridge/culvert | Reconstruction, rehabilitation” widening of |
| | ne ces
bbycrosang BRST Thabitanty
aea/schooU/hospitas/educational institute |
Foot over bridge ete.
ete.
| cast aiiur, Yc
Various safety “measures including crash
i barriers |
Animal/cattle crossing
Hill roads/sharp curves