No. 3700122168 WUR-31 PT 13.8 KV NKBS - Reviewed

The maintenance of 4 unit potential transformers at the New Kota Batak Substation included: - Cleaning the external parts of the potential transformers from dust, moss, and other contaminants. - Cleaning the primary and secondary terminal contacts on each potential transformer. - Cleaning the secondary control panels. - Performing electrical tests (test results attached): insulation resistance, polarization index, transformer turn ratio tests. - Applying a seal to the secondary control panel backdoors. - Repainting the potential transformer panel boxes. - Performing housekeeping after work completion.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views15 pages

No. 3700122168 WUR-31 PT 13.8 KV NKBS - Reviewed

The maintenance of 4 unit potential transformers at the New Kota Batak Substation included: - Cleaning the external parts of the potential transformers from dust, moss, and other contaminants. - Cleaning the primary and secondary terminal contacts on each potential transformer. - Cleaning the secondary control panels. - Performing electrical tests (test results attached): insulation resistance, polarization index, transformer turn ratio tests. - Applying a seal to the secondary control panel backdoors. - Repainting the potential transformer panel boxes. - Performing housekeeping after work completion.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

FINAL REPORT POTENTIAL TRANSFORMER

Job Description : MO Service TX & VR New Kota Batak Substation


Contract No. : SPHR00192A
RO. No : 3700122168
Job Code : WUR-31
Equipment : POTENTIAL TRANSFORMER
Manufacture : ABB.Ltd (ASEA BROWN BOVERI)
Serial No PT #1 : 20139770
PT #2 : 20139769
PT #3 : 20139772
PT #4 : 20139771
Location : NEW KOTA BATAK SUBSTATION
Start Date : 27 Juli 2023
Finish Date : 29 Juli 2023

PT. RADIANT UTAMA INTERINSCO TBK PT. PERTAMINA HULU ROKAN


Disusun Oleh: Diperiksa Oleh: Diketahui Oleh: Disetujui Oleh:

Andika Permana Joni Erwan


Electrical Analyst TAR Supervisor TAR
Tanggal: Tanggal: Tanggal: Tanggal:

RO No. 3700122168 Page 1 of 15


FINAL REPORT POTENTIAL TRANSFORMER

REVISION
Page 0 1 2 3 4 5 6 7 8 Remarks
1 X
2 X
3 X
4 X
5 X
6 X
7 X
8 X
9 X
10 X
11 X
12 X
13 X
14 X
15 X
16 X
17 X
18 X

RO No. 3700122168 Page 2 of 15


FINAL REPORT POTENTIAL TRANSFORMER
A. Personil
No Nama Pelaksana Jabatan Sertifikasi
1 Joni Erwan Supervisor TAR BNSP 3, Scaffolder Inspector
2 Edyson Field Coordinator TAR South BNSP 2
3 Kurnia Ilahi Sr. Technician (PMCoW) BNSP 2, TKPK 2 & Lifting Rigging
4 Andris Hutabarat Sr. Technician BNSP 2. TKPK 1 & Scaffolder
5 Irsa Yananto Jr. Technician -
6 Andika Permana Electrical Analyst TAR BNSP 2 & TKPK 1

B. Peralatan
No Keterangan Nama Peralatan Merek Peralatan Specification/type
Peralatan
1 Standard Tool Box Electrical Various Brands Handtools Complete
Umum

Insulation Resistance Tester HIOKI IR3455


2 Alat Ukur
TTR MEGGER -
AVO (Multi Meter) HIOKI -
Flame Retardant, anti-
Coveralls long sleeve FLEMING static & with reflective
strive
SNI or ASTMF2413-
Safety shoes Krusher
2005
Perlengkapan Safety Helmets complete ANSI Z89.1-2003 Type
3 MSA
Safety with chain straps 1 Class E & G

Safety Glasses complete


VT 7050-2 Safety Work
with chain side shields

Rubber handglove - Safety work


Cotton Handglove - Safety work

RO No. 3700122168 Page 3 of 15


FINAL REPORT POTENTIAL TRANSFORMER
C. SUMMARY

Pemeliharaan 4 unit Potential Transformer New Kota Batak Substation dilakukan meliputi:
 Membersihkan seluruh bagian terluar (Body) Potential Transformer dari kontaminasi
debu, lumut & kotoran
 Membersihkan setiap kontak terminal pada Primary & Secondary Potential Transformer
 Membersihkan panel Control Secondary
 Melakukan pengujian Electrical (Hasil Pengujian Terlampir):
 Insulation Resistance & Polarization Index
 Transformer Turn Ratio Test
 Memberi Red Seal pada backdoor Secondary Control Panel Potential Transformer
 Melakukan pengecatan ulang pada Panel Box Potential Transformer
 Melakukan Housekeeping pada saat pekerjaan selesai

Belajar dari pengalaman koneksi Secondary PT yang


terbalik di 8D TX-2, mohon dicantumkan juga pengecekan
koneksi kabel secondary terhadap 4 buah PT

RO No. 3700122168 Page 4 of 15


FINAL REPORT POTENTIAL TRANSFORMER
D. LINGKUP PEKERJAAN

Name Plate Potential Transformer


Description PT #1 PT #2 PT #3 PT #4
Manufacture ABB ABB ABB ABB
Ser. Number 20139770 20139769 20139772 20139771
Ratio 1:120 1:120 1:120 1:120
BIL 110 KV 110 KV 110 KV 110 KV
Primary Volts 14400/14400Y 14400/14400Y 14400/14400Y 14400/14400Y
Type 7525A89G10 7525A89G10 7525A89G10 7525A89G10
Acurracy Class 0.3 W THRU Z 0.3 W THRU Z 0.3 W THRU Z 0.3 W THRU Z
Freq 60 60 60 60
Manufactured Year 2001 2001 2001 2001

PT #1

PT #2

NAMEPLATE PT

PT #3

PT #4

RO No. 3700122168 Page 5 of 15


FINAL REPORT POTENTIAL TRANSFORMER
INSULATION RESISTANCE & POLARIZATION INDEX TEST

Description Specification
Manufacture HIOKI
Model/Type IR3455

Before Service Insulation Resistance Test PT 1 & 2

Tanggal Pengujian : 27 Juli 2023


Waktu Pengujian : 10:00 WIB
Amb. Temp : 31 °C
Cuaca : Cerah

Insulation Resistance PT #1
Test Voltage After Converted to
t = 1 Menit t = 10 Menit PI Remarks
Connection (VDC) 20°C (1 Menit*1.6)
HV to Ground 5000 43.8 GΩ 47.3 GΩ 1.08 70.08 GΩ PASS
HV to LV 5000 63.1 GΩ 68.0 GΩ 1.08 100.9 GΩ PASS
LV to Ground 500 13.6 GΩ 21.0 GΩ 1.34 21.76 GΩ PASS
Insulation Resistance PT #2
Test Voltage After Converted to
t = 1 Menit t = 10 Menit PI Remarks
Connection (VDC) 20°C (1 Menit*1.6)
HV to Ground 5000 23.8 GΩ 26.6 GΩ 1.12 38.0 GΩ PASS
HV to LV 5000 34.0 GΩ 43.7 GΩ 1.29 54.4 GΩ PASS
LV to Ground 500 1.60 GΩ 18.9 GΩ 1.63 2.56 GΩ PASS

Reference:
 ANSI/NETA MTS 2019 TABEL 100.1
Minimum test voltage 5000 VDC. Insulation Resistance greater than 10 GΩ
Minimum test voltage 500 VDC. Insulation Resistance greater than 25 MΩ
 Correction Factor according to Contract No. SPHR00129A
Correction Factor dry type transformer = 1.6

Summary :
Nilai hasil pengujian tahanan insulasi sesuai kriteria standard pengujian

Tested By :
Andris Hutabarat
Irsa Yananto

RO No. 3700122168 Page 6 of 15


FINAL REPORT POTENTIAL TRANSFORMER

Description Specification
Manufacture HIOKI
Model/Type IR3455

After Service Insulation Resistance Test PT 1 & 2

Tanggal Pengujian : 28 Juli 2023


Waktu Pengujian : 14:45 WIB
Amb. Temp : 32 °C
Cuaca : Cerah

Insulation Resistance PT #1
Test Voltage After Converted to
t = 1 Menit t = 10 Menit PI Remarks
Connection (VDC) 20°C (1 Menit*1.6)
HV to Ground 5000 78.7 GΩ 103 GΩ 1.31 125.9 GΩ PASS
HV to LV 5000 121 GΩ 137 GΩ 1.13 193.6 GΩ PASS
LV to Ground 500 25.3 GΩ 35.2 GΩ 1.39 40.48 GΩ PASS
Insulation Resistance PT #2
Test Voltage After Converted to
t = 1 Menit t = 10 Menit PI Remarks
Connection (VDC) 20°C (1 Menit*1.6)
HV to Ground 5000 42.0 GΩ 51.5 GΩ 1.23 67.2 GΩ PASS
HV to LV 5000 73.7 GΩ 85.2 GΩ 1.16 117.9 GΩ PASS
LV to Ground 500 21.6 GΩ 24.9 GΩ 1.15 34.56 GΩ PASS

Reference:
 ANSI/NETA MTS 2019 TABEL 100.1
Minimum test voltage 5000 VDC. Insulation Resistance greater than 10 GΩ
Minimum test voltage 500 VDC. Insulation Resistance greater than 25 MΩ
 Correction Factor according to Contract No. SPHR00129A
Correction Factor dry type transformer = 1.6

Summary :
Nilai hasil pengujian tahanan insulasi sesuai kriteria standard pengujian

Tested By :
Andris Hutabarat
Irsa Yananto

RO No. 3700122168 Page 7 of 15


FINAL REPORT POTENTIAL TRANSFORMER

Description Specification
Manufacture HIOKI
Model/Type IR3455

Before Service Insulation Resistance Test PT 3 & 4

Tanggal Pengujian : 28 Juli 2023


Waktu Pengujian : 10:00 WIB
Amb. Temp : 30 °C
Cuaca : Cerah

Insulation Resistance PT #1
Test Voltage After Converted to
t = 1 Menit t = 10 Menit PI Remarks
Connection (VDC) 20°C (1 Menit*1.6)
HV to Ground 5000 38.6 GΩ 50.0 GΩ 1.30 61.76 GΩ PASS
HV to LV 5000 51.6 GΩ 147 GΩ 2.85 82.56 GΩ PASS
LV to Ground 500 12.5 GΩ 17.8 GΩ 1.42 20.0 GΩ PASS
Insulation Resistance PT #2
Test Voltage After Converted to
t = 1 Menit t = 10 Menit PI Remarks
Connection (VDC) 20°C (1 Menit*1.6)
HV to Ground 5000 24.4 GΩ 25.5 GΩ 1.02 39.04 GΩ PASS
HV to LV 5000 45.0 GΩ 50.7 GΩ 1.13 72.0 GΩ PASS
LV to Ground 500 9.45 GΩ 14.5 GΩ 1.53 15.12 GΩ PASS

Reference:
 ANSI/NETA MTS 2019 TABEL 100.1
Minimum test voltage 5000 VDC. Insulation Resistance greater than 10 GΩ
Minimum test voltage 500 VDC. Insulation Resistance greater than 25 MΩ
 Correction Factor according to Contract No. SPHR00129A
Correction Factor dry type transformer = 1.6

Summary :
Nilai hasil pengujian tahanan insulasi sesuai kriteria standard pengujian.

Tested By :
Andris Hutabarat
Irsa Yananto

RO No. 3700122168 Page 8 of 15


FINAL REPORT POTENTIAL TRANSFORMER

Description Specification
Manufacture HIOKI
Model/Type IR3455

After Service Insulation Resistance Test PT 1 & 2

Tanggal Pengujian : 29 Juli 2023


Waktu Pengujian : 15:50 WIB
Amb. Temp : 33 °C
Cuaca : Cerah

Insulation Resistance PT #1
Test Voltage After Converted to
t = 1 Menit t = 10 Menit PI Remarks
Connection (VDC) 20°C (1 Menit*1.6)
HV to Ground 5000 34.1 GΩ 108 GΩ 3.17 54.56 GΩ PASS
HV to LV 5000 42.1 GΩ 166 GΩ 3.94 67.36 GΩ PASS
LV to Ground 500 16.5 GΩ 23.0 GΩ 1.39 26.4 GΩ PASS
Insulation Resistance PT #2
Test Voltage After Converted to
t = 1 Menit t = 10 Menit PI Remarks
Connection (VDC) 20°C (1 Menit*1.6)
HV to Ground 5000 37.0 GΩ 39.2 GΩ 1.06 59.2 GΩ PASS
HV to LV 5000 46.4 GΩ 62.8 GΩ 1.35 74.24 GΩ PASS
LV to Ground 500 8.14 GΩ 15.0 GΩ 1.84 13.0 GΩ PASS

Reference:
 ANSI/NETA MTS 2019 TABEL 100.1
Minimum test voltage 5000 VDC. Insulation Resistance greater than 10 GΩ
Minimum test voltage 500 VDC. Insulation Resistance greater than 25 MΩ
 Correction Factor according to Contract No. SPHR00129A
Correction Factor dry type transformer = 1.6

Summary :
Nilai hasil pengujian tahanan insulasi sesuai kriteria standard pengujian.

Tested By :
Andris Hutabarat
Irsa Yananto

RO No. 3700122168 Page 9 of 15


FINAL REPORT POTENTIAL TRANSFORMER

TRANSFORMER TURN RATIO TEST PT#1 & PT#2

Before Service TTR Test

Tanggal Pengujian : 27 Juli 2023


Waktu Pengujian : 11:00 WIB
Amb. Temp : 32 °C
Cuaca : Cerah

Equipment HV Voltage LV Voltage Expected Ratio (V) Actual Ratio (V) Error (%) Remark

PT#1 14400 120 120 119.75 -0.21 PASS


PT#2 14400 120 120 119.73 -0.22 PASS

After Service TTR Test

Tanggal Pengujian : 28 Juli 2023


Waktu Pengujian : 15:00 WIB
Amb. Temp : 32 °C
Cuaca : Cerah

Equipment HV Voltage LV Voltage Expected Ratio (V) Actual Ratio (V) Error (%) Remark

PT#1 14400 120 120 119.76 -0.20 PASS


PT#2 14400 120 120 119.74 -0.22 PASS

Referensi:
IEEE Std 62-1995 Page 12 Section 6.1.2.4 “Interpretation of the Transformer Ratio Test”
“The Turns Ratio Tolerance Should be within 0.5% of the nameplate specification for all
windings”

Summary:
Hasil pengujian telah sesuai standard pengujian karena % Error Deviation Lebih kecil dari 0.5

Tested by:
Andris Hutabarat
Irsa Yananto

RO No. 3700122168 Page 10 of 15


FINAL REPORT POTENTIAL TRANSFORMER
TRANSFORMER TURN RATIO TEST PT#3 & PT#4

Before Service TTR Test PT#3 & PT#4

Tanggal Pengujian : 28 Juli 2023


Waktu Pengujian : 11:35 WIB
Amb. Temp : 32 °C
Cuaca : Cerah

Equipment HV Voltage LV Voltage Expected Ratio (V) Actual Ratio (V) Error (%) Remark

Ganti PT#1 14400 120 120 119.77 -0.19 PASS


Label ke PT#2 14400 120 120 119.76 -0.20 PASS
PT#3 &
PT#4 After Service TTR Test PT#3 & PT#4

Tanggal Pengujian : 29 Juli 2023


Waktu Pengujian : 15:10 WIB
Amb. Temp : 32 °C
Cuaca : Cerah

Equipment HV Voltage LV Voltage Expected Ratio (V) Actual Ratio (V) Error (%) Remark

PT#1 14400 120 120 119.78 -0.18 PASS


PT#2 14400 120 120 119.78 -0.19 PASS

Referensi:
IEEE Std 62-1995 Page 12 Section 6.1.2.4 “Interpretation of the Transformer Ratio Test”
“The Turns Ratio Tolerance Should be within 0.5% of the nameplate specification for all
windings”

Summary:
Hasil pengujian telah sesuai standard pengujian karena % Error Deviation Lebih kecil dari 0.5

Tested by:
Andris Hutabarat
Irsa Yananto

RO No. 3700122168 Page 11 of 15


FINAL REPORT POTENTIAL TRANSFORMER
LAMPIRAN:

Dokumentasi Foto Pekerjaan PT 1, 2, 3 & 4


Proses Pengujian TTR Potential Transformers

RO No. 3700122168 Page 12 of 15


FINAL REPORT POTENTIAL TRANSFORMER

RO No. 3700122168 Page 13 of 15


FINAL REPORT POTENTIAL TRANSFORMER
Panel Box PT Before Clean Up

Proses Clean up panel Box Potential Transformer

Lampirkan foto koneksi secondary PT (4 pcs)


sebelum dan sesudah service
RO No. 3700122168 Page 14 of 15
FINAL REPORT POTENTIAL TRANSFORMER
Standard Reference

a. Insulation Resistance

ANSI/NETA MTS 2019 TABLE 100.1


 Correction Factor berdasarkan kontrak nomor. SPHR00129A untuk Type Dry = 1.60
 Correction Factor berdasarkan kontrak nomor. SPHR00129A untuk Type Oiled = 1.98

b. Transformer Turn Ratio Test


 IEEE Std 62-1995 Page 12 Section 6.1.2.4 “Interpretation of the Transformer
Ratio Test”

“The Turns Ratio Tolerance Should be within 0.5% of the nameplate specification for all
windings”

RO No. 3700122168 Page 15 of 15