Sap Interview PM Avni
Sap Interview PM Avni
-------------Real time---
----------
……………………………………………….
From PM basics to advance to HANA ----get the answers of these question
to be SAP PM interview ready for :
TCS
HCL
IBM
LNT
ITC
TechM
WIPRO
INFOSYS
CAPGEMINI
Big4(Deloitte,PWC,EY,KPMG)
Product based companies
Switch from Domain to Consulting
………………………………………………………………………………..
9. Can you describe the process of asset master data creation and maintenance in SAP
PM?
10. What are different master data in SAP PM? what will be sequence to load it in SAP?
11. Which tool you will use to load data?
12. What were the business cases which could not fit in standard and have you created
any custom solution for the business?
13. Explain? Have you worked on Interfaces, report what kind of interface reports you
have created give live project examples?
• Next comes the difference between HANA and ECC? And specifically, in regards to
SAP PM
• How does IP30H differs from IP30?
• Have you heard about role-based maintenance?
• What are cutover activities? Have you performed any?
• What is fiori ? have you used Fiori application?
• Name some PM fiori apps ?
A. Yes, it is possible to schedule an individual plan. You may use t code IP10
Q. Can you use call horizon and shift factors in multiple counter plan?
A. No, there is no such option. Call horizon and shift factors are assigned in Single Cycle
Plan and Maintenance strategy plan not in Multiple Counter plan.
Q. Suppose I have two counters in a multiple counter plan. One is 1000 kms and another is
2000 running hours.
If I want to trigger a maintenance order when both criteria are full fill or if any one of the
criteria full fills. Do I need to make an enhancement in system or there is an SAP standard
setting to achieve this?
A. There is an standard facility in Multiple counter plan where we can assign two counters
and put the condition whether we want both conditions to satisfy or any one condition to
satisfy to trigger the maintenance order. To check this facility you have to run t code IP43.
Then enter desired information and go to tab “Maintenance Plan Scheduling Parameters“.
Under this tab there is a box with title “Operation Type“, here we have two radio buttons
‘AND’ & ‘OR’. Please refer below screenshot:
If we select radio button ‘OR‘, it means that any of the counters cross the threshold value the
maintenance order will trigger from Multiple Counter plan.
If we select radio button ‘AND‘, it means that both counters must cross the threshold value to
trigger the maintenance order.
Please note that above concept is applicable in only Multiple Counter Plans. Q.
A. Maintenance Plant is the place where all the technical objects (structure and machinery)
are physically installed. In SAP it is a 4 digit alphanumeric key Q. How do you create a
maintenance plant?
A. Planning plant is the place where all the maintenance planning activities are carried out.
In SAP it is a 4 digit alphanumeric key. Q.
For example:
Planner group can be created according to different departments:
ELE – Electrical
MEC – Mechanical CVL – Civil
INS – Instrumentation
Planner group can also be created as per shift because many times activities are planned for
each shift:
There are lot of standard SAP Reports which can help tracking maintenance activities, history
and cost at planner group level.
Normally this field is used to mark the Equipment number as maintenance department
language/terminology.
A. QS41
Q. You tried to install an equipment on a functional location but system gives you an error.
What could be the possible reason?
A. There are four important settings which must be check before installing an equipment.
Although the error messages are self explanatory, but we can check few settings in SPRO
and master data