RCoC-B + SKM - Tentative-10 Days
RCoC-B + SKM - Tentative-10 Days
Week 1
Day 1 (Saturday)
1.1. Terminology
9:00 AM – 12:00 PM Chapter 1: 1.2. Introduction to ICAO and Civil Aviation Act
Air Law/Responsibilities 1.3. The UAS Regulation
1.4. Privacy and data Protection
12:15 PM – 2:15 PM
(REST) Chapter 2: 2.1 Airspace overview
UAS Airspace Operating 2.2 Airspace classification
Principles/ Rules of Air 2.3 Specific airspace types
2.4 Airspace reservations
2:30 PM – 5:30 PM 2.5 Obtaining information/approvals
Day 2 (Sunday)
3.1. Good airmanship principles
9:00 AM – 12:30 PM 3.2. Operations in visual line of sight
3.3. Operating environment
Chapter 3: 3.4. Remote pilot records
3.5. Logbooks and associated documentation
12:45 PM – 1:45 PM Airmanship and Aviation 3.6. Good airmanship principles
(REST) Safety 3.7. Aeronautical decision-making
3.8. Aviation safety
3.9. Air proximity reporting
3.10. Advanced airmanship
2:00 PM – 5:30 PM
Day 3 (Monday)
Chapter 4 : 4.1. Development of operational procedures
9:00 AM – 12:30 PM Operations Manual
Page | 1
Day 4 (Tuesday)
Chapter 6: 6.1. Introduction to
9:00 AM – 12:30 PM obtaining and
Meteorology interpreting
advanced
12:45 PM – 1:45 PM (REST) weather
information
6.2. Effects of weather on
2:00 PM – 5:30 PM the unmanned aircraft
Day 5 (Wednesday)
7.1. Pre-flight
9:00 AM – 12:30 PM 7.2. In-flight
Chapter 7: 7.3. Post-flight
7.4. Situational awareness
Operational Procedures 7.5. Communications
12:45 PM – 1:45 PM (REST) 7.6. Mission planning,
airspace
consideration and
site-risk
2:00 PM – 5:30 PM assessment
7.7. Multi crew cooperation
(MCC)
Day 6 (Thursday)
Chapter 8: 8.1. Aviation charts –
9:00 AM – 12:30 PM Navigation 1:500,000 and 1:250,000
8.2. Navigation aids
9
Page | 2
Day 7 (Friday)
(Practical Pre-flight
9:00 AM – 12:30 PM Assessment Day) In-flight
Post-flight
Situational awareness
12:45 PM – 1:45 PM (REST) Communications
Mission planning, airspace
consideration and site-risk
2:00 PM – 5:30 PM assessment
Multi crew cooperation (MCC)
Day 8 (Saturday)
9:00 AM – 12:15 PM
All Chapters Included
(Theoretical Assessment Day)
12:30 PM – 2:15 PM (REST)
2:30 PM – 5:30 PM
Week 2
Day 9 & 10 (Sunday &
Monday) Pre-flight
SKM Level 2 PPL Verification (PPA- In-flight
9:00 AM – 12:30 PM PPT) Post-flight
(Practical Assessment Day) Situational awareness
Communications
12:45 PM – 1:45 PM (REST) Mission planning, airspace
consideration and site-risk
assessment
2:00 PM – 5:30 PM
Multi crew cooperation (MCC)
-THE END-
Page | 3