This geotechnical investigation report summarizes soil testing conducted for a proposed aqueduct construction project near Jagepur Ghassa Village, Kanpur, India. 18 boreholes were dranged and soil samples were collected from depths ranging from 1.5 to 15 meters based on standard penetration and undisturbed sampling tests. The samples were analyzed in a laboratory to determine properties like bearing capacity, settlement potential, and maximum allowable settlement. The report includes bore logs, test results, and recommendations for foundation design based on the soil conditions.

Uploaded by

Pritesh RAI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
149 views37 pages

Ilovepdf Merged

This geotechnical investigation report summarizes soil testing conducted for a proposed aqueduct construction project near Jagepur Ghassa Village, Kanpur, India. 18 boreholes were dranged and soil samples were collected from depths ranging from 1.5 to 15 meters based on standard penetration and undisturbed sampling tests. The samples were analyzed in a laboratory to determine properties like bearing capacity, settlement potential, and maximum allowable settlement. The report includes bore logs, test results, and recommendations for foundation design based on the soil conditions.

Uploaded by

Pritesh RAI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 37

GEOTECHNICAL SOIL INVESTIGATION

WORK

At:

PANDURIVER CHAINAGE 5.15 KM to 5.20 KM


NEAR BRIDGE OF
JAGEPUR GHASSA VILLAGE,
KANPUR

For

CONSTRUCTION OF
PROPOSED AQUEDUCT

Submitted to:

EXECUTIVE ENGINEER
L.G.C.
KANPUR

Submitted By :

SHREE INFRATECH
SHARDA NAGAR,
KANPUR-208025
ACKNOWLEDGEMENI

Project: - GEOTECH INVESTIGATION REPORT FOR PROPOSED CONSTRUCTION OF


AQUADUCT

Client: - EXECUTIVE ENGINEER, L.G.C. KANPUR

Subject: - Geotech lnvestigation Report at Location: Pandu River Chainage 0.00 Km, Kanpur
Utar Pradesh

The investigation ended up with conclusions and recommendations relevant to the findings. Those.
in addition to the laboratory test results, engineering recommendations are also here with attached.

We look forward for further co-operation and would like to take this opportunity to highly
considerate confidence in our laboratory. For any clarification concerning the report. please
contact us at your convenience.

Report Prepared By and


Checked by
(Saurabh Agarwal)
(Authorized sign.)
S.K.Pandey

B tech (Civil)IITK M tech(Geo tech)iITD SHREE INFRATECH


Principal Consultant 117/Q/199, Kuasalya nagar
Kanpur sharda nagar ,Kanpur-208025
Mo-7355203171,9956194828

DATE.20-9-23
CONTENTS
1. INTRODUCTION 1

2. REFERENCES 1

3. FIELD INVESTIGATION 2

4. LABORATORY TESTS 3

5. INTERPRETATION OF LAB TEST RESULTS


a. GENERAL NATURE OF SOIL STRATA 4

b. S.P.T. VALUES 4

C. WATER TABLE 4

6. RECOMMENDATIONS 6

ANNEXURES

7. BEARING CAPACITY CALCULATIONS Annexure I


Annexure Il
8. RESULTS SHEETS
9. BORE-LOG CHARTS Annexure ill

10.SITE IMAGE Annexure IV


Geo-technical
for
Capacity and
settlernent
Bearing
the
table. foundations.
study form. differential
Safe consultancy.
water
to Disturbed collected.
determine ground
investigations
Capacity.settlement,
of
foundation settlement
and
existent samples
to Test.
Undisturbed
laboratory Bearing
laboratory maximum
includingPenetration
economical soil of
calculation
on of
in in testsdetermination
permissible
and and worksampling
Standard
field fieldmost for
laboratory
field l)-1976
the at the for
for for for for angular
distortion.
with both with 2132-1986all 6403-1981
1892-19742131-1981 1904-1986
8009(Part
INTRODUCTION soil for
deals soil REFERENCES 2720
foundation
AQUEDUCIof
reportproperties IS: IS: IS: IS: IS: IS: IS:
The 1. 2. 3. 4. 5. 6. 7.
the
wereusingcasing is was the iogs.in recorded m tubes the labeled were
18-12-20Z2. m attached of per recorded it collected 1.50
1.50 harnner
as from
as cm.
penetration sarmpling lifting.
mm progressed
shellrneter. bore
everysarnpler cm account 45 every carefully
150 was labeled. retrieval
to operated
20.Orn 45
standard than were
respective during
diameter at drivenpenetration at thin-walled
17-12-2022 boreholes
spoon into less boreholes
was or cmn sampler
sealed, afterwere slipped
manually
15.0 of taken
was 30 was These
of borehole split means in tubes
boreholes of sampler
cm not next incorporated
penetration spoon properly the in wherever
from depth the Standard specifications,
ends.
of
The use in by 15 was from sampling
out
the conducted boreholes each for
penetration split were
03
carried by
structure.
The
specifications. blows collected bothUDS profile.
out to
advanced cm. for total standardtesting.
samples
up is These testing.
at
requiredof the penetrated soil
was carried oither the 75 sampling sealed
the was cm number Wherever These for were the
site in of from laboratory length.
was of further are (SPT) driven heightblows15 (UDS) and for in
well
this boreholes per obtained per laboratory
worklayoutand as
first The depth size. mm waxed as
at Teststratawas afromof the value. as
work investigation to Samples logs
proposed
augers number transportedstrata450
suitable
INVESTIGATION
EELD All Penetration rods for drive. the samples properly
investigation of freely blows 'N' & and the bore
depth. changedrill seating
operated and
SPT
blows of Soil ofchange to the
the
INFRATECH following desired
SHREE of falling of
specifications Soil bags dia. were transported
in
within and end number
as carefullyUndisturbed mm marked
manually Standard kg designated
Considered of polythene
field lower numberDisturbed & boreholes
interval 63.50 interval
100
made the
The The The and and duly
to to of
SHREE INFRATECH Geotech Investigation Report

LABORATORY TESTS:
The following laboratory tests wera conducled to determine the engineering
characteristics of sub-soils:

Natural moisture contents were determined by oven drying method as per IS 2720
(Part ll)-1973. The results have been reported in result sheet attached.
Dry and Bulk density of soil strata were obtained using Shelby tubes in accordance with
IS 2720 (Part XXIX)-1975. The results have been reported in result sheet attached.

Particle size analysis test by hydrometer method were performed in accordance with
IS 2720 (Part IV) - 1965 on the part of soil samples obtained after the sieve analysis The
results have been reported in resut sheet attached.

Atterberg Limits' tests were performed in accordance with IS 2720 (Part V) - 1985 and
results have been reported in result sheet attached.

Specific gravity tests were performed in accordance with IS 2720 (Part II Section1) -
1980 and the results have been reported in result sheet attached.

Triaxial Compression Test under Unconsolidated Un-drained (UU) condition as per IS


2720 (Part-Xl)-2011 were performed on the undisturbed soil samples obtained during the
field investigation. The results have been reported in result sheet attached.

Direct shear tests were performed as per IS 2720 (Part XIll)-2015, on the undisturbed
soil samples obtained during the field investigation. The results and the density of
samples have been reported in result sheet attached.

Consolidation tests were performed as per IS 2720 (Part XV)-1986. on the

undisturbed soil samples obtained during the field investigation. The result in the form of
compression index (Cc) is reported in result sheet attached.
SHREE INFRATECH Geotech Investigation Report

INTERPRETATION OF THE LAB TEST RESULTS


GENERAL NATURE OF SOIL STRATA
The results of lab tests and bore hole log charts of bore holes 01,02 and 03 indicate that
the strata at the site is found to comprise of both cohesive as well as non-cohesive soil.
The cohesive type soil comprises of either silty clay soil of low and mediurn plasticity
and compressibility belonging to 'CL' and 'CI' group of IS classification.
However, the non-cohesive type soil is found to comprise of sandy silt ML type soil
group of IS classification.
The results of classification tests indicate that the natural soil stratum present at the Site
is found to comprise of both fine-grained soils (clayey soil) from 5.50m to terrnination
depth and coarse-grained soils (sandy soil) is from EGL to 5.50m depth.
S.P.I. VALUES
However, the S.P.T. values obtained in the respective sandy layer region present as per
bore-log charts enclosed are found to range from 8 to 13 indicating Loose' to 'Medium
relative density.
The S.P.T. values obtained in the respective clayey layer region present as per bore-iog
charts enclosed are found to range from 14 to 32 indicating 'Stiff to Very stiff
consistency.
is 'Loose' to ell'
The results of S.P.T. values indicate that the stratum at the Site
Compacted.
WATER TABLE
to 1.58 metre below
Water Table at the Site was observed at a depth from 15.0 metre
table may rise in
ground level on the day of soil investigation. However, the existing water
table at ground level has been
the post-monsOon period in general. Therefore, a water
adopted for calculation purposes.
Geotech Investigation Report
RECOMMENDATION FOR PROPOSED CONSTRUCTION OF AQUEDUCT
The Net Safe Bearing
Capacity/Safe Allowable Pressure is as follows: -
Bore Depth of Size of Footing Safe
Hole Shape Net Safe
Foundation of Settlement
Allowable Recommended
No below GL Bearing Pressure/ Allowable
Footing Length Width Capacity
Produced
Permissible Pressure
(m) Settlement
m) (m)
1.50
T/m' (mm) T/m' T/m'
SQUARE 2.00 2.00 9.17 9.97 9.17
1.50 SQUARE 3.00 3.00 10.43 17.42 10.43
01 1.50 SQUARE 4.00 4.00 11.81 36.91 11.81
2.00 SQUARE 2.00 2.00 11.62 12.64 11.62
2.00 SQUARE 3.00 3.00 12.76 27.66 12.76
2.00 SQUARE 4.00 4.00 14.09 50.92 13.20/50 13.20
1.50 SQUARE 2.00 2.00 9.89 9.86 9.29

1.50 SQUARE 3.00 3.00 11.22 17.52 11.22


1.50 SQUARE 4.00 4.00 12.67 37.85 12.67
02
2.00 SQUARE 2.00 2.00 12.50 12.46 12.50

2.00 SQUARE 3.00 3.00 13.66 27.98 13.66

2.00 SQUARE 4.00 4.00 15.03 47.57 15.03

1.50 SQUARE 2.00 2.00 9.51 12.64 9.51

1.50 SQUARE 3.00 3.00 10.79 21.11 10.79

1.50 SQUARE 4.00 4.00 12.18 42.46 12.18


03
2.00 SQUARE 2.00 2.00 12.02 13.92 12.02

2.00 SQUARE 3.00 3.00 13.13 32.57 13.13

2.00 SQUARE 4.00 4.00 14.45 54.43 13.18/50 13.18

NOTE: -
The above recommendations are based on the field investigation data results and the
laboratory tests results of the samples collected from the test locations and our
experience in this regard. If the actual sub-soil conditions during excavation for the
foundations differ from that has been reported, a reference should be made to us for

suggestions.
Further, the recommendations are based on the assumptions as mentioned in the Report
as
and the designer of the Structure should take into consideration all the factors required
per codes. The recommendations should be taken as guidelines for the designer.
Civil Engineer SHREE INFRATÈCH
Signature 117/Q/199, Kaushalya Kutir
Sharda Nagar, Kanpur- 208025 SHREE INFRATECH
Mob- 7355203171, 9956194828 Kanay
TAuthòrized. sign)
Capacit

Bearing
Net
Ultimate aN/m2
N/m

Capscity
shear Locat
3.00 1.50

6403-1981safely posl(m)
Factor
AQUEDUCT Sumed
of
Factor
Factors Depth
Parameters o
Dd
OF 1,60 0.00
IS: CONSTRUCTION Dd
Resistance sv
PER Factors Shape
S
balow for
table(m)
Water Se
lovol
borahole
usod
AS (m)
calculation
aring Ny
table She Nq
SHEET
PROPOSEDWater Ne 11
Ny
Nq
CALCULATION
FOR
Ne
Surcharge kN/m2
REPORT
Effective 12
36

0656
37
20
666
2029

INVESTIGATION istance Shes Anglote


metre
CAPACITY Gones Kg/em2
8
15.00
GEOTECH N/m)
24

BEARING (gms/ec)

of boreholeInput
Depth Parameters
(N/m3)
&
24 24

(gms/ec)
Rulk 34

(m)
OF
PROJECT
NAME
01
BOREHOLE im) 200 150
000
()
ength 00
2
(m) 150

SQUARE
ANNEXURE-I

S720
Apede
Bearng
Ultimate
Net kym2
N/m2
N/n

CapactY

.00 .58

safety monsoon
ise
(m)
AQUEDUCT Assumed
post lg
of lc
Factor Dy
Parameters
Resistance
Shearing
Dq
1580.00 D
OF
CONSTRUCTION Sy
s Sq
tabie
below
Water
(m) for
level
borehole se
used Ny
calculation
(m)
table Ng
PROPOSEDWater N
Ny
Nq
FOR Ne
AN/m2
REPORT

INVESTIGATION
metr

Kg/cm2
15.00
GEOTECH (N/m3)
307

(gms/cc)
Buik
of
Depth
boreholeInput
Parametets
N/m3)

(gms/ce)
Bulk

NAME
OF
PROJECT anoqy ysuag
02
BOREHOLE (m)
ANNEXURE-I

kN/m2 141
71

Bearing
Utimate
Net kN/m2

Capacity
nN/m
kN

3.00 I.50

(m)
rise
monsoon y
6403-1981 safetypost
AQUEDUCT Assumed lg

of le
Factor Dy
Parameters
Resistance
Shearing Dg
1.50 0.00 D
IS: OFCONSTRUCTION Sy
PER 5d
levelfor
(m)
below
tabie
Water Sc
used(m)
AS calculaion Ny
table
SHEET borahole
PROPOSED
Nq
Ne
Water
Ny
Nq
CALCULATION Nc
FOR
q kN/m2 1746
0658
2520
REPORT

INVESTIGATION 19
320 203

CAPACITY Kg/cm2
29

20.00
GEOTECH (kN/m3)|

BEARING Bulk
(gms/cci
89 191
ofDepth
boreholeInput
Parameters (N/m3)|
1

(gms/ce)

m)
PROJECT
OF
NAME
BOREHOLE
03
settlement
Total (mm) 9.97 ANNEXURE-I

Immediate
settlement
(mm) 12.465

Consolidation
settlement
1BOREHOLE (mm)

offoundation
Depth
Correction
Water factor 0.500
SQUARE

Settlement
Unit Pressure
for (mm) 0.212
1.00 0.80

1):1976
foundation
ofType increment
stress kN/m2 29.36
Depthfactor
Rigidity
factor 0P
(PART
Effective
stress P. kN/m2 25.45
8009
IS Corrected 14.00
PER SPT N
AS
CALCULATION Compression
Index
Width (m)
bgl kN/m2
X
Raito
Void
1.50 0.00 89.92
SETTLEMENT
Density (gms/cc)
L.84 L.89
base
depthcalculation
foundation Thickness 1.50 3.00
zone Layer (m)
for
effective
depthat
Pressure End depth
Layer 1.50 4.50
Table
Settlement
WaterApplied
Start
Layer
depth 0.00 1.50
(m)

SAND SAND
of Layer
Type CLAY SAND
métremetre metre

Layer
No
1.50 2.00 2.C0 1 2

Width S.No.
Depth Length 1 2
SHEET
2CALCULATION
sett
ement
Tstal (mm) 17.42
ANNEXURE-I

ettlement
Imrediate
mn)
17.092

Consolidation
settlement
1BOREHOLE (mim) 4.688

foundation
of
Depth
Correction
Water factor 0.500
W
SQUARE

Settlement
Pressure 0.232
1.00 0.80 for
Unit (mm)

1976
Increment 36.84 17.52
: foundation
Type
of stress kN/m2
1) Depthfactor
fatorRigidity BP
(PART
Effective
stress kN/m2 29.81 49.50
P.
8009
IS Corrected 14.00
PER SPT

AS
CALCULATION Compression 0.117
Index
Width (m)
bgl kN/m2

Raito
Void 0.642
1.50 0.00 102.32
SETTLEMENT
Density (gms/cc) 1.84 1.89 1.91

base
depthcalculation
foundation Thickness 1.50 4.00 0.50
zone Layer m)
for
eftective
depthat
Pressure End
Layer 1.50 5.50 6.00
depth m)
Table
Settlement

WaterApplied
Start
Layer
depth
0.00 1.50 S.50
(m)

SAND SAND CLAY


Tvpe
of Layer CLAY SAND
metremetremetre

Laye
No.
2 3
1.50 3.00 3.00

Width
DepthLength
$.No 2 3
settlement
Total (m) 36.91 ANNE

settlement
Immediate 25.005
(mm)

Consolidation
settlement
BOREHOLE
1 136
21

foundation
of
Depth
Correction 0.500
Water factor
SQUARE

Settlement
Pressure 0.243
1.00 0.80 for
Unit (mm)

:1976
foundation
Type
of Increment
stress kN/m2 51.47 22.87
1) Depthfactor
Rigidity
factor P

(PART
Efective
Stress
kN/m2 29.81 S6.19
P.
8009

IS Correctéd 14.00
PER N

AS
CALCULATION Compresslon 0.117
Index
Cc
Width (m)
bgl KN/m2
X
Raito
Void 0.542
115.80
1.50 0.00 e
SETTLEMENT
(gms/cc) 1.84 1.89 1.91
Density

base
depthcalculation
foundation Thickness 1.50 4.00 2.00
zone Layer (m)
for
effective
depth at
Pressure Layer
End 1.50 5.50 7.50
Table depth
Settlement
WaterApplied
Start
Layer 0.00 1.50 5.50
depth (m)

SAND SAND CLAY


ot Layer
Type CLAY SAND
metre metremetre

Layer
No
1.50 4.00 .00 2

DepthLength
Width S.
No. 2 3
settlement
Total (nm) 12.64
ANNEXURE-I

Immediate
ment
(mm) 15.801
set

Consolidation
1BOREHOLE settiement
(mm)

foundation
of
Depth
Correction
Water factor 0.500
W
sQUARE

Settlement
L00 0.80 Unit Pressure
for (mm) 0.212
1976
foundation
Type
of Increment 37.22
: factor
Rigldity
stress kN/m2
1) actor
Depth P
(PART
Efective
Stress kN/mz 29.57
8009 Pa

IS Corrected 14.00
PER SPT
AS
CALCULATION Compression
Index
Width (m)
bgl kN/m2

Raito
Void
113.98
1.50 9.00
SETTLEMENT
Density (gms/cc) 1.84 1.89
base
calculation
depth
foundation
Thickness 2.00 3.00
zone ye m)
for
effective
depthat
Pressure Layer
End
depth 2.00 5.00
Table
Settlement
Water Applied
Start
Layer 0.00 2.00
depth (m)

SAND SAND
Type
of Layer CLAY SAND
metremétrémetre

Layer
No.
2.00 .00

DepthLengthWidth S.No.
1 2
CALCULATION
SHEET settlement
Total (mm) 27.66
ANNEXURE-I

Immediate
settiement
(mm)
23.156

Consolidation
1BOREHOLE settlement
(mm) 11.419

foundation
of
Depth
Correction
Water factor 0.500
W
SQUARE

Settlement
1.00 U.80
UnitPressure
for (mm) 0.232

1976
foundation
Type
of Increment
kN/m2 49.90 22.98
:1) factor
Rigidity stress
BP
factor
Depth
(PART
Efective
stress kN/m2
31.75 51.49
8009 P.

IS Corrected 14.00
PER SPT
N

AS
CALCULATION Compression 0.117
Index
Width
bgl kN/m2
(m)
K
125.11 Raito
Void 0.642
1.50 J.00
SETTLEMENT
Density (gms/cc) 1.84 .89 .91

foundation
base
depthcalculation
Thickness 2.00 3.50 1.00
tone Layer (m)
for
effective
depthPressure
Applied
at
Enddepth
Layer 2.00 5.50 6.50
Table (m)
Settlement
Water
Start
Layer 0.00 2.00 5.50
depth
m

SAND SAND CLAY


Type
of
Layer
CLAY SAND

metremetremetre

Layer
No.
1 2 3
2.00 3.00 3.00

DepthLength
Width $.No. 1 2
CALCULATION
6
SHEET
settlement
Total 50.92
(mm)
ANNEXURE-I

Immediate
settlemeat
32.480
(mm)

Consolidation
1BOREHOLE settlement
31.172
(mm)

foundation
of
Depth
Correction
Water factor 0.500
SQUARE

Settlement
.00 U.80 Unit Pressure
for (mm) 0.243

:1976
foundation
Type
of Increment
stress kN/m2 66.85 28.87
1) fatorRigidity
factor BP
(PART
Depth
EHective
stress
KN/mz 31.75 58.18
8009 Pe

IS Corrected 14.00
PER SPT
N
AS
CALCULATION Compression 0.117
Index Cc
X (m)
Width bgl N/m2

Raito
Void 0.642
1.500.00 138.14
SETTLEMENT
Density Igms/cc) 1.84 1.89 1.91

base
calculatlon
effective
zone
depth
foundation 2.00 3.50 2.50
Thickness
Layer
for
depthat .
Pressure ayer
End depth 2.00 5.50 8.00
Table (m)
Settlement

WaterApplied
Start
Layer
depth 0.00 2.00 5.50
(m)

SAND SAND CLAY


Type
of Layer CLAY SAND
metremetremétre

Layer
No.
2 3
2.00 4.00 4.00

DepthLength
Width S.No. 1 3
settlement
Total (mm) 49.99
ANNEXURE-I
Immediate
settlernent
(mm) 31.830

Consolidation
1BOREHOLE settlement
30.657
mm)

foundation
Depth
of
Correction
Water factor 0.500
W
SQUARE

Settlement
1.00 0.80 Unit Pressure
for (mm) 0.243

1976
-

foundation
ofType Inrement
stress kN/m2 65.51 28.29
factor
Rigldity AP
:
1) factor
Depth

(PART kN/m2
Efective
stress 31.75 58.18

8009
TRIAL
FINALSPTCorrected
IS 14
PER N

AS
CALCULATION Compression
Index
0.117
|X
Width(m)
bgl kN/m2

Ralto
Void 0.b42
135.38
SETTLEMENT
1.50 0.00

Density (gms/cc) 1.84 1.89 1.91

base
depthcalculation
foundation Thickness
Layer
2.00 3.50 2.50
zone
for
effective
depthat
Pressure Layer
tnd 2.00 5.50 S.00
depth
Table
Settlement
WaterApplied
Start
Layer 0.00 2.00 5.50
depth (m)

SAND SAND CLAY


Type
of Layer CLAY SAND
metremetremetre

Layer
No.
1 2
2.00 .00

DepthLength
Width S.
No. 2 3
1
settlement
Total (mm) 9.86
ANNEXURE-I

settlement
Immediate
(mm) 12.326

Consolidation
settlement
2BOREHOLE (mm)

foundation
of
Depth
Correction
Water factor 0.500
W'
SQUARE

Settlement
UnitFressure
for
1.00 0.80 (mm) 0.195
1):1976
foundatlon
Type
of Increment kN/m2 31.67
Stress
Depthfactor
Rigidlty
factor AP
(PART
Effective kN/m2 25.15
stress
8009 P

IS Corrected
Compression 15.00
PER SPT
N
AS
CALCULATION
Index
Width (m)
bgl |kN/m2 Cc

X
Raito
Void
1.50 0.00 97.00
SETTLEMENT
Density (gms/cc) 1.88
1.83
basa
depthcalculation
foundation Thickness
(m) 1.50 3.00
zone Layer
for
effective
depthat
Pressure Layer
End depth 1.50 4.50
Table
Settlement
WaterApplied
Start
layer
depth 0.00 1.50

SAND SAND
Type
of Layer CLAY SAND
metre metremetre

Layer
No.
1.50 2.00 2.00 1 2

DepthLength
width S.
No.
1 2
settlement
Total (mm) 17.52
ANNEXURE-I

settlermnent
Immediate
16.847
(mm)

Consolidation
settlerment
2BOREHOLE (mm) 5.057

foundation
of
Depth
Correction
Water tactor 0.500
W
sQUARE

Settlement
1.00 0.80 for
UnitPressure
mm)
0.213
1976
foundation
ofType Increment
: stress AP kN/m2 39.61 18.84
1) factor
Algldlty
factor
Depth
(PART
Effective
stress kN/m2 29.47 48.94
8009 P

IS Corrected 15.00
PER SPT N"
AS
CALCULATION Compression
0.117
Index
bgl 110.02KN/m2
XWidth
(m) Cc

| Raito
Void 0.636
1.50 0.00
SETTLEMENT
(gms/cc)
Density 1.83 1.88 1.90
base
depthcalculation
foundation
zone Layer
Thickness
.50 4.00 0.50
(m)
for
effective
depth
at
Pressure End
depth 1.50 5.50 6.00
Table
Settlement (m)
Start
Layer
WaterApplied
depth m) 0.00 150 5.50

Type
of Layer SAND
SAND SAND CLAY
CLAY
metremetremetre

Layer
No.
2.00 3.00 3.00 1 2 3

DepthLength
Width No.
i 2 3
.
Total (mm) 37.85
ANNEXURE-I

settlement
Immediate
(mm) 24.587

Consolidation
settlement
2BOREHOLE (mm) 22.722

foundation
ofDepth
Correction
Water tactor 0500
W
sQUARE

Settlement
Pressure
1.00 0.80
for
Unit (mm) 0.223

1976
Increment
1): foundation
Type
of stress kN/m2 55.21 24.54
factor
Rigidity
factor
Depth AP
(PART
Effective
Stress
kN/m2 29.47 55.56
8009 P

IS Corrected 15.00
PER SPT N"
AS
CALCULATION Compression
Index 0.117
Width(m)
bgl kN/m2
X
Raito
Void 0.636
124.22
SETTLEMENT
1.50 0.00

Density (gms/cc) L.83 1.88 1.90


base
calculation
depth
foundation
Thickness 1.50 4.00 2.00
zone Layer (m)
for
effective
depthat
Pressure Enddepth
Layer 1.50 5.50 7.50
Settlement
Table (m)

WaterApplied
Start
Layer
depth 0.00 1.50 5.50
m)

SAND SAND CLAY


of Layer CLAY SAND
Type
metremetremetre

Layer
No.
1.50 4.00 4.00 1 2 3

Width
DepthLength S.No.
1 2 3
settlement
Immediate
(mm) 15.579

Consolidation
settlement
2BOREHOLE (mm)

foundation
Depth
of
Correction
Water factor 0.500
W
SQUARE

Settlement|
1.00 0.30 Unit Pressure
for (mm) 0.195
1976
:1) foundation
Type
of Increment
stress kN/m2 40.03
factor
Rigidity
factor
Depth AP
(PART
Effective kN/m2 29.22
stress
8009 P

IS Corrected
Compression
PER SPT 15.00
N
AS
CALCULATION
Index Cc
Width(m)
bgl kN/m2
X
Raito
Void
1.50 0.00 122.60
SETTLEMENT
(gms/cc)
Density 1.83 1.88
foundation
base
depthcalculation

zone Thickness 2.00 3.00


Layer (m)
for
effetive
depthPressure
Applied
at
Layer
End depth 2.00 5.00
Table
Settlemnent

Water
Start
Layer 0.00 2.00
depth

SAND SAND
Type
of Layer CLAY SAND
metremetremetré

Layer
No.
2.00 2.00 2.00 1 2

DepthLength
Width S.
No.
1 2
settlement
Total (mm) 27.98
ANNEXURE-I

settlement
Immediate
(mm) 22.728

Consolidation
settlement
2BOREHOLE (mm) 12.248

foundation
Depth
of
Correction
Water factor 0.500
W
SQUARE

Settlement
.00 0.80 Unit Pressure
for (mm) 0.213
1976
:1) foundation
of Increment
stress kN/m2 53.43 24.60
DepthRigidity
factor
factor
(PART
Type Ettective
stress kN/m2 31.38 50.90
8009
IS Corrected 15.00
PER SPT

AS
CALcULATION Compression
0.117
Index
Width (m)
bgl kN/m2

133.96 Raito
Void 0.636
SETTLEMENT
1.50 0.00

(gms/cc)
Density 1.83 1.88 1.90
base
depthcalculation
foundation Thickness 2.00 3.50 1.00
zone Layer (m)
for
effective
depthat
Pressure End
Layer
depth 2.00 5.50 6.50
Table (m)
Settlement

WaterApplied
Start
Layer
depth 0.00 2.00 5.50
m)

SAND SAND CLAY


Type
of Layer CLAY SAND
metremetremetre

No.
ayer
2.00 3.00 3.00 1 2

Width
DepthLength S.No. 3
1
ANNEXURE-I
30.293 27.56 57.76 0.117 0.636 1.90 2.50 8.00 5.50 CLAY 3
47.57 29.175 0.500 0.223 65.51 29.47 15.00 1.88 4.00 5.50 1.50 SAND 2
foundation Depth
of -
1.83 1.50 1.50 0.00 SAND 1 1
(mm) (mm) (mm) (mm) kN/m2 kN/m2 (gms/cc) (m)
m (m) SAND
AP Pe Cc CLAY
e
ent settlement factor Pressure
settiement stress stress SPT Index Thickness
Total Immediate
Consolidation Correction Unit for
Increment Etfective Raito Void Density depth
Startdepth Layer Layer
No. Layer
Water Settlement Corrected Compression Layer En
Layer Type
of No. .
SQUARE foundation Type
of kN/m2 147.40 foundation
base Pressure
at Applied
metre
BOREHOLE2 0.80 factor Rigidity bgl (m) 0.00
calculation fodepth
r Table Water Width
metre Length
1.00 factor Depth XWidth 1.50 depth zoneeffective Settlement A.00
CULATION
EET6 metre 2.00 Depth
1976 (PART
1)
: 8009 CALCULATION
IS
PER AS SETTLEMENT
1SHEET
CALCULATION settdement
Tatal 12.64
(m)
ANNEXURE-I

settlement
Irnmediate
(mm) 15.799

Consolidation
settiement
3BOREHOLE (mm)

foundation
of
Depth
Correction
Water factor 0.500
SQUARE

Settlement
Unit Pressure
for (mm) 0.259
100 0.80

1976
Intrement kN/m2 30.45
1): foundation
Type
of stress
BP
DepthRigidity
factor
factor
(PART
sHective kN/m2 26.04
8009
IS Corrected 12.00
PER SPI
N
AS
CALCULATION Compression
Index
Width (m)
bg! kN/m2
x
Raito
Void
1.500.00 93.25
SETTLEMENT
Density
(gms/cc) 1.88 1.39

base
depthcalculation
foundation
at 1.50 3.00
tone
Thickness
Layer
for
etfective
depth
Pressure
Applied Layer
End
1.50 4.50
Settlement
Table depth

Water
Start
Layer 0.00 150
depth

SAND SAND
of Layer CLAY SAND
Type
métremefremete

Layer
N 1 2

DepthLengthWidth $.No. 2
ANNEXURE-I
CALCULATION
SHEET
1| settlement 12.64
Total (mm)

Immediate
settlement 15.799
(rmm)

Consolidation
settlement
(mm)
3BOREHOLE
foundation
ofDepth
Correction 0.500
Water factor

SQUARE

Settlement 0.259
Unit Pressure
for (mm)
1.00 0.80

:1976
Increment kN/m2 30.45
foundation
ofType stress
AP
1) Depthfactor
Rigidity
factor
(PART 26.04
Effective kN/m2
stress Po
8009
12.00
IS Corrected
SPT
PER N

AS
Compression
CALCULATION Index Cc
bgl kN/m2
Width (m)

(
Void
Raito

1.50 0.00 93.25


SETTLEMENT
Density
(gms/cc) 1.88 1,89

base
calculation
depth
foundation Thickness 1.50 3.00
Layer (m)
zone
for
effective
depthat
Layer
End 1.50 4.50
Pressure depth (m)
Table
Settlement

WaterApplied 1.50
Start
Layer 0.00
depth (m)

SAND SAND
of
TypeLayer CLAY SAND

metremetre metre

Layer
Ne.
2
1.50 2.60 2.00

DepthLength
Width S.No. 2
CALCULATION
SHEET
2
settlement
Z1.11
Total {mm)
ANNEXURE

Immediate
settlement
(mm) 21.595

Consolidation
settiement
3BOREHOLE (mm) 4.791

foundation
ofDepth
Correction
Water factor 0.500
W
SQUARE

Settlement
1.00 0.80 Unit Pressure
for 0.284
(mm)

1976
1):
(PART
Increment 38.08 18.11
tion stress kN/m2
factor
DepthRigidity
factorfounda AP

of Effective 30.40 50.11


Type stress kN/m2
8009 Po

PERIS Corrected 12.00


SPT
N
AS
CALCULATION Compression
0.117
Index
Width (m) kN/m2 CC
bgl
X
Raito
Void
1.50 0.00 105.77 0.636
SETTLEMENT
(gms/cc)
Density 1.88 1.89 1.92
base
depthcalculation
foundation Thickness
zone Layer (m) 1.50 4.00 0.50
for
etfective
depthat
Pressure Layer
End
depth 1.50 5.50 6.00
Table
Settlement (m)

WaterApplied
Layer
Start
depth 0.00 1.50 S.50
m)

Type
of Layer SAND SAND CLAY
CLAY SAND
metremetremetre

Layer
No,
1.50 3.00 3.00
1 3

DepthLength
Width S.No.
1 2 3
CALCULATION
SHEET
3 settlement ANNEXURE-|
Total (rnm)
42.46

settlemnent
Immediate 31.518
(mm)

Consolidation
settlement
3BOREHOLE 21.551
(mm)

foundation
ofDepth
Correction
Water factor 0.500
W'
SQUARE

Settlenent 0.297
Unit Pressure
for (mm)
1.00 0.80

:1976
foundation
ofType Increment kN/m2 53.08 23.59
stress
1) Depthfactor
Rigidity
factor OP

(PART
Effective kN/m2
30.40 56.88
stress
Po
8009

IS Corrected 12.00
PER SPT

AS
CALCULATION Compression
0.117
Index
Width(m) Cc
bgl kN/m2

119.42
Raito
Void 0.636
1.50 0.00
SETTLEMENT
Density (gms/cc) 1.88 1.89 1.92
base
depthcalculation
foundation
Thickness 1.50 4.00 2.00
zone Layer (m)
for
effective
depthat
Pressure Layer
End 1.50 5.50 7.50
Table
depth (m)
Settlemnent

WaterApplied
Start
Layer
depth (m) 0.00 1.50 5.50

of Layer CLAY SAND


Type
SAND SAND CLAY
tnetre
metremetre

Layer
No.
1.50 4.00 4,00 1 2 3

DepthLength
Width S.
No.
2 3
CALCULATION
SHEET4
settlement
Total (mm) 13.92 ANNEXURE-I

settlement
Immediate 17.394
(mm)

Consolidation
settlement
BOREHOLE
3 (mm)

Depth
foundation
of
Correction
Water factor 0.500
W
SQUARE

Settlement
1.00 0.80
for
UnitPressure
(mm) 0.259
1):1976
Increment kN/m2 33.52
foundation
of
Type stress
DepthRigidity
factor AP
(PART factor

Effective kN/m2 32.53


8O09 stress
Po

PEkTS
Corrected 12.00
SPT
N
AS
UTENCALOLAnON Compression
Index
Width (m)
bgl kN/m2 Cc

Raito
Void
117,85
1.50 9.00

Denslty (gms/cc) 1.88 1.89

base
depthcalculation
foundation
Thickness 2.00
zone Layer (m)
3.50
for
effective
depthat
Pressure Layer
Enddepth
Table
2.00 5.50
Settlement (m)

WaterApplied 8
Layer
Start
depth 0.00 2.00

Type
of Layer CLAY SAND
SAND SAND
metre metremetre

Layer
No.
2.00 2.00 2.00
1 2

DepthLength
Width S.
No.
1 2
CALCULATION
SHEET
s settlement
Total (rnm) 32.57 ANNEXURE-I

Immediate
settlement 29.133
(mm)

settlement
Consolidation
11.585
3BOREHOLE (mm)

foundation
of
Depth
Correctíon
Water factor 0.500
W'
SQUARE

Settlement
for
UnitPressure (mm) 0.284
1.00 0.80

:1976
foundation
ofType Increment kN/m2 51.37 23.65
stress
1) Depthfactor
Rigidity
factor AP

(PART
Effective kN/m2 32.53 52.32
stress
8009
IS Corrected 12.00
PER SPT N"

AS
CALCULATION Compression 0.117
Index
Cc
Width (m)
bgl kN/m2

Raito
Void 0.636
1.50 0.00 128,78
SETTLEMENT e

Density
(gms/cc) 1.88 1.89 1.92

base
depthcalculation
foundation Thickness
Layer 2.00 3.50 1.00
zone (m)
for
effective
depthat
Pressure Layer
End 2.00 5.50 6.50
Table depth (m)
Settlement

WaterApplied
Start
Layer 0.00 2.00 5.50
depth
(m)

SAND SAND CLAY


Type
of Layer CLAY SAND
metre
metretmetre

Layer
No.
2.00 3:00 3.00 1 2 3

DepthLength
Width S.No.
1 2 3
E
SEET
CALCUATON settlemnent 54.43 ANNEXURE-I
Totat {mm)

Immediate
settlement 40.722
(mm)

Consolidation
settlement 27.311
3BOREHOLE (mm)

foundation
ofDepth
Correction 0.500
Water factor
W
SQUARE

Settlement
UnitPressure
or 0.297
1.00 (mm)

1976
foundation
Type
of Increment kN/m2 68.58 31.38
: stress
1) Deptàfactor
Rigicity
factor
(PART
Effective N/m2 32.53 S6.83
stress
&009

IS 12.00
PER Corrected
SPT

AS
CALCULATION Compression
0.117
tndex
Width
(rm)
bg
X
Raito
Void 0.636
141.71
SETTLEMENTL50
2

Density (gms/cc) 1.88 1.89 1.92


base
depthcalculation
foundation
Thickness
zone Layer {m) 2.00 3.50 2.00
for
effective
depthat
Pressure
End
Layer
Table
Settlement
depth 2.00 5.50 10.00

WaterApplied
Start
Layer
depth (m) 0.00 2.00 8.00

Type
of Layer CLAY SAND
SAND SAND CLAY
metremetremetre

Layer
No.
2.00 4.00 4.00
1 2 3

Length
Depth Width
S.No.
1 2 3
SHEET
6}
CALCULATION
settlement
Total (mm) 49.99 ANNEXURE-|

settlement
Immediate 37.148
(mm)

Consolidation
settlement
3BOREHOLE 25.341
(mm)

foundation
Depth
of
Correction 0.500
Water factor
W
SQUARE

Settlement 0.297
Unit
for Pressure (mm)
1.00 0.80

1976 foundation
of
Type Increment kN/m2 62.56 28.63
stress
AP
Depthfactor
Rigidity
factor
:
1)
(PART Effective kN/m2 32.53 56.83
stress
Po

8009
TRIAL
FINALSPTCorrected
IS 12
PER N

AS Compression 0.117
CALCULATION Index
Cc
Width (m)
bgl kN/m2
X
Raito
Void 0.636
1.50 0.00 129.27
SETTLEMENT
Density (gms/cc) 1.88 1.89 1.92

foundation
base
depthcalculation
Thickness 2.0
Layer (m) 2.0 3.5
zone
for
effective
depthApplied
Pressure
at
Enddepth
Layer 10.0
(m) 2.0 5.5
Table
Settlement

Water
Start
Layer 0.0 2.0 8.0
depth (m)

SAND SAND CLAY


Type
of Layer CLAY
SAND

metre metremetre

Layer
No.
2 3
2.00 4.00 4.00

Width
DepthLength S.No. 3
(Cc) 0.117 0.110
mptessio 24

CD/Ur
Test Of
Ype 23 CD UU UU
Characterisitics

Shear
Friction
Internal (Ø)N
22 29
Angle
of 9 7
}(Kg/sqcm
Cohesion 21 0.0 0.30 0.45

Ratio Void 20 0.656 2.66


0.642 2.67
0.638
AQUEDUCT
Gravity Specific (G)o19 1.57
2.60

(gms/cc)
Density Buik Dry 18 1.55 1.60 1.62 1.62 1.63 1.63 1.65 1.64 .66

OF Moisture Ornginal
18.84 20.11 20.81 18.25 17.54 17.13 16.75 16.06 15.32 14.63
CONSTRUCTION 17
1.50
Densty Bulk Wet (gms/cc) 1.84 1.89 1.93 1.92 1.90 1.91 1.90 1.91 1.89 .90
16

bgl)
symbol
PROPOSED group 15 ML ML ML ML CL CL CI CI CI loCI CI

SHEET
RESULT (m
Level Completed
Commenced
on
on Limits
Atterberg PI
%
14 NON-PLASTIC
NON-PLASTIC NON-PLASTIC
NON-PLASTIC 10 10 14 14 14 |4 |5

Water LL|
PL 30
20 20 36
22 36
22 36
22 23 37
22
% 13
FOR
12 30 37
of
REPORT o
Depth
Factor Silt 11

INVESTIGATION0.075 (mm) 78 72
Passing
Material
% 10 75 68 71 95 92 87 38 69
26.582381
80.105739
100.000
IS 0.425
Sleve
(mm)

(mm)
9
90 91 87
1alsal
88 100
100|
100 00 92 90 89 38 87

100 100
100 100
100 100
97 93 90
4750.000 100 100
100 95 94
GEOTECH (mm)]
Longitude 100 99 98 98
Elevation 7 97
Latitude
diatancy todue 12.84 14.02 15.13
-

12.84 14.02 15.25


corrected
Coordinate lue Va
SPT 5
-

Value SPT 10 12 14 90.600


SPT
18 20 22 25 27
8 14
4
98.100
SPTI SPT! 92.100
SPT|
-

89.550
UD 89.100 SPT UDSPT
86.100JD 84.600SPT
Sample of
ype DS UD JUSPT JU UD 93.600
SPT 92.550UD91.050
UD SPT 88.050UD
3

99.50098.550 97.050 95.10094.050


96.60095.550
600 86.550 85.050
Reduced
Level 87
(Assumned)
15.00 metre

39.55088.500
- - -

0.50
100.000
| 98.55097.500
1.45
99.000 95.55094.500
97.05096.000 92 |895
94.05093.000
550 91.500
91.05090.000 050 87.000
13.90 50085
86.55085 050
PROJECT
88

1.90 2953.40 4,454.90 5.95640 7.457.90 9.40 10,45 40


10.90 11.95 13.45 15.40
14.95
THE Depth
ofBore 12
of Bore
Bore
Hole Hole
(m)
No.Total
depth
OF Hole metre
1
NAME - -

1.45 2.502.95 4.004.45 5.505.95 7.007.45 8.508.95 10.00


0.00 1.00
-

11.95
10.45 11.50 13.00
13.45 14.95
14.50
(Cc)24 0.117 |0.109

Test ofYpe CDIUU -

23 CD UU UU
Characterlsitics
Friction
Shear
Nanterna! (Ø) 22 29 10
Angle
of 9
-

(Kg/sqcm)
ohesion | 21 0.30
0
0.4

KatiO Voia 20 0.652


2.61 1.62
0.636
2.65 1.62
0.642
2.66
o

AQUEDUCT
oSpecific
Gravity (G) 19

Density Bulk Dry (gms/cc) a1.55 1.58 1.60 1.61 1.63 1.65 1.64 1.66

OF Moisture origal
in 17.84 20.11 19.81 18.25 17.35 16.74 16.35 16.06 15.10 14.63
CONSTRUCTION 17
1.58
Density aWat
Bulk (gms/cc) 1.83 1.90 1.92 1.92 1.89 1.90 1.88 1.91 1.89 1.90
16

bgl) symboi group 15 ML ML ML ML CL CL CL CI CI CI


PROPOSED
(m
SHEET
RESULTon on
LevelCompleted
Commenced
Limits
Atterberg PI % 14
NON-PLASTIC
|
NON-PLASTIC NON-PLASTIC
NON-PLASTIC
9
10 20 14 |4 14 15

LL
PL 13 29
20 30
20 10
30 38
24 38
24 36
22 22
Water
FOR 37
% 12
of
REPORT
Depth
Factor ilt 11 - -

-
-

-
-

INVESTIGATION (mm) 72 70 70 94 94 90 92 89 88 89
Passing
Material
% 10 68
80.105729
26.582381
100.000
g80.425Sieve
IS
(mm)|
89 90 87 90 100 100 100
95 100
98 92 94 92

100| 100 100|


(mm) 100 100 100 100
2.000 100 100
8
GEOTECH (mm) 100 100 100 100 100 100 100 100
Longltude 100 100 100
4.750
Elevatlon
Latitude 7

14.50 15.22 15.78


dilatancy todue
cted corre ValolzsPT
ue N 6 -
-

adue
overburden to 14.50 15.43 16.55
Coordinate Value PT

13 15 16 19 21 23 27 32
Value SPT
Sample Typeof N 4
-
-

98.100
5-

|SPT UD SPT
19
ss UD SPT JD
s |9s
90.600UD SPT| JD SPT UD SPT JDSPT
92.100SPT
JD SPT
-

84.600|
UD UD SPI
3
95.100 94.050
93.60092.550 89.10088.050
91.050 89.550 86.10085.050
87.60086.550
96.60095.550
99.50098.550 97.050
Reduced
Level
(Assumed)
15.00
metre
2 2
100.000 97.05096.000 94.05093.000
95.55094.500 92.55091.500
91.05090.000 88.05087.000
89.55088.500 86.55085.500
85.050
PROJECT 98.55097.500
99.000
1.90

0.50 1.45 2.953.40 4.454.90 5.956.40 7.457.90 8.959.40 10.45 12.40 13.45
10.90 11.95 13.90 14.95
15.40
THE Depth
of
Bore
Bore
Hole
No. Total
depth
of Bore
Hole
(m)
Hole metre
OF 1
NAME 1.45
0.00 1.00 2.502.95 4.00
4.45 5.505.95 7.45
7.00 8.508.95 10.00 11.95 13.00
10.45 11.50 13.45 14.50
14.95
(Cc)
23 0.117 0.108
Compression
- -

Typa oaCD/Ur
Tos Of 23 CD UU Ur

Friction
risitics
Rainte
rnal 22 29 0
Shear
Characte
(Kg/sqcm)
Cohesion 21 0.32 0.35
-

0.658 |0.636
2.65 2.66
0.602
Ratio Void eo 20
AQUEDUCT
- -
-

oSpecific
Gravity (G)
(gmslce)
19 2.62
-

Density Bulk Dry 1.59 1.58 1.61 1.62 1.64 1.63 1.64 1.66 1.66 1.67 1.65 1.66 1.67
8
-

OF 17.86 17.44 16.67 16.22 15.95 15.68 15.22


Moisture Original 18.23 19.36 18.75 18.13 17.11 16.34
CONSTRUCTION % 17
1.50
Densty oWet
Bulk {gms/cc) 1.88 1.89 1.91 1.91 1.93 1.91 1.92 1.94 1.93 1.94 1.91 1.92 1.92
16

bgl) symbol group 1S CI CI


15 ML ML ML ML CL CL CL CL CI C C
PROPOSED
(m -PLASTICI
NON NON NON
-PLASTIC
| -PLASTIC|
NON
SHEET
RESULT
Commenced
on on
Level Completed
Limits
Atterberg PI
%
14
-PLASTIC
9
31
21
10 10 14 14 15 15 15 15

20 29
20 30
20 36
22 36
22 23 23 23 37
22
Water PL o 13
FOR 38 38 38
29
LL % 12
REPORT
of
Depth
Factor Sit
1 -
- -
-

INVESTIGATION (mm)(mm) 92 96 93 90 38 92 94 93
91
% 0.075
26.5823810
80.1057290
PaSsing
Material 10 68 71 74 72 94

100.000 100 100 100 100 100


100
100 100
100 100
100
94 95
IS0.425
Sieve 95 93 93 91 96
100|
100 100
100 100
(mm)lmm 100 100
100 100 100
100 100
100 100 100
2.000 100
100 100
GEOTECH 100 100
Elevation4.750
Longitude
Latitude 7
100

corectod TYalue 15.45 16.57 15.75


N"
6 -
-
-
- - -

ovorburdon |dueto 15.90 18.13 16.49


N 5
Coordinate -
- - -

23 27
SPT
84.600 30
Value SPT N
10 13 3 |4 |5 8 21 26 31
-
-

Sample of
Type UD SPT UD SPT
98.550 UD 95.100UD 93.600
SPT SPT UD 92.100
|SPT UD SPT UD UD SPT JDSPT UD JD SPT UD SPT UD SPT
80.100DS
DS SP
3

96.60095.550 94.059 92.550 91.050


98.10097.050 89.10088.050
90.60089.550 86.10085.050
87.60086.550 83.10082.050
83.550 81.60080.550 80.000
99.500
Reduced
Level
(Assumed)
20.00 metre
3 2
99.000
100.00O 97.05096.000
98.55097.500 95.55094.500 92.55091.500
94.05093.000 90.000
10.45
91.050 89.55088.500
88.050
87.000 85.05084.000
86.55085.500 16.45 82.05081.000
83.550 82.500 19.45
80.55080.100
20.00
PROJECT

1.45 4.90 5.956.40 7.457.90 8.959.40 10.90 11.95 13.90 14.95


12.4013.45 15.40 16.90 17.95
18.40 19.90
0.50 1.90 2.953.40 4.45
THE Depth
of
Bore
Bore
Hole
No.Total
depth
of Bore
Hole
(m)
OF Hole metre

NAME 8.508.95 10.00


10.45 11.50 13.45 14.50
11.95 13.00 14.95 16.00
16.45 17.95 19.00
17.50
-

19.4519.90
-

1.45 2.502.95
0.00 1.00 4.00 5.95 7.007.45
4.45 5.50
ANNEXURE-!

BORE-LOG CHART

ME OF THE PROJECT:

TER TABLE 1.50 METRE DEPTH BELOW GROUND LEVEL


BORE HOLE NO.:- 01
DEPTH IN VISUAL FIELD I.S. S.P.T. VALUE S.P.T. VALUES

63NDEEOBSERVATIONS GROUPH¤TCHING NI N2 N3 N2+N3 10 20 30 40 50 60 70 80 90 100

0.00-0.50 SANDY-SILT D. ML

100-1,45
SANDY-SILT ML f
-U.D. 3 4. 4. 8----
1.45-1.90--. S.P.T.
50.295 -SANDYSLL ML

2,95-3.A0. JS.P. 3 10 --4

4.00-4.45 SANDY-SILT UD. ML

4.45-4.90 |SPT 5 7 12

.58-6.25 SILTY-CILAY CI. 5 7 714


00-7:45 SILTY-CLAY UD.
-6-68. 14.
45-7.90 S.PI

8.90-8.46 SILTY-CLAY C 810. 18.

.00-10.45 sUY.CLAY.....,.J.D....C.
45-10.90 SP.T. 9 11 .
20

50-11.95 SILTYCAYUD. --C--4


95-12.40 .P.TE 10 h2 22
13.00-13.45 SILTY-CLAY U.D....CI.I"
45-13.90 eL 1M 25

50-14.95 SILTY-CLA.

1495-15.40.. . S.P.T. 1T2--15---27--


ANNEXURE-I||

BORE-LOG CHART

ME OF THE PROJECT:

TER TABLE 1.58 METRE DEPTH BELOW GROUND LEVEL BORE HOLE NO.;- 02

DEPTH IN VISUAL FIELD 1.S. S.P.T. VALUE S.P.T. VALUES


ETRES BELOW
OUND LEVEL OBSERVATIONS CI
GROUP HATCHING N1|N2 N3 N2+N3|
10 20 30 40 50 60 70 0 90 100
-t1
O.00:0.50.. SA ND Y-SILT
ML
LLoU145 SANDYSILF=YD.
ML
1.45-1.90 S.P.T! 4 4 5 9

P2.50-2,.95- -SANDY-SILT W.Dt-ML.


S.P.T
2.95-3.40 - - 6 11

4.00-4.45-. SANDY-SILT U-Ð. ML-.


4.45-4.90 S.P.TI 7 13
5.50-5.95 SILTY-CLAY U.D CL
..5.95:6.40. s.P.T 7 15

7.00-7.45 SILTY-CLAY U.D. CL


7.45-7.90 s.P.T. -|--.W1-
6 B-3-416..1.Al ..L..
8.50-8.95 SILTY-CLAY U.D. CL
8.95-9.40 Is.P.T. 89019.
10.00-10.45 SIL TYCL AY
U.D. CI

ere 10.45-10.90 ---5..T.


l1.5.0-11_95 SILTY-CLAY
baP-T. 23

SILTY-CLAY U.D C
13.00-13.45

B.45-13.90 = -===-:FF== 99992|:13| 1 -27=


4.50-14.95
S.P.T CI 32
4,95:15.40. SILTY-CLA