Metode Statement of Fabrication Rebar
Metode Statement of Fabrication Rebar
GDS WSP
PT. ACSET INDONUSA
Nomor : 004/AI/NDP Fabrication Rebar Revisi No : N.A
METHOD OF STATEMENT
1. References
2. Resources
2.1 Materials
2.1.1 Reinforcement Bar
2.2 Equipment
2.2.1 Bar bending machine
2.2.2 Bar cutting machine
2.2.3 Hand gloves
2.3 Workers
2.3.1 Supervisor
2.3.2 Worker
3. INTRUCTION OF WORK
3.1 Preparation at work
3.1.1 Make sure the shop drawing
3.1.2 Approval of materials to be used.
3.1.3 Preparation of the workplace.
3.1.4 Preparation of materials and tools.
3.1.5 Reposition should be permitted by consultant and competents personel.
3.2 Method of work
3.2.1 Layout fabrication
3.2.1 layout
Page 1 of 4
PROJECT 3RD STOREY BUILDING DATA CENTER NONGSA BATAM INCONESIA
Owner Consultant Management Main Contactor
GDS WSP
PT. ACSET INDONUSA
Nomor : 004/AI/NDP Fabrication Rebar Revisi No : N.A
3.2.2 Shop drawing and bar bending schedul
Page 2 of 4
PROJECT 3RD STOREY BUILDING DATA CENTER NONGSA BATAM INCONESIA
Owner Consultant Management Main Contactor
GDS WSP
PT. ACSET INDONUSA
Nomor : 004/AI/NDP Fabrication Rebar Revisi No : N.A
3.2.4 Bar Bending
For bending rebar, the method of work uses Bar Bending Machine. When carrying out the
rebar bending process, workers must study the hazards to ensure that the bending radius is
not too sharp. Rebar can crack or weaken if bent too sharply. Bar Bending Machine has
various pressure specifications and several bend angles. In the process of cutting the
rebar the length of the cut must accommodate the length of the element to the length of
the bending rebar. This machine uses electrical energy so it must ensure the electric
current is safe. Make sure to check and provide machine tagging before operating the
machine and make sure the person doing the job has the competence to operate the tool.
Page 3 of 4
PROJECT 3RD STOREY BUILDING DATA CENTER NONGSA BATAM INCONESIA
Owner Consultant Management Main Contactor
GDS WSP
PT. ACSET INDONUSA
Nomor : 004/AI/NDP Fabrication Rebar Revisi No : N.A
4. SAFETY
4.1 Safety kick-off meeting
4.2 PTW Cold and Hot and JSA
4.3 Safety Signs
5. Attachments
5.1 Shop drawing detail rebar
5.2 Site plan temporary facilities
Page 4 of 4
NOTE :
13775
37216 FUEL TANK B BOUNDARY FENCE
BOUNDARY FENCE
19 21 17
22 20
BOUNDARY FENCE
CE
TOILET PEKERJA
PAGAR
N
BIOTEC
F E
KLINIK SHE ROOM MUSHOLA
WUDHU
Y
40950
DAR
JENDELA JENDELA
11
Partisi Full
18
RAK SURVEY
ENGINEERING RUANG QC R.MEETING
GENSET B
RUANG QS
JENDELA
Partisi H=1,2m
9
RUANG SURVEY
RAK SEPATU & ROMPI
RAK DOKUMEN
Partisi Full
Site Office / Direksi Keet
RUANG PM
(ACSET)
BOUN
JENDELA
Partisi Full
RUANG DPM, PAM & POM
APAR
RAK DOKUMEN APAR P3K APAR RAK DOKUMEN
JENDELA JENDELA
EMERGENCY LAMP
EMERGENCY LAMP
JENDELA
JENDELA
RAK DOKUMEN APAR P3K EXHAUST FAN
10
KM
JENDELA
PANTRY
RUANG PM
KM
RUANG MEETING BESAR
RAK DOKUMEN
JENDELA
JALUR PEJALAN KAKI
EMERGENCY LAMP JENDELA
RAK SEPATU & ROMPI JALUR PEJALAN KAKI
6
FUEL TANK B
2 5 8 11 14
P
O
8 N
K
GENSET B
M
00
DATA CENTER B
BOUNDARY FENCE H
G
J
00
F
E
MUW B
D
R8
BUFFER TANK B
MUW B
B
A
37216 P
1
1
3
3
4
4
6
6
7
7
BUFFER TANK A
9
9
10
10
12 13
12 13
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
O
N
M
MUW A L
K
J1
J
H G
DATA CENTER A
F
E
A
RWDP
SUMP 2 5 8 11 14
FUEL TANK A
D
ROW 18M
16160
6 7 8 9 9
TC - - - -
5
By Drawing Description Rev Date
R7
Singapore 238868
T: +65 6864 9950
F: +65 6491 1259
5 Parking
00
ARCHITECT:
6 Muster Point
00
3HPArchitects Pte. Ltd.
Blk. 162 #04-3555 Bukit Merah Central
CE
Building System and
Diagnostics Pte. Ltd.
12 Genset Shutter & Fuel Tank
N
22 Veerasamy Road,
E
Singapore 207328
T: +65 6560 0702
F
13 Mushola / pray room MHO4 F: +65 6795 0020
Y
NDAR
14 Common Toilet MAIN CONTRACTOR :
PT. ACSET INDONUSA TBK
15 Mechanic Keet & storage 4 ACSET BUILDING
JL. Majaphit No.26
BOU
Petojo Selatan - Gambir
500 500
500
D25-150
M 804
1000
804
734
-
500
KEY PLAN
D13-150 LINK
D25-150
PC1A DETAIL
SCALE 1:20 GRADIE
NT
1:12
- - - -
SHOP DRAWING
F1 D25-150
75 75 CLIENT / LAND OWNER:
F2' D25-150
Kompleks Citranusa Niaga Blok A2 No. 5-7
Batam 29467 - Indonesia
MAIN CONTRACTOR :
PT. ACSET INDONUSA TBK
ACSET BUILDING
JL. Majaphit No.26
Petojo Selatan - Gambir
Jakarta, Indonesia 10160
member of ASTRA Telp : (021) 3511961
Fax : (021) 3441413
800
400 400
D19-150
400
O
800
-
400
KEY PLAN
D10-150 LINK
D19-150
GRADIE
NT
1:12
PC1C DETAIL
SCALE 1:20
- - - -
By Drawing Description Rev Date
SHOP DRAWING
CLIENT / LAND OWNER:
LEED CONSULTANT:
Building System and
Diagnostics Pte. Ltd.
50
22 Veerasamy Road,
Singapore 207328
150
MAIN CONTRACTOR :
PT. ACSET INDONUSA TBK
ACSET BUILDING
JL. Majaphit No.26
PROPOSED 3-STOREY
DATA CENTER BUILDING DEVELOPMENT
AT NONGSA - BATAM ISLAND, INDONESIA
TITLE
1:20
Rev.
23 NOV 2023
00
- Refer To. 10330442-CS-GF-543
Drawn
Drawing no. SD-AI-STR-DCB-GF-007
-
NOTE :
2500
600 1300 600
650 650
600
D25-150
650
D25-150
J
2500
1300
D25-300
- D13-150 LINK
D25-150
D25-300
650
KEY PLAN
D25-150
600
GRADIE
NT
1:12
PC4 DETAIL
SCALE 1:40
- - - -
By Drawing Description Rev Date
SHOP DRAWING
CLIENT / LAND OWNER:
75 F1 D25-150 75 ARCHITECT:
F: +65 6491 1259
LOCAL CONSULTANT:
F4 D25-900
T: +62 778 711116 - 711265
F: +62 778 711115
1500
MAIN CONTRACTOR :
PT. ACSET INDONUSA TBK
ACSET BUILDING
JL. Majaphit No.26
PROJECT :
PROPOSED 3-STOREY
DATA CENTER BUILDING DEVELOPMENT
AT NONGSA - BATAM ISLAND, INDONESIA
TITLE
SECTION J-J
SCALE 1:40 Approved
-
Plot Size
A3
Date
23 NOV 2023
Scale Rev.
Designed
1:40 00
- Refer To. 10330442-CS-GF-542
Drawn
Drawing no. SD-AI-STR-DCB-GF-009
-
NOTE :
3000
600 1800 600
900 900
600
D25-150
900
D25-300
D25-150
I
3000
1800
- D25-300
KEY PLAN
900
D13-150 LINK
D25-150
D25-150
600
GRADIE
NT
1:12
PC5 DETAIL
SCALE 1:50
- - - -
By Drawing Description Rev Date
SHOP DRAWING
CLIENT / LAND OWNER:
75 F1 D25-150 75 ARCHITECT:
3HPArchitects Pte. Ltd.
F1' D25-150 Blk. 162 #04-3555 Bukit Merah Central
Singapore 150162
T: +65 6235 8333
75
LOCAL CONSULTANT:
Singapore 207328
150
PROJECT :
PROPOSED 3-STOREY
DATA CENTER BUILDING DEVELOPMENT
AT NONGSA - BATAM ISLAND, INDONESIA
SECTION I-I
SCALE 1:50 TITLE
H
-
2700
600 1500 600
750 750
600
D25-150
1500
KEY PLAN
D25-300
D25-300
4200
D25-150
D25-150
GRADIE
NT
1:12
1500
D25-150
D13-150 LINK
600
- - - -
By Drawing Description Rev Date
SHOP DRAWING
CLIENT / LAND OWNER:
LOCAL CONSULTANT:
LEED CONSULTANT:
VERTICAL BAR MIDDLE BAR F3, F3' D25-300 F5 D13-150 LINK Building System and
Diagnostics Pte. Ltd.
22 Veerasamy Road,
F4 D25-900
1800
Singapore 207328
TITLE
SECTION H-H
SCALE 1:50
Approved Plot Size Date
A3 23 NOV 2023
-
Scale Rev.
Designed
1:30 00
- Refer To. 10330442-CS-GF-542
Drawn
Drawing no. SD-AI-STR-DCB-GF-011
-
NOTE :
4000
600
1400 D25-150
D25-300
B
4000
D25-300
- KEY PLAN
D25-150
D25-150
1400
GRADIE
NT
1:12
600
PC9A DETAIL
SCALE 1:50 - - - -
By Drawing Description Rev Date
SHOP DRAWING
CLIENT / LAND OWNER:
Singapore 150162
T: +65 6235 8333
F: +65 6733 0809
LOCAL CONSULTANT:
VERTICAL BAR F3' D25-300 F5 D13-150 LINK PT. HASKON CITRA PERDANA
F4 D25-900 F3 D25-300 Jl. Mas Surya Negara 1, Kawasan Industri Terpadu Kabil
Kompleks Citranusa Niaga Blok A2 No. 5-7
Batam 29467 - Indonesia
CONCRETE CAST IN SITU
2000
MAIN CONTRACTOR :
PT. ACSET INDONUSA TBK
ACSET BUILDING
PROJECT :
SQ. 500mm CONCRETE PILE PROPOSED 3-STOREY
DATA CENTER BUILDING DEVELOPMENT
AT NONGSA - BATAM ISLAND, INDONESIA