Metode Statement of Fabrication Rebar

This document outlines the method of statement for the fabrication of rebar for a 3rd storey building data center project in Batam, Indonesia. It details the resources needed, including materials, equipment, and workers. The instruction of work includes preparation, layout, bar cutting using a cutting machine, bar bending using a bending machine, and safety procedures. Drawings and attachments are also referenced.

Uploaded by

arif
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
162 views11 pages

Metode Statement of Fabrication Rebar

This document outlines the method of statement for the fabrication of rebar for a 3rd storey building data center project in Batam, Indonesia. It details the resources needed, including materials, equipment, and workers. The instruction of work includes preparation, layout, bar cutting using a cutting machine, bar bending using a bending machine, and safety procedures. Drawings and attachments are also referenced.

Uploaded by

arif
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

PROJECT 3RD STOREY BUILDING DATA CENTER NONGSA BATAM INCONESIA

Owner Consultant Management Main Contactor

GDS WSP
PT. ACSET INDONUSA
Nomor : 004/AI/NDP Fabrication Rebar Revisi No : N.A

METHOD OF STATEMENT
1. References

1.1 Technical Specifications

2. Resources
2.1 Materials
2.1.1 Reinforcement Bar
2.2 Equipment
2.2.1 Bar bending machine
2.2.2 Bar cutting machine
2.2.3 Hand gloves
2.3 Workers
2.3.1 Supervisor
2.3.2 Worker

3. INTRUCTION OF WORK
3.1 Preparation at work
3.1.1 Make sure the shop drawing
3.1.2 Approval of materials to be used.
3.1.3 Preparation of the workplace.
3.1.4 Preparation of materials and tools.
3.1.5 Reposition should be permitted by consultant and competents personel.
3.2 Method of work
3.2.1 Layout fabrication

3.2.1 layout

Page 1 of 4
PROJECT 3RD STOREY BUILDING DATA CENTER NONGSA BATAM INCONESIA
Owner Consultant Management Main Contactor

GDS WSP
PT. ACSET INDONUSA
Nomor : 004/AI/NDP Fabrication Rebar Revisi No : N.A
3.2.2 Shop drawing and bar bending schedul

3.2.2 Drawing BBS

3.2.3 Bar Cutting


For rebar cutting, the method of work uses Bar Cutting Machine. In the cutting
process, place the rebar on the engine gear, make sure the iron position is in accordance
with the position of the engine safety blade. This safety blade provides pressure so that
the engine gear is firmly fixed and the surface is flat. Make sure to check and provide
machine tagging before operating the machine and make sure the person doing the job has
the competence to operate the tool.

3.2.2 Bar Cutting Machine

Page 2 of 4
PROJECT 3RD STOREY BUILDING DATA CENTER NONGSA BATAM INCONESIA
Owner Consultant Management Main Contactor

GDS WSP
PT. ACSET INDONUSA
Nomor : 004/AI/NDP Fabrication Rebar Revisi No : N.A
3.2.4 Bar Bending
For bending rebar, the method of work uses Bar Bending Machine. When carrying out the
rebar bending process, workers must study the hazards to ensure that the bending radius is
not too sharp. Rebar can crack or weaken if bent too sharply. Bar Bending Machine has
various pressure specifications and several bend angles. In the process of cutting the
rebar the length of the cut must accommodate the length of the element to the length of
the bending rebar. This machine uses electrical energy so it must ensure the electric
current is safe. Make sure to check and provide machine tagging before operating the
machine and make sure the person doing the job has the competence to operate the tool.

3.2.2 Bar Bending Machine

3.2.5 Flow chart

Page 3 of 4
PROJECT 3RD STOREY BUILDING DATA CENTER NONGSA BATAM INCONESIA
Owner Consultant Management Main Contactor

GDS WSP
PT. ACSET INDONUSA
Nomor : 004/AI/NDP Fabrication Rebar Revisi No : N.A

4. SAFETY
4.1 Safety kick-off meeting
4.2 PTW Cold and Hot and JSA
4.3 Safety Signs

5. Attachments
5.1 Shop drawing detail rebar
5.2 Site plan temporary facilities

Page 4 of 4
NOTE :

BOUNDARY FENCE 158192


12 13 14 15 16

13775
37216 FUEL TANK B BOUNDARY FENCE
BOUNDARY FENCE
19 21 17
22 20
BOUNDARY FENCE

CE
TOILET PEKERJA

PAGAR

JALUR PEJALAN KAKI

N
BIOTEC

F E
KLINIK SHE ROOM MUSHOLA

WUDHU

Y
40950

DAR
JENDELA JENDELA

11
Partisi Full

18
RAK SURVEY
ENGINEERING RUANG QC R.MEETING

GENSET B
RUANG QS

JENDELA
Partisi H=1,2m

9
RUANG SURVEY
RAK SEPATU & ROMPI

RAK DOKUMEN RAK DOKUMEN Partisi H=1,2m


JENDELA

RAK DOKUMEN

Partisi Full
Site Office / Direksi Keet
RUANG PM
(ACSET)

JALUR PEJALAN KAKI


OPERATION OPERATION

BOUN
JENDELA
Partisi Full
RUANG DPM, PAM & POM
APAR
RAK DOKUMEN APAR P3K APAR RAK DOKUMEN

JENDELA JENDELA
EMERGENCY LAMP

EMERGENCY LAMP

Dinding Bata + Partisi

JENDELA

JENDELA
RAK DOKUMEN APAR P3K EXHAUST FAN

10
KM
JENDELA

PANTRY

RUANG PM
KM
RUANG MEETING BESAR

Partisi Full RAK DOKUMEN


Site Office / Direksi Keet
APAR

JALUR PEJALAN KAKI


Partisi Full
(WSP) EXHAUST FAN
APAR
Partisi H=1,2m

RAK DOKUMEN

Partisi Full JENDELA


OPERATION OPERATION OPERATION OPERATION

JENDELA
JALUR PEJALAN KAKI
EMERGENCY LAMP JENDELA
RAK SEPATU & ROMPI JALUR PEJALAN KAKI

DATA CENTER B KEY PLAN

6
FUEL TANK B
2 5 8 11 14

P
O

8 N

K
GENSET B
M

00
DATA CENTER B

BOUNDARY FENCE H
G
J

00
F
E
MUW B
D

R8
BUFFER TANK B

MUW B
B
A

37216 P
1
1
3
3
4
4
6
6
7
7

BUFFER TANK A
9
9
10
10
12 13
12 13
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23

O
N

M
MUW A L
K
J1
J
H G

DATA CENTER A
F
E

BUFFER TANK B GENSET A VISITOR


D CENTER
C

A
RWDP
SUMP 2 5 8 11 14

FUEL TANK A
D

ROW 18M

16160
6 7 8 9 9
TC - - - -

5
By Drawing Description Rev Date

REMARK : SHOP DRAWING


Boundary Fence

BUFFER TANK A CLIENT / LAND OWNER:

1 Main Gate GDS IDC SERVICES


2 Security Pos
3 Sendiment Control Box MUW A LEAD / M&E CONSULTANT:
120192

HDR Consulting Pte. Ltd.


350 Orchard Road
4 Car wash bay #18-01/02 Shaw House

R7
Singapore 238868
T: +65 6864 9950
F: +65 6491 1259
5 Parking

00
ARCHITECT:

6 Muster Point

00
3HPArchitects Pte. Ltd.
Blk. 162 #04-3555 Bukit Merah Central

7 Steel Structure Unloading Area DATA CENTER A Singapore 150162


T: +65 6235 8333
F: +65 6733 0809

8 Formwork Stock Yard & Fabrication LOCAL CONSULTANT:

PT. HASKON CITRA PERDANA


9 Rebar Stock Yard & Fabrication 3 Jl. Mas Surya Negara 1, Kawasan Industri Terpadu Kabil
Kompleks Citranusa Niaga Blok A2 No. 5-7
Batam 29467 - Indonesia
10 Warehouse GENSET A VISITOR T: +62 778 711116 - 711265
F: +62 778 711115

11 Subcontractor Site Office 15 CENTER LEED CONSULTANT:

CE
Building System and
Diagnostics Pte. Ltd.
12 Genset Shutter & Fuel Tank

N
22 Veerasamy Road,

E
Singapore 207328
T: +65 6560 0702

F
13 Mushola / pray room MHO4 F: +65 6795 0020

Y
NDAR
14 Common Toilet MAIN CONTRACTOR :
PT. ACSET INDONUSA TBK
15 Mechanic Keet & storage 4 ACSET BUILDING
JL. Majaphit No.26

BOU
Petojo Selatan - Gambir

16 Domestic Waste member of ASTRA


Jakarta, Indonesia 10160
Telp : (021) 3511961
Fax : (021) 3441413

17 Metal Waste 3 PROJECT :


E-mail : [email protected]

18 Site Office FUEL TANK A


PROPOSED 3-STOREY
DATA CENTER BUILDING DEVELOPMENT
AT NONGSA - BATAM ISLAND, INDONESIA
19 Wokers Toilet
20 Rest Area D
BOUNDARY FENCE
BOUNDARY FENCE ROW 18M
186948
21 Container Casting Curing 1
22 Smoking Area 22 TITLE

2 SITE PLAN TEMPORARY FACILITY


SITE PLAN TEMPORARY FACILITY
DATA CENTER
SCALE 1:400

Temporary Access Road Approved Plot Size


A1
Date
02 NOV 2023
-
Scale Rev.
Designed 1 : 400 00
Stock material area Drawn
- Drawing no.
SD-AI-
-
NOTE :

500 500

500
D25-150
M 804
1000

804

734
-
500

KEY PLAN
D13-150 LINK
D25-150

PC1A DETAIL
SCALE 1:20 GRADIE
NT
1:12

- - - -

1000 By Drawing Description Rev Date

SHOP DRAWING
F1 D25-150
75 75 CLIENT / LAND OWNER:

GDS IDC SERVICES


F1' D25-150
75

LEAD / M&E CONSULTANT:


HDR Consulting Pte. Ltd.
350 Orchard Road
#18-01/02 Shaw House
Singapore 238868
T: +65 6864 9950
F: +65 6491 1259
ARCHITECT:
3HPArchitects Pte. Ltd.
Blk. 162 #04-3555 Bukit Merah Central
Singapore 150162
T: +65 6235 8333
F3 D13-150 LINK LOCAL CONSULTANT:
F: +65 6733 0809
1200

PT. HASKON CITRA PERDANA


Jl. Mas Surya Negara 1, Kawasan Industri Terpadu Kabil

F2' D25-150
Kompleks Citranusa Niaga Blok A2 No. 5-7
Batam 29467 - Indonesia

EXISTING PILE BAR T: +62 778 711116 - 711265


F: +62 778 711115

TO BE EXPOSED F2 D25-150 LEED CONSULTANT:


Building System and
Diagnostics Pte. Ltd.
22 Veerasamy Road,
Singapore 207328
T: +65 6560 0702
50

F: +65 6795 0020


150

MAIN CONTRACTOR :
PT. ACSET INDONUSA TBK
ACSET BUILDING
JL. Majaphit No.26
Petojo Selatan - Gambir
Jakarta, Indonesia 10160
member of ASTRA Telp : (021) 3511961
Fax : (021) 3441413

100mm THK PROJECT :


E-mail : [email protected]

LEAN CONCRETE PROPOSED 3-STOREY

500 500 DATA CENTER BUILDING DEVELOPMENT


AT NONGSA - BATAM ISLAND, INDONESIA

SQ. 500mm CONCRETE PILE TITLE

CONCRETE PILE CAP PC1A DETAILS AND SECTION

SECTION M-M Approved Plot Size Date


A3 23 NOV 2023
-
Scale Rev.
Designed
1:20 00
- Refer To. 10330442-CS-GF-543
Drawn
SCALE 1:20 -
Drawing no. SD-AI-STR-GSB-GF-006
NOTE :

800
400 400

D19-150
400
O
800

-
400

KEY PLAN
D10-150 LINK

D19-150

GRADIE
NT
1:12

PC1C DETAIL
SCALE 1:20

- - - -
By Drawing Description Rev Date

SHOP DRAWING
CLIENT / LAND OWNER:

GDS IDC SERVICES

LEAD / M&E CONSULTANT:


50 50 F1 D19-150 HDR Consulting Pte. Ltd.
350 Orchard Road
#18-01/02 Shaw House
F1' D19-150 Singapore 238868
T: +65 6864 9950
F: +65 6491 1259
ARCHITECT:
50

3HPArchitects Pte. Ltd.


Blk. 162 #04-3555 Bukit Merah Central
Singapore 150162
T: +65 6235 8333
F: +65 6733 0809

F3 D10-150 LINK F2 D19-150 LOCAL CONSULTANT:

PT. HASKON CITRA PERDANA


Jl. Mas Surya Negara 1, Kawasan Industri Terpadu Kabil

F2' D19-150 Kompleks Citranusa Niaga Blok A2 No. 5-7


800

Batam 29467 - Indonesia


T: +62 778 711116 - 711265
F: +62 778 711115

LEED CONSULTANT:
Building System and
Diagnostics Pte. Ltd.
50

22 Veerasamy Road,
Singapore 207328
150

T: +65 6560 0702


F: +65 6795 0020

MAIN CONTRACTOR :
PT. ACSET INDONUSA TBK
ACSET BUILDING
JL. Majaphit No.26

100mm THK member of ASTRA


Petojo Selatan - Gambir
Jakarta, Indonesia 10160
Telp : (021) 3511961
Fax : (021) 3441413

400 400 LEAN CONCRETE PROJECT :


E-mail : [email protected]

PROPOSED 3-STOREY
DATA CENTER BUILDING DEVELOPMENT
AT NONGSA - BATAM ISLAND, INDONESIA

SQ. 400mm CONCRETE PILE

TITLE

CONCRETE PILE CAP PC1C DETAILS AND SECTION

SECTION O-O Approved Plot Size Date

SCALE 1:20 Designed


-
Scale
A3

1:20
Rev.
23 NOV 2023

00
- Refer To. 10330442-CS-GF-543
Drawn
Drawing no. SD-AI-STR-DCB-GF-007
-
NOTE :

2500
600 1300 600
650 650

600
D25-150

650

D25-150
J
2500
1300

D25-300
- D13-150 LINK

D25-150

D25-300
650

KEY PLAN

D25-150
600

GRADIE
NT
1:12

PC4 DETAIL
SCALE 1:40

- - - -
By Drawing Description Rev Date

SHOP DRAWING
CLIENT / LAND OWNER:

GDS IDC SERVICES

2500 LEAD / M&E CONSULTANT:


HDR Consulting Pte. Ltd.
350 Orchard Road
#18-01/02 Shaw House
Singapore 238868
T: +65 6864 9950

75 F1 D25-150 75 ARCHITECT:
F: +65 6491 1259

3HPArchitects Pte. Ltd.


F1' D25-150 Blk. 162 #04-3555 Bukit Merah Central
Singapore 150162
T: +65 6235 8333
75

F: +65 6733 0809

LOCAL CONSULTANT:

PT. HASKON CITRA PERDANA


VERTICAL BAR MIDDLE BAR F3,F3' D25-300 Jl. Mas Surya Negara 1, Kawasan Industri Terpadu Kabil
Kompleks Citranusa Niaga Blok A2 No. 5-7
Batam 29467 - Indonesia

F4 D25-900
T: +62 778 711116 - 711265
F: +62 778 711115
1500

F5 D13-150 LINK LEED CONSULTANT:


F2 D25-150 Building System and
Diagnostics Pte. Ltd.
22 Veerasamy Road,
F2' D25-150 Singapore 207328
T: +65 6560 0702
F: +65 6795 0020
50
150

MAIN CONTRACTOR :
PT. ACSET INDONUSA TBK
ACSET BUILDING
JL. Majaphit No.26

1500 1000 100mm THK member of ASTRA


Petojo Selatan - Gambir
Jakarta, Indonesia 10160
Telp : (021) 3511961

LEAN CONCRETE Fax : (021) 3441413


E-mail : [email protected]

PROJECT :
PROPOSED 3-STOREY
DATA CENTER BUILDING DEVELOPMENT
AT NONGSA - BATAM ISLAND, INDONESIA

TITLE

CONCRETE PILE CAP PC4 DETAILS AND SECTION

SECTION J-J
SCALE 1:40 Approved
-
Plot Size
A3
Date
23 NOV 2023
Scale Rev.
Designed
1:40 00
- Refer To. 10330442-CS-GF-542
Drawn
Drawing no. SD-AI-STR-DCB-GF-009
-
NOTE :

3000
600 1800 600
900 900

600

D25-150
900

D25-300

D25-150
I
3000
1800

- D25-300
KEY PLAN
900

D13-150 LINK
D25-150

D25-150
600

GRADIE
NT
1:12

PC5 DETAIL
SCALE 1:50

- - - -
By Drawing Description Rev Date

SHOP DRAWING
CLIENT / LAND OWNER:

GDS IDC SERVICES

LEAD / M&E CONSULTANT:


HDR Consulting Pte. Ltd.
3000 350 Orchard Road
#18-01/02 Shaw House
Singapore 238868
T: +65 6864 9950
F: +65 6491 1259

75 F1 D25-150 75 ARCHITECT:
3HPArchitects Pte. Ltd.
F1' D25-150 Blk. 162 #04-3555 Bukit Merah Central
Singapore 150162
T: +65 6235 8333
75

F: +65 6733 0809

LOCAL CONSULTANT:

PT. HASKON CITRA PERDANA


VERTICAL BAR MIDDLE BAR F3,F3' D25-300 Jl. Mas Surya Negara 1, Kawasan Industri Terpadu Kabil

F4 D25-900 Kompleks Citranusa Niaga Blok A2 No. 5-7


Batam 29467 - Indonesia
1500

F5 D13-150 LINK T: +62 778 711116 - 711265


F: +62 778 711115
F2 D25-150
LEED CONSULTANT:
EXISTING PILE BAR F2' D25-150 Building System and
Diagnostics Pte. Ltd.
TO BE EXPOSED 22 Veerasamy Road,
50

Singapore 207328
150

T: +65 6560 0702


F: +65 6795 0020

1500 1500 100mm THK MAIN CONTRACTOR :


PT. ACSET INDONUSA TBK
LEAN CONCRETE ACSET BUILDING
JL. Majaphit No.26
Petojo Selatan - Gambir
Jakarta, Indonesia 10160

SQ. 500mm CONCRETE PILE member of ASTRA Telp : (021) 3511961


Fax : (021) 3441413
E-mail : [email protected]

PROJECT :
PROPOSED 3-STOREY
DATA CENTER BUILDING DEVELOPMENT
AT NONGSA - BATAM ISLAND, INDONESIA

SECTION I-I
SCALE 1:50 TITLE

CONCRETE PILE CAP PC5 DETAILS AND SECTION

Approved Plot Size Date


A3 23 NOV 2023
-
Scale Rev.
Designed
1:50 00
- Refer To. 10330442-CS-GF-542
Drawn
Drawing no. SD-AI-STR-DCB-GF-010
-
NOTE :

H
-
2700
600 1500 600
750 750

600

D25-150
1500

KEY PLAN

D25-300
D25-300
4200

D25-150
D25-150

GRADIE
NT
1:12
1500

D25-150
D13-150 LINK
600

- - - -
By Drawing Description Rev Date

SHOP DRAWING
CLIENT / LAND OWNER:

PC6 DETAIL GDS IDC SERVICES


SCALE 1:50
LEAD / M&E CONSULTANT:
HDR Consulting Pte. Ltd.
350 Orchard Road
#18-01/02 Shaw House
Singapore 238868
T: +65 6864 9950
F: +65 6491 1259
ARCHITECT:
3HPArchitects Pte. Ltd.
4200 Blk. 162 #04-3555 Bukit Merah Central
Singapore 150162
T: +65 6235 8333

75 F1 D25-150 75 F: +65 6733 0809

LOCAL CONSULTANT:

F1' D25-150 PT. HASKON CITRA PERDANA


75

Jl. Mas Surya Negara 1, Kawasan Industri Terpadu Kabil


Kompleks Citranusa Niaga Blok A2 No. 5-7
Batam 29467 - Indonesia
T: +62 778 711116 - 711265
F: +62 778 711115

LEED CONSULTANT:
VERTICAL BAR MIDDLE BAR F3, F3' D25-300 F5 D13-150 LINK Building System and
Diagnostics Pte. Ltd.
22 Veerasamy Road,
F4 D25-900
1800

Singapore 207328

F2 D25-150 CONCRETE CAST IN SITU T: +65 6560 0702


F: +65 6795 0020

EXISTING PILE BAR MAIN CONTRACTOR :


F2' D25-150 PT. ACSET INDONUSA TBK
TO BE EXPOSED ACSET BUILDING
JL. Majaphit No.26
50

Petojo Selatan - Gambir


150

Jakarta, Indonesia 10160


member of ASTRA Telp : (021) 3511961
Fax : (021) 3441413
E-mail : [email protected]

600 1400 1400 800 100mm THK PROJECT :


PROPOSED 3-STOREY
LEAN CONCRETE DATA CENTER BUILDING DEVELOPMENT
AT NONGSA - BATAM ISLAND, INDONESIA

SQ. 500mm CONCRETE PILE

TITLE

CONCRETE PILE CAP PC6 DETAILS AND SECTION

SECTION H-H
SCALE 1:50
Approved Plot Size Date
A3 23 NOV 2023
-
Scale Rev.
Designed
1:30 00
- Refer To. 10330442-CS-GF-542
Drawn
Drawing no. SD-AI-STR-DCB-GF-011
-
NOTE :

4000

600 1400 1400 600

600
1400 D25-150

D25-300
B
4000

D25-300
- KEY PLAN

D25-150
D25-150
1400

D25-150 D13-150 LINK

GRADIE
NT
1:12
600

PC9A DETAIL
SCALE 1:50 - - - -
By Drawing Description Rev Date

SHOP DRAWING
CLIENT / LAND OWNER:

GDS IDC SERVICES

4000 LEAD / M&E CONSULTANT:


HDR Consulting Pte. Ltd.
350 Orchard Road
#18-01/02 Shaw House
Singapore 238868
75 F1 D25-150 75 T: +65 6864 9950
F: +65 6491 1259
ARCHITECT:
F2 D25-150 3HPArchitects Pte. Ltd.
75

Blk. 162 #04-3555 Bukit Merah Central


75

Singapore 150162
T: +65 6235 8333
F: +65 6733 0809

LOCAL CONSULTANT:

VERTICAL BAR F3' D25-300 F5 D13-150 LINK PT. HASKON CITRA PERDANA
F4 D25-900 F3 D25-300 Jl. Mas Surya Negara 1, Kawasan Industri Terpadu Kabil
Kompleks Citranusa Niaga Blok A2 No. 5-7
Batam 29467 - Indonesia
CONCRETE CAST IN SITU
2000

T: +62 778 711116 - 711265


1725

F: +62 778 711115

F1' D25-150 LEED CONSULTANT:


Building System and
Diagnostics Pte. Ltd.
EXISTING PILE BAR 22 Veerasamy Road,
F2' D25-150 TO BE EXPOSED
Singapore 207328
T: +65 6560 0702
F: +65 6795 0020
50
150

MAIN CONTRACTOR :
PT. ACSET INDONUSA TBK
ACSET BUILDING

600 1400 1400 600 100mm THK JL. Majaphit No.26


Petojo Selatan - Gambir

LEAN CONCRETE member of ASTRA


Jakarta, Indonesia 10160
Telp : (021) 3511961
Fax : (021) 3441413
E-mail : [email protected]

PROJECT :
SQ. 500mm CONCRETE PILE PROPOSED 3-STOREY
DATA CENTER BUILDING DEVELOPMENT
AT NONGSA - BATAM ISLAND, INDONESIA

SECTION B-B TITLE

SCALE 1:50 CONCRETE PILE CAP PC9A DETAILS AND SECTION

Approved Plot Size Date


A3 23 NOV 2023
-
Scale Rev.
Designed
1:50 00
- Refer To. 10330442-CS-GF-541
Drawn
Drawing no. SD-AI-STR-DCB-GF-008
-