Daily Production'17!02!2017
Daily Production'17!02!2017
BARATAMA ENERGY
Jl. Patimura No. 2A Kel. Batu Ampar Balikpapan – East Kalimantan – Indonesia 76126
Phone : +62 542 – 7212578 - 7212579 Date : 27-Nov-23 Date :
Fax : +62 542 - 8510308 Date : ###
Email Address : [email protected]
AT 'A35D
OB Coal Remark
Shift LOADER WH HAULER Trip BCM Seam Distance Material WH Trip Ton Seam Distance WH OB WH Coal Rain Slippery
12.00 - - PC1100-06
12.00 - - ZX870H-07
PC 300 12.00 - - - - - - - -
Night Shift
12.00 - - PC1100-06
12.00 - - ZX870H-07
M. Norfadly
Prod. Adm Coor Engineering Prod. Adm
PT. ARTHA SADDHANA MULIA
PIT 2N AND F (INTERN) PC 200 PC 300 Cobelco 300 DAILY PERFORMANCE Daily Performance '
CODE OVERBURDEN COAL OVERBURDEN COAL OVERBURDEN COAL 927.000 - 927.000
Type Unit AS BU
C/N UNIT RITASE
UNIT Volume OB RITASE
Tonage RITASE
UNIT Volume OB RITASE
Tonage RITASE
UNIT Volume OB RITASE
Tonage OB (Bcm) COAL (MT) OB (Bcm)
(Hauler) (Bcm) ( MT ) (Hauler) (Bcm) ( MT ) (Hauler) (Bcm) ( MT )
SUB Total - - - 0.000 103 927.00 - 0.000 - - - 0.000 SUM day shift 927.00 - SUM day shift 927.00
Date : 27-Nov-23
C / N Unit
Total
No HT-008 HT-009 HT-011 HT-012 DT-006
Time Ritase Tonage Ritase Tonage Ritase Tonase Ritase Tonase Ritase Tonage Ritase Tonage
Seam
1 - - - - - - -
2 - - - - - - -
3 - - - - - - -
4 - - - - - - -
5 - - - - - - -
6 - - - - - - -
7 - - - - - - -
DAY SHIFT
8 - - - - - - -
9 - - - - - - -
10 - - - - - - -
11 - - - - - - -
12 - - - - - - -
13 - - - - - - -
14 - - - - - - -
15 - - - - - - -
16 - - - - - - -
17 - - - - - - -
18 - - - - - - -
19 - - - - - - -
20 - - - - - - -
21 - - - - - - -
22 - - - - - - -
23 - - - - - - -
Sub Total - - - - - - - - - - - -
C / N Unit
Total
No HT-008 HT-009 HT-011 HT-012 DT-006
Time Ritase Tonage Ritase Tonage Ritase Tonase Ritase Tonase Ritase Tonage Ritase Tonage
Seam
1 - - - - - - -
2 - - - - - - -
3 - - - - - - -
4 - - - - - - -
5 - - - - - - -
6 - - - - - - -
7 - - - - - - -
8 - - - - - - -
9 - - - - - - -
10 - - - - - - -
11 - - - - - - -
12 - - - - - - -
13 - - - - - - -
14 - - - - - - -
15 - - - - - - -
16 - - - - - - -
17 - - - - - - -
18 - - - - - - -
19 - - - - - - -
20 - - - - - - -
21 - - - - - - -
22 - - - - - - -
Sub Total - - - - - - - - - - - -
Total Daily - - - - - - - - - -
Total Night - - - - - - - - - - - -
Grand Total - - - - - - - - - - - -
TOTAL
MOHH
Type Unit Code WH STB BD PA % UA %
OB COAL GEN TRA'V UNIT START END TOTAL OB COAL OB COAL ( Liter ) S01 S02 S03 S04 S05 S06 S07 S08 S09 S10 S11 S12 S13 S14
Dozer / Grader
D 85 ESS DZ 001 12.00 - - 12.00 - 12.50 12.00 12.00 8014.4 8,021.30 6.90 100% 100% 150 - - - - - - - - - - - - - -
D 85 ESS DZ 003 12.00 - - 12.00 - - 12.00 12.00 12.00 12.00 100% 100% - - - - - - - - - - - - - - -
GD 120 H GD 002 12.00 - - 12.00 - - 12.00 12.00 12.00 12.00 100% 100% - - - - - - - - - - - - - - -
TOTAL
MOHH
Type Unit Code WH STB BD PA % UA %
OB COAL GEN TRA'V UNIT START END TOTAL OB COAL OB COAL ( Liter ) S01 S02 S03 S04 S05 S06 S07 S08 S09 S10 S11 S12 S13 S14
Loader
PC 200 EX 001 12.00 - - 12.00 - - - - 12.00 12.00 5855.3 5,863.00 7.70 - - 100% 100% - - - - - - - - - - - - - - -
PC 300 EX 002 12.00 - - 12.00 - - - 16.67 12.00 12.00 13290.0 13,297.00 7.00 927.000 - 100% 100% 77 200 - - - - - - - - - - - - - -
Cobelco 300 EX 003 12.00 - - 12.00 - - - - 12.00 12.00 12.00 12.00 - - 100% 100% - - - - - - - - - - - - - - -
Average 12.00 - - 12.00 - - - 3.33 - 3,839.20 10.14 927.00 - 100% 100% 200 - - - - - - - - - - - - - -
MOHH
Code WH STB BD PA % UA %
Artik & DT OB COAL GEN TRA'V UNIT START END TOTAL OB COAL OB COAL ( Liter ) S01 S02 S03 S04 S05 S06 S07 S08 S09 S10 S11 S12 S13 S14
Hauler
Izuzu 280 DT 061 5.67 6.33 - 5.67 - - - 26.47 5.67 12.00 5.67 5.67 261.00 - 100% 47% 46 150 - - - - - - - - - 1.00 - - - -
Izuzu 280 DT 103 8.45 3.55 - 6.17 - 2.28 - - 8.45 12.00 8.45 8.45 333.00 - 100% 70% 54 - - - - - - - - - 1.00 - - - -
Izuzu 280 DT 139 6.67 5.33 - 6.67 - - - - 6.67 12.00 6.67 6.67 333.00 - 100% 56% 50 - - - - - - - - - - - - - -
Izuzu 280 DT 155 2.00 10.00 - 2.00 - - - - 2.00 12.00 2.00 2.00 - - 100% 17% - 10.00 - - - - - - - - - - - -
Izuzu 280 DT 012 12.00 - - 12.00 - - - - 12.00 12.00 12.00 12.00 - - 100% 100% - - - - - - - - - - - - - -
Izuzu 280 DT 014 12.00 - - 12.00 - - - - 12.00 12.00 12.00 12.00 - - 100% 100% - - - - - - - - - - - - - -
Izuzu 280 DT 015 12.00 - - 12.00 - - - - 12.00 12.00 12.00 12.00 - - 100% 100% - - - - - - - - - - - - - -
Average 10.20 1.80 - 10.04 - 0.16 - 1.89 10.20 12.00 927.00 - 100% 85% 150 - 0.71 - - - - - - - 0.14 - - - -
Actual ' SA
Note :
Approved by Prepared by,
DAILY STANDING HOURS PERFORMANCE REPORT
Indra, Engineering Adm.
- - - - 2.55 2.28 - - 3.55 12.00 12.00 70% ,,,,,,,OVER SHIFT + REST,,,,,,,,,GENERAL WORK,,
Formula :
UA = Eff WH / (Eff WH + STB) x 100 %
DAY
DAY
Loader
, PC 200 EX 001 0.00
, PC 400 EX 002 0.00
, PC 400 EX 003 0.00
,
HUJAN
0.00
0.00
0.00
SLEPERY
PT. ARTHA SADDHANA MULIA DZ $I19 AT $I23 DT 01 $I30
DAILY STANDING HOURS PERFORMANCE REPORT
MINING CONTRACTOR & SERVICES GLD $I55 HT $I50 DT 011 $I40
EXC $I12
SITE PT. BU Samboja. I Date Of ReportMonday, November 27, 2023
TOTAL
MOHH
Type Unit Code WH STB BD PA % UA %
OB COAL GEN TRA'V UNIT START END TOTAL OB COAL OB COAL ( Liter ) S01 S02 S03 S04 S05 S06 S07 S08 S09 S10 S11 S12 S13
Dozer / Grader
D 85 ESS DZ 001 12.00 - - 12.00 - - 12.00 12.00 8021.30 8,033.30 12.00 100% 100% - - - - - - - - - - - - -
Total 12.00 - - 12.00 - - 100% 100% - - - - - - - - - - - - - -
TOTAL
FUEL
MOHH
Type Unit Loader Code WH STB BD PA % UA %
OB COAL GEN TRA'V UNIT START END TOTAL OB COAL OB COAL ( Liter ) S01 S02 S03 S04 S05 S06 S07 S08 S09 S10 S11 S12 S13
PC 200 Exc 001 12.00 - - 12.00 - - - - 12.00 12.00 5863.00 5,875.00 12.00 - - 100% 100% - - - - - - - - - - - - -
PC 300 EX 002 12.00 - - 12.00 - - - - 12.00 12.00 13297.00 13,309.00 12.00 - - 100% 100% - - - - - - - - - - - - -
Cobelco 300 EX 003 12.00 - - 12.00 - - - - 12.00 12.00 12.00 24.00 12.00 - - 100% 100% - - - - - - - - - - - - -
FUEL
MOHH
Actual'
Note :
Approved by Prepared by,
DAILY STANDING HOURS PERFORMANCE REPORT
Formula :
UA = Eff WH / (Eff WH + STB) x 100 %
PT. ARTHA SADDHANA MULIA
MINING CONTRACTOR & SERVICES PERFORMANCE REPORT
SITE PT.
SITE PT. BU
BU Samboja.
Samboja.
TOTAL
MOHH
Type Unit Code WH STB BD PA % UA %
OB COAL GEN TRA'V UNIT HM AWAL HM AKHIR TOTAL OB COAL OB COAL ( Liter )
Dozer / Grader
D 85 ESS DZ 001 24.00 - - 24.00 - 6.25 24.00 24.00 8,014.4 8,033.30 18.90 100% 100% 150
D 85 ESS DZ 003 24.00 - - 24.00 - - 24.00 24.00 0.0 24.00 24.00 100% 100% -
GD 120 H GD 002 24.00 - - 24.00 - - 24.00 24.00 0.0 24.00 24.00 100% 100% -
Average 24.00 - - 24.00 - 2.08 24.00 24.00 100% 100% 150
TOTAL
FUEL
MOHH
Type Unit Code WH STB BD PA % UA %
OB COAL GEN TRA'V UNIT HM AWAL HM AKHIR TOTAL OB COAL OB COAL ( Liter )
Loader
PC 200 EX 001 24.00 - - 24.00 - - - - 24.00 24.00 5,855.3 5,875.00 19.70 - - 100% 100% - - -
PC 300 EX 002 24.00 - - 24.00 - - - 8.33 24.00 24.00 13,290.0 13,309.00 19.00 927.00 - 100% 100% 39 - 200
Cobelco 300 EX 003 24.00 - - 24.00 - - - - 24.00 24.00 0.0 24.00 24.00 - - 100% 100% - - -
Average 24.00 - - 24.00 - - - 1.67 24.00 24.00 22.14 927.00 - 100% 100% 200
TOTAL
FUEL
MOHH
Type Unit Code WH STB BD PA % UA %
OB COAL GEN TRA'V UNIT HM AWAL HM AKHIR TOTAL OB COAL OB COAL ( Liter )
Hauler
Kerax Renauld DT 001 17.67 6.33 - 17.67 - - - 8.49 17.67 24.00 5.7 23.33 17.67 261.000 - 100% 74% 15 - 150
Kerax Renauld DT 004 20.45 3.55 - 18.17 - 2.28 - - 20.45 24.00 8.5 28.90 20.45 333.000 - 100% 85% 18 - -
Kerax Renauld DT 005 18.67 5.33 - 18.67 - - - - 18.67 24.00 6.7 25.33 18.67 333.000 - 100% 78% 18 - -
Kerax Renauld DT 011 14.00 10.00 - 14.00 - - - - 14.00 24.00 2.0 16.00 14.00 - - 100% 58% - - -
Kerax Renauld DT 012 24.00 - - 24.00 - - - - 24.00 24.00 12.0 36.00 24.00 - - 100% 100% - - -
Kerax Renauld DT 014 24.00 - - 24.00 - - - - 24.00 24.00 12.0 36.00 24.00 - - 100% 100% - - -
Kerax Renauld DT 015 24.00 - - 24.00 - - - - 24.00 24.00 12.0 36.00 24.00 - - 100% 100% - - -
Average 22.20 1.80 - 22.04 - 0.16 - 0.61 22.20 24.00 927.00 - 100% 92% #REF! #REF! 150
CT 001 N58 N73
-
- - - - - - - - - 1.00 - - - - - - - - 5.33 - - - 6.33 24.00 24.00 74% OVER SHIFT + REST
- - - - - - - - - 1.00 - - - - - - - - 2.55 2.28 - - 3.55 24.00 24.00 85% OVER SHIFT + REST GENERAL WORK
- - - - - - - - - - - - - - - - - - 5.33 - - - 5.33 24.00 24.00 78%
- 10.00 - - - - - - - - - - - - - - - - - - - - 10.00 24.00 24.00 58% TIDAK ADA DRIVER / OPERATOR
- - - - - - - - - - - - - - - - - - - - - - - 24.00 24.00 100%
- - - - - - - - - - - - - - - - - - - - - - - 24.00 24.00 100%
- - - - - - - - - - - - - - - - - - - - - - - 24.00 24.00 100%
- 0.71 - - - - - - - 0.14 - - - - - - - - 0.94 0.16 - - 1.80 24.00 24.00 92%
-
Formula : Formula :
UA = Eff WH / (Eff WH + STB) x 100 % PA = Eff WH + STB
Eff WH + STB + DT
S1 TIDAK ADA DRIVER/OPERATOR SAKIT S6 : STB TIDAK MATCHING S11 : SAFETY TALK S16: HUJAN Formula :
S2 TIDAK ADA DRIVER / OPERATOR S7 : DT STB KARENA A2B B/D S12 : P2H S17 : SLIPPERY UA = Eff WH / (Eff WH + STB) x 100 %
S3 TUNGGU PERBAIKAN FRONT S8 : A2B STB KARENA DT B/D S13 : MAINTENANCE TERLAMBAT DATANG S18 : FORCE MEJUER/DEMO
S4 STOCK HABIS S9 : UNIT AMBLAS / INSIDENT S14 : TRANSPORTASI TERLAMBAT S19 : OTHERS Formula :
S5 STB TIDAK ADA DI LOKASI S10 : OVER SHIFT + REST S15 : REFUELING GN : GENERAL WORK PA = Eff WH + STB
GN : GENERAL TRAVELLING BD : BREAKDOWN Eff WH + STB + DT
PT. ARTHA SADDHANA MULIA Distribution :
MINING CONTRACTOR & SERVICES
~ Coor. Engineering
SITE PT. BU Samboja.
DAILY PRODUCTION & PERFORMANCE REPORT ~ File
TOTAL
Remarks
FUEL
Type Unit BD STB MOHH PA % UA %
C/N UNIT OB COAL GEN TRA'V OB COAL OB COAL FUEL
(Bcm/h) (MT/h) (Liter/h)
Kerax Renauld DT 001 17.67 - - - 17.67 261.000 - 150 - 6.33 24.00 100% 74% 15 8
HAULER OVERBURDEN
Kerax Renauld DT 004 18.67 - - - 18.67 333.000 - - - 5.33 24.00 100% 78% 18 -
Kerax Renauld DT 005 14.00 - - - 14.00 - - - - 10.00 24.00 100% 58% -
Kerax Renauld DT 011 24.00 - - - 24.00 - - - - - 24.00 100% 100% -
Kerax Renauld DT 012 24.00 - - - 24.00 - - - - - 24.00 100% 100% -
Kerax Renauld DT 014 24.00 - - - 24.00 - - - - - 24.00 100% 100% -
Kerax Renauld DT 015 22.04 - 0.16 - 22.20 927.000 - 150 - 1.80 24.00 100% 92% 42 7
SUB TOTAL 126.70 - 0.16 - 144.53 1,521.000 - 300 - 23.47 168.00 100% 86% 12 2
TOTAL 330.54 - 2.45 - 350.65 1,521.000 - ### - 33.351 384.00 100% 91% 5 - 1
SUPPORT
OVERBURDEN (BCM)
NO ACTUAL PLAN
LOKASI ACHIEV
Day MTD Day MTD
1 Pit
Kendala-kendala penyebab ketidak tercapaian target produksi Overburden dan Coal tanggal ……………………….,
COAL (TON) SR
ACTUAL PLAN
ACHIEV ACT PLAN
Day MTD Day MTD
………………………., yaitu :
ang terlambat.