Report-Bank Management System
Report-Bank Management System
Lucky Chauhan
Yash tickoo
Aditya Sahani
Submitted to:
CSE. DEPT.
MS. TANU MAM
(ASST. PROFESSOR)
Class: CSE Sem-IIIrd
ACKNOWLEDGEMENT
I am thankful to all the faculty members, providing their
valuable time and guidance in elaborating view of studying the
project details and getting the right vision for its implementation.
I am also thankful to Mrs. TANU MAM, who is having a vast
knowledge of DBMS, System Analysis and Design &
Programming concepts which are the building block of project.
I also thank Mrs. SAKSHI MAM, our H.O.D., and all other
faculty members who are directly or indirectly involved with our
project. I am also pleased with the support and co-operation of the
lab in charge in order to make use of the free lab slots.
Abstract
Table of Contents
1. Introduction of the Project
1.1. Project Objective
1.2. Project Benefit
1.3. Project Scope
1.4. Project Limitation
3. System Design
3.1. Interface Design
3.1.1. User Interface
3.1.2. Communication Interface
3.2. Detailed System Specification
3.2.1. Detailed System Design
3.2.1.1. Functional Flow of System
3.2.1.2. Data Flow of System
5. Appendix
5.1. References
• Banks may deploy their own assets in securities with consequent risk
to commercial and savings deposits.
Implementation Preliminary
Investigation
Determination of
System Testing Requirements
Development of
Design of System
System
1. Preliminary Investigation
2. Determination Requirements
3. Design of System
4. Development of System
5. System Testing
6. Implementation
2.1. Preliminary Investigation
For this, the need arises to understand the viewpoint of two important
entities…
After carrying out these interviews, I drew conclusion about the Top
Management’s requirements and whether users are in support of the new
system.
Hardware Requirements
Server Machine:
Client Machine:
Printer:
Software Requirements
The Top Management reviewed the above factors and gave their
ascent. After the consent to request approval, the design was taken up.
Design of System
• User Interface
• Communication Interface
The design that we have formed for the new system are given
as under:-
Account No
User
Account
Details
Bank
System
Transaction
Flow chart
ACC. NO. ADDRESS.
NAME BALANCE.
START
BANK
h
CUSTOMER
as
TRANSACTION Done
by
DEBIT CREDIT
START
CUSTOMER
has has
FIXED ACCOUNT
DEPOSITE
Transaction Process
TRANSACTION CUSTOMER
CURRENT BALANCE
DEBIT CREDIT
BALANCE
Unit Testing:
Integration Testing:
Integration testing is performed after all the software units are combined
together. The objective here is to test the software interfaces. Project
team conducts the integration testing. Before entering integration
testing, it may be ensured that code review and unit testing have been
performed on the individual software modules.
I conducted the unit testing for finding errors and the results of the
unit testing are recorded and action initiated for rectification of the
errors/defects.
VALIDATION
APPENDIX
5.1. References
Books:
http://www.intranic.in
http://www.google.com