JICT Script
JICT Script
SCRIPT
Draft 1
OUTLINE
• JICT Business Profile
• Information of new tech services, equipment, etc.
• Achievements
• Animation of on-going projects
ASPECTS
1. Equipment – additional number and technology upgraded of QC, RTGC, Truck
2. Expansion Plan – The completed CY and direct toll access
3. Facility – new interior building, new CY, new sewage plant, new joint Gate
4. Data Update
5. New Shoot – Berth, CY, office, gate, equipment
6. JICT new system
7. Terminal Capacity
8. JICT Achievement
9. Graphical & Storyboard
STORYLINE
Expansion Plan – To optimize our services and supporting the growth of national economy,
JICT has embarked a number of expansion projects such as:
1. Enhancement Quay Crane container
2. Expansion of Container Yard
3. Sophisticated terminal operating system
4. The first auto gate system in Indonesia Port
5. Direct toll access
Facility – with more equipment so support the growth of the companies, JICT has a total of
facilities with 45.50 Ha surface area, capable to sustain 39.884 Teus, and 10.560 Ground Slot.
Equipped with 16 units of Quay Crane Container, 128 units Head Truck, 15 forklift diesel, 6
units Side Loader, and 4 units Reach Stacker.
JICT now has upgraded with new interior building, new sewage plant, and new joint gate.
JICT NEW SYSTEM – With a global success now JICT has an online integrated system that can
be access anytime, anywhere. With a click to www.JICT.co.id, you can access all about JICT,
facilities, operation, and tracking. Now with just a Container ID, you can track your shipment
online.
ACHIEVEMENT – JICT has won an ISDA Award 2018 in CSR program for RumBel (Rumah
Belajar) and Green Dock School. This mark the winning of JICT as the most socially-responsible
company for 2 years in a row.