Module 8-STRUCTURE ITEM
Module 8-STRUCTURE ITEM
PREPARED BY :
––
REFERENCES
INTRODUCTION
1
–OBJECTIVE
EQUIPMENTS
FORMWORK
1. Circular saw
2. Hand saw
3. Hammer
4. Nail
5. Tape
6. L-shape
BEAM REINFORCEMENT
1. Rc cutter
2. Tape
3. Bar bending
4. Work bench
5. Pincher
6. Tie hook
CONCRETE
1. Digital balance
2. Bucket
3. Scoop
4. Shovel/trowel
5. Mixer
6. Mixing tray
MATERIAL
FORMWORK
1. Plywood 10mm
2. Timber 2”X1”
BEAM REINFORCEMENT
1. Rc bar diameter 10, link diameter 6
2. Wire
CONCRETE
1. Cement
2. Sand
3. Aggregate
4. Water
2
PROCEDURES EXAMPLE FROM GOOGLE WEB PAGES
3
4
Explanation must include :
Method of construction for formwork, reinforcement bar work and concreting.
Introduction of each materials and practical work such as cutting a timber,
nailing the formwork, reinforcement Practical on hook/bend/link of
reinforcement also calculation and practical work of concreting the beam.
EXAMPLE
5
4 1. Glove
5 Tied 1. Hook
6 Rectangular tied
beam
6
PRACTICAL WORK ON CONCRETING
NO DIAGRAM PRACTICAL TOOLS / EQUIPMENT
WORKS
7
5. Put the water Bucket
inside the Water
hole.
8
8 Put mixture in Rc Beam
the formwork Formwork
and let it for 24 Concrete
hours before
demould.
OBSERVATION OF RESULT
9
PHOTO OF BEAM
10