Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
105 views
Design Basis Report BLT J&K
Design Basis Report BLT J&K
Uploaded by
AGNIVO RAY
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Design Basis Report BLT J&K For Later
Download
Save
Save Design Basis Report BLT J&K For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
105 views
Design Basis Report BLT J&K
Design Basis Report BLT J&K
Uploaded by
AGNIVO RAY
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Design Basis Report BLT J&K For Later
Carousel Previous
Carousel Next
Save
Save Design Basis Report BLT J&K For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 36
Search
Fullscreen
EE Rahee Infratech Limited Quality First, Speed Always CIN Ne U67120WBI996°LC076870 LXXIV/J&K/IRCON/2022-2023/1735 Dated: 28.03.2023 ‘The Executive Director/J&K M/s IRCON international Limited USBRI. Head Office, Satyam Complex, Marble Market, P.O. Sainik Colony, Jammu {J&K) 180011 Dear Sir, Sub:- Submission of updated DBR (Rev-7.1) for BLT with inside derailment guard in Tunnel (Straight & Curves) Le. T14, T15,T48 & T49 in connection with the work of ‘Design with Proof Checking of Broad Gauge Ballast less Track including Supply, Installation, Testing and Commissioning between Arpinchala to Dharam and Sangaldan - Ind ~ Basindadar (approx. 42.500 km) in the section of Udhampur-Srinagar- Baramulla Rail Link Project, J&K. (Package: BLT-03). Contract Agreement No, IRCON/J&KCELL/JAT/14/1014/K-B/Basindadar- Arpinchala/BLT-03/448/9279 dated 03/08/2021. 2. IRCON letter no.6648 on approval of DCN & Drawings (Rev-6.2) for tunnels in straight & Curve with inside Derailment Guard 3. Our letter no.LXXIV/J&K/IRCON/2022-2023/1464 dated 04.02.2023 on submission of DBR (R7) Ref: smail communi t.16,03.202: With reference to the point no.4, the clause 4.5 in DBR Tunnel is changed in line with approved BLT Tunnel DCN and is being submitted herewith for your perusal: SI. Title Document no. Rev. No. Design Basis Report (DBR) - BLT Track 1 | Structure with, without and deep invert for | 10054-STR-RPT-0001.R7.1 | 7.1 Tunnels We request you to approve the attached document at the earliest. ‘Thanking you. Yours faithfully, For Rahe} Infratech Limited JGM (Contracts) Enél.: As above. Cou 1, The CGM/Sangaldan: For kind information 2, The JGM/Design/Jammu: For kind information Regd. Office : Kemwel Miner Sth Flor, 1ID/2 Ho Chi Minh Saran Kallas -700 0718 (ida) Corporate Office +17, Lakknaaya Tila Rosé Shalimar Howrah 71) 103, West Benge India P-+91 38 266895903737 E info@rahee commRAHEE ifigg) = ~O-«ere Korea Railroad Technical Corporation 03 DECEMBER 2022 Katra—Banihal Section of Udhampur-Srinagar— Baramulla Rail Link Project, Jammu & Kashmir (Between Arpinchala to Dharam and Sangaldan — Ind — Basindadar) Design Basis Report (DBR) — BLT Track Structure with, without and deep invert for Tunnels (For Tunnels- T-14, T-15, T-48 and T-49) DESIGN BASIS REPORT ~
Lp Revised as per Comments received from LDC 6 29/07/2021 [~ Name ‘Choi Hyeonseob ‘Oh Janghaun Kang Senature Description Details of Track Structure at Inspection Pit has been added 5 [zenaraant | Name Masi 18. Rao Kong Description Revised as per the comments received from Etude Services through IRCON 7 _[sonsraeat | Wome asi 18 Rae "ene Description Derailment Guard Details Updated as per IRPWM 3 [290/202 | Name M.Aasim ‘sujths Kang Description Revised as per the comments received from Etude Services: 2 [sperm | Name Mi Fas Suns ne Description Revised as per the comments received from IRCON 2 [209700 | Name M. Assim suiths vere Description For Approval 0 | ereszo2. Maas suns wang Revision | Date Prepared Checked Approved Document No, Tite Revision | Pages| T0054 STR-RPT-OOOT DBR ALT Track Structure with, without and degp invert for Tunnels 7 2of 35Table of Contents 1 INTRODUCTION AND SCoPE. 1.1 PROJECT OVERVIEW. so 1.2. SCOPE OF THIS DOCUMENT..... 1.3. TERMS AND ABBREVATIONS 2. REFERENCE DOCUMENTS. 2:1 EMPLOYER REQUIREMENTS AND OTHER DOCUMENTS 2.2. INDIAN RAILWAY STANDARDS... 2.3. INDIAN STANDARDS... 2.4 INTERNATIONAL STANDARDS... 3. TRACK SYSTEM DESCRIPTION-TWIN BOOTED BLOCK SYSTEM 3.1 STRAIGHT & CURVED TRACK SYSTEM 3.2. TRACK TOLERANCES. 3.3. DERAILMENT GUARD. 4 MATERIAL AND COMPONENTS FOR TRACK SLAB. 4.1 RUNNING RAIL 4.2. FASTENING SYSTEM-TWIN BOOTED BLOCK DETAILS... 43. CONCRETE FOR TRACK INFILL CONCRETE 4.4 REINFORCEMENT FOR DERAILMENT CONTAINMENT GUAR! 4.5 CONCRETE COVER FOR REINFORCEMENT... 4.6 DESIGN SERVICE LIFE 5 LOADS AND LOAD COMBINATIONS. 5.1 LOADS 5.2 VERTICALLOADS.... 5.21 — DEADLOAD (Dl) sn A 5.22 SUPER IMPOSED DEAD LOAD (SI0L) 19 5.23 TRAIN LIVE LOAD (LL) 5.24 DYNAMICIMPACT LOAD (DY). 5.25 LURCHING FORCE (LF1) 5.2.6 VERTICAL COMPONENTS OF TRANSVERSE LOADS.. 5.3 TRANSVERSE LOADS 53.1 GUIDING FORCES... 53.2 CENTRIFUGAL FORCE (Cf)... 53.3. RACKING FORCE (RF)... 53.4 SEISMICLOAD (SL). 53.5 WINDLOAD (WU) oun 5.3.6 RADIAL FORCE DUE TO TEMPERATURE (RT), 53.7 DERAILMENT (OR) 5.4 LONGITUDINAL LOADS. 54.1 TRACTION & BRAKING FORCE (TF). 5.4.2 LONG WELDED RAIL FORCE (LWR) 5.5 TEMPERATURE LOAD. 55.1 TEMPERATURE GRADIENT (EQ). 5.6 LOAD SUMMARY [7 Document Na. Tite & 2] Revision [TooseSiRRPr-0007 | __ DBR=BUT Tack Seucture with without and deep vert [UTEDR/AHEE ian “© kere 31 32 32 32 33 33 34 35 5.6.1 LOAD COMBINATION... 6 _ DETAILED DESIGN APPROACH AND METHODOLOGY .. 6.1 OBJECTIVES ‘a 6.2. FINITE ELEMENT MODELING AND ANALYSIS. 6.3 SOFTWARE USED.. 64 DETAILED DESIGN OUTPUT 7 ANNEXURE A... 8 ANNEXURE B. List of Tal Table 3-1 Location of Track System in Tunnels... Table 3-2 Track Tolerances during construction and Service ne B Table 4-1 Components of Booted Block as per Figure 4-3. Table 5-1 Loads considered for the design 18 Table 5-2 Centrifugal force with respect to radius of curve Table 5-3 Radial Forces with respect to Radius of curve Inside Tunnel. 27 Table 5-4 Description of load and load direction wrsmnnesnnrsnne Table 5-5 Load Combination & Load Factors List of Figures Figure 3-1 Typical Track Slab arrangement for Straight Track. Figure 3-2 Typical Track Slab arrangement for curved Track for Max Cant 165mm (Tentative) Figure 3-3 Vertical gradient forming Summit Curve... Figure 3-6 C/s Track Structure at inspection Pit Location (Tentative)....... Error! Bookmark not defined. Figure 3-7 Indicative RCC cross section at inspection pit loCatION ...1.ne.. Error! Bookmark not defined. Figure 3-8 Plan of Track Structure at Inspection Pit (Tentative) waged Figure 3-9 Track Structure in Tunnel T-14 and T-15 with nvert.. 12 Figure 3-10 Track Structure in Tunnel T-14 and T-15 without Invert.. Error! Bookmark not defined. Figure 3-11 Track Structure in Tunnel T-48 without Invert . . Error! Bookmark not defined. Figure 3-12 Track Structure in Tunnel T-48 with Invert. Error! Bookmark not defined. Figure 3-13 Track Structure in Tunnel T-49 without invert... ...£rror! Bookmark not defined. Figure 3-14 Track Structure in Tunnel T-49 with Invert. ‘ror! Bookmark not defined. Figure 3-15 Track Structure in Tunnel T-49 with Deep Invert ..u..nunn« Errorl Bookmark not defined. Figure 4-1 Rail profile UIC 60 with dimensions. 1 Figure 4-2 Plan of Booted Block Section Figure 4-3 Section at A-8 of booted block Document Ne Ti TOOSESTR-APT-O00T ‘DBR BLT Track Suture with, ar aren ET]R/AHEE iizan
0.10m<0.25m © h3=0.3h<0.15m Negative temperature difference © hL=h4=0.2h<0.25m Poe Teronanre Ofernes Revere Taronstae Often we 108 su an rm ogy Let-J bL-—Ldt eo 2a oe Figure 5-5 Design Temperature Difference Document No. Tite Revision | Pages] ([Toosa-sTa-RPT-000T ‘DBR BLT Track Structure with, without and deap invert for Tunnels 7 Worse5.6 LOAD SUMMARY ‘The loads to be taken into account in the track calculation are presented in the following section. Some of them are applied vertically and the others are applied horizontally. Table 5-4 Description of load and load direction Type of Dead DL Self-weight (Fy) 25 kN/m? (Density of Concrete) frame ca CF: = 41,62 KN/axle CFy = 43.62 kN/axl CF | Centrifugal Force (F:) & (Fy) Vowe live CF.= 0.55 kN/axle Loads Mx= 3.79 kN-m/axle GF__| Guiding Forces* (Fz) 147.15 kN/wheel Fr= 5.88 KN/m RF Racking Force (F2) Me= 0.534 kN-m/m 14.715 kN/wheel Fx= 0.19 kKN/wheel TE _| Traction / Braking Force (F,) 51.5 kN/wheel LR [Long Welded Rail (LWR) Forces (F,) __| 12 kN/Fastener SLz= 41.385 kN/axle Other Skis = 43.37 kN/axle Loads semi Sle = 27.59 kN/axle SL__| Seismic Load (F2) & (F) Sha = 0.54 ki/axe Sl = 0.34 kN/axle Le | Lurching Force (F) Mx =3.76 kN-m/axle TL_| Temperature toad As applicable for different depths ar Rares dea ema eranon Sa? kVfartaner Fas75 kN/m F200 KN Derailment Load (Fl rE toad (Fa) F2=196.2 kN/m for 5m My=17.85 kN-m/m for 5m “Since CF is less than GF, GF shall be considered as the total lateral force on the rail and CF shall be ignored. Document No. Title Pages TOOSH-STR-RPT-OOOT DBR BLT Frack Structure with, without and deep invert for Tunnels 7 3003s0 R/AHEE Mon a KRTS 5.6.1 LOAD COMBINATION The following load combinations are proposed for arriving at the forces on the fasteners. The factors are adopted from [IR1] * LCL — :Dead load and Live Load © LC2A _:Seismic load without Live Load + LC2B :Seismic load with Live Load © LC3 Live load with Radial Force and Temperature © LCA :Dead Load and SIDI with LR Load © LCS :Dead Load and SIDL with Derailment Load Table 5-5 Load Combination & Load Factors Toad Factors ici [12a | 1c2e | ice | tea | 1s US | aas | £25 | 425 | 42s | Las | 12s sis | 1.00 | 1.00 10 | 1.00 1.00 | 1.00 ‘Super Imposed Dead Load | ULS | 2.00 | 2.00 2.0 2.00 2.00 | 2.00 Loads is Dead load (DL) {si0u) ss | 120 | 120 | a2 | 120 | 120 | 100 live Load (includes all] US | 1.75 140 | 140 effects) sis | 1.10 100 | 1.00 Seismic load (St) us. Leo [228 35 100 | 1.00 Long Welded Rail Load (LR) | US = SIS; 1.00 us 150 Radial Force (RT) sis 1.00 Differential Temperature | ULS 115 Effect (Tl) Bg 0.80 Derailment = 100 ss 100 ‘+ Note 1 ULS: Ultimate Limit State; SLS: Serviceability Limit State «Note 2 Superimposed dead load shall include dead loads track, fasteners etc. + Note 3~Live Load shall also include dynamic effect, forces due to curvature exerted on track, longitudinal forces, and forces due to eccentricity. ‘+ Note 4 For Combination LC2B, the combination factor for live load shall be 50% for both ULS and StS according to Cl. 7.1 of [IR3] ie. 0.7 for ULS and 0.5 for SLS. + Note 5 ~The Crack width is Checked only for SLS-1 Combination as per Cl, 11.3.2 of [IR] [i eaament Tile Revision | Pease TOOSASTARFTOOOT | DARALT Track Sractre with without and deep Tver for Tunnels 7 [sors]R/AHEE Mun “O krre 6 _ DETAILED DESIGN APPROACH AND METHODOLOGY 6.1 OBJECTIVES The objective of the detailed design of the Track Structure is to meet the Technical specifications Clause 2.0 of [T2], as shown below: ‘© Suitable for Main line for 25T axle load & speed 100 kmph (proposed for goods traffic) & 22Taxle load & speed 160kmph (for passenger traffic) Loop line for 25T axle load & speed SOkmph (Clause 2.1 of [T2]} Resist the track forces. Provide a level base for uniform transmission of rail force. ‘+ Have geometrical accuracy and enable installation of track to the tolerance laid down, Ensure drainage. ‘© Resist weathering ‘+ Be construction friendly, maintainable and quickly repairable in the event of derailment. Ensure provision for electrical continuity between consecutive plinth/stab/sleepers by an appropriate design. 6.2 _ FINITE ELEMENT MODELING AND ANALYSIS The load calculations for the loads to be applied on the FE Model will be carried out with respect to the requirements of Ultimate Limit State (ULS) and Serviceability limit state (SLS) given in Section 5.6 Loads effectively acting on a single booted block are determined from a 3D FE model subjected to the loads as calculated above. The 3D FE model comprises of volumetric mesh for rails and booted block (using simplified geometry) and elastic springs for rail pads, resilience pad and block rubber. The Vertical, Lateral and Longitudinal Loads are applied at wheel-rall contact point considering the critical load position. The distribution factors for the loads shall be worked out and applied based on the stiffness of the booted block system. The resistance of the surrounding concrete against Longitudinal and Lateral loads introduced through the block is determined using a 3D model of the area around one booted block. The stiffness of the track base shall be modelled as spring stiffness with consideration of bedding modulus k according to Clause B.1.3.4 of fIN3} Considering conservative bedding modulus according to above calculations, Bedding modulus with invert is eritical than box type tunnel. Hence for FE modelling, lower bedding modulus shall be considered for analysis, After analysis the Principal stress will be extracted and compared with the permissible values. To evaluate the effect of shrinkage cracks (if any), a simplified separate analysis will be carried out. The Derailment containment guard shall be designed to care of derailment load as per Section 5.3.7, [Document Wo. Tile | Roose sra-nor-coo Daw ALT Track Siacture with, without and deep inven Tor Tunnels Pages Bolas/AHEE Hea o- KRTC Korea Rairoud Technical Corporation 6.3 SOFTWARE USED STAD / MIDAS / Ls-Dyna Advanced program shall be used for analysis of forces. # Manual program in excel sheet is used for design checks / calculations. # AutoCAD shall be used for production of typical drawings. 6.4 DETAILED DESIGN OUTPUT ‘A conclusive report shall be provided for each set of calculation including: ‘© Finite element analysis results (stress contours). ‘© Detail Design calculation for moments in TCL as per [IN7] Typical design reference drawings Document No. Tile Revision | Pages| [Hosa sTe-ReT-0007 Daw = BLT Track Structure with, without and deep invert for Tunnels 7 30135| V/AHEE 7 ANNEXURE A ICSI, Spanish Naonal Resorch Cour} Sete a Carn Say “Edsord Toreje] Page.no.15 2 Desa pod 3 Dest pst 3 Dest gout pes ps3 The test resis ar detsiled in Table 6: “Table 6. Ress ofthe logit slip test afer sepeat load test Tatas ® 7 2 3 D1 (mm) 148 146 14l 134 D2 (am) 12 108 098 | 090 D3 (am) 035 O37 on | 044 FF 0) 1035 17 po | Ba Langan pretence, F Ganglia ‘NOTE: AsD3 <0.5 mum, the slip has been taken as the load for a displacement of A= 0.3 mm Document No. Te Revision Pages FDOSESTR-RPT-OOOT Daw = LT Track Structure with, without and deep Inver Tor Tunnels i 30h 35R/AHEE Mizu O krre ANNEXURE B PANDROL August 25, 2021 ‘To Whomsoever It May Concern Pando! Iberica is the original designer of the Removable RUCSO Booted Block Assembly. Pandro! erica contiems tha the design service life of components for the assembly are as follows: Elastic clip — 300GMT or 15 years, whichever is less. Rail pad ~ 300GMT or 15 years, whichever is less. ‘Angle quide plate — 300GMT or 15 years, whichever Is less. ‘GS boll - Should not be required to be ‘during Service ite of 30 years. Flat washer 300GMT or 15 years, ‘isless. ‘Crumb rubber pad — 300GMT or 18 years, whichever is loss. Rubber boot with asymmetric channels ~ 300GMT oF 15 years, whichever is less. {emovable RUC6O Bock with GS Dowel Should not be required tobe replaced aunng service years. ‘This design life fs under normal operating conditions and would be different if abnormal conditions: affect the performance of the system such as derailment, inundation, land movement etc exopaeNs ‘Signed on behalf of Panarot ibenca Name: Francisco Javier Lépez Giménez Designation: Pandrot iberica Sales director toft1Page Regatered OMhca “Hanmre Manor th Pea, 1970/3 Document No, Tie Revision | Pages TO054 STR-RPT-OOOT DAR BLT Track Structure with, without and deep laver for Tunnals 7 35 0f35
You might also like
Ussor 2021
PDF
67% (3)
Ussor 2021
153 pages
Madhukari - Buddhadeb Guha
PDF
25% (4)
Madhukari - Buddhadeb Guha
631 pages
2024 MIDAS Price List (INR) Civil Private-1
PDF
No ratings yet
2024 MIDAS Price List (INR) Civil Private-1
1 page
NIPR-2618.1 Alignment Design On RFR Corridors
PDF
No ratings yet
NIPR-2618.1 Alignment Design On RFR Corridors
10 pages
Design Basis Report_ONly_C
PDF
No ratings yet
Design Basis Report_ONly_C
50 pages
Buffer Stop
PDF
No ratings yet
Buffer Stop
2 pages
Chapter 7-Aerial Structures/Bridges Table of Contents
PDF
No ratings yet
Chapter 7-Aerial Structures/Bridges Table of Contents
90 pages
LAA 421 C0U 1400033 A - Methodology For Vibration Mitigation in Corridor 1&2
PDF
100% (1)
LAA 421 C0U 1400033 A - Methodology For Vibration Mitigation in Corridor 1&2
26 pages
Innovative Rail Fastening Systems
PDF
No ratings yet
Innovative Rail Fastening Systems
9 pages
Rail Steel Bridge Condition Issues On SER, Indian Railways
PDF
No ratings yet
Rail Steel Bridge Condition Issues On SER, Indian Railways
37 pages
Major Bridge Construction Concept For Budding Engineers
PDF
No ratings yet
Major Bridge Construction Concept For Budding Engineers
65 pages
Introductions: Concrete Crack of Ballastless Track Structure and Its Repair
PDF
No ratings yet
Introductions: Concrete Crack of Ballastless Track Structure and Its Repair
7 pages
Final Report - 2007 - 04 - 02
PDF
No ratings yet
Final Report - 2007 - 04 - 02
77 pages
DG RDSO Mission Raftaar 230518
PDF
No ratings yet
DG RDSO Mission Raftaar 230518
14 pages
Track Manual
PDF
100% (1)
Track Manual
367 pages
CP N-05 Vol.2 Sec.6 Ib Ts 100
PDF
No ratings yet
CP N-05 Vol.2 Sec.6 Ib Ts 100
217 pages
Esveld Presentation Serbia 22-11-12
PDF
No ratings yet
Esveld Presentation Serbia 22-11-12
141 pages
A-IV C-1 Track Structure For Metro
PDF
No ratings yet
A-IV C-1 Track Structure For Metro
11 pages
Land Viaduct Design Dynamic Behaviour-Completed
PDF
100% (1)
Land Viaduct Design Dynamic Behaviour-Completed
23 pages
PC03-SYS-GEN-ST-REP-10001 Daar Report Draft - 2022 - 04 - 07
PDF
No ratings yet
PC03-SYS-GEN-ST-REP-10001 Daar Report Draft - 2022 - 04 - 07
42 pages
LTC MAHSR C3TFL 2023 0183 Temporary Facilities (Rev C)
PDF
No ratings yet
LTC MAHSR C3TFL 2023 0183 Temporary Facilities (Rev C)
85 pages
Ueeiv Fixed Track Forms Journal of Proceedings Web
PDF
100% (1)
Ueeiv Fixed Track Forms Journal of Proceedings Web
30 pages
Fastening System 300-1W (Patil Infrasyructure PVT LTD)
PDF
No ratings yet
Fastening System 300-1W (Patil Infrasyructure PVT LTD)
96 pages
O20361-Q-VIA-CM-ME-35204 (Rev A)
PDF
No ratings yet
O20361-Q-VIA-CM-ME-35204 (Rev A)
33 pages
Draft Certificate - Final DPR Submitted - Brahmapuri With Bridge Details
PDF
No ratings yet
Draft Certificate - Final DPR Submitted - Brahmapuri With Bridge Details
3 pages
TSC
PDF
No ratings yet
TSC
101 pages
Vol-IV 2 of 2
PDF
No ratings yet
Vol-IV 2 of 2
103 pages
1.rail Track Analysis Wizard
PDF
No ratings yet
1.rail Track Analysis Wizard
29 pages
ESC 230 Traverse
PDF
No ratings yet
ESC 230 Traverse
31 pages
20 Points Annexures - MOB GAJWEL
PDF
No ratings yet
20 Points Annexures - MOB GAJWEL
87 pages
LWR Final Book 7JULY
PDF
No ratings yet
LWR Final Book 7JULY
172 pages
Design Loads For Bridges Highspeed 10-Design - 20b
PDF
No ratings yet
Design Loads For Bridges Highspeed 10-Design - 20b
30 pages
Raising Speed To 150 KMPH On New Delhi - Agra Cantt Section: Issues & Works Invovled
PDF
No ratings yet
Raising Speed To 150 KMPH On New Delhi - Agra Cantt Section: Issues & Works Invovled
8 pages
Part 1045 Rail Track Support Systems
PDF
No ratings yet
Part 1045 Rail Track Support Systems
20 pages
P4B02 Gut CV Bas PP4 00 00 Des 0007 B01
PDF
No ratings yet
P4B02 Gut CV Bas PP4 00 00 Des 0007 B01
57 pages
Overseas Railway Project Applied Delkor ALT - or ALT - : Attachment
PDF
No ratings yet
Overseas Railway Project Applied Delkor ALT - or ALT - : Attachment
3 pages
Specifications of Optic Fibre: in This Chapter
PDF
No ratings yet
Specifications of Optic Fibre: in This Chapter
10 pages
Global RFP Document For Modern Fastening
PDF
No ratings yet
Global RFP Document For Modern Fastening
32 pages
Transition System ON Approaches of Bridges: AUGUST-2005
PDF
No ratings yet
Transition System ON Approaches of Bridges: AUGUST-2005
17 pages
Alternative To Floating Slab Track High Attenuation Sleeper by IAN ROBERTSON ALSTOM
PDF
100% (1)
Alternative To Floating Slab Track High Attenuation Sleeper by IAN ROBERTSON ALSTOM
26 pages
Construction of BLT Rheda - 2000 in Tunne PDF
PDF
No ratings yet
Construction of BLT Rheda - 2000 in Tunne PDF
17 pages
GRAW Track Measurement Systems
PDF
No ratings yet
GRAW Track Measurement Systems
48 pages
Japan Report - UIC
PDF
No ratings yet
Japan Report - UIC
7 pages
Handbook On LWR On Girder Bridges
PDF
No ratings yet
Handbook On LWR On Girder Bridges
25 pages
HS2 HS2 CV Spe 000 011700
PDF
No ratings yet
HS2 HS2 CV Spe 000 011700
28 pages
Manual of Instruction On Long Welded Rails
PDF
No ratings yet
Manual of Instruction On Long Welded Rails
60 pages
Innovations PDF
PDF
No ratings yet
Innovations PDF
12 pages
Track Design Handbook TCRP - RPT - 155 2nd Ed. (2012) - Part2
PDF
No ratings yet
Track Design Handbook TCRP - RPT - 155 2nd Ed. (2012) - Part2
6 pages
History, General - RTT
PDF
100% (1)
History, General - RTT
33 pages
Train A Grande Vitesse
PDF
No ratings yet
Train A Grande Vitesse
5 pages
Test Methods Based On Relevant IS Codes
PDF
No ratings yet
Test Methods Based On Relevant IS Codes
10 pages
Railway LRT Metro References 2021
PDF
No ratings yet
Railway LRT Metro References 2021
16 pages
AB-DD-PT-034 - R1 - 20231206 Approved
PDF
No ratings yet
AB-DD-PT-034 - R1 - 20231206 Approved
1 page
High Level Engineering For Stay Cable Replacement: Erik Mellier
PDF
No ratings yet
High Level Engineering For Stay Cable Replacement: Erik Mellier
8 pages
Chennai Metro Rail Ltd. +: Horizontal and Vertical Alignment Drawing (Up Line) Sheet 01 of 16
PDF
No ratings yet
Chennai Metro Rail Ltd. +: Horizontal and Vertical Alignment Drawing (Up Line) Sheet 01 of 16
1 page
14
PDF
No ratings yet
14
424 pages
Design Basis Report BLT
PDF
No ratings yet
Design Basis Report BLT
33 pages
Model Design Basis Report (DBR) For Bored Tunnel Sections of Me PDF
PDF
100% (1)
Model Design Basis Report (DBR) For Bored Tunnel Sections of Me PDF
19 pages
TWK02-CVG-T00-3102-001-R03
PDF
No ratings yet
TWK02-CVG-T00-3102-001-R03
1 page
RVNL-DBEC-RKSH-CRS-0004
PDF
No ratings yet
RVNL-DBEC-RKSH-CRS-0004
3 pages
R.2957bmrugnsdtun001-0 0
PDF
No ratings yet
R.2957bmrugnsdtun001-0 0
88 pages
Revised Programme Presentation - 23 May 14
PDF
No ratings yet
Revised Programme Presentation - 23 May 14
11 pages
layout_plan_rangpo_plan
PDF
No ratings yet
layout_plan_rangpo_plan
1 page
011224 Disruption of NH-10
PDF
No ratings yet
011224 Disruption of NH-10
17 pages
Letter no 581 dated 01.03.2025 Reg- PMO Proforma for the month of Feb-25
PDF
No ratings yet
Letter no 581 dated 01.03.2025 Reg- PMO Proforma for the month of Feb-25
4 pages
Letter No. R3701 dated 25.03.25_Delta_T11_TPT
PDF
No ratings yet
Letter No. R3701 dated 25.03.25_Delta_T11_TPT
3 pages
R1 - Detailed Project Report - Rangpo Station - 13.12.2023
PDF
100% (1)
R1 - Detailed Project Report - Rangpo Station - 13.12.2023
221 pages
ArmaGreen - Ircon - Dec 2024 (1)
PDF
No ratings yet
ArmaGreen - Ircon - Dec 2024 (1)
16 pages
L N Malviya 2754 (1) - 1
PDF
No ratings yet
L N Malviya 2754 (1) - 1
531 pages
01 Mageba BROCHURE en
PDF
No ratings yet
01 Mageba BROCHURE en
16 pages
BLT Technical Specification
PDF
0% (1)
BLT Technical Specification
35 pages
(BS EN 14487-2 - 2006) - Sprayed Concrete. Execution
PDF
0% (1)
(BS EN 14487-2 - 2006) - Sprayed Concrete. Execution
20 pages
Flash Butt Welding of Rails
PDF
No ratings yet
Flash Butt Welding of Rails
5 pages
(BS EN 14488-7 - 2006) - Testing Sprayed Concrete. Fibre Content of Fibre Reinforced Concrete
PDF
100% (1)
(BS EN 14488-7 - 2006) - Testing Sprayed Concrete. Fibre Content of Fibre Reinforced Concrete
10 pages
Karimganj Delay Register
PDF
No ratings yet
Karimganj Delay Register
2 pages
Culvert Drawings Signed
PDF
No ratings yet
Culvert Drawings Signed
21 pages
Annexure-5-Karimganj - Project Updated Works Programme With Resource - Cost Added - R2-DTD. 31-10-2018
PDF
No ratings yet
Annexure-5-Karimganj - Project Updated Works Programme With Resource - Cost Added - R2-DTD. 31-10-2018
5 pages
Shuktara Goenda 2
PDF
100% (2)
Shuktara Goenda 2
294 pages